PROJECT NAME: Carlsbad Racewav Business Park
APPROVAL DATE: October 17,200 1 CONDITIONAL NEG. DEC.:
The following environmental mitigation measures were incorporated into the Conditions of Approval for this project in order to mitigate identified
environmental impacts to a level of insignificance. A completed and signed checklist for each mitigation measure indicates that this mitigation measure
has been complied with and implemented, and fulfills the City’s monitoring requirements with respect to Assembly Bill 3 180 (Public Resources Code
Section 21081.6).
Mitigation Measure
a. Prior to the recordation of a final map, the developer shall
design, dedicate, and bond for the following roadways:
1.
Melrose Drive shall be constructed as a Prime Arterial from
existing terminus at the Carlsbad I Vista boundary south to
the intersection of Palomar Airport Road. Additional Right
turn lanes are required at Poinsettia Ave and at Palomar
Airport Road.
Poinsettia Ave. (“B” Street) shall be constructed as an
Industrial Collector from Business Park Drive to Melrose
Drive. Additional widening may be required at the
Poinsettia I Melrose intersection to accommodate turn lanes.
Intersection improvements to Faraday Ave at Melrose Drive
including but not limited to: Additional right of way,
additional roadway, lane configuration, traffic signal
modification and inter-connect, street signs, and roadway
striping.
Monitoring I Monitoring Shown on
Plans
Grading1
Improvement
Verified
Implementation Remarks
Exolanation of Headings: Type = Project, ongoing, cumulative.
Monitoring Dept. = Department, or Agency, responsible for monitoring a particular mitigation measure.
information.
Shown on Plans = When mitigation measure is shown on plans, this column will be
initialed and dated.
Verified Implementation = When mitigation measure has been implemented,
Remarks = Area for describing status of ongoing mitigation measure, or for other
this column will be initialed and dated.
RD - Appendix P.
Mitigation Measure
b. Prior to recordation of final map, Faraday Ave. shall be
financially guaranteed as a Secondary Arterial to be constructed,
*as specified in the appropriate agency permissions, from the
existing terminus in the City of Vista west of Melrose Drive to
the existing terminus in the City of Carlsbad at Orion Way.
Potential impacts to water quality shall be mitigated through
compliance with the provisions of the “Carlsbad
Racewayh‘alomar Forum Storm Water Pollution Prevention”
summary NPDES study prepared for the project by O’Day
Consultants dated June 6,2001.
3. Biological mitigation to mitigate both upland and wetland
habitats, as described in Helix Environmental Planning, Inc.
mitigation proposals, shall consist of the following:
2.
Preserve 9.6 acres of DCSS on site
Restore 8.5 acres of DCSS on manufactured slopes adjacent
to wildlife corridor
Decompact and seed 9 acres of disturbed habitat onsite with
DCSS seed mix
Provide a 12’ high arched wildlife movement under-
crossing at Melrose
Create 1.84 acres of wetland habitat including:
1.46 acres of wetland habitat and
.38 acre of streambed habitat and removal of exotic weeds
for a period of 5 years
Plant as container stock 100 California adolphia and 20
summer holly in upland restoration areas.
Conduct burrowing owl surveys prior to construction and
relocate if necessary.
Monitoring - Type
Plancheck
Plancheck -
Receipt of
wildlife agency
permits
~ Monitoring
Department
Engineering
Planning
Shown on
Plans
Grading1
Improvement
Verified
Implementation Remarks
Emlanation of Headines:
Type = Project, ongoing, cumulative.
Monitoring Dept. = Department, or Agency, responsible for monitoring a particular mitigation measure.
* Amended per City Council direction December 4, 2001
Verified Implementation = When mitigation measure has been implemented,
Remarks = Area for describing status of ongoing mitigation measure, or for other
this column will be initialed and dated.
in formation. Shown on Plans = When mitigation measure is shown on plans, this column will be RD - Appendix P.
initialed and dated.
Mitigation Measure
0 Obtain all necessary permits from U.S. Army COT of
Engineers, US. Fish and Wildlife Service, and California
Department of Fish and Game prior to final map approval.
0 Submittal of wetland and coastal sage scrub restoration
program for approval by City and wildlife agencies prior to
construction activities.
0 Prior to final map approval:
0 Provide an engineering and feasibility study for a
potential wildlife crossing under Palomar Airport Road;
Either construct an acceptable wildlife crossing on
Street “B” or pay $100,000 to mitigate the effect of the
Street “B” crossing of the wildlife corridor if an
acceptable crossing is not constructed;
0 Pay $225,865.90 to mitigate impacts to non-native
grassland and southern mixed chaparral
0 If HMP is approved prior to final map approval, the
engineering and feasibility study is not required and the
mitigation funds will be used for acquisition of acreage in the
designated core area as described in the City’s HMP.
0 If the HMP is not approved prior to final map approval, the
City in consultation with the wildlife agencies will determine
the most beneficial use of mitigation funds including but not
limited to: acquisition of acreage in the County Core area;
construction of a wildlife crossing under Palomar Airport
Road; or other programs as determined by City to enhance
habitat preservation in the City.
Monitoring
Type
Monitoring
Department
Shown on
Plans
Verified
Implementation Remarks
Exolrnation of Headings:
Type = Project, ongoing, cumulative.
Monitoring Dept. = Department, or Agency, responsible for monitoring a particular
mitigation measure.
information.
Shown on Plans = When mitigation measure is shown on plans, this column will be
initialed and dated.
Verified Implementation = When mitigation measure has been implemented,
Remarks = Area for describing status of ongoing mitigation measure, or for other
this column will be initialed and dated.
RD -Appendix P.
~~
Mitigation Measure
4. The tentative map will be conditioned to require that the
following mitigation measures will be incorporated into projects
prior to approval of the Planned Industrial Permit required for
each lot.
Prohibit placement of mechanical equipment on roofs
unless project incorporates architectural treatment
consisting of architectural elements or parapets that are of
sufficient height and design to screen future mechanical
roof equipment.
Prohibit installation of roof screens other than building
parapets or architectural elements that are integrated into
the architectural design of buildings;
Prohibit loading bays that are visible from Palomar Airport
Road or Melrose Drive.
Require enhanced architectural treatment of all building
elevations that are visible from Palomar Airport Road or
Melrose Drive.
Monitoring
Type
Plancheck
Monitoring
Department
Planning
Shown on
Plans
Future PIP site
plans
Verified
Implementation Remarks
I
Exolanation of Headings:
Type = Project, ongoing, cumulative. Monitoring Dept. = Department, or Agency, responsible for monitoring a particular
mitigation measure.
information.
Shown on Plans = When mitigation measure is shown on plans, this column will be
initialed and dated.
Verified Implementation = When mitigation measure has been implemented,
Remarks = Area for describing status of ongoing mitigation measure, or for other
this column will be initialed and dated.
RD - Appendix P.