SUBJECT: PIP 94-03 - AUTO SCIENTIFIC LTD.
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department
has reviewed your Planned Industrial Permit, application no. PIP 94-03, as to its completeness
for processing.
The application is incomplete, as submitted. Attached are two lists. The frrst list is information
which must be submitted to complete your application. This list of items must be submitted
directly to your staff DIanner bv amointment. All list items must be submitted
simultaneously and a CODY of this list must be included with your submittals. No processing
of your application can occur until the application is determined to be complete. The second list
is issues of concern to staff. When all required materials are submitted the City has 30 days to
make a determination of completeness. If the application is determined to be complete,
processing for a decision on the application will be initiated. In addition, please note that you
have six months from the date the application was initially filed, September 7, 1994, to either
resubmit the application or submit the required information. Failure to resubmit the application
or to submit the materials necessary to determine your application complete shall be deemed to
constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn,
a new application must be submitted.
Please contact your staff planner, David Rick, at (619) 438-1 161 extension 4328, if you have any
questions or wish to set up a meeting to discuss the application.
GAR& E. WAYNB
Assistant Planning Director
0Ew:DR:vd
C: Michael J. Holzmiller
Adrienne Landers
Bobbie Hoder
Bob Wojcik
Ken Quon
Fide copy
Data Entry
Marjorie/Rich
2075 Las Palrnas Drive - Carlsbad, California 92009-1576 - (619) 438-1 161 49
LIST OF ITEMS NEEDED
TO COMPLETE APPLICATION:
NO. PIP 94-03 - AALTO SCIENTIFIC LTD.
PLANNING:
6 cotie~ req\EsI+pd
pr pYJ4 c.qa 1. The following information needs to be added or corrected on your site plan:
60 lO/lg /a) Add the date of map preparation
J b) Add the application type and number (PIP 94-3.)
uc) Add street address (1959 Kellogg Avenue)
~d) Add the City zoning and land use.
shown. Please revise to 70 spaces.
future building area.
e) ā I counted 70 parking spaces shown, yet the parking tabulation indicates 43 spaces
./ f) Under parking tabulation indicate that total building area includes proposed and
, Jā g) Show improvements and amenities in interiorlexterior employee eating areas.
ENGINEERING:
1. J The plans should indicate the grading quantities proposed for this project, including the
number of cubic yards of cut, fill, import, and export.
2. J Please include a drawing of the typical street section of Kellogg Avenue on the plans.
ISSUES OF CONCERN
PLANNING:
1. The outdoor eating facility needs to be located in a more desirable location. The
proposed location is to close to the truck loading bay and lacks privacy. One possible
solution would be to locate it within the lawn area west and slightly north of the loading
dock
2. The parking area must be located 10 feet from the rear property line with no parking
overhang permitted. Eighteen foot stall depths, as proposed on your plans, allow cars to
overhang the curb. If the stalls are 20 feet deep, then the parking isle can be located 10
feet from the property line. If the stalls are to remain at 18 feet deep, then the parking isle
must be 12 feet from the rear property line.
3. No refuse collection bins are shown on the site plan. These bins must be designed in
accordance with Engineering standards, which now include area for recycling bins. A
, copy of the standard is enclosed.
4. The building architecture needs to be enhanced. This could be done through additional
building articulation or creation of an area of particular visual interest.
5. Since this building is located between the 65 CNEL and 70 CNEL noise range as shown
on Appendix H of the Comprehensive Land Use Plan for McClellan-Palomar Airport,
mitigation measures must be incorporated into the project to reduce interior noise levels
to 50 CNEL.
6. A 5 foot bump-out needs to be incorporated at the southwest corner of the property.
7. The walkway and curb-ramp leading to Kellogg Ave may or may not be allowed/required.
Building Department staff is currently reviewing the new handicap requirements, and a
determination regarding handicap access requirements from the public right-of-way will
be made in the near future. If you have any questions concerning this requirement, please
contact Mike Peterson in the Building Department at (619) 438-1161 ext. 4462.
ENGINEERING:
1. The parking lot should be designed to drain with a minimum 1 % slope, as opposed to the
0.6% slope currently shown on the grading plan.
2. Overall, drainage of the site should be designed to catch the low flow in the vegetated
swale for pollutant mitigation purposes, as well as accommodate those periods of high
runoff without eroding or eradicating the swale. For low flows, we suggest providing
additional openings along the length of the curb to drain to the vegetated swale. To help
protect the swale during high flows, we recommend the top of berm of the vegetated
swale have a minimum width of 12" to prevent failure during periods of heavy runoff.
L -" . i .. -