HomeMy WebLinkAboutPIP 95-05; Daily Industrial Building; Planned Industrial Permit (PIP) (3)5
July 13, 1995
Larry Kloha
Smith Consulting Architects
5355 Mira Sorrento Place, Suite 750
San Diego, CA 92121
SUBJECT: PIP 95-05 - DAILY INDUSTRIAL BUILDING
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has
reviewed your Planned Industrial Permit, application no. PIP 95-05, as to its completeness for processing.
All of the items requested of you earlier have not been received and therefore your application is still
deemed incomplete. Listed below are the item(s) still needed in order to deem your application as
complete. This list of items must be submitted directlv to vow staff planner by aDpointment. All
list items must be submitted simultaneouslv and a CODY of this list must be included with vour
submittals. No processing of your application can occur until the application is determined to be
complete. When all required materials are submitted the City has 30 days to make a determination of
completeness. If the application is determined to be complete, processing for a decision on the
application will be initiated. In addition, please note that you have six months from the date the
application was initially filed, February 15, 1995, to either resubmit the application or submit the required
information. Failure to resubmit the application or to submit the materials necessary to determine your
application complete shall be deemed to constitute withdrawal of the application. If an application is
withdrawn or deemed withdrawn, a new application must be submitted.
Please contact your staff planner, Elaine Blackburn, at (619) 438-1161 extension 4471, if you have any
questions or wish to set up a meeting to discuss the application.
Sincerely,
Planning Director
MJH:EB:lh
C: Gary Wayne
Brian Hunter
Bobbie Hoder
Bob Wojcik
Data Entry
Marjorie/Morgan
,::.me cop#
2075 Las Palmas Drive - Carlsbad, California 92009-1 576 - (61 9) 438-1 161 @
~ ~~ ~~~~~ ~~~
LIST OF ITEMS NEEDJ3D
TO COMPLm APPLICATION
NO. PIP 95-05 - DAILY INDUSTRIAL BUILDING
PLANNING
1. Please submit 3 copies of an updated Preliminary Title Report (current within the last six
months). The title insurance policy received on July 10 cannot substitute for a title report.
ENGINEERING:
1. Please submit an updated title report.
ISSUES OF CONCERN
PLANNING:
1. Staff notes that the resubmitted sheets, although revised, did not show a revision date in legend
as required. Please be sure that any future submittals reflect an appropriate drawing revision
date.
ENGINEERING:
1.
2.
3.
4.
5.
One area of the parking lot indicates a grade of 0.05%. We suggest that the grades be adjusted
so that all areas have a mihimum grade of 1.00%.
Please show curb openings or indicate on the grading plan how runoff from the paved area will
flow to the landscaped areas. It is unclear as to how runoff will be directed to the inlet in the
general area of the eating terrace.
To properly mitigate or remove pollutants from runoff from the paved areas, the proposed grass-
lined earthen ditch should be lengthened along the west side of the building. We suggest
replacing half of the proposed pipe with additional grass-lined earthen ditch. Additionally, the
landscape plan does not indicate the grass-lined earthen ditch.
The plans should indicate the location of the outlet pipe for the proposed sump pump in the
loading dock area.
The driveway shows a grade of 15.5%. City standards allow a maximum 12% driveway grade.