Loading...
HomeMy WebLinkAboutPIP 97-04; Cornerstone Corporate Centre; Planned Industrial Permit (PIP) (17)April 23, 1997 Christer Westman Planning Department CITY OF CARLSBAD Community Development Building 2075 Las Palmas Drive Carlsbad, CA 92009- 1 576 Via Facsimile & U.S. Mail 438-0894 RE: Cornerstone Corporate Centre; PIP Case No. 97-04 Dear Christer: As a follow up to previous discussions which you have had with Mr. Scott Merry, we thought it would be helpful for the City to better understand our rationale for designing the building pad elevations as we have shown them on the PIP. As you are aware, the site currently terraces downward from north to south in a series of three separate pad elevations. The existing elevations start from approximately 21 5 on Lots 7 and 8 and down to 180 on Lot 1 1. We are desirous of lowering the pad elevations on Lots 7 and 8 by approximately 15 feet and using that material to raise the pad elevation on Lot 1 1 by approximately 18 feet. This will create a more uniform elevatipn and relationship upon which each of the three hture office buildings will be constructed. While re-grading these three lots to facilitate this site plan will require the use of retaining walls around portions of the project, it is our belief that it will create a much more functional project for on-site circulation, parking proximity and meet the necessary ADA accessibility requirements. As you know, we are proposing to construct Class “A” type office buildings that will create a “Fortune 500” company building image. This will require high visibility of the offices from traffic passing the site on Palomar Airport Road. Raising the building pads on Lots 8 and 1 1 will provide this visibility. Also, by removing the terracing between Lots 8 and 11, we can facilitate the design of twin buildings which share a people pleasing courtyard between them. These are the type of amenities necessary to attract higher end corporate companies. Prior to the submittal of the above-referenced PIP application, great lengths were taken in evaluating the existing site constraints of Lots 7, 8 and 1 1 to design the most functional site plan. The SDG&E easement located across the northern portion of the site prohibits placement of any buildings on the uppermost pad site of Lots 7 and 8. The existing terraced topography impedes on-site circulation and frustrates the parking proximity to the future building sites. By re-grading all three lots to accommodate a single pad elevation for all three buildings, traffic circulation 5050 Avenida Encinas, Suite 350 Carlsbad, California 92008 619-438-4242 FAX: 619-438-0046 Christer Westman April 23, 1997 Page 2 fkom Palomar Oaks Way and Wright Place can be greatly improved, as will be the overall parking efficiency of the site. After careful evaluation, we are proposing several landscape design elements at the southern portion of Lot 11 which will soften the increased building pad height and retaining walls. Among these, we have designed a 2:l slope in fiont of the southern most retaining wall along Lot 1 1. This creates a more natural transition between the existing 3 : 1 landscaped slope along the nonh side of Palomar Airport Road and the retaining wall. The 2:l slope also reduces the height of the retaining wall at the top of the slope. This 2:l slope will be landscaped and planted to minimalize and soften visual impacts. The retaining wall itself will be constructed of an inter- locking plantable type retaining wall. This type of retaining wall creates a horizontal planting shelf every four vertical feet. We are proposing to utilize a fast growing, self-adhering plant material such as creeping fig or cats claw. Both of these types of vines will completely cover the retaining wall within several years. Lastly, in Mr. Wayne’s preliminary review letter dated February 19, 1997, the recommendation is made to lower the building pads on Lots 8 and 11 by 8 to 10 feet. Lowering these pads by 8 to 10 feet would generate approximately 80,000 - 100,000 cubic yards of export material. It will cost approximately $5.00 per cubic yard to excavate, load, haul and dispose of this excess material. Therefore, lowering these pads by the recommended 8 or 10 feet could cost as much as $500,000. We are confident this letter will assist you in better understanding our rationale for re-grading the entirety of Lots 7, 8 and 11 and thereby approve this condition. We look forward to working with you and the balance of staff to create Cornerstone Corporate Centre as a top-ranked, up- scale office project that both Newport National and the City of Carlsbad can be proud of. Should you have any questions, please feel free to contact me at your convenience. Sincerely, j’ c/ Project Manager JC/jdg cc: Scott L. Merry, Ninteman Construction Company Len Zegarski, Brian Paul & Associates James McCann, Newport National Corporation f:\deptk.dmin\grmtj\john\ccc\weshnm.doc