HomeMy WebLinkAboutPIP 98-06; Carlsbad Palomar Business Park; Planned Industrial Permit (PIP) (2)/-
May 27,1998
TO: VAN LYNCH, ASSISTANT PLANNER
FROM: Associate Engineer Quon
CONDITIONS TRANSMITTAL
CARLSBAD PALOMAR BUSINESS PARK, PIP 98-06
The Engineering Department has completed its review of the subject project. The Engineering
Department is recommending that the project be approved subject to the following conditions:
General
46. Prior to hauling dirt or construction materials to or from any proposed construction site
within this project, the developer shall submit to and receive approval from the City
Engineer for the proposed haul route. The developer shall comply with all conditions
and requirements the City Engineer may impose with regards to the hauling operation.
FeeslAnreements
50. The developer shall pay all current fees and deposits required.
51. The owner of the subject property shall execute an agreement holding the City harmless
regarding drainage across the adjacent property.
Grading
58. Based upon a review of the proposed grading and the grading quantities shown on the
site plan, a grading permit for this project is required. The developer must submit and
receive approval for grading plans in accordance with City codes and standards prior to
issuance of a building permit for the project.
59. Prior to the issuance of a grading permit or building permit, whichever occurs first, the
developer shall submit proof that a Notice of Intention has been submitted to the State
Water Resources Control Board.
Dedicationsllmprovements
70. The developer shall comply with the City's requirements of the National Pollutant
Discharge Elimination System (NPDES) permit. The developer shall provide best
management practices as referenced in the "California Storm Water Best Management
Practices Handbook'' to reduce surface pollutants to an acceptable level prior to
discharge to sensitive areas. Plans for such improvements shall be approved by the
City Engineer. Said plans shall include but not be limited to notifying prospective
owners and tenants of the following:
A. All owners and tenants shall coordinate efforts to establish or work with
established disposal programs to remove and properly dispose of toxic and
hazardous waste products.
B. Toxic chemicals or hydrocarbon compounds such as gasoline, motor oil,
antifreeze, solvents, paints, paint thinners, wood preservatives, and other such
fluids shall not be discharged into any street, public or private, or into storm drain
or storm water conveyance systems. Use and disposal of pesticides, fungicides,
herbicides, insecticides, fertilizers and other such chemical treatments shall meet
Federal, State, County and City requirements as prescribed in their respective
containers.
C. Best Management Practices shall be used to eliminate or reduce surface
pollutants when planning any changes to the landscaping and surface
improvements.
Code Reminder
The project is subject to all applicable provisions of local ordinances, including but not limited to
the following:
79. The developer shall exercise special care during the construction phase of this project to
prevent offsite siltation. Planting and erosion control shall be provided in accordance
with the Carlsbad Municipal Code and the City Engineer.
+ Prior to issuance of building permit, the developer shall file and receive approval
of a boundary adjustment application with the City to consolidate lot lines as
shown on the site plan, and to avoid buildings being constructed over lot lines.
+ Prior to issuance of building permit, the applicant shall obtain a City right-of-way
permit for installation of driveway aprons on Loker Avenue East.
If you have questions regarding any of the comments above, please contact me at extension
4380.
KENNETH W. QUON
Associate Engineer
C: Public Works Director
Bob Wojcik, Principal Civil Engineer
COMMUNITY: CSBD PAL BUS PARK ENG CONDITIONS