HomeMy WebLinkAboutPIP 87-02A; Atrium II; Planned Industrial Permit (PIP) (3)c
City of Carlsbad
November 15,2000
Newport National Corporation
21 17 Industrial Court Suite E
Vista, CA 92083
SUBJECT: PUD 00-1 12/PIP87-02(A) - ATRIUM II
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department
has reviewed your Nonresidential Planned Unit Development and Planned Industrial Permit
Amendment, application no. PUD 00-1 12 and PIP87-02(A), as to its completeness for
processing.
The application is incomplete, as submitted. Attached are two lists. The first list is information
which must be submitted to complete your application. This list of items must be submitted
directly to your staff planner by appointment. All list items must be submitted
simultaneously and a copy of this list must be included with your submittals. No
processing of your application can occur until the application is determined to be complete. The
second list is issues of concern to staff. When all required materials are submitted the City has
30 days to make a determination of completeness. If the application is determined to be
complete, processing for a decision on the application will be initiated. In addition, please note
that you have six months from the date the application was initially filed, October 16, 2000, to
either resubmit the application or submit the required information. Failure to resubmit the
application or to submit the materials necessary to determine your application complete shall be
deemed to constitute withdrawal of the application. If an application is withdrawn or deemed
withdrawn, a new application must be submitted.
Please contact your staff planner, Paul Godwin, at (760) 602-4625, if you have any questions or
wish to set up a meeting to discuss the application.
Sincerely,
MICHAEL khOmILLER
Planning Director
MJH:PG:cs
C: Chris DeCerbo
Jeremy Riddle
File Copy
Data Entry
Planning Aide
1635 Faraday Avenue Carlsbad, CA 92008-731 4 (760) 602-4600 FAX (760) 602-8559 www.ci.carlsbad.ca.us @
LIST OF ITEMS NEEDED
TO COMPLETE THE APPLICATION
NO. PUD 00-1 12/PIP 87-02(A)
Planning:
None.
Engineering:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
On the site plan identify the projected average daily traffic (ADT) for the proposed project
utilizing latest SANDAG figures.
On the site plan include the distance from the project driveway to the southerly
intersection with Palomar Airport Road.
On the site plan and conceptual grading plan, identify the record document that secures
the reciprocal access easements for the shared driveway entrance with the adjacent
property. Provide a copy for our records.
On the site plan provide sufficient dimensions on the site plan to clearly identify the size
of parking stalls and drive aisle widths.
On the site plan and conceptual grading plan depict and call-out all existing underground
facilities along the project frontage of Loker Avenue (size, type, hydraulic grade line,
reference drawings, etc.)
Provide a Soils Report addressing the feasibility and recommendations associated with
the proposed project. Identify if there is anticipated remedial grading required for the
project.
Provide a title report for the subject property.
Provide a hydrology study that addresses storm flows experienced by the site and what
measures are required in order to intercept the flows. Identify measures to ensure that
post-development storm flows do not exceed pre-development storm flows.
Revise the site plan to depict all proposed easements. The current one only shows
existing easements.
Revise the site plan to show the existing and proposed facilities required to serve the
project.
ISSUES OF CONCERN
Planning:
1. Please include employee eating area calculations on plans.
2. Please show proposed roof screening plan.
_-
Engineering:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
The updated National Pollution Discharge Elimination System (NPDES) permit is
nearing approval, and would involve significant changes to this project and other projects
processed throughout the San Diego region. It is our understanding that these changes
would not include a grandfather clause for projects. This means that this project and all
other projects will be immediately impacted pursuant to the approved NPDES
requirements, no matter what stage projects are in. We encourage you to review the
draft permit requirements so that you understand the nature of our comments when they
are made on projects. In order to facilitate compliance of this project, the following are .
some criteria that should be incorporated into the design of the project:
a) Post development run-off should not exceed predevelopment run-off. This shall
be certified via engineering calculations in the project hydrologylhydraulic report.
Revise the plans to show all provisions to ensure no increase storm flows via
methods such as detainment areas, ponded parking lots, detention basins, etc.
b) On parking lot areas, include additional measures required to capture anticipated pollutants from the site. More often than not, grass-lined swales should be
utilized to filter storm water before entering inlets. Fossil-filters alone may not be
sufficient to capture all pollutants.
c) Offsite and downstream siltation would not be permitted at any time during the
project (long term or near term).
On the site plan and conceptual grading plan depict the preliminary location of
irrigation and fire sprinkler service connections required to serve the project. Revise
the legend to include all necessary symbols and call-outs.
Revise the conceptual grading plan and the site plan to include minimum 24-foot
drive aisles. A 21.5 foot aisle is un acceptable.
Coordinate all elements of the project between the site plan and the conceptual
grading plan. Missing items will lead to discrepancies in the project design (trash
enclosures, water meter construction, etc.). '
Consider having the site plan contain all the project information versus having a
conceptual grading plan and a site plan. This may ease coordination and eliminate
having duplicate information between the two drawings.
On the conceptual grading plan revise the topographic numbers so they are legible.
Revise the conceptual grading plan to identify how the northerly sump area drains.
Identify the system that conveys storm water from this area.
Revise the site plan and conceptual grading plan to depict the location of the onsite
storm drain system to ensure there are no conflicts with the project design.
On the site plan and conceptual grading plan clarify the granting of two types of
easements. One should be a public waterline easement granted to the Carlsbad
Municipal Water District. The other will be a access easement granted to the City of
Carlsbad.
On the site plan and conceptual grading plan include the proposed driveway slope
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
on the plans.
On the site plan and conceptual grading plan identify the paved width of the existing
driveway.
On the site plan and conceptual grading plan provide vehicular access to the existing
sewer access-hole as shown on the returned plan. City crews must be able to
maneuver a vactor truck to the access-hole in order to perform maintenance or
repairs as needed to this public facility.
On the site plan and conceptual grading plan locate and callout the proposed potable
water and irrigation water meter close to each other for ease of meter-reader access.
On the site plan and conceptual grading plan ensure that all meter boxes are located
within the proposed public water easement. This includes meters that are relocated
as part of the project.
On the site plan, conceptual grading plan, and conceptual landscape plan add
callouts to ensure that deep-rooted landscaping will not be installed over the existing
public sewer main.
On the site plan, conceptual grading plan, and conceptual landscape plan callout the
size and type of the existing public sewer main and callout all existing access-holes.
On the conceptual grading plan identify the location of the trash enclosure to serve
Lot 1.
On the conceptual grading plan, indicate how a truck (per Caltrans 407-E) with a 42-
foot turning radius will circulate throughout the site. Depict the inside and outside
turning radius of the truck at all critical turns to demonstrate feasibility.
On the site plan, conceptual grading plan, and conceptual landscape plan depict the
line-of-sight at the driveway entrance looking onto Loker Avenue using Caltrans
Standards.
On the site plan and conceptual grading plan, depict the double detector check valve
assembly of the fire service for the site (per CMWD standards). Ensure the double
detector check valve is not located within public water easements, since are the
responsibility of the owner.
On the site plan and conceptual grading plan, identify all measures required to ensure
that post-development run-off does not exceed pre-development run-off.
Revise the project hydrology study to comply with the above item.
Address redlines as noted on the returned site plan, conceptual grading plan, and
conceptual landscape plan.
Attached is a redlined check print of the project with Engineering staff comments.
Please be advised, this check print must be returned with the revised plans to
facilitate continued staff review.