HomeMy WebLinkAboutPIP 86-01A; Carlsbad Crossroads; Planned Industrial Permit (PIP) (4)LAND PLANNING
ARCHiTECTURE
ENGINEERING
SURVEYING
4877 Viewridge Avenue
Son Diego, California
92 123- 1667
(619) 278-5750
FAX (6 19) 278-9258
Roderick F Wrlght.
President I Architect
Tat L. Wal.
Sr Vice Resident I
Clvil Englneer
Anthony G. Arnbrose.
Vice President /
Land Planning
Mlchael P Bingham.
Vice Presldent /
Fleld Operations
V Scott Cairns.
Vice President I
Architect
Duane Joseph Gerry. Jr Director I CIVII Englneer
Leland Clark Ritter. Ill. Director I LandScape Archltect 2218
April 9. 1990
Mr. Mike Grim
P1 anni ng Department
CITY OF CARLSBAD
2075 Las Palmas Drive Carl sbad. CA 90208
Project: Carl sbad Crossroads Bui 1 ding "E"
P.I.P. 86-1(A) HCH Partners Job No. 10165
Subject : P.I.P. Conformance
Dear Mike:
Per our meeting of March 21, 1990 with Nei 1 Medlock of St. Croix Development and our subsequent telephone conversation, submitted herewith are eight (8) of the following dated 3/30/90:
1. Sheet 1 - Site Plan 2. Sheet 2 - Floor Plan
3. Sheet 3 - 4. Sheet C-1 5. Sheet L-1 6. Sheet 3 - 7. Sheet 2 -
8. Sheet 1 -
9. Sheet 2 -
Exterior Elevations - Grading P1 an
- Landscape Concept Plan Phase I Improvement Plans
Phase I Grading Plan Phase I1 Improvement P1 ans Phase I I Grading P1 ans
In reference to the City of Carlsbad Planning Department's 1 etter of January 15, 1990 to HCH Partners, we resolved the
following issues per mutual agreement.
Enaineerina:
1. Vicinity map is on Sheet 1. 2. Date is on each sheet 3/30/90. 3. All facilities are shown "existing" or "proposed" on
4. Location of adjacent structures and uses of
Sheet 1.
surrounding land shown on Sheet 1.
4 .-._
Mr. Islike Grim April 9. 1990 Page 2
5. Distance between buildings shown on Sheet 1. 6. Building setbacks are shown on Sheet 1. 7. There are no walls or fences. 8. Location and note on sign is shown on Sheet 1. 9. The adjacent street information is on Sheet 1. (Loker
10. Typical cross section of Loker Avenue West on Sheet 1.
11. Easement for water lines shown on improvement drawings. 12. Public and private streets and utilities shown on improvement and grading plans included in each set of
Avenue West)
are existing from first and second
nd turning radii shown on Sheet 1.
ns for Phases I and 11. es shown on Sheet C-1. shown on Sheet C-1. age shown on Sheet C-1.
improvements shown on attached
19. Site drainage see grading plans for Phases I and 11.
20. Per agreement this site will not generate more than 500 vehicles per day and a Circulation Impact Analysis is not required.
.PI annina; 1. Phase I1 under construction, no revisions will be made. 2. On Sheet 1 we have identified the employee outdoor eating areas for Building "E". as well as shown where
additional tables and benches will be for Phase 11. 3. We have shown enhanced landscaping for the parking area in front of Building "E" on L-1 (see new peninsul a 1. ,$. We have removed all notes about extra parking spaces at loading areas.
Fnai neeri na ( Issues of concern) t
1. Precise plan of existing uses and improvements are shown on Sheet 1. 2. Because of low ADT generated by the Building "E". a Circulation Impact Analysis is not required. There was no copy of the mu1 ti -tenant 1 oading zone policy attached. Please forward. 4. Building "E" was not shown on original P.I.P. only pad area for future.
HCH Partners, 4877 Viewridge Avenue, San Diego, California 92123-1667. (619) 278-5750, FAX (619) 278-9258
c -.
Mr. t-Ii ke Grim April 9, 1990 Page 3
It is our intention by the meeting of March 21. 1990 and the submission of these eight sets, that we will be granted P.I.P. Conformance. If there are any issues which you feel need further attention, please contact me immediately.
Thank you for your cooperation in this approval.
Sincerely ,
HCH PARTNERS
V. Scott Cairns A.I.A. Vice President Architect
VSC : tmv
cc: Nei 1 Medlock
HCH Partners, 4877 Viewridge Avenue, Son Diego, California 92123-1667, (619) 278-5750, FAX (619) 278-9258