Loading...
HomeMy WebLinkAboutPIP 86-04; McNary White; Planned Industrial Permit (PIP) (3)PLANNED INDUSTRIAL PERMIT DATE : October 16, 1986 FROM: Development Processing Services TO: Engineering Department SUBJECT: PIP 86-4 The City has completed a review of the application for a planned industrial permit for development located Las Palmas Drive, south of Camino Vida Roble. It is the Planning Director's determination that the project is consistent with the City's Planned Industrial Zone regulations (Chapter 21.34) and with all other applicable City ordinances and policies. The Planning Director, therefore, recommends approval of this request based on the following: Findings: 1) The site indicated by the Planned Industrial Permit is adequate in size and shape to accommodate the proposed use, and all yards spaces, walls, fences, parking, loading, landscaping and other features required by this chapter. 2) The improvements indicated on the Planned Industrial Permit are located in such a manner to be related to existing and proposed streets and highways. 3) The improvements as shown on the Planned Industrial Permit are consistent with the intent and purpose of this zone and all adopted development, design and performance standards as set forth in this chapter. Conditions: 1) Approval is granted for PIP 86-4 as shown on Exhibits "A" - "D", dated October 8, 1986, on file in the Planning Department and incorporated herein by reference. Development shall occur substantially as shown unless otherwise noted in these conditions. 2) All uses established in this structure(s) shall be consistent with Section 21.34.020 (Permitted Uses). 3) All roof appurtenances shall be shielded from view and architecturally integrated with the building design. 4) Unless otherwise stated, this industrial project shall comply with all applicable City ordinances and requirements. This project is approved upon the express condition that building permits will not be issued for development of the subject property unless the City Engineer determines that sewer facilities are available at the time of application for such sewer permits and will continue to be available until time of occupancy. This note shall be placed on the final map. Water shall be provided to this project pursuant to the Water Service agreement between the City of Carlsbad and the Costa Real Water District, dated May 25, 1983. The applicant shall prepare a detailed landscape and irriga- tion plan which shall be submitted to and approved by the Planning Director prior to the issuance of grading or building permits, whichever occurs first. All parking lot trees shall be a minimum of 15 gallons in size. All landscaped areas shall be maintained in a healthy and thriving condition, free from weeds, trash, and debris. Any signs proposed for this development shall be designed in conformance with the City's Sign Ordinance and shall require review and approval of the Planning Director prior to installation of such signs. No outdoor storage of material shall occur onsite unless required by the Fire Chief. In such instance a storage plan will be submitted for approval by the Fire Chief and the Planning Director. Engineering This project is approved upon the express condition that building permits will not be issued for development of the subject property unless the City Engineer determines that sewer capacity is available at the time of application for such permits and will continue to be available until time of occupancy. All slopes within this project shall be no steeper than 2:l. The owner of the subject property shall execute a hold harmless agreement regarding drainage across the adjacent property prior to approval of any grading or building permit for this project. The developer shall comply with all the rules, regulations and design requirements of the respective sewer and water agencies regarding services to the project. -2- If you have any questions please call me at 438-1161. MICHAEL J. HOLZMILLER Planning Director MJH:EVR:bn -3- W