HomeMy WebLinkAboutPIP 97-11; Sea Lion Commerce Center; Planned Industrial Permit (PIP) (6)c -. November 13 1997 Mike McGill Smith Consulting Architects 5355 Mira Sorrento Place Suite 650 Sa Diego, CA 92 12 1 SUBJECT: PIP 97-11 - SEA LION COMMERCE CENTRE Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has reviewed your Planned Industrial Permit, application no. PIP 97-1 1, as to its completeness for processing. The application is incomplete, as submitted. Attached are two lists. The first list is information which must be submitted to complete your application. This list of items must be submitted directly to your staff planner by appointment. All list items must be submitted simultaneously and a copy of this list must be included with your submittals. No processing of your application can occur until the application is determined to be complete. The second list is issues of concern to staff. When all required materials are submitted the City has 30 days to make a determination of completeness. If the application is determined to be complete, processing for a decision on the application will be initiated. In addition, please note that you have six months from the date the application was initially filed, October 14, 1997, to either resubmit the application or submit the required information. Failure to resubmit the application or to submit the materials necessary to determine your application complete shall be deemed to constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new application must be submitted. Please contact your staff planner, Brian Hunter, at (760) 438-1161, extension 4457, or your staff engineer, Frank Jimeno, at (760) 438-1 161, extension 4501 if you have any questions or wish to set up a meeting to discuss the application. Sincerely, . MICHAEL J. HOYZMILLER Planning Director MJH: bwh:kc C: Gary Wayne Clyde Wickham Bobbie Hoder File Copy Data Entry Planning Aide 2075 Las Palmas Dr. Carlsbad, CA 92009-1576 - (619) 438-1161 - FAX (619) 438-0894 LIST OF ITEMS NEEDED TO COMPLETE THE APPLICATION NO. PIP 97-1 1 Planning: There are no planning items needed to complete the application. Engineering: 1. . Clarify name of OwnerlApplicant; should match Title Report. 2. Show correct street address for the project. 3. Show all existing or proposed public and private easements. Specifically, plot Title Report items No. 6, 7, 12, and 13. 4. Show existing topographic contours within a 100 foot perimeter of the boundaries of the site. 5. Show existing cul-de-sac; full bulb and a portion of the straight street section. Also show all existing utilities. ISSUES OF CONCERN Planning: 1. While not an issue of concern it should be noted that the project will be conditioned to place a deed restriction on site to indicate what uses have been parked, that these uses will be retained, and that no other uses requiring additional parking shall be allowed without the creation of additional parking. Engineering: 1. The drainage design must meet Engineering standards. Design must adhere to the provisions of the National Pollutant Discharge Elimination System. Specifically, show how you meet this requirement for the portion of the drainage not going through the grass lined swale. Show the grass lined swale in the landscape plan. 2. Show the type of entrance driveway in the site plan to be the same as the one in the grading plan. Please return the redlined check print with the corrected plans to assist us in our review.