Loading...
HomeMy WebLinkAboutPIP 93-02C; Callaway Golf Test Facility Enclosure & Stairway; Planned Industrial Permit (PIP)September 4, 1996 Mark Langan Smith Consulting Architects 5355 Mira Sorrento Place, Ste. 750 San Diego CA 921 21 SUBJECT: PIP 93-02(C) - CALLAWAY GOLF TEST FACILITY ENCLOSURE AND STAIRWAY The City has completed a review of the application for an amendment to a Planned Industrial Permit for development consisting of a storage structure and stairway located at 5860 Dryden Place within the Carlsbad Airport Centre, Specific Plan 181 (A), Lots 21 and 22 of Carlsbad Tract 81-46 Unit No. 1 according to Map No. 11 287. It is the Planning Director's determination that the project IS consistent with the City's Planned Industrial Zone regulations (Chapter 21.34) and with all other applicable City ordinances and policies. The Planning Director, therefore, APPROVES this request based on the following: Findinas: 1. 2. 3. 4. 5. The site indicated by the P1,anned Industrial Permit is adequate in size and shape to accommodate the proposed use, and all yards, spaces, walls, fences, parking, loading, landscaping and other features required by the P-M Zone and SP 181 (A) in that the outdoor storage enclosure is located within the buildable portion of the site, is designed without metal siding, and is located so that it will be visually screened by landscaping from surrounding properties. Additionally, the proposed stairway located on the landscaped slope separating Lots 20 and 21 and providing pedestrian access will not significantly reduce existing landscaping and will be visually screened by landscaping. The improvements indicated on the Planned Industrial Permit are located in such a manner to be related to existing streets in that the proposed storage structure is accessory to the main facility which is adequately served by Dryden Place, a local industrial street. The improvements as shown on the Planned Industrial Permit PIP 93-02(C) are consistent with the intent and purpose of P-M Zone and SP 181 (A) and all adopted development, design and performance standards as set forth in this chapter. The Planning Director has determined that the project is exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301 (e)(2) of the State CEQA Guidelines and will not have any adverse significant impact on the environment. The project is consistent with the Comprehensive Land Use Plan (CLUP) for the McClellan-Palomar Airport, dated April 1994, in that the accessory building does not exceed the existing building height and will not adversely impact flight operations at the airport. The project is compatible with the projected noise 2075 Las Palmas Dr. Carlsbad, CA 92009-1576 - (619) 438-1161 - FAX (61 9) 438-0894 @ ? z A PIP 93-02(C) - CALLAVL,, I GOLF September 4, 1996 Paqe 2 levels of the CLUP; and, based on the noise/land use compatibility matrix of the CLUP, the proposed land use is compatible with the airport. Conditions: 1. 2. 3. 4. 5. 6. 7. 8. Approval is granted for PIP 93-02(C) as shown on Exhibits "A"-"C", dated September 4, 1996, on file in the Planning Department and incorporated herein be reference. Development shall occur substantially as shown unless otherwise noted in these conditions. All uses established in this structure shall be consistent with Section 21.34.020 (Permitted Uses). All roof appurtenances shall be shielded from view and architecturally integrated with the building design. Unless otherwise stated, this industrial project shall comply with all applicable City ordinances and requirements. Landscaping surrounding the storage structure and stairway shall be replaced in accordance with Exhibit "C" and the approved landscape plan for PIP 93-02 (Dwg. No. 336-3L) shall be to the satisfaction of the Planning Department prior to final inspection approval. The applicant shall be responsible for coordination with SDG&E, in accordance with the following: A. Documentation shall be supplied from SDG&E stating that they are aware of, and concur with, the implementation of this project. The owner shall execute a hold harmless agreement for geologic failure for stairway construction on the slope at the north end of the site. A reciprocal access and maintenance agreement shall be executed between the developer (Callaway Golf) and the owner of the adjacent property (Koll) for the stairway If you have any questions, please call Anne Hysong at (61 9) 438-1 161, extension 4477. CITY _OF CARLSMAD Assishnt Planning Director GEW:AH:bk c: Richard Merk, Callaway Golf Bobbie Hoder Brian Hunter Mike Shirey Bob Wojcik Don Rideout Data Entry File Copy