HomeMy WebLinkAboutPE 2.91.50; SHELTER COVE LOT 4; Engineering Applicationp S pE2.q/,5
CITY OF CARLSBAD
10 ENGINEERING DEPARTMENT
GRADING PERMIT APPLICATION
SITE ADDRESS: 4:514- Cove_ Ir,
ASSESSORS PARCEL NUMBER(S): Z77 /O — 0 4
LEGAL DESCRIPTION:kt no. 9 - 5u/-t'- c c, 4 d'
af Diey€, '5/i' ce/ez
f,'-q'
PROJECT NAME:
PROJECT ID:
OWNER: $Cz' T r
ADDRESS l27('0 nYqI /wFf L7p-,v 5fe.3/ CA 92/30
PHONE NUMBER: -'9/
CIVIL ENGINEER: _ E/<cJJi/ PE NO.: _31(' 3
ADDRESS /13 --e-s Pr C/j4d C4 1700
PHONE NUMBER: 72-
SOILS ENGINEER:, .MPie. PE NO.:L6 —7 82
ADDRESS 57/ /,-, Cai.chaç/, -,4 gz'
PHONE NUMBER: 43 -'
GRADING CONTRACTOR: _STATE LICENSE NO.:____________
ADDRESS CITY BUSINESS LICENSE NO.___________________
PHONE NUMBER: 24 HOUR PHONE NO.:
PROPOSED USE OF GRADE SITE: M_-.j Cd'a'i/i,e-€,i-i (#i(/, ()
GRADING aUANTfliES:CUT340 FILL 110 IMPORT 0 WASTE /50
PROPOSED START DATE: FINISH DATE:
hereby acknowledge The I have read the application and .ts that the informon I have provided is correct and agr.e to comply with all City
ordinances and Stale Ls.vl r.quIatng .xcrng and grading, and thi provisions and conditions of any psnTht issued purluant to thi$
:z:t::e of Applicant_ DATE: ///2
FOR CITY USE ONLY
Received by: CFJVED
Entered Into Computer by Date:
Permit No. PC Z. 9 1. Q Project Engineer:
1399 U-)
Drawing No321o_9APlancheck Fee oe0;r-)40.'' crry OF CARLSBAD
COUNTER
LDA1ESrAMPRECEIVED
Approved for Issuance: Oats:
07/25/90
TELEPHOrIE
2O75 LAS PALMAS DRIVE (619)438-1161
CARLSBAD, CALIFORNIA 920094859
Office of the City Engineer
Um IEERi
(!ILtL! 11 Ott th1itit) 5
TO: DEVELOPMENT PROCESSING SERVICES
FROM: ENGINEERING INSPECTION DIVISION
• DATE: I
ROUGH GRADING APPROVAL FOR PROJECT NO.
TP. E. or TRACT #)
••L0 ~h c0v Lf Cave
(Project Name and Address)
3 e ft cs eli 7 a 8/ b,-. 3v/. 3 ~
(Developer Name and Address)
We have inspected the grading 16r Lo ~f74e Phase or
of the above mentioned project. In addition, we have receivdd rough grading
ceitification fromf the Soils Engineer,
dated 47g , 'd from
. 4/
the Supervision Grading Engineer, dated •,.aiid are satisfied
that the rough grading has been completed in accordance with City Standards.'
Based on these.certifications and our observation, we take no exception to the
issuance of a building pernit for Lot or Phase of
project 2. . _- 4 e/%- Co v. froui a grading
standpoint. This release, however, is not intended to certify the project from
other engineering concerns including site development, water or sewer availa-
bility, or final grading. '
-. We will need to be advised prior to the issuance of a Certificate of Occupancy
so that we can veify that final grading and landscaping has •beer'i completed
in accordance witft the approved plans for the project. • "
APPROVED:
Project rading Inspector ' •
-
Sr. C,,ónstruction Inspector
I, -