HomeMy WebLinkAboutPIP 89-14; Carlsbad Oaks East Lot 25; Planned Industrial Permit (PIP) (9)December 6, 1989
HCH Partners
4877 Viewridge Avenue
San Diego, CA 92123
SUBJECT: PIP 89-14 CARLSBAD OAKS EAST - LOT 25
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning
Department has reviewed your Planned Industrial Permit, application no. PIP 89-14, as to its
completeness for processing.
The application is incomplete. Attached are two lists. The first list is information which
must be submitted to complete your application. All list items must be submitted
simultaneouslv at the C0mmUnitV Development Building counter. and to the attention of
Erin Letsch. A cow of this list must be included with vour submittal. No processing of
your application can occur until the application is determined to be complete. The second
list is issues of concern to staff. When all required materials have been submitted as outlined
above, the City has 30 days to make a determination of completeness. If the application is
determined to be complete, processing for a decision on the application will be initiated. In
addition, please note that you have six months from the date the application was initiallv filed,
November 15, 1989, to either re-submit the application or submit the required information.
Failure to resubmit the application or to submit the materials necessary to determine your
application complete shall be deemed to constitute withdrawal of the application. If an
application is withdrawn or deemed withdrawn, a new application must be submitted.
Please contact your staff planner, Jeff Gibson, at (619) 438-1161, if you have any questions
or wish to set up a meeting to discuss the application.
Sincerely,
MICHAEL J. HOXZMILLER
Planning Director
MJH:JG/lh
C: Gary Wayne
Crystal/Angelina
Erin Letsch
Bob Wojcik
2075 Las Palmas Drive - Carlsbad. California 92009-4859 (619) 438-1 161
I
LIST OF ITEMS NEEDED
TO COMPLETE APPLICATION
NO. PIP 89-14 - CARLSBAD OAKS EAST - LOT 25
PLANNING
Indicate type of materials for proposed walls.
Label the various plant species so their location on the Landscape Plan can be
identified. Label and show all existing landscaping along the two streets.
Indicate all exterior building and parking lot lighting.
One (1) copy of 8 1/2" or 11" Location Map (suggested scale 200" - Vicinitv Maps
on the Site Plan are not acceDtable.
One copy of Colored Elevation Plan.
Updated title report indicating Davision Partners as the legal owner or the signature
of Carlsbad Oaks East, Ltd., on a new application form are required.
ENGINEBRING
Typical street cross sections for all adjacent streets and streets within the project.
(and driveways).
Width, location and use of all existing and/or proposed public or private easements,
(call them out on the plan).
Public and private streets and utilities clearly identified.
Show access points to adjacent undeveloped lands. Show the driveway on both
plans.
Show all existing and proposed street lights and utilities (sewer, major gas, and fuel
lines, major electric and telephone facilities) within and adjacent to the project.
Projects with ADT greater than 500 vehicles per day require two copies of a
Circulation Impact Analysis prepared by a registered Engineer.
Break ADT into uses and include total ADT. Use SAJWAG traffic generation
rates dated July 1988 (copy included).
1
H & H Partners
December 6, 1989
Page 3
ISSUES OF CONCERN
PLANNING
From local streets such as Sea Otter Place and hker Avenue East an average 35’
front and street side setback is required by Specific Plan 200 (Carlsbad Airport
Business Center). Parking spaces cannot encroach into this setback area.
Eight (8) foot screen wall in the street side setback along Sea Otter Place is not
permitted per SP 200. Walls are not to exceed 3 feet in height.
Parking lot trees (min. 15 gallon) should be provided at a ratio of one tree per
every 5 parking spaces. Trees in the required 10’ landscape setbacks or in any
other required setback do not count towards meeting this requirement.
No outdoor eating areas may be located in any street side or front yard setbacks.
Outdoor eating areas should not be located in the required 10’ landscaping strip
required by SP 200. These areas must be entirely landscaped and will not count
towards the square footage needed to satisfy the outdoor eating area requirements
of 300 square feet for each 5,000 square feet of building area.
Approximately 390 square feet more employee eating area is required. (Setback
areas are subtracted out.) Also show eating area improvements on the plans such
as tables, benches, and chairs, etc. These areas should be screened from the
parking areas by use of landscaping.
You need to create unique yet unified identity for each building through site design,
building graphics and landscaping. Uniformity of structures, rectangular buildings
and similar building facades and landscaping do not create enough visual interest
and architectural relief for the site.
Front loading industrial buildings directly across from rear loading units is not
desirable. Creates auto and loading conflicts.
Street elevations are not acceptable. Screen walls and front loading industrial
building do not provide a visually interesting street view. Front loading building
should be located entirely away from view of streets.
H & H Partners
December 6, 1989
Page 4
h
ISSUES OF CONCERN - PLANNING - (CONTINUED):
d Project is developed too intensely with a maze like effect. Narrow driveways with
many corners will create difficulty for larger trucks to complete turn movements.
The project should be opened up with a primary circulation route established.
$d Particular attention should be made to any building elevations facing canyons and
open space.
ENGINEERING.
First twenty (20) feet of both driveways must be at 5% maximum slope.
All aisle widths must be a minimum of 24 feet wide. '
Use Multi-Tenant Design Standards (copy included). If units are wider than 24',
use Diagram #2 (Building "A" and T"). Clearly mark service and loading areas
(per those standards).
Include a typical driveway section.
Include typical street sections for both Sea Otter Place and hker Avenue East.
Show utilities in the street (i.e. sewer, water, storm drain).
Show sewer and water laterals.
TITLE REPORT:
&. Item #9 refers to an SDG&E easement. Submit building locations to
SDG&E for their approval. Include the letter from SDG&E with the next
submittal. The letter should also state any restrictions.
%. Show and label common area easement #14 on plan.
e. Show and label sewer and drainage easement Item #7.
"D. Show and label private drainage easement #17.
H & H Partners
December 6, 1989
Page 5
ISSUES OF CONCERN - ENGINEERING - (COFlTlNU2D):
d. What are the "proposed" easements. If they are on this property, show them.
2. Has your lot signed the Sunnycreek Drainage Agreement? If so, include a
copy with your next submittal.
4 Obtain reciprocal access easement with Lot 24.
U. This plan will require a grading permit.