Loading...
HomeMy WebLinkAboutPIP 84-08; Birtcher Business Center; Planned Industrial Permit (PIP)PLANNED INDUSTRIAL PERMIT DATE : February 11; 1985 - FROM: Michael J. Holzmiller, Land Use Planning Manager TO: Engineering Department SUBJECT: PIP-84-8 The City has completed a review of the application for a planned industrial permit for development located on the south side of Palomar Airport road and west of Palomar Oaks Way. It is the Land Use Planning Manager's determination that the project is consistent with the City's Planned Industrial Zone + regulations (Chapter 21.34) and with all other applicable City ordinances and policies. The Land Use Planning Manager, therefore, recommends approval of this request based on the following: Findinas: 1) The site indicated by the Planned Industrial Permit is. adequate in size and shape to accommodate the proposed use, and all yards spaces, walls, fences, parking, loading, landscaping and other features required by this chapter. 2.') The improvements indicated on the Planned Industrial Permit are located in such a manner to be related to existing and proposed streets and highways.. 3) The improvements as shown on the Planned Industrial Permit are consistent with the intent and purpose of this zone and all adopted development, design and performance standards as set forth in this chapter. Conditions: 1) Approval is granted for PIP-84-8 as shown on Exhibits nAa - "In, dated December 14, 1984, on file in the Land Use Planning Office and incorporated herein .by unless otherwise noted in these conditions. . ' reference. -Development shall occur substantially as shown 2) All uses established in these structures shall be consistent with Section 21.34.020 (Permitted Uses). ~ll roof appurtenances shall be shielded from view and architecturally integrated with the building design, Unless otherwisd stated, this industrial project shall comply with all applicable City ordinances and requirements. The applicant shall prepare a detailed landscape and irrigation plan which shall be submitted to and approved by the Land Use Planning Manager prior to the issuance of building permits. All landscaped areas shall be maintained in a healthy and thriving condition, free from weeds, trash, and debris. Any signs proposed for this development shall be designed in conformance with the City’s sign ordinance and shall require review and approval of the Land Use Planning Manager prior to installation of such signs. A uniform sign program for this development shall be submitted to the Land Use Planning Manager for his review and approval prior to occupancy of any building. Trash receptacle areas shall be enclosed by a six-foot high masonry wall with gates pursuant to City standards. Location of said receptacles shall be approved by the Land Use Planning Manager. All roof appurtenances, including air conditioners, shall be architecturally integrated and shielded from view and the sound buffered from adjacent properties and streets, pursuant to Building Department Policy No. 80-6, to the satisfaction of the Land Use Planning Manager and Building and Planning Director. The project shall provide bus stop facilities at locations subject to the satisfaction of the North County Transit District. Said facilities shall at a minimum include a bench, free from advertising, and a pole for the bus stop sign. The bench and pole shall be designed in a manner so as to not detract from the basic architectural theme of the project and said design shall be subject to the approval of the Land Use Planning Manager and North County Transit District. . .. .. Engineering Conditions 12) The location and size of the drainage channel shown on the site plan is approved on a conceptual basis only. The developer shall 'provide substantiating calculations, drawings, and additional information as deemed necessary by the City Engineer. The design, substantiating calculations, and construction for the drainage structure shall be to the satisfaction of the City Engineer. Approval of the design shall be obtained by the Developer prior to the issuance of any building permits for this project. Construction of the channel shall be completed prior to the occupancy of any building in this project. 13) All of the conditions of Resolution No. 1995 CT 82-4/PUD-38, are hereby incorporated by reference and shall be complied with in their entirety prior to issuance of building permits for this project. MICHAEL J. AOLZMILLER Land Use Plannfng Manager MJH: ad . .. . - .. .