HomeMy WebLinkAboutPE 2.90.41; KAMGAR RESIDENCE; Engineering ApplicationE.
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
GRADING PERMIT APPLICATION
SITE ADDRESS: -?/49 iD-; r.
ASSESSOR'S PARCEL NUMBER(S): 2. / -5 - 0 /
LEGAL DESCRIPTION: I-ô 7- J L4 Ct's 7 M £AD 0 LJS J '-IA4 P
A/#. 7'7
PROJECT NAME: 1&Z'A fri -A/ R E S 1b E" C6
PROJECT ID: PE 2-+/
s.
ADDRESS \
PHONE NUMBER: ( /,L4DD 7 Li, 7
CIVIL ENGINEER:E' #4 t'V C j' S O::
ADDRESS I c Po k/i4)' IO
PHONE NUMBER: - 2-13 40
SOILS ENGINEER: 7tH 70 ' /I4S5 PE NO.:_____________________
ADDRESS 1/ 1 '4 y , eA(L-s,g4p ,e,IL-
PHONE NUMBER: g ?, 1 1 cs
GRADING CONTRACTOR:— STATE LICENSE NO.:____________
ADDRESS CITY BUSINESS LICENSE NO.____________________
PHONE NUMBER: 24 HOUR PHONE NO.:
PROPOSED USE OF GRADE SITE:
GRADING QUANTITIES:CUT 3S' FILL Z 3 3 ° IMPORT I 4 2— WASTE -
0
PROPOSED START DATE: FINISH DATE:
I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City
ordinances and State Laws requlating excavating and grading, and the provisions and conditions of any permit issued pursuant to this
application.
Signature of Applicant i4f /i DATE: ) Q
FOR CITY USE ONLY
Received 'b :._..7 .
Entered Into Computer by e .1tJtacr
UG 3 1 9O
Permit No. ?EZ-D.4-1 Project Engineer:________
Drawing 1oPIancheck Fee Deposit) 4L1O . CITY OF CARLSBAD
Vi9P i4W E3P
Approved for Issuance: Date: DATE STAMP RECEIVED
07/25/90
CITY OF CARLSBAD
- -&4 LAND USE REVIEW APPLICATION FORM ,4,..j PAGE 1 OF 2
1) APPLICATIONS APPLIED FOR: (CHECK BOXES)
(For De t. (For Dept Use Ony) - Use On y)
Master Plan ...............
Specific Plan .............
Precise Development Plan...
Tentative Tract Map........
Planned Development Permit
Non-Residential Planned
Development Permit........
Condominium Permit.........
ESpecial Use Permit..........
Redevelopment Permit.......
Tentative Parcel Map.......
Administrative Variance.....
.1 General Plan Amendment.......
E Site Development Plan.......
D Zone Change..................
Conditional Use Permit......
Hillside Development Permit.
Environmental Impact
Assessment................
Variance....................
Planned Industrial Permit...
Coastal Development Permit..
Planning Commission Deter...
I- -I
-I
, LOCATION OF PROJECT: ON THE I WEST -1 SIDE OF OBELISCO CIRCLE
(NORTH, SOUTH, EAST, WEST) (NAME OF STREET)
BETWEEN J OBELISCO PLACE 1 AND FOBELISCO COURT
(NAME OF STREET.) (NAME OF STREET)
BRIEF LEGAL DESCRIPTION:J LOT 688 LA COSTA MEADOWS - UNIT NO. 4
7149 OBELISCO CIRCLE
4) ASSESSOR PARCEL NO(S). 215-450-16
LOCAL FACILITIES 1 1 6) EXISTING GENERAL1 7 PROPOSED GENERALI N/A MANAGEMENT ZONE PLAN DESIGNATION . LAN DESIGNATION
8) EXISTING ZONING[ I) PROPOSED ZONINGj N/A . I's) GROSS SITE1
ACREAGE
11) PROPOSED NUMBER OFF 1 112) PROPOSED NUMBER[ 1 113) TYPE OF I RES I RESIDENTIAL UNITS OF LOTS SUBDIVISION
(RESIDENTIAL 141 NUMBER OF EXISTING RESIDENTIAL UNITS NONE NONE 1 COMMERCIAL
INDUSTIR.AL)
15) PROPOSED INDUSTRIAL —0— 16) PROPOSED COMMERCIAL J - OFFICE/SQUARE FOOTAGE SQUARE FOOTAGE
ARFM0008.DH 4/89
CITY OF CARLSBAD
Engineering Department
WORKSHEET FOR FEES, DEPOSITS AND SECURITIES REQUIRED
DURING MAP CHECK AND PLANCHECK PERIOD
Project Name: MfrR. 2-€5It7 E?JC-€ Prepared By: 13E73 L_LCQ_14Jate 13/7Z
A. FEES AND DEPOSITS REQUIRED WITH FINAL MAP AND PLANS SUBMITTAL (UNLESS OTHERWISE SHOWN
ON THE CONDITIONS OF APPROVAL)
Computations Am9unt
Final Parcel/Tract Map Fee ..................... $_I//+
Grading & Erosion Control Plancheck Fee ..........
Landscape & Irrigation Plancheck Fee . . .i .fIiF.
Improvement Plancheck Fee ................ -
CMWD Plancheck Fee . ........................ --
Other_______________________________________
B. FEES REQUIRED PRIOR TO FINAL MAP AND PLANS APPROVAL (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
Final Parcel/Tract Map Fee Balance ...........4,... ._.. $
Grading & Erosion Control Plancheck Fee Balance..3
Landscape & Irrigation Plancheck fee B4alnc,-... fle_PET__fl!,:lEr)iL*jZfr eL,4(fC..
Improvement Plancheck Fee-BaIae . (D).gzs..-
Landscape & Irrigation Inspection Fee) .......
Improvement Inspection Fee ......(U,S3).(J.. L .)(O . O__- _
17
Duplicate Tracing Fee ...........\. ...........
Street Light Energizing Fee .....................
Street Light Connection Fee .....................
Street Sign Deposit
11. Drainage Drainage Area Fee ............................
Park-in-Lieu Fee ..............................
Other_______________________________________
C. SECURITIES REQUIRED PRIOR TO FINAL MAP AND PLANS APPROVAL (UNLESS OTHERWISE SHOWN ON
THE CONDITIONS OF APPROVAL)
Grading & Erosion Control Security ......74)Z 7 $_7 _O55
Grading & Erosion Control Cash Securi
.
ty .... (0)L7k'_H'73
Improvement Faithful Performance/Warranty SecIrity .. -' _-2O -
Improvement Labor & Materials Security ...........C -
Subdivision Monumentation Security ..............-o-
Other_______________________________________
D. FEES REQUIRED PRIOR TO GRADING PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
Grading Permit Fee $_33..5V
lnf ill Grading Permit Fee/(When Applicable) ..........
Other_______________________________________
E. FEES REQUIRED PRIOR TO RIGHT-OF-WAY PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
I. Right-of-Way Permit Fee .......................
2. Other_______________________________________
F. FEES REQUIRED PRIOR TO BUILDING PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
Bridge & Thoroughfare Fee .....................
Public Facilities Fee
Traffic Impact Fee ............................
Facilities Management Fee ......................
Sewer Benefit Area Fee .........................
One-Time Special Development Tax For CFD District No 1
(When Applicable) ............................
Water Service Connection Fee ...................
G. OTHER FEES (WHEN APPLICABLE)
SchoolFee ...............................
Sewer Permit Fee .........
Sewer Lateral Charges (Deposit When Applicable)
Fire Hydrant Fee (Deposit When Applicable) ........
NOTE: SOME FEES SHOWN HEREON ARE ESTIMATES OF FUTURE FEES. FEE ARE SUBJECT TO CHANGE. IN
SOME INSTANCES, DEVELOPER WILL BE REQUIRED TO PAY NEW FEE AT TIME OF COLLECTION.
P:D0CS\MISF0RMS\FRM00025.FRM Rev. 01/14/92