Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutPE 2.91.43; US COMMUNITY SAVINGS BANK; Engineering ApplicationCITY OF CARLSBAD
ENGINEERING DEPARTMENT
GRADING PERMIT APPLICATION
SITE ADDRESS: 44
ASSESSORS PARCEL NUMBER(S):
LEGAL DESCRIPTION: —PM 0I7S
PROJECT NAME: 4SA- 4MI7 'Th1
PROJECT ID:
OWNER:
ADDRESS _I5 MNT OLL&..J
PHONE NUMBER: (o 73-4
CIVIL ENGINEER: A*-&}J PE NQ.: 4DZO
ADDRESS W4 '7t-' oc,,tde (4.
PHONE NUMBER: -.
SOILS ENGINEER: _11M M&rZL. NO.: It4Z. _P9
ADDRESS T741 JA( / 491--D (/ 2S
PHONE NUMBER: 35
GRADING CONTRACTOR:t*'N STATE LICENSE NO.:___________
ADDRESS CITY BUSINESS LICENSE NO.___________________
PHONE. NUMBER: 24 HOUR PHONE NO.:
PROPOSED USE OF GRADE SITE: NL..& LML)(
GRADING QUANTITIES: CUT 7 FILL— W IMPORT 2C'
PROPOSED START DATE: FINISH 'DATE: 31 t'10V9
I h.i-sby acknowledge that I have read vw sØcen and mi fAst th into vnon I have provided is con.ct and agr.e to comy wrtP all Cty
ordinances and Stms Lasys rsqutng csvng and Qr.dtnq. and ths peovia.ona and condons o any permit issued pursuant to this
aØphcaton.
Signature of Applicant 4AC J---'1 01 DATE:
FOR CITY USE ONLY
Received by: / RE/ED
Entered Into Computer by /— Date:______
Permit 2-9( q3 Project Engineer:_______
1991
3
Drawing No.3'2'MPlancheck Fee Deposit iôc) PA'f Cl iv OF CARLS3AD
Approved for Issuance: Oats:___________
07/25/90
CITY OF CARLSBAD
Engineering Department
WORKSHEET FOR FEES, DEPOSITS AND SECURITIES REQUIRED
I III •• A I A &I l A II
Project Name: __LV3 1W 5-pared By: L'1iiP-/i Date 610Z ______
M $ c.4?v'%tPJI17 $rVfr4 5 1,< &.*Pfr G I
A. FEES AND DEPOSITS REQUIRED WITH FINAL MAP AND PLANS SUBMITTAL (UNLESS OTHERWISE SHOWN
ON THE CONDITIONS OF APPROVAL)
Computations Amount.
Final Parcel/Tract Map Fee .................. .... $ Grading & Erosion Control Plancheck Fee ........ecF1Pr A/O ,3 2 ? I. O6O
Landscape & Irrigation Plancheck Fee ............
/
5 CIiWD Plancheck Fee
6. Other____________________________________
B. FEES REQUIRED PRIOR TO FINAL MAP AND PLANS APPROVAL (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
Final Parcel/Tract Map Fee Balance ............... $ 1/Pr ut Grading & Erosion Control Plancheck Fee Balance ... 3. Landscape & Irrigation Plancheck fee Balpnce . . . .. ffi-. L.-k72.4&'1
4. Improvement Plancheck Fee Balance . ('13'J). ( ) - 5 t;t -ô
1 P.
- C S. Landscape & Irrigation Inspection Fee .>- (14' 13li-c1 iI_L1
improvement Inspection Fee ....... .f).,~?1 47- Duplicate Tracing Fee .........................______________________ Street Light Energizing Fee ....................._______________________ Street Light Connection Fee ..................
Street Sign Deposit ...........................
Drainage Area Fee ............................
Park-in-Ueu Fee ..............................
Other___________________________________
C. SECURITIES REQUIRED PRIOR TO FINAL MAP AND PLANS APPROVAL (UNLESS OTHERWISE SHOWN ON
THE CONDITIONS OF APPROVAL)
Grading & Erosion Control Security ........... J3i I
Grading & Erosion Control Cash Security ............ i;.. Lj4
Improvement Faithful Performance/Warranty Security
Improvement Labor & Materials Security ...........
Subdivision Monumentatlon Security .............. /D/A-
5. Other______________________________________
D. FEES REQUIRED PRIOR TO GRADING PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL) MOLE
1 1wIg Permit Fee ....... . .3....(A41C. YI?rZD
2. Other
E. FEES REQUIRED PRIOR TO RIGHT-OF-WAY PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
Right-of.Way Permit Fee .......................
Other -
F. FEES REQUIRED PRIOR TO BUILDING PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
Bridge & Thoroughfare Fee .....................
Public Facilities Fee ...........................
School Fee ................................. Traffic Impact Fee ............................
- Facilities Management Fee ......................
Sewer Benefit Area Fee ........................
Sewer Service Connection Fee ............. ..... Sewer Lateral Fee ............................ Fire Hydrant Fee .............................
Other_________________________________
NOTE: SOME FEES SHOWN HEREON ARE ESTIMATES OF FUTURE FEES. FEE ARE SUBJECT TO CHANGE. IN SOME INSTANCES, DEVELOPER
WILL BE REQUIRED TO PAY NEW FEE AT TIME OF COLLECTION.
P:\DOCS\MISFORMS\FRM00025.FRM 13.0 fill AlOe
Y