WILLIAM C. KROMMENHOEK, A.1.A
JOHN M. McKEOWN, A.I.A.
ARCHITECTURE/ENGINEERING/PLANNING
KRO"EN~.K/MCKEM & ASSOClATE
POST OFFICE BOX 82208. SAN DIEGO, CALIFORNIA 92138-2208
1515 MORENA BOULEVARD, SAN DIEGO, CALIFORNIA 92110-3784 (619) 276-7710
AUGUST 8, 1988
CITY OF CARLSBAD
2075 LAS PALMAS DRIVE
CARLSBAD, CALIFORNIA 92009-4859
ATTENTION: MICHAEL HOLZMILLER, PLANNING DIRECTOR
PROJECT: KAISER ELECTRO-OPTICS JOB NO.: 86-117XJ
SUBJECT: KAISER ELECTRO-OPTICS,
CARLSBAD OAKS LOT P.I.P. 86-7
DEAR MR. HOLZMILLER:
PLEASE REVIEW THE ATTACHED DRAWING SHOWING THE ADDITION OF
COMPRESSOR AND WATER CIRCULATION UNIT. PER SPECIFIC PLAN FOR CARLSBAD OAKS BUSINESS PARK (ATTACHED) SECTION N: "EXTERIOR COMPONENTS OF PLUMBING, PROCESSING HEATING, COOLING AND VENTILATING SYSTEMS (INCLUDING BUT NOT LIMITED TO... COOLING AND VENTILATING FANS, COMPRESSORS, ETC.) SHALL NOT BE DIRECTLY VISIBLE TO SURROUNDING AREAS AND SHALL BE SCREENED TO THE SATISFACTION OF THE PLANNING DIRECTOR.
AN EXTERIOR, MASONRY ENQDSURE FOR SCREENING AN AIR
THE DRAWING INDICATES A 7' - 4" HIGH MASONRY ENCLOSURE WHICH
WILL COMPLETELY SCREEN ALL EQUIPMENT FROM THE STREET. THE
ENCLOSURE IS SIZED TO ALLOW FOR THE 24' DRIVE AISLE
CLEARANCE REQUIRED FOR THE ADJACENT PARKING LOT.
THE EQUIPMENT WAS NOT LOCATED ON THE ROOF FOR THE FOLLOWING
REASONS :
1. HOT WATER PIPEWORK FROM THE WATER RECIRCULATION UNIT CHILLER TO THE COATING CHAMBER WOULD BE LOCATED ABOVE THE ACOUSTICAL CEILING WITH EXPENSIVE AND DELICATE
ELECTRONIC EQUIPMENT BELOW. IF LEAKS WERE TO DEVELOP
THIS EQUIPMENT WOULD BE DAMAGED.
SENIOR ASSOCIATES: THOMAS E. AWBREY, A.I.A./DALE DREXLER/JON LEE EBERT ASSOCIATES: ROBERT E. BROTHERTON. A.I.A./TIMOTHY J. RUBESH, A.I.A./ROBERT E. SMITH, A.I.A.
RICHARD J. STICKLER, A.I.A/BRUCE C. THOMAS, A.I.A.
h
MICHAEL HOLZMIUER
AUGUST 8, 1988
PAGE TWO
2. THE CHILLER PROTECTS A $300,000.00 COATING CHAMBER AND MUST BE CONSTANTLY MONITORED TO ENSURE CONTINUOUS OPERATION. IF EQUIPMENT WERE TO FAIL, SERVICE COULD BE PERFORMED MORE QUICKLY DUE TO ITS GROUND LEVEL LOCATION.
3. EXPENSIVE STRUCTURAL CHANGES WOULD BE REQUIRED TO ROOF
STRUCTURE TO SUPPORT THIS EQUIPMENT AND MODIFICATIONS
WOULD DISRUPT PRODUCTION IN AREAS BELOW.
4. DUE TO DISTANCE FROM THE ROOF TOP MECHANICAL AREA AND
THE COATING CHAMBER, LARGER PUMPS WOULD BE REQUIRED FOR
MORE WASTEFUL ENERGY USAGE.
PLEASE CALL AFTER YOU HAVE REVIEWED THIS INFORMATION.
KAISER ELECTRO-OPTICS IS ANXIOUS TO PUT THE COATING CHAMBER,
WHICH THIS PROTECTS, INTO FULL OPERATION. THEREFORE YOUR
PROMPT ATTENTION TO THIS ALTERATION WILL BE GREATLY APPRECIATED.
VERY TRULY YOURS,
TOM AWBREY, PROJECT MANAGER
CC: JOHN BALKWILL - KAISER ELECTRONICS
JACK MC KEOWN - KMA
ROB SMITH - KMA
WILMA DIEPERSLOOT - CARLSBAD PLANNING DEPARTMENT