Loading...
HomeMy WebLinkAboutPS 90-19; Remote Control; Sign Permits/Programs (PS)City of Carl sbad % 2075 Las Palmas Drive I@ Carl sbad, CA 92009 (619) 438-1161 SIGN PROGRAM FEE $150.00 RECEIPT NO. %-ST APPLICANT MUST SUBMIT THREE (3) SETS OF SIGN/SITE PLANS. Average processing Time: 2 weeks NAME OF PROJECT: kb& r0hk-e ADDRESS OF PROJECT: F7ap kcCd cf- NAME AND PHONE NUMBER OF APPLICANT: flxl- /05/3tf14ffl 823 d3/09. U.C. 9+V PLANNING CASE NUMBER: SIGN TYPE: @ Commercial (b) Industri a1 (c) Residential 47y-ywC, (e) Real Estate (e) Freeway (f) Marquee (9) Community identity (h) Service Stn. Prices (I) Campaign SIGN PROGRAM AND/OR SPECIFIC PLAN CRITERIA: Yes No - SPECIFIC PLAN NUMBER VILLAGE REDEVELOPMENT AREA Yes No - **REQUIRES VR APPROVAL SIGN ORDINANCE: Yes J No - COASTAL ZONE: Yes NO //COASTAL PERMIT Yes No - EXISTING SIGNS: TvDe Number Size PERMITS ISSUED FOR EXISTING SIGNS: Yes / No - Date REMAINING SIGN ALLOWANCE (AT PRESENT) : PROPOSED SIGN: 32 REMAINING SIGN ALLOWANCE (AFTER THIS SIGN): BUILDING FRONTAGE: (Building street frontage) 176 ft. EXISTING SIGNS (SQ. FT.): 32 sq. ft. sq. ft. sq. ft. sq. ft. PLANNER CHECK LIST: 1. Field check by pl anner. 2. Within maximum length, area. 3. Style consistent with Specific Plan criteria, if applicable. 4. Location: In right-of-way In visibility triangle at corner On roof visibility issues. 5. Pole and monument signs to be checked by Bob Johnson, Traffic Engineer, for APPROVED: P1 anner : Date: qd&o "3 t y "2 c4 L e, w 0 iL a I I23 rn Q c I + c I I II I I '. I t I 5. i THE CITY OF SAN DIEGO CITY OPERATIONS BUILDING 1222 FIRST AVENUE SAN DIEGO ~ALIFQRNIA BUI LDlNG INSPECTION DEPARTMENT T __ Mortar or rnasonrv cap 2'- O"moximorn when stcel required A- *3 bar or top course Locote steel in center of wall I ladder mesh under the City of San Oiego Inspection Department. I 5" 0" . ~"concrete i I 1 Block I 8" 8" 4" None CONCRETE FOR FOOTING, 1 Part cement 2% parts sand 3% parts gravel. MORTAR MIX: 1 Part cement 'A to 72 part hydrated lime or lime putty. 3%2 parts sand or 1 part plastic cement and 3 parts sand. GROUT: Same as mortar mix, water added to pouring consistency. All cells containing StceI to be solidly filled with grout. Rod or vibrate grout within 10 rnin. of pouring to in:urc solid consolidatiorl. INSPECTIONS: 1. -Call for foundation inspl ction afier footing har t:c,p!; forn-1c.d and steel is tied securely in final position, and before olaoir;g concrete. 2. Call for second inspcction after thc blocks have bcc,:l laid ulj to t thc full height of thc wall, with steel in plxe. but b!:forc thc grout ';* is poured. 3. Call for final inspcction clltvl all work is conlplctctl. 7-75 MASONRY FENCE DETAILS BID-7