Loading...
HomeMy WebLinkAboutPE 2.90.47; WESTERN FINANCIAL PLAZA; Engineering ApplicationS 0 City of Carlsbad Engineering Department TO DEVELOPMENT PROCESSING SERVICES, FROM ENGINEERING INSPECTION DIVISION DATE ROUGH GRADING APPROVAL FOR PROJECT NO E 2. 99 4-7 (PE ORTRACT#) W-$hyy f-2L.1(M/ P/a2-i (PROJECT NAME & ADDRESS) W ; P' .' Is. /O/+r7 fldL/4LlI 1::7,ir, J)vt/q 9,' (DEVELOPER'S NAME & ADI5RESS) We have inspected the grading for Lots' _/ 3 or Phase of the above mentioned project in addition, we have received rough grading certification from l-eigL11-o aii 45$oe. .r.-,c ,the Soils Engineer, dated and from J=j the Supervision Grading Engineer, dated 32e P 6,4 '91 and are satisfied that the' rough grading has been completed in accordance wit City Standards Based on these certifications and our observation, we take no exception to the issuance of a building hermit for Lots_I 3'. or Phase of pioject 9a. 7' from a grading standpoint. This release, however, is not intended to certify the project from other engineering concerns including site development, water or sewer availability, or final grading We will need to be advised prior to the issuance'of a Certificate of Occupancy so that we can verify that final 'grading and landscaping has been completed in accordance with the approved plans for the project APPROVED V PROJECT GPA6ING INSPECTOR S • ,/SR. CONSTRUCTION INSPECTOR S - S H:\LiBRARVDPSWPDATAVNSPECT\ROUGGRAD.F0R S Vs S - 'r' • - V V 2075 Las Palmas Drive • Carlsbad, Caiifornia92009-1 576 • (619) 438-1161 - CITY OF CARLSBAD GRADING INSPECTION CHECKLIST FOR PARTIAL SITE RELEASE PROJECT INSPECTOR Al 1(4SW.i DATE Al . 26 / PROJECT ID 1'ec-v r,P(t2 GRADING PERMINo.LfZ9 '44J LOTS REQUESTED FOR RELEASE: Lyt Z , •/?r1../g34-, r1.~. N/A = Not Applicable / = Complete, 0 = Incomplete or unacceptable 1st. 2nd * 1. Site access to requested lots adequate and logically grouped Site erosion control measures adequate Overall site adequate for health, safety and welfare of public 4 Letter of request for partial release submitted 5. 8-1/2" X 11" site plan showing requested lots submitted 6 Compaction report from soils engineer submitted Engineer-of-work certificétion of work done and pad elevations Geologicengineer's letter if unusual geologic or subsurface. 01A conditions exist 9 Project conditions of approval checked for conflicts / 10. Can water service be installed prior to bringingbuilding V combustibles On site. I Partial release of grading for.' the. above stated lots is approved for thepurpase of building permit issuance. Issuance of building permits is still subject to all normal City requirements required pursuant to the building permit process. Partial release of the siteis denied for the following reasons:. T INSP1 7TOR DATE PROJECT ENGINEER 7 - J7/f INSPECTOR /DAT' ' DATE