HomeMy WebLinkAboutPRE 2019-0018; JUNIPER CONDOMINIUMS; Preliminary Review (PRE),,
CITY OF CARLSBAD APPLICATION FORM FOR PRELIMINARY REVIEW APPLICATION
CITY USE ONLY
Project Number: () G 2-() I Development Number: b~v' 'U> \ ,9-o ,~~
PROJECT NAME:
Assessor's Parcel Number(s): .Z.. O 4 -1-31....-oq -cl ,Z,.o4-1-;-2 -o1-ot. -Z..04-"2.3'2-0°I '3,
Description of proposal (add attachment if necessary):
f~l! ~~ ~
Would you like to orally present your proposal to your assigned staff planner/engineer? @ □ □
No
Please list the staff members you have previously spoken to regarding this project. If none, please so state.
C 1-/-/2-I <S
OWNER NAME (Print): CslJN-tJ!Z.. ~vtZ~E!,
MAILING ADDRESS: ( fo ~ v t-J \ f' ~ Avr£
CITY, STATE, ZIP: C-Aa-1-"3,f!>p,,0 ~ A Cf~
TELEPHONE: "2-1 "3 q ,u,,-4~t'?
EMAIL ADDRESS:
*Owner's signature indicates permission to conduct a preliminary
review for a development proposal.
I CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE
ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST
o~~~~ ~,-~ 1-ti;-~,
SIGNATURE DATE '
APPLICANT NAME (Print): \)Oµ l.-c,t?f-jf:-'(
MAILING ADDRESS: 1-q 4,; ~ I >JG, ~ ~ I (
CITY, STATE, ZIP: C.Al2.( .. .S (3AO £ C 4 q.-z~of5
TELEPHONE: 7 6o 4 34--,q b b
EMAIL ADDRESS: DoN. t>L-O~c;;l4'N a)
'/Alfot>,, c.o M
I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE
OW,Pjtt=rt~ND JHA1 ALL THE ABOVE INFORMATION IS TRUE
N O RE TT THE BEST OF MY KNOWLEDGE. 1.z,. ZDl<J
DATE
APPLICANT'S REPRESENTATIVE (Print): _..,..ca=·-·· ...;:~::;...;..'/v""'"--_""'L-_tt:> ____ CJ_~ __ .... Y _____________ _
~q4-,:; ~ttvtr 'S"r ~2--tl MAILING ADDRESS:
CITY, STATE, ZIP:
TELEPHONE:
EMAIL ADDRESS:
IN THE PROCESS OF REVIEWING HIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF TO INSPECT
AN?J:NTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. INI/E CONSENT TO ENTRY FOR THIS PURPOSE. ~✓h1-~
PROPERTY OWNER SIGNATURE
FEE REQUIRED/DATE FEE PAID: _<fL___.1.1_1L._Cf'..!....:_'-~----,_.!..,.../-=s_._!-+/__,l'-"'fl:::,__ ____ -..--;:---:,----------G'A~ 04 JUL 3 I 2019 RECEIVED BY:
P-14 Page 3 of 3
CITY OF-CA~"<LSB/\D
PLANN!f', ; · ,1,110: 't'··,, .. I ., ' .. ·''"
Revised 07/17
PRELIMINARY REVIEW CHECKLIST
Staff would like to know what information you primarily want from this review. With this known, we
can focus most of our attention on researching and answering your main questions(s). Please check
the one or two boxes below which best describes the information you would like us to concentrate
on, and/or check the box marked "other'' and tell us in your own words what information you would
like from us.
0 SITE DESIGN:
Focus is on reviewing issues such as development standards (setbacks, building height, etc.),
hillside compliance, landscaping, signage, open space requirements, and other physical
aspects of zoning. Plans adequately illustrating these features are needed for review.
0 LANDUSE:
Focus is on determining the compatibility of the proposed land use with the existing general
plan and zoning designations, determining whether staff could support a general plan
amendment or zone change, and determining compatibility of the proposed land use with
surrounding land uses.
0 ARCHITECTURE:
Focus is on establishing quality architecture and checking its compatibility with the surrounding
area and against any applicable guidelines or plans. Building elevations or other architectural
information are needed for review.
0 ZONING INTERPRETATIONS:
Focus is on interpreting any aspects of the zoning ordinance.
0 LAND DEVELOPMENT ENGINEERING STANDARDS:
P-14
Focus is on reviewing all engineering-related issues, such as grading, drainage, Best
Management Practices for Storm Water Pollution Control, circulation and traffic, street
vacations, easements, subdivisions, etc.
OTHER:
In the space below, please list any other issues you would like us to review.
Page 2 of3 Revised 07/17
,----, ..------------= .. ;;...• ------~
July 31th, 2019
PROJECT: Juniper Ave condominiums elevator and stairs
SUBJECT: Preliminary review, 140 Juniper Ave
Project Description
Replace existing egress stair with new. New accessible elevator, New +/-300 sf of non-habitable
circulation area.
Replace non code compliant stair at north side of building with new. Add 3rd level deck+/-250sf at
north side of building.
Questions
Will zoning allow the new stair tower & elevator to be above the 24 ft height limit but under the existing
height of the existing building?
Will zoning allow the new deck railing on the north side of the building to exceed the 24ft height limit?
Sincerely,
Don Looney
don.dldesign@yahoo.com
760 434-7966
Don Looney Architect
DON LOONEY ARCHITECT, INC. ♦ 2945 HARDING ST., #211 ♦ CARLSBAD, CA 92008
don.dldesign@yahoo.com
(760) 434-7966
1