Loading...
HomeMy WebLinkAboutPE 2.92.09; SUNFRESH ROSES; Engineering ApplicationCITY OFARLSBAD - ENGINEERING •PARTMENT APPLICATION GRADING PERMIT PROJECT NAME:Lone Pine NurseW PERMIT NUMBER:PE292O09 PROJECT LOCATION: 6515 El Camino Real ASSESSOR PARCEL NUMBER(S): 215-020-12 PROJECT DESCRIPTION:-Grading and reveqetation required to mitigate grading violation OWNER Anthony Bons ADDRESS 6515 El Camino Real Carlsbad CA 92009 PHONE NUMBER 438-2625 I CERTIFY THAT I AM THE LEGAL OWNER OF THIS PROPERTY AND ! AUTHORIZE THE GRADING ASSOCIATED WITH This PERMIT. S S OWNER SIGNATURE DATE: CIVIL ENGINEER: Brian C. Regan S ADDRESS: 350 West 9th Avenue Suite B. Escondido CA PHONE NUMBER: 741-9921 5 5 SOILS ENGINEER: MV Engineering . .ADDRESS: 2450 Vineyard AvenUe #103, Escondido CA 92029 5 PHONE NUMBER: 743-1214 5 5 GRADING CONTRACTOR: STATE LICENSE NO.:__________ ADDRESS: S CITY BUSINESS LICENSE NO: PHONE NUMBER BASIS OF PERMIT FEES: • 3530 cy S S GRADING QUANTITIES: 3530 cy cut 120 cy fill cy remedial 3410 cy export - S S VERIFIED TOTAL PERMIT FEES: $666.00 BALANCE DUE: $586.00 BY: Sherri I hereby acknowledge that I have read the application and information provided is correct. I agree to comply with all City ordinances and state laws relating to excavating and grading, including OSHA permit requirements for trenches over five (5) feet, and the provisions and conditions of any permit issued pursuant to this application APPLICANT NAME PHONE NO ADDRESS APPLICANT'S SIGNATURE: S . DATE: S P:\D0CS\MISF0RMS\FRM00065 S S S S S S REV. 03/08/93 CITY OF CARLSBAD ENGINEERING DEPARTMENT GRADING PERMIT APPLICATION SITE ADDRESS: , c/c Li clf'- ( ASSESSORS PARCEL NUMBER(S): / LEGAL DESCRIPTION:L9 71/&O 7/7 PROJECT NAME:Rases PROJECT ID: p.IR. 09 OWNER: iZ'1 -_ ADDRESS PHONE NUMBER: CIVIL ENGINEER: v 'i C N PE NO.: LS:3 4_3 ADDRESS5O UJe 4. PHONENUMBER: ';g/— 9.j ENGINEER, -____________ _'1 V Z'-Icfr PE NO.: GC-93 SOILS ADDRESS 245o V/A/6V/7 ñV PHONE NUMBER: ___ - _____ 2. GRADING CONTRACTOR: ...Jc - 11:1w,(If LICENSE NO.:___________ ADDRESS BUSINESS LICENSE NO.___________________ _CITY PHONE. NUMBER: 17 A !Z,7, 3 5 24 HOUR PHONE NO.: PROPOSED USE OF GRADE SITE: GRADINGOUANTrrIES:CuT-FILL_/ Z.o 'IMPORT WASTE c.ty PROPOSED START DATE: ,41//Z/t 3cf;D ,9Z- FINISH DATE: L7)A/6 3 _9 I hereby acknow.dgs that I have read the sp4Ieoai said utgs that the intormon I have provkw is eoai.ct and sgr.is to compty with all Ciry ecdinaaies said S%. Laws rsgutng eav ccndiboais of wy permit issued pljrsuwfl to this application. Signatureof _____________________________________________ __________________________________DATE: /1— 'FOR CITY USE ONLY Received by: Entered Into Computer by /4'_- Date:_______ Permit No. 92, o Pro.ct Engineer: Drawing No. &ZP-3APIancheck Fee DeposIt/i 2-0 00 Approved for issuance: LU A PR 28 1992 07125/90 tu CITY OF CARAD ENGINEERING COUNTER Engineering Department WORKSHEET FEES, DEPOSITS AND SECU PIES REQUIRED DURING MAP CHECK AND PLANCHEC rERIOD it Project Name: & .ut 6-ud't t'tQJO k4ifl/1 Prepared By: 3WJv.. .I4ADa-4 Date____________ o 52e-&c A. FEES AND'DEPOSITS REQUIRED WITH FINAL MAP AND PLANS SUBMITTAL (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Computations Amount 1. Final Parcel/Tract Map Fee ......................_______________________ $_._...... 2.' Grading & Erosion Control Plancheck Fee 1WL Landscape & Irrigation Plancheck Fee ............. Improvement Plancheck Fee .................... CMWD Plancheck Fee . ......................... Other j-t::P 2,(95 r?- _________________ a) B. FEES REQUIRED PRIOR TO FINAL MAP AND PLANS APPROVAL (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Final Parcel/Tract Map Fee Balance ............... Grading & Erosion Control Plancheck Fee Balance Landscape & Irrigation Plancheck fee Balance ....... Improvement Plancheck Fee Balance .............. Landscape & Irrigation Inspection Fee ............. Improvement Inspection Fee ..................... Duplicate Tracing Fee .........._______________________ Street Light Energizing Fee ..................... Street Light Connection Fee ....................... Street Sign Deposit ........................... Drainage Area Fee ...... Park-in-Lieu Fee .............................. Other___________________________________ C. SECURITIES REQUIRED PRIOR TO FINAL MAP AND PLANS APPROVAL (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Grading & Erosion Control Security ................ Grading & Erosion Control Cash Security ............ Improvement Faithful Performance/Warranty Security Improvement Labor & Materials Security ... Subdivision Monumentation Security .............. 5. Other_______________________________________ D. FEES REQUIRED PRIOR TO GRADING PERMIT ISSUANCE (UNLESS • OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Grading Permit Fee UO2.4. . ....................____________________ $ O .cCc Other toujL Fr( If F6 E. FEES REQUIRED PRIOR TO RIGHT-OF-WAY PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Right-of-Way Permit Fee .......... Other______________________________________ F. FEES REQUIRED PRIOR TO BUILDING PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Bridge & Thoroughfare Fee .. . :..... . t ........ Public Facilities Fee .... 'S. SchooFeG........ ............ .............................5-. Traffic Impact Fee ........................... .. - Facilities Management Fee ......... Sewer Benefit Area Fee ............................. - Sewer Service Connection Fee .............. Sewer Lateral Fee ............. ................ Fire Hydrant Fee . ................................ Other NC5FE: SOME FEES SHOWN HEREON ARE ESTIMATES OF FUTURE FEES. FEE ARE SUBJECT TO CHANGE. IN SOME INSTANCES, DEVELOPER WILL BE REQUIRED TO PAY NEW FEE AT TIME OF COLLECTION., P:\DOCS\MISFORMS\FRM00025.FRM Rev. 01/14/92