Loading...
HomeMy WebLinkAboutPS 95-43; SDG&E; Sign Permits/Programs (PS) (4)ADDRESS P HONZ APPLICANT i SIZt LOCATION - SDGE' San Diego Gas & Electric LETTER OF TRANSMITTALICOMMUNICATION DATE: TRANSMITTAL PURPOSE: - d FOR YOUR ACTION REFERENCE DPSS NO.: I u FOR REVIEW & COMMENT u APPROVED AS SUBMITTED - - u A CONFIRMATION L. APPROVED AS NOTED 8 RTTENTION: - m6, TW. 0 MAKE CORRECTIONS AS NOTED 0 REJECTED SUBJECX I NO. OF COPIES I DESCRIPTION I GENERAL REMARKS 0 ENCLOSURE - IF ENCLOSURES ARE NOT AS NOTED, PLEASE NOTIFY US AT ONCE 0 SAN DIEGO DISTRICT OFFICE 0 PROJECT MANAGEMENT - METRO 0 PROJECT MANAGEMENT - ORANGE COUNTY 101 ASH STREET 701 33RD STREET 662 CAMINO DE LOS MARES PO. BOX 1831 SAN DIEGO, CA 92102-3341 SAN CLEMENTE, CA 92673-2827 SAN DIEGO, CA 92112-4150 0 PROJECT MANAGEMENT - NORTHERN ELECTRIC SYSTEM DESIGN 1623 WEST MISSION ROAD 8316 CENTURY PARK COURT ESCONDIDO, CA 92029-1109 FORM 124-12203G (047904) 0493 SAN DIEGO, CA 92123-1582 .. , I --- 1. ~-"------ /- .. , : , . . , . . . .. . - 1 * CITY OF CARLSBAD REQUEST FOR REFUND 880-519-9258-0000 ' Account No. Vendor No. Amount of Refund Fee Paid For: Signs in Ripht-of-Way by SDGdE Date Fee Paid: 09/11/95 Facts Supporting Request: F~~ paid gY: San Diego Gas & Electric Company - PS 95-43 All signs removed. Name of Applicant: San Diego Gas & Electric - Mark Chomyn 2732, Address: PO BOX 1831 San Diep;o CA 92112-4150 (619) 696 3868 - Street City State Zip Telephone Sianature of ADplicant: Date \bid 44 " .. r Dept. Justification: n I<, "klA&&@,\,W I 0/&"~ Rec: Approve 0 Disapprove 'Ddte .. . . . . . . . . ,. NOTICE OF PROPOSED CONSTRUCTION Batiquitos 138 kV Underground Transmission Line CPUC Advice Letter Number 956-E Proposed Project: San Diego Gas & Electric (SDG&E) plans to construct a new underground 138 kV transmission line between the existing Batiquitos Substation and an existing transmission line. The new underground line will be approximately 0.7 miles long. The line will be constructed within portions of two existing transmission ' rights-of-way and along Alga Road and Alicante Road within the City of Carlsbad. Construction activities will include approximately 600 feet of trenching in portions of the two existing rights-of-way, and approximately 3200 feet of trenching in Alga Road and Alicante Road to install vaults and conduits. Trenching within existing rights-of-way will occur in disturbed or cleared areas such as access roads. After all conduits and vaults are installed and trenches backfilled, the underground cable will be installed. Construction will also include installing one steel riser pole and replacing two steel pole structures in the existing transmission line, near the intersection of Alicante Road and Altisma Way. The estimated construction period will be August 1, 1996 through June 1, 1997. However, actual construction is expected to occur only about'seven monttis during this period and possibly less if some construction activities can be performed concurrently. Magnetic Field Management: The California Public Utilities Commission (CPUC) requires SDG&E to employ "no cost" and "low cost" measures on new projects to reduce public exposure to magnetic fields. In accordance with S,DG&E's "EMF Design Guidelines for Transmission, Distribution, and Substation Facilities", filed with the CPUC in compliance with CPUC Decision 93-1 1-013, SDG&E will take the following measures for this project: 0 Rearrange underground conductors in a triangular configuration. 0 Increase depth of underground conductor installation. 0 Rephase existing overhead conductors to a low magnetic field configuration in the existing utility corridor immediately adjacent to the Batiquitos Substation. Exemption from CPUC Authority: Pursuant to CPUC General Order 131 -D, Section Ill, B.1, projects meeting specific conditions are exempt from the CPUC's requirement to file for an application requesting authority to construct.' SDG&E believes this project is qualified for the following exemption: This power line will be constructd entirely in an existing franchise and ar: existing utility easement and therefore is exempt in accordance with CPUC General Order 131-D, Section 111, B.l .g. Public Review Process: Persons or groups may protest the proposed construction if , they believe that the utility has incorrectly applied for an exemption or believe there, is reasonable possibility that the proposed project or cumulative effects or unusual circumstances associated with the project may adversely impact the environment. Protests must be filed by October IO, 1995 and should include the following: 1. Your name, mailing address, and daytime telephone number. 2. Reference to the CPUC Advice Letter Number 956-E and Project Name, Batiauitos 3. ~ A clear description of the reason for the protest. 138 kV Underaround Transmission Line. The letter stiould also indicate whether you believe that evidentiary hearings are necessary to resolve factual disputes. Protests for this project must be mailed within 20 calendar days to: California Public Utilities Commission Patricia Fleming CACD, Deputy Director AND San Diego Gas'& Electric 505 Van Ness Avenue, 3rd Floor 101 Ash Street San Francisco, CA 94102 P. 0. Box 1831 San Diego, CA 921 12-9241 SDG&E must respond within five business days of receipt and serve copies of its response on each protester and the CACD. Within 30 days after SDG&E has submitted its response, the Executive Director of the CPUC will serid you a copy of an Executive Resolution granting or denying the request and stating the reasons for the decision. Assistance in Filing a Protest: For assistance in filing a protest, contact the CPUC Public Advisor in San Francisco at (415) 703-2074 or in Los Angeles at (213) 897- 3544. Additional Project Infotmation: To obtain further information on the proposed project, please contact: Paul O'Neal, SDG&E's Public Affairs Representative at (61 9) 438-61 I 1.