HomeMy WebLinkAboutPIP 87-03A; Palomar Oaks; Planned Industrial Permit (PIP)PLANNED INDUSl". PERMIT
January 13, 1992
Henry Worley Associates, Inc.
7875 Convoy Court, Suite A-2
San Diego, CA 92111
SUBJECT: PIP 873(A) - PALOMAR OAKS
The City has completed a review of the application for a Planned Industrial Permit
for development located on Lots 15-16 inclusive of Carlsbad Tract 80-38 along
Palomar Oaks Way.
This amendment was initiated when review of adjustment plat 357 by the Planning
Department indicated a condition (number 25) of PIP 87-3 which was inconsistent
with the request. It required consolidation of lot lines. The project being approved
subject to the conditions as listed it is the Planning Director's determination that the
project is consistent with the City's Planned Industrial Zone regulations (Chapter
21.34) and with all other applicable City Ordinances and policies. The Planning
Director, therefore, recommends approval of this request based on the following:
1) The site indicated by the Planned Industrial Permit is adequate in size and
shape to accommodate the proposed use, and all yards, spaces, walls, fences,
parking, loading, landscaping, and other features required by this chapter.
2) The improvements indicated on the Planned Industrial Permit are located in
such a manner to be related to existing and proposed streets and highways.
3) The improvements as shown on the Planned Industrial Permit are consistent
with the intent and purpose of this zone and all adopted development, design,
and performance standards as set forth in this chapter.
2075 Las Palmas Drive - Carlsbad, California 92009-4859 - (619) 438-1 161 a
Conditions:
All conditions of PIP 87-3, with the exception of condition number 25, are
incorporated herein by reference.
Approval is granted for PIP 87-3(A) as shown on Exhibirs "A" and "B", dated
January 1, 1992, on file in the Planning Department and incorporated herein
by reference. Development shall occur substantially as shown unless otherwise
noted in these conditions.
Prior to issuing a building permit the property owner shall submit for an
adjustment plat and obtain a certificate of compliance for a lot line
adjustment.
Prior to issuing a building permit the owner shall provide for mutual access
and parking between both parcels of the lot line adjustment to the satisfaction
of the City Engineer.
If you have any questions, please contact me at 438-1161, extension.
~klY$ WAYNE /
Assistant Planning Director
GEW:BH:lh
c: Engineering Department
Erin Letsch
Bob Wojcik
Don Rideout
Data Entry
File Copy
PIP873A.LTR
, ,."'