Loading...
HomeMy WebLinkAboutPIP 98-03; Cornerstone Corporate Centre Lot 7; Planned Industrial Permit (PIP) (6)Latitude 33 File: 255.00 July 22, 1998 Mr. Clyde Wickham CITY OF CARLSBAD Engineering and Development 2075 Las Palmas Drive Carlsbad, CA 92009- 1576 SUBJECT: PIP 98-03 Cornerstone Corporate Center Dear Clyde: We are writing this letter in response to issues raised during your review of the.PIP submittal for Cornerstone Corporate Center, Lot 7. Our response follows the order presented on that list. 1. We have proposed a new boundary adjustment for the project as a result of comments raised by the Planning Department. We had to relocate the proposed trash enclosure away from Palomar Oaks Way, in doing so we need to revise the lot lines to position the trash enclosure within Lot 7. The new boundary adjustment has been assigned No. 536 and is in second plan check. We have a building permit for Lot No. 8 and this building is currently under construction. We do not see why there would be a need to amend the Lot 8 PIP. Reciprocal access for circulation access drainage are accommodated within the project’s CC&R’s. A copy has been submitted for review and is consistent with what as reviewed and approved for the other Lots 8 and 11 which are under construction at this time. 2. We have an approved P.U.D. for this project, which shows the overall circulation, drainage, grading, etc., supporting the development of this project. This is the final lot to be developed and will complete the site improvements. Backbone grading and drainage improvements have been constructed per drawing No. 355-2A. This information has been noted on C1 of the PIP drawing. 3. Noted. We will revise the notes on the PIP drawings as suggested. 4. All driveways and intersections within 300 feet of the project will be shown on the drawings. 5. Notes 2,3, and 8 on Sheet C1 have been revised as suggested. 6. This reference has been removed from the drawing. 7. The existing 18” RCP storm drain has been removed and replaced by a 24” RCP storm drain. The existing B inlet has been modified by extending the opening, as recommended in the approved drainage study for the project. This project does not redirect drainage; it connects to the existing system as was previously designed with the original development. 4180 La Jolla Village Dr., Ste. 330 - La Jolla, CA 92037 - 619-552-0033 - Fax 619-552-0756 Mr. Clyde Wickham City of Carlsbad July 22, 1998 Page 2 We appreciate the opportunity to respond to your issues of concern regarding the project PIP. It is important to resolve these issues and obtain final approval so that the project schedule can be met. Thank you for your assistance and if you have any questions please do not hesitate to give us a call. Yours truly, Tony&onseski, P.E. Project Manager cc: Chris DeCerbo, City of Carlsbad, Planning John Couvillion, Prentiss Properties Len Zegarski, Brian Paul Associates 255\wickham.doc