November 16, 1994
Smith Consulting Architects
5355 Mira Sorrento Place, Suite 750
San Diego, California 92121
Re: Lot 18, Carlsbad Airport Centre
CMWD Project No. 94-207
Dear Mr. Blatchley:
In response to your request for a letter of conformance for Zone No. 5, City of Carlsbad
Growth Management Plan, the Developer/Owner must abide by the following conditions:
1. The entire potable water system, reclaimed water system and sewer system shall
be evaluated in detail to insure that adequate capacity, pressure and flow
demands can be met.
2. The Developer shall be responsible for all fees, deposits and charges which will
be collected before and/or at the time of issuance of the building permit. The San
Diego County Water Authority capacity charge will be collected at issuance of
application for meter installation.
3, Seqwmtialiy, the Deveiopei's Engineer shail do the foiiowiny:
I
A. Meet with the City Fire Marshall and establish the fire protection
requirements. Also obtain G.P.M. demand for domestic and irrigational
needs from appropriate parties.
B. Prepare a colored reclaimed water use map and submit to the Planning
Department for processing and approval.
C. Prior to the preparation of sewer, water and reclaimed water improvement
plans, a meeting must be scheduled with the District Engineer for review,
comment and approval of the preliminary system layouts and usages (ie-
"Serving Carlsbad for over 35 years'' @
GPM - EDU).
Page 2
Hunsaker & Associates
November 16, 1994
4. This project is approved upon the expressed condition that building permits will
not be issued for development of the subject property unless the water district
serving development determines that adequate water service and sewer facilities
are available at the time of application for such water service and sewer permits
will continue to be available until time of occupancy. This note shall be placed
on the final map.
5. The Developer shall be required to meet all the requirements/conditions of the
Major Facilities Zone 5 of the Growth Management Program.
If you have any questions, please contact the undersigned.
Very truly yours,
CARLSBAD MUNICIPAL WATER DISTRICT
Associate Engineer
FJW: sjs