HomeMy WebLinkAboutPE 2.92.09; SUNFRESH ROSES; Engineering ApplicationCITY OFARLSBAD - ENGINEERING •PARTMENT
APPLICATION
GRADING PERMIT
PROJECT NAME:Lone Pine NurseW PERMIT NUMBER:PE292O09
PROJECT LOCATION: 6515 El Camino Real
ASSESSOR PARCEL NUMBER(S): 215-020-12
PROJECT DESCRIPTION:-Grading and reveqetation required to mitigate grading violation
OWNER Anthony Bons
ADDRESS 6515 El Camino Real Carlsbad CA 92009
PHONE NUMBER 438-2625
I CERTIFY THAT I AM THE LEGAL OWNER OF THIS PROPERTY AND ! AUTHORIZE THE GRADING ASSOCIATED
WITH This PERMIT. S
S
OWNER SIGNATURE DATE:
CIVIL ENGINEER: Brian C. Regan
S
ADDRESS: 350 West 9th Avenue Suite B. Escondido CA
PHONE NUMBER: 741-9921 5
5
SOILS ENGINEER: MV Engineering .
.ADDRESS: 2450 Vineyard AvenUe #103, Escondido CA 92029 5
PHONE NUMBER: 743-1214 5 5
GRADING CONTRACTOR: STATE LICENSE NO.:__________
ADDRESS: S CITY BUSINESS LICENSE NO:
PHONE NUMBER
BASIS OF PERMIT FEES: • 3530 cy S
S
GRADING QUANTITIES: 3530 cy cut 120 cy fill
cy remedial 3410 cy export
- S S VERIFIED
TOTAL PERMIT FEES: $666.00 BALANCE DUE: $586.00 BY: Sherri
I hereby acknowledge that I have read the application and information provided is correct. I agree to
comply with all City ordinances and state laws relating to excavating and grading, including OSHA permit
requirements for trenches over five (5) feet, and the provisions and conditions of any permit issued
pursuant to this application
APPLICANT NAME PHONE NO
ADDRESS
APPLICANT'S SIGNATURE:
S
. DATE: S
P:\D0CS\MISF0RMS\FRM00065 S
S
S S S S
REV. 03/08/93
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
GRADING PERMIT APPLICATION
SITE ADDRESS: , c/c Li clf'- (
ASSESSORS PARCEL NUMBER(S): /
LEGAL DESCRIPTION:L9 71/&O 7/7
PROJECT NAME:Rases
PROJECT ID: p.IR. 09
OWNER: iZ'1 -_
ADDRESS
PHONE NUMBER:
CIVIL ENGINEER: v 'i C N PE NO.: LS:3 4_3
ADDRESS5O UJe 4.
PHONENUMBER: ';g/— 9.j
ENGINEER, -____________ _'1 V Z'-Icfr
PE NO.: GC-93 SOILS
ADDRESS 245o V/A/6V/7 ñV
PHONE NUMBER: ___ - _____ 2.
GRADING CONTRACTOR: ...Jc - 11:1w,(If LICENSE NO.:___________
ADDRESS BUSINESS LICENSE NO.___________________ _CITY
PHONE. NUMBER: 17 A !Z,7, 3 5 24 HOUR PHONE NO.:
PROPOSED USE OF GRADE SITE:
GRADINGOUANTrrIES:CuT-FILL_/ Z.o 'IMPORT WASTE c.ty
PROPOSED START DATE: ,41//Z/t 3cf;D ,9Z- FINISH DATE: L7)A/6 3 _9
I hereby acknow.dgs that I have read the sp4Ieoai said utgs that the intormon I have provkw is eoai.ct and sgr.is to compty with all Ciry
ecdinaaies said S%. Laws rsgutng eav ccndiboais of wy permit issued pljrsuwfl to this
application.
Signatureof _____________________________________________ __________________________________DATE: /1—
'FOR CITY USE ONLY
Received by:
Entered Into Computer by /4'_- Date:_______
Permit No. 92, o Pro.ct Engineer:
Drawing No. &ZP-3APIancheck Fee DeposIt/i 2-0
00
Approved for issuance: LU
A PR 28 1992
07125/90 tu
CITY OF CARAD
ENGINEERING COUNTER
Engineering Department
WORKSHEET FEES, DEPOSITS AND SECU PIES REQUIRED
DURING MAP CHECK AND PLANCHEC rERIOD it
Project Name: & .ut 6-ud't t'tQJO k4ifl/1 Prepared By: 3WJv.. .I4ADa-4 Date____________
o 52e-&c
A. FEES AND'DEPOSITS REQUIRED WITH FINAL MAP AND PLANS SUBMITTAL (UNLESS OTHERWISE SHOWN
ON THE CONDITIONS OF APPROVAL)
Computations Amount
1. Final Parcel/Tract Map Fee ......................_______________________ $_._......
2.' Grading & Erosion Control Plancheck Fee 1WL
Landscape & Irrigation Plancheck Fee .............
Improvement Plancheck Fee ....................
CMWD Plancheck Fee . .........................
Other j-t::P 2,(95 r?-
_________________
a)
B. FEES REQUIRED PRIOR TO FINAL MAP AND PLANS APPROVAL (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
Final Parcel/Tract Map Fee Balance ...............
Grading & Erosion Control Plancheck Fee Balance
Landscape & Irrigation Plancheck fee Balance .......
Improvement Plancheck Fee Balance ..............
Landscape & Irrigation Inspection Fee .............
Improvement Inspection Fee .....................
Duplicate Tracing Fee .........._______________________
Street Light Energizing Fee .....................
Street Light Connection Fee .......................
Street Sign Deposit ...........................
Drainage Area Fee ......
Park-in-Lieu Fee ..............................
Other___________________________________
C. SECURITIES REQUIRED PRIOR TO FINAL MAP AND PLANS APPROVAL (UNLESS OTHERWISE SHOWN ON
THE CONDITIONS OF APPROVAL)
Grading & Erosion Control Security ................
Grading & Erosion Control Cash Security ............
Improvement Faithful Performance/Warranty Security
Improvement Labor & Materials Security ...
Subdivision Monumentation Security ..............
5. Other_______________________________________
D. FEES REQUIRED PRIOR TO GRADING PERMIT ISSUANCE (UNLESS • OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
Grading Permit Fee UO2.4. . ....................____________________ $ O .cCc
Other toujL Fr( If F6
E. FEES REQUIRED PRIOR TO RIGHT-OF-WAY PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
Right-of-Way Permit Fee ..........
Other______________________________________
F. FEES REQUIRED PRIOR TO BUILDING PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
Bridge & Thoroughfare Fee .. . :..... . t ........
Public Facilities Fee ....
'S. SchooFeG........ ............ .............................5-.
Traffic Impact Fee ........................... .. -
Facilities Management Fee .........
Sewer Benefit Area Fee ............................. -
Sewer Service Connection Fee ..............
Sewer Lateral Fee ............. ................
Fire Hydrant Fee . ................................
Other
NC5FE: SOME FEES SHOWN HEREON ARE ESTIMATES OF FUTURE FEES. FEE ARE SUBJECT TO CHANGE. IN SOME INSTANCES, DEVELOPER
WILL BE REQUIRED TO PAY NEW FEE AT TIME OF COLLECTION.,
P:\DOCS\MISFORMS\FRM00025.FRM Rev. 01/14/92