Loading...
HomeMy WebLinkAboutPIP 94-04; Blackmore Airport Centre; Planned Industrial Permit (PIP) (10)" I .. Carlsbad Municipal Water District fif:i:": '' .d !- i'*jg(f 5950 El Camino Real, Carlsbad, CA 92008 Engineering: (619) 438-3367 Administration: (61 9) 438-2722 Fax: (619) 431-1601 November 16, 1994 Smith Consulting Architects 5355 Mira Sorrento Place, Suite 750 San Diego, California 92121 Re: Lot 18, Carlsbad Airport Centre CMWD Project No. 94-207 Dear Mr. Blatchley: In response to your request for a letter of conformance for Zone No. 5, City of Carlsbad Growth Management Plan, the Developer/Owner must abide by the following conditions: 1. The entire potable water system, reclaimed water system and sewer system shall be evaluated in detail to insure that adequate capacity, pressure and flow demands can be met. 2. The Developer shall be responsible for all fees, deposits and charges which will be collected before and/or at the time of issuance of the building permit. The San Diego County Water Authority capacity charge will be collected at issuance of application for meter installation. 3, Seqwmtialiy, the Deveiopei's Engineer shail do the foiiowiny: I A. Meet with the City Fire Marshall and establish the fire protection requirements. Also obtain G.P.M. demand for domestic and irrigational needs from appropriate parties. B. Prepare a colored reclaimed water use map and submit to the Planning Department for processing and approval. C. Prior to the preparation of sewer, water and reclaimed water improvement plans, a meeting must be scheduled with the District Engineer for review, comment and approval of the preliminary system layouts and usages (ie- "Serving Carlsbad for over 35 years'' @ GPM - EDU). Page 2 Hunsaker & Associates November 16, 1994 4. This project is approved upon the expressed condition that building permits will not be issued for development of the subject property unless the water district serving development determines that adequate water service and sewer facilities are available at the time of application for such water service and sewer permits will continue to be available until time of occupancy. This note shall be placed on the final map. 5. The Developer shall be required to meet all the requirements/conditions of the Major Facilities Zone 5 of the Growth Management Program. If you have any questions, please contact the undersigned. Very truly yours, CARLSBAD MUNICIPAL WATER DISTRICT Associate Engineer FJW: sjs