HomeMy WebLinkAboutPRE 2018-0018; 2952 HARDING STREET STAND-ALONE RETAIL; Preliminary Review (PRE)DpcuSign Einvelope ID: 546E8E 10-1 A0B-49C3-A 110-3DAB4483ABF1
r-_,
CITY OF CARLSBAD APPLICATION FORM FOR PRELIMINARY REVIEW APPLICATION
CITY USE ONLY
Project Number: ~ f V 2,o I S ... o I o 2-
PROJECT NAME: 2952 Harding Street Stand Alone Retail
Assessor's Parcel Number(s): 203-355-04-00 --------------------------------
Description of proposal (add attachment if necessary): Remodel Existing 1,260 sq ft single story building with drive thru lane.
Reconstruct north wall to widen opening for drive thru lane, re facade the entire building to improve architecture and enhance building aesthetics.
Re align drive thru entry to improve vehicular turning radius and provide additional stacking length.
Would you like to orally present your proposal to your assigned staff planner/engineer? Yes [Z] No
Please list the staff members you have previously spoken to regarding this project. If none, please so state.
Scott Donnell.
OWNER NAME (Print): Walek Family Liv Trust/Talley Trust
MAILING ADDRESS: 1875 Business Center Dr
CITY, STATE, ZIP: San Bernardino, CA 92408
APPLICANT NAME (Print): Sycamore Group LLC
MAILING ADDRESS: 10 Sycamore Canyon Dr
CITY, STATE, ZIP: Dove Canyon, CA 92679
TELEPHONE: 949-357-9015
□
TELEPHONE: 1'f°f _ Cj L/$-07;2.ol.,, --------------EMAIL ADDRESS: pt4mark@aol.com EM A IL ADDRESS: william@lagunacg.com
*Owner's signature indicates permission to conduct a
preliminary review for a development proposal.
I CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE
ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE
M,'t;~~G){VLEDGE. 5/24/2018 I 08: ~ CR!))RRECT TO THE BEST59~~1di~or1~?¥dh2
"V\A .._ ~,_J,1-~ 5/24/:liWB2QHi2:37:31 PDT ~ 5/24/2015 PDT
l..fil~!"tY8j4Eo DATE SIGNATURE DATE
APPLICANT'S REPRESENTATIVE (Print): William Nascimento ------------------------------MA I LING ADDRESS: 10 Sycamore Canyon Dr
CITY, STATE, ZIP: Dove Canyon, CA 92679
TELEPHONE: 949-357-9015
EMAIL ADDRESS: william@lagunacg.com
I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE
APPLICANT AND THAT ALL THE ABOVE INFORMATION IS TRUE AND
CORRECT TO THE BEST OF MY KNOWLEDGE.
~ 5/24/2018 I 12:38:12 PDT
SIGNATURE DATE
IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF TO INSPECT
AG~ifilg~dT~E PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. IMJE CONSENT TO ENTRY FOR THIS PURPOSE.
,11. ~-L ~1 -5/24/2018 I 08: 38: 53 PDT V"'... .--,,~ 5/24/2018 I 12:37:31 PDT
CFD28CC3.f?R@f>ERTY OWNER SIGNATURE
FEE REQUIRED/DATE FEE PAID:
RECEIVED BY:
P-14
c:>O -
Page 3 of 3
REC~l\lED
MAY 2 4 2018
CITY OF CAt<.LSf\L\0
PLANNING OIVl~>\ON Revised 02/13
DocuSign linvelope ID: 546EBE1D-1A0B-49C3-A110-3DAB4483ABF1
{._ City of
Carlsbad
PRELIMINARY REVIEW
SUBMITTAL PROCEDURES
AND CHECKLIST
P-14
WHAT is a Preliminary Review?
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.gov
It is an early, informal review of your project by the Planning, Land Development Engineering,
Building and Fire Divisions prior to a formal application submittal. The Preliminary review is
required for projects within the CommercialNisitor-Serving Overlay Zone.
WHY should you do a preliminary review?
• To obtain early project direction
• To reduce your development costs
• To shorten your processing time
• To alleviate costly redesigns
• Required for projects in the CommercialNisitor Overlay Zone
• Required for affordable housing projects
WHAT you need to give us:
•
•
•
•
•
Application form (signed by the owner(s) of the property unless applicant has
sufficient legal interest in the property.)
Checklist
Four (4) sets of your site plan folded to 8½ x 11. Provide enough details to allow staff to
adequately review your plans and answer your questions. Projects within the
CommercialNisitor-Serving Overlay Zone shall provide conceptual building elevations
Fee (See current fee schedule for cost)
Other information you want to provide to explain your proposal
WHEN and WHERE to submit:
Your application may be submitted at the Planning Division counter at 1635 Faraday Avenue, from
7:30 a.m. to 4:30 p.m. Monday through Thursday or 8:00 a.m. to 4:00 p.m. on Friday.
HOW your application is processed:
After a submittal is made, a staff planner and staff engineer will be assigned to take your project to
their respective staff meetings for review. You may either make a brief presentation prior to the
staff meeting to discuss your project with your staff planner and engineer or after the receipt of a
response letter from the City to discuss the staff comments. If you indicate this on the application
form you will be contacted to set up a meeting time.
Written responses to your submittal will be mailed following the staff meeting review and should be
received by you within thirty days after the application date. A copy of your project will be kept on
file in the Planning Division.
Should you submit a formal application in the future, the Planning Division will make every attempt
to assign the application to the same staff planner who processed your Preliminary Review
Application.
The preliminary review does not represent an in-depth analysis of your project. The completeness
and accuracy of your submittals will dictate the quality of your project's preliminary review.
Additional issues of concern may be raised after your application is formally submitted and
processed for a more specific and detailed review.
P-14 Page 1 of 3 Revised 02/13
D'.:lcuSign envelope ID: 546E8E1D-1A0B-49C3-A1 ~DAB4483ABF1
PRELIMINARY REVIEW CHECKLIST
Staff would like to know what information you primarily want from this review. With this known, we
can focus most of our attention on researching and answering your main questions(s). Please
check the one or two boxes below which best describes the information you would like us to
concentrate on, and/or check the box marked "other" and tell us in your own words what
information you would like from us.
□
□
SITE DESIGN:
Focus is on reviewing issues such as development standards (setbacks, building height,
etc.), hillside compliance, landscaping, signage, open space requirements, and other
physical aspects of zoning. Plans adequately illustrating these features are needed for
review.
LAND USE:
Focus is on determining the compatibility of the proposed land use with the existing general
plan and zoning designations, determining whether staff could support a general plan
amendment or zone change, and determining compatibility of the proposed land use with
surrounding land uses.
□ ARCHITECTURE:
Focus is on establishing quality architecture and checking its compatibility with the
surrounding area and against any applicable guidelines or plans. Building elevations or other
architectural information are needed for review.
□ ZONING INTERPRETATIONS:
Focus is on interpreting any aspects of the zoning ordinance.
□ LAND DEVELOPMENT ENGINEERING STANDARDS:
Focus is on reviewing all engineering-related issues, such as grading, drainage, Best
Management Practices for Storm Water Pollution Control, circulation and traffic, street
vacations, easements, subdivisions, etc.
~ OTHER:
P-14
In the space below, please list any other issues you would like us to review.
Review renovation architecture and site plan to ensure that
existing entitlements are preserved. Review exterior facade
renovation, and building footprint adjustment to accommodate
12' drive thru lane and concur that it does not trigger loss of
entitlement. Review site plan which includes improved drive
thru lane entry and radius, and widened lane to ensure existing
entitlements are preserved.
Page 2 of 3 Revised 02/13