Loading...
HomeMy WebLinkAboutPUD 92-03B; Parkside; Planned Unit Development - Non-Residential (PUD)me City of CARLSBAD Planning Departm A REPORT TO THE PLANNING COMMISSION P.C. AGENDA OF: February 17,1999 Item No. Application complete date: Project Planner: Project Engineer: April 1, 1998 Jeff Gibson Mike Shirey SUBJECT: CT 92-02fBVPUD 92-03(BVSDP 92-06(CVCDP 99-05 - PARKSIDE - Request for a Tentative Tract Map Revision, Planned Development Permit Amendment, Site Development Plan Amendment, and a Coastal Development Permit to develop 48 single-family units on a 7.5 acre graded site located on the southeast corner of Hidden Valley Road and Plum Tree Road, within Local Facilities Management Plan Zone 20. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolutions No. 4456, 4457, 4458, and 4486 APPROVING CT 92-02(B), PUD 92-03(B), SDP 92-06(C), and CDP 99-05 based upon the findings and subject to the conditions contained therein. II. INTRODUCTION The application is a request for a revised tentative map and an amendment to a Planned Development Permit, Site Development Plan, and a Coastal Development Permit for Planning Area "D", which is a small part of the larger Sambi Seaside Heights project (see attached exhibits). The original project, Sambi (CT 92-02), was approved by the City Council in March 1994 and included 349 dwelling units. In 1996 the City Council approved an amendment to the Sambi project (Sambi Seaside Heights - CT 92-02(A)) which reduced the Sambi project's total dwelling units to 277. The proposed revisions and amendments (CT 92-02(B)) to Planning Area "D" would result in the replacement of the 58 approved twin-home units with 48 single-family homes. This latest amendment request would reduce the overall Sambi Seaside Height's total dwelling units from 277 to 267 units. Planning Area "D" is located at the southeast comer of Hidden Valley Road and Plum Tree Road and is within the Coastal Zone and Specific Plan 203(A). Planning Area "D" is graded into a large flat and vacant building pad. The necessary surrounding infrastructure, including public streets, curbs and gutters, has been constructed. Affordable townhomes are currently being constructed in Planning Area "A" to satisfy the inclusionary housing for the entire Sambi Seaside Heights project, including the requirements for Planning Area "D". The project complies with City standards and all the necessary findings can be made for the approvals being requested. In conclusion, staff believes that the project has addressed all issues and, therefore, recommends approval. (WSDP 92-06(C)/CDP 99-05 - PARKSlSCT 92-02(B)/PUD 92-03(^SDP 92-06(C)/CDP 99-05 - PARKSI February 17, 1999 Page 2 III. PROJECT DESCRIPTION AND BACKGROUND The project site, approximately 7.5 acres in size, is located on the southeast corner of Hidden Valley Road and Plum Tree Road, and is within the Coastal Zone and Specific Plan 203(A). The site has been rough graded into a large flat building pad and all the public roadway (Hidden Valley Road & Plum Tree Road) and utility (sewer, drainage, & water) infrastructure around the parcel has been constructed. All the proposed development would occur within the boundaries of the existing rough graded pad area. The surrounding neighborhood consists of a graded and vacant 1.8 acre community facility site to the north, single-family homes on 7,500+ square foot lots to the east, a vacant 8 acre elementary school site to the south, and Poinsettia Community park to the west. The site is zoned RD-M-Q and the project consists of 32 foot wide private streets with sidewalks on both sides leading to 48 single-family air space condominium units containing from 3,500 to 5,300 square feet of exclusive use yard area. There would also be two common passive neighborhood recreational areas totaling 8,125 square feet in size and a 1,050 square foot recreational vehicle storage area. The proposed two-story homes would range in size from 1,880 to 2,251 square feet and range in height from 25 to 26 feet. The proposed products include four floor plans (each with different architectural treatments). They would also contain two-car attached garages. The architectural style is generally described as a mix of beach cottage, craftsman, and Spanish motif with concrete tile roofing, stucco building walls, exposed rafter tails, paned windows, wood fascia, wood shutters, and gabled roofs. All homes feature front porches or second story balconies. Garages (many with "Pasadena" driveways) are recessed 5 to 58 feet from the front of the houses which creates the opportunity for additional off-street guest parking. Each home will have a minimum 15' x 15' private rear yard. The site plan consists of a private street leading from Plum Tree Road. The homes are situated along this private street which forms a circular loop through the 7.5 acre site. The Parkside project is an amendment to plans approved by the Planning Commission and City Council and includes the following comparative features: A. A reduction from 58 approved twin-home units on small lots to 48 proposed single- family air space condominium units; B. An increase in the common recreational area from 6,724 square feet to 8,125 square feet; C. A reduction in the building height from 28 feet to 25 to 26 feet; D. The addition of a perpendicular guest parking bay with 5 parking spaces; and, E. An enhanced street scene with traffic calming median islands in the private street, two-car garages located near the rear of the homes and away from the private street, and the addition of some turf lined "Pasadena" driveways. IV. ANALYSIS The project is subject to the following regulations and requirements: A. Carlsbad General Plan - RM (Residential Medium Density) designation; CT 92-02(B)/PUD 92-03 February 17, 1999 Page 3 i/SDP 92-06(C)/CDP 99-05 - PARKS B. Specific Plan 203(A) (Zone 20 Specific Plan); C. Planned Development Ordinance (Carlsbad Municipal Code Chapter 21.45) and, RD-M- Q Zone (Carlsbad Municipal Code Chapter 21.10 and Chapter 21.06); D. Subdivision Regulations (Carlsbad Municipal Code Title 20); E. Mello II Segment of the Carlsbad Local Coastal Program; and, F. Growth Management. The recommendation for approval for this project was developed by analyzing the project's consistency with the applicable regulations and policies. The project's compliance with each of the above regulations is discussed in detail in the sections below. A. General Plan The General Plan land use designation for the Parkside property is Residential Medium (RM). The City Council approved Specific Plan 203 (A) in 1996 and made the finding that the specific plan implements the General Plan and is consistent with the goals, objectives, and policies of the General Plan. The finding was based on the fact that the specific plan provides for the following: (1) the provision of the necessary circulation element roadways and improvements (Aviara Parkway, Hidden Valley Road, and Poinsettia Lane); (2) the protection and enhancement of the native habitat areas; (3) the provisions for affordable housing; and (4) compliance with the Local Facilities Management Plan Zone 20 for public facilities and services, including utility infrastructure (sewer, water, drainage), open space, a park, and a school. Based on this implementation and consistency relationship between Specific Plan 203(A) and the General Plan, it can be assumed that if the Parkside project is consistent with the specific plan it is also consistent with the General Plan. B. Specific Plan 203(A) The project is located within Specific Plan 203(A) which provides a framework for the development of the vacant properties within Zone 20. The plan ensures the logical and efficient provision of public facilities and community amenities for the residents of the planning area. The Parkside project is consistent with Specific Plan 203(A) and meets all applicable requirements as demonstrated in Table A below: Table A - SPECIFIC PLAN 203(A) COMPLIANCE STANDARD Land Use - Residential Medium 6 du/ac/RD-M-Q Inclusionary Housing - 15% of all market rate dus PROPOSED Single-family at 6.4 du/acre Clustered development with transfer of density via PUD 42 affordable housing units under construction - Area "A" COMPLIES? Yes Yes CT 92-02(B)/PUD 92-03 February 17, 1999 Paee4 DP 92-06(C)/CDP 99-05 - PARKS Architectural Standards: Window/door enhancements Individualized entry treatments - Articulated building forms - Curvilinear street design - Recessed windows with border treatment/several door styles with differing details 4 plans, each with 3 different front building elevations (see Table B small lot guidelines) Circular looping street system Yes Yes Yes Landscaping:Landscaped slopes, project entryway, and front yards with a combination of trees, shrubs and ground cover Yes Special Design Criteria: Enhanced Street Planting Hidden Valley Road - Earth Tone Roof Colors - Street trees, ground cover Valley Road shrubs, and along Hidden Grey-green/grey- brown/brown-red Yes Yes C. Planned Development & RD-M-Q Zone The utilization of the Planned Development (PD) Ordinance in conjunction with the tentative map for this project provides a method to approve the separate ownership of the air space condominium single-family homes located on the one common 7.5 acre lot. Planning Area "D" currently has an approved PD Permit (PUD 92-03 (A)) for 58 twin-home units and the Parkside project represents an amendment to that permit. The zoning for the property is RD-M-Q and the RD-M zone allows one-family homes, in addition to two-family and multiple-family product types. The PD Ordinance states that, in addition to the general provisions and development standards in the PD regulations, the requirements of the underlying zone shall also apply. In general, the City's PD regulations supersede the development standards contained within the RD-M zone. However, where the PD regulations are silent, the RD-M zone is in effect. Single-family units may be clustered using any of several options and variations of the standard PD regulations for lot size, setbacks, and lot frontage. In return for these more flexible regulations, the City Council, via its Policy 44, established special architectural guidelines for small lot subdivisions. These guidelines require the project's architecture to be enhanced on certain percentages of the homes. Among other things, the enhancements include requirements for a minimum number of offsetting planes in both front and rear building elevations and roof lines. Based on all this, the project meets or exceeds all applicable requirements of the PD regulations, the RD-M-Q Zone, and the small lot single-family guidelines as demonstrated in Table B below. CT 92-02(B)/PUD 92-0 February 17, 1999 Page 5 i)/SDP 92-06(C)/CDP 99-05 - PARKSJTOE Table B - DEVELOPMENT STANDARDS STANDARD Min lot area: (PD) 3,500 sq. ft. Setbacks (Minimum) Front (PD) (off private street) Garage: 20 ft. Home: 10 ft. with 15 ft average Front (off public street): (RD-M) 20ft. Street Side - Hidden Valley Road: 10 ft. Interior Side: 5 ft. Rear: 10ft. Min distance between structures: (PD) 10ft. Parking (PD) Resident: 2 covered spaces per unit - 96 spaces Visitor: 15 spaces RV Storage: (PD) 960 sq. ft. Storage Space: (PD) 480 cf/du Height Limit: (PD) 30 ft. Private Street: (PD) 30 ft. min Common Rec. Area (PD) 200 sq. ft./du = 9600 sq. ft. Private Passive: Rear Yard 15x1 5 ft. S.F. Common, Passive: 4,800 sq. ft. PROPOSED 3,500 - 5,300 sq. ft. exclusive use yard area** 20ft. 10ft. with 15 ft. average 20 ft. from Plum Tree Rd 30 ft. from Hidden Valley Rd 50ft. 10ft. 10ft. Two-car garage per home 25 spaces -along private street and in parking bay 1,080 sq.ft. .- provided within individual two-car garages 25 - 26 ft. 32 ft. wide, parking one side 15x15 ft. rear yards - 225 sq. ft. x 48 = 10.800 sq.ft. 8.125 sq. ft. COMPLIES? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes ** Note - With an air space condominium project there is one large common lot. Residents own the structure and the air space within their single-family home. They do not own the land under or around it. To meet the intent of the PD regulations for single-family development, the Planning Department requires that each home have a minimum of 3,500 sq. ft. of area under and around the home for the exclusive use of the homeowner. This exclusive use right is established, defined, and protected through the project's approved site and landscaping plan, conditions of approval of the tentative map, and eventually the required CC&Rs. The project entry area, streets, slopes, front yard landscaping, drainage facilities, and other common areas will be maintained by the homeowners' association. Rear and side yard landscaping will be maintained CT 92-02(B)/PUD 92-03 February 17, 1999 Page 6 (™SDP 92-06(C)/CDP 99-05 - PARKSID? by the individual homeowner. The zoning for the property includes the Qualified Development Overlay Zone (Q) which also requires the processing of a Site Development Plan. The Q Overlay ensures compatibility with the public park and surrounding development, as well as requiring attractive and harmonious site design. A Site Development Plan has been submitted with the project in compliance with Chapter 21.06. D. Subdivision Regulations The Engineering Department has reviewed the proposed project and has concluded that it complies with all applicable requirements of the Subdivision Map Act and the City's Subdivision regulations as designed and conditioned. The project will not result in any environmental damage to the site since it contains no sensitive species or habitat. The site is of sufficient size and configuration to accommodate the proposed development while complying with all development standards, including structure setbacks and separation requirements. The proposed building height, setbacks, structure separations, and the design of the homes will allow adequate opportunities for passive heating and cooling. The project is conditioned to require and install private interior street improvements to a 32 foot wide right-of-way, including curbs, gutters, parkways, sidewalks, street lights, and fire hydrants. Adequate drainage facilities will be provided and maintained by the project's homeowners' association. The existing slopes within the project site have terrace drains; the homes will have roof drains; and there will be subterranean drains in the rear and side yards to protect the yards from flooding. Hidden Valley Road, Plum Tree Road, and the associated frontage improvements and utilities for Planing Area "D" have all been constructed and would adequately serve the needs of the project. E. Mello II Segment The project is located within the Coastal Zone. A coastal development permit for the approved Sambi Seaside Heights project (CT 92-02(A)), which included the subdivision of the original 68 acre property into separate legal lots, infrastructure location and construction, and mass grading was issued by the California Coastal Commission. The permit was approved based on findings of project consistency with the policies and standards of the Mello II Coastal Resource Protection Overlay Zone and Coastal Agricultural Overlay Zone. The City of Carlsbad has taken over permit jurisdiction in the coastal zone, therefore, since the proposed project does not change or affect the original coastal development permit the changes will be subject to a new coastal development permit reviewed by the Planning Commission. The Sambi Seaside Heights project, including Area "D", has been mass-graded in compliance with the approved coastal development permit. The project was conditioned to mitigate impacts to sensitive coastal resources including riparian and coastal sage scrub habitat. The required project resource mitigation, including receipt of various Federal and State permits and the purchase of mitigation credits from the Carlsbad Highlands Mitigation Bank have already been implemented. The Sambi Developer has also paid the required "Agricultural Conversion Mitigation Fee" to the California Coastal Conservancy. The project site is already graded, and contains no native habitat. The project will not impact agricultural resources or operations in the area. The site is not located in any coastal viewshed CT 92-02(B)/PUD 92-03W/SDP 92-06(C)/CDP 99-05 - PARKSlK February 17, 1999 Page? area and will not negatively impact coastal view resources. The project must comply with the City's Storm Water Management Ordinance and meet all standards of the City's NPDES Permit to reduce urban pollutant runoff from the site. Therefore, the project is in compliance with the Mello II Segment policies and will not negatively impact the resources of the Coastal Zone. F. Growth Management An amendment to the Local Facilities Management Plan for Zone 20 was approved concurrently with Specific Plan 203(A). At that time all facility impacts were analyzed and it was determined that all facilities would be provided prior to or concurrent with need pursuant to the facilities performance standards of Growth Management. Since the proposed project is consistent with the specific plan in which all facilities were determined to be in compliance with adopted performance standards and the project has been conditioned to comply with all requirements of the LFMP for Zone 20, no further growth management analysis is necessary. Facility impacts are noted on the attached Local Facilities Impacts Assessment Form. V. ENVIRONMENTAL REVIEW The proposed project was included in the Program EIR prepared with Specific Plan 203. The Program EIR addressed subsequent discretionary approvals of the specific plan, including actions such as tentative maps and site plans. The proposed project is consistent with the land uses, design guidelines, and facility improvements required in the specific plan. No new impacts are anticipated and no new mitigation measures are necessary, therefore, no further environmental review is required. Through an Initial Study, the Planning Director has determined that the proposed residential project is pursuant to and in conformance with Specific Plan 203 for which a Program Environmental Impact Report was prepared and certified, therefore, the project is exempt from further environmental review under Section 15182 of the California Environmental Quality Act. ATTACHMENTS: 1. Planning Commission Resolution No. 4456 (CT) 2. Planning Commission Resolution No. 4457 (PUD) 3. Planning Commission Resolution No. 4458 (SDP) 4. Planning Commission Resolution No. 4486 (CDP) 5. Location Map 6. Background Data Sheet 7. Disclosure Statement 8. Local Facilities Impact Assessment Form 9. Exhibit "XX", Sambi Seaside Heights 10. Reduced Exhibits 11. Exhibit "YY" Maintenance Responsibility 12. Small Lot Single-Family Architectural Guidelines Summary 13. Full Size Exhibits "A" - "Z" dated January 20,1999 JG:eh:mh r i i i PARKSIDE CT 92-02(B)/PUD 92-03(B)/ SDP 92-06(C)/CDP 99-05 BACKGROUND DATA SHEET CASE NO: CT 92-02(BVPUD 92-03(BVSDP 92-Q6(CVCDP 99-05 CASE NAME: PARKSIDE APPLICANT: SHEA HOMES REQUEST AND LOCATION: 48 single-family homes on a previously graded 7.5 acre lot located at the southeast comer of Hidden Valley Road and Plum Tree Road LEGAL DESCRIPTION: Lot 141 of CT 92-02. City of Carlsbad. San Diego County. State of California, according to Map No. 13378. filed in the office of the County Recorder. December 9. 1996. APN: 214-544-04 Acres: 7.5 Proposed No. of Lots/Units: 48 units GENERAL PLAN AND ZONING Land Use Designation: Residential Medium Density Allowed: 4-8 du/acre Density Proposed: 6.4 du/acre - Clustered development Existing Zone: RD-M-0 Proposed Zone: N/A Surrounding Zoning and Land Use: (See attached for information on Carlsbad's Zoning Requirements) Zoning Land Use Site RD-M-Q RM/VACANT North RD-M-Q .^ KM/COMMUNITY FACILITY SITE South RD-M-Q RM/SCHOOL SITE East RD-M-Q RM/SINGLE-FAMILY West PC OS/PARK PUBLIC FACILITIES School District: CARLSBAD Water District: CARLSBAD Sewer District: CARLSBAD Equivalent Dwelling Units (Sewer Capacity): 48 Public Facilities Fee Agreement, dated: Augusts. 1998 ENVIRONMENTAL IMPACT ASSESSMENT 2<j Certified Environmental Impact Report, dated PROGRAM EIR 90-03/SPECIFIC PLAN 203(A) Other, EXEMPTION PER SECTION 15182 OF THE CEOA GUIDELINES City of Carlsbad Planning Department DISCLOSURE STATEMENT Applicant's statement or disclosure of certain ownership interests on all applications which will require discretionary action on the part of the City Council or any appointed Board, Commission or Committee. The following information MUST be disclosed at the time of application submittal. Your project cannot be reviewed until this information is completed. Please print. Note: Person is defined as "Any individual, firm, co-partnership, joint venture, association, social club, fraternal organization, corporation, estate, trust, receiver, syndicate, in this and any other county, city and county, city municipality, district or other political subdivision or any other group or combination acting as a unit." Agents may sign this document; however, the legal name and entity of the applicant and property owner must be provided below. 1. APPLICANT (Not the applicant's agent) Provide the COMPLETE. LEGAL names and addresses of ALL persons having a financial interest in the application. If the applicant includes a corporation or partnership, include the names, title, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON- APPLICABLE (N/A) IN THE SPACE BELOW. If a publiclv-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) person Corp/Part Shea Hones Land Holdings LLC Title Title__ Address Address 10721 Treena Street, Ste. 200 San Diego, CA 92131 2. OWNER (Not the owner's agent) Provide the COMPLETE, LEGAL names and addresses of ALL persons having any ownership interest in the property involved. Also, provide the nature of the legal ownership (i.e, partnership, tenants in common, non-profit, corporation, etc.). If the ownership includes a corporation or partnership, include the names, title, addresses of all individuals owning more than I0% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publiclv- owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person Corp/Part Shea Homes Land Homings LLC Title Title Address Address 10721 Treena Street; Ste. 200 San Diego, CA 92131 2075 Las Palmas Dr. • Carlsbad, CA 92OO9-1576 • (76O) 438-1161 • FAX (760) 438-O894 Disclosure Statement, Attachment Parkside - CT 92-02(B) / PUD 92-03(6) and SDP 92-06(C) Shea Homes Land Holdings, LLC The following individuals own more than 10% of the shares of Shea Homes Land Holdings, LLC: General Partner Limited Partner Limited Partner Limited Partner Limited Partner Limited Partner Limited Partner J.F Shea Company, Inc. Shea Investments Tahoe Partnership I Balboa Partnership John F. Shea, Trustee John F. Shea Family Trust Peter O. Shea Edmund H. Shea, Jr. Trustee Edmund and Mary Shea Real Property Trust 655 Brea Canyon Road, Walnut, CA 91789 655 Brea Canyon Road, Walnut, CA 91789 655 Brea Canyon Road, Walnut, CA 91789 655 Brea Canyon Road, Walnut, CA 91789 655 Brea Canyon Road, Walnut, CA 91789 655 Brea Canyon Road, Walnut, CA 91789 655 Brea Canyon Road, Walnut, CA 91789 irofit NON-PROFIT O^ANIZATION OR TRUST If any person identmed pursuant to (1) or (2) above is a nonprofit organization or a trust, list the names and addresses of ANY person serving as an officer or director of the non-profit organization or as trustee or beneficiary of the. Non Profit/Trust Title Non Profit/Trust Title Address Address Have you had more than $250 worth of business transacted with any member of City staff. Boards. Commissions, Committees and/or Council within the past twelve (12) months? Yes X No If yes, please indicate person(s):_ NOTE: Attach additional sheets if necessary. 1 certify that all the above information is true and correct to the best of my knowledge. Signature of owner/date Rick Schroeder Signature of applicant/date Rick Schroeder Rick Schroeder Print or type name of owner Rick Schroeder Print or type name of applicant Signature of owner/applicant's agent if applicable/date Print or type name of owner/applicant's agent H:ADMIN\COUNTER\DISCLOSURE STATEMENT 5/98 Page 2 O< 2 CITY OF CARLSBAD GROWTH MANAGEMENT PROGRAM LOCAL FACILITIES IMPACTS ASSESSMENT FORM (To be Submitted with Development Application) PROJECT IDENTITY AND IMPACT ASSESSMENT: FILE NAME AND NO: PARKSIPE - CT 92-02(6VPUD 92-02(BVSDP 92-06(CVCDP 99-05 LOCAL FACILITY MANAGEMENT ZONE: 20 GENERAL PLAN: RM ZONING: RD-M-O DEVELOPER'S NAME: SHEA HOMES LAND HOLDINGS LLC ADDRESS: 10721 TREENA STREET. SUITE 200 SAN DIEGO CA 92131 PHONE NO.: N/A ASSESSOR'S PARCEL NO.: 214-544-04 QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): 7.5 AC/48 DU ESTIMATED COMPLETION DATE: N/A A. City Administrative Facilities: Demand in Square Footage = 166.88 B. Library: Demand in Square Footage = 89.0 C. Wastewater Treatment Capacity (Calculate with J. Sewer) N/A D. Park: Demand in Acreage = .33 E. Drainage: Demand in CFS = N/A Identify Drainage Basin = N/A (Identify master plan facilities on site plan) - «":=•""'' F. Circulation: Demand in ADT= 480 (Identify Trip Distribution on site plan) G. Fire: Served by Fire Station No. = No. 4 H. Open Space: Acreage Provided = 1.1 I. Schools: Carlsbad Unified (Demands to be determined by staff) J. Sewer: Demands in EDU 48 Identify Sub Basin = D (Identify trunk line(s) impacted on site plan) K. Water: Demand in GPD = 10.560 L. The overall Sambi Seaside Heights project is 45.17 units below the Growth Management Dwelling unit allowance. EXHIBIT "XX" SAMBI SEASIDE HEIGHTS, ~\\( A PLANNING AREA "A" 82 DU B PLANNING AREA "B" 35 DU C PLANNING AREA "C" 102 DU D PLANNING AREA "D" 58 DU E PLANNING AREA "E" COMMUNITY FACILITY SITE SAMBI SEASIDE HEIGHTS CT 92-02(A)/PUD 92-03(A)/ SDP 92-06(A) GENERAL INFORMATION: APPLICATION: IK Kxunot >u« nm neou twit ufiS«M MOO C* WWb; tlt-Mt-UM m jr. M> eo.. •&. * «eowwnew, « CMML » PLAN PREPARED BY: SM new e* nwdHL: tlt~)M-lUO •MOTH* MMotoKOtt* mitxvranw *>c*«« ocoo c* WIM PROJECT DATA: rot*t MU: 7»« *t CKSWC IDMMO HD-M-fl UKM. FACUIft WMUOOCWI IMC IWt M WtffK flMt MJWVft »U jy*i _ fg fEcoug jn i-<no iran) UN v n (Mil ftxq t-(Tw noon JMJ » • iMns t**«f-(TW tMn) 2MO V l« IWT> (2H0 MO nv, if. (» i/. «» u own mu«m irwn•.». ST. (J * >IC*> »1*1MI ton ao.an v. •9m —J3Jpg * ij* UMrV*e NOTES: t MI wuvm AMAH tmutiva UMIVU OM MM PLM SITE DEVELOPMENT PLAN - PARKSIDE CARLSBAD TRACT CT 92-02(B), PUD 92-03(8), SDP 92-08 (C) (PLANNING AREA 'D') .AStOO*n(M 1HM1 HMTAM MS COOMH. VlCINmf MAP SERVICES DISTRICTS: x«a - c>tJB«e MMCVA WTR aanvSTOM HUM (ACMOlTl MC MMMMMn AlKCXMO •* IK er» « wuuo. ffW » f" MtPttCD MIUUHt an/ru axn (ti VAX) (WOOD WTIMMWU. Mtcroaa KXMI mm. fUM m NUMDI V V V too p lot Kt. y«p Ma lll^ arv or ASSESSOR'S PARCZt NO. ZM-5M-M TYPICAL LOT CRAPING. DRAINAGE * SETBACK REQUlREMCTJg ant ocvniirweMT HAN rot: sx* n-M(c) PARKSIDE 1>IAN Nil 1 Ml>l!(1!'!:?vcl ms si PI AN No 1'!M2sf SHEA HOMES CARI^BAD PARKSIDE 1 JAM 2 8 1999 - KK51ITSIDE ELEVATION LEFT SIDE ELEVATION FRONT ELEVATION PLAN 1 A SHEA HOMES CARLSBAD PARKSIDE Jai JAN 2 8 1999 MCI-TSIDE ELEVATION FRONT ELEVATION ['IAN 1 run SHEA HOMES CARLSBAD PARKSIDE 1 JAN 2 8 1999 RIGHT SIDE ELEVATION I,EFr SIDE EU^VATION FKONT ELEVATION PIJ\N 1 C SHEA HOMES CARLSBAD PARKSIDE inn op .022 sf PLAN JVo 2 Lower 1.0VC! Tnlal 2033 sf " 1T l]I sf run SHEA HOMES CARLSBAD PARKSIDE JAN Z 8 1999 RIGHT SIDE ELEVATION HOOK PUN" REAR ELEVATION TYPICAL FINISH MATERIALS •LOW PROFILE CONCHKIE HOOK I1I.E •w<x>r> FASCIA •VINYL WINDOWS LEFTSIDE ELEVATION nrn SHEA HOMES CARLSBAD PARKSIDE .IAN 2 8 1999 RIGHT SIDE ELEVATION _._.V-»-»-.-« ?^nr -dzzzzz^zzt- REAR ELEVATION TVE!CAL_FINISI1_MATER1ALS •u»w rnoHi.E roN<:nt:jE nnor III.K •WCJOU FAKc:iA •SUHX'O •VINV1.W1NIHIWS LEFT SIDE ELEVATION FRONT ELEVATION PlJ\N 2 B ru~i SHEA HOMES CARLSBAD PARKSIDE .IAN 2 8 1999 K1GMTSIDE ELEVATION UJW WOFU.E CXlNrRETE HOOF I1I.E WOOD FASCIA wooDSinnTENS LEFTSIDE ELEVATION FRONT ELEVATION PI-AN 2 C nrn SHEA HOMES CARLSBAD PARKSIDE inn o p 1QQQ _ Upper Level j 156 sf ['LAN No 3 Lower 1-eycl toial 2100 sf " ~ " 94 f5 sf SHEA HOMES CARLSBAD PARKSIDE 9 KIOl IT SIDE ELEVATION REAR ELEVATION TYPICAL FINISH MATERIALS UJW I'lmtMLE CONCHE1E HOOI- 'I1LE EXIf )SEI) RAFItn TAIL snicco VIN>1. WINDOWS woon ELEVATION FRONT ELEVATION PLAN 3 A run 034 « 3CW.E !'<--! 0- SHEA HOMES CARLSBAD PARKSIDE RIGHT SIDE ELEVATION LICIT SIDE ELICVATION FRONT ELEVATION H.AN :5 I?run SHEA HOMES CARLSBAD PARKSIDE JAN 2 8 1999 ' ;x 1 1 ffl —j II K RIGHT SIDE ELEVATION rync/u, FINISH MATEHIALS •U»W I-ROFILE CONCHK1E n«JOF [Il.E •WUOU FASCIA •SIUCUO •VIHfl. WINFXJWS •wuoi)smrnr.ns LEFTSIDE ELEVATION FRONT ELEVATION I'lJVN 3 C run SHEA HOMES CARLSBAD PARKSIDE (AM 9 R 1QQQ PLAN No 4 Upper Level 1085 si'" PLAN No 4 1-ower Level Toiaf 2151 sf liOOsf SHEA HOMES CARLSBAD PARKSID E inn oo 1OOQ RIGHT SIDE ELEVATION REAR ELEVATION TYPICAL FINISH MATERIALS •LOW PROFILE CONCRE1E HOOF '11I.E • EXPOSED RAFTER TAIL. •wooosNirrTKH.i •STUCCO •VINYL WINDOWS LEFT SIDE ELEVATION FRONT ELEVATION PLAN 4 A n_rn SHEA HOMES CARLSBAD PARKSIDE 14 IflM 9. 8 1PP9 RIGHT SIDE ELEVATION REAR ELEVATION TYPICAL FINISH MATERIALS U>W PROFILE CONCRETE ROOF 1H.K EXTOSFJ) HAF[T-R TAU, SllO O VINYL WINDOWS ' 1 I I ( < I -t-> LEFT SIDE ELEVATION FRONT ELEVATION PIJVN4 n run SHEA HOMES CARLSBAD PARKSIDE inn o o 1OOO u RIGHT SIDE ELEVATION LEFT SIDE ELEVATION SHEA HOMES CARLSBAD PARKSIDE REAR ELEVATION TYPICAL FINISH MATERIALS PROFILE CONCRF1C ROOF TILE WOOD FASCIA srucco VINYL WINIKJWS FRONT ELEVATION PLAN 4 C n_n SCALE: 1/4'-1 0" Pll EXHIBIT "YY" 'dated February 17, 1999 PARKSIDE - CT 92/02(B)/PUD 92-03(B)/SDP 92-06(C) UNIT OWNER MAINTENANCE RESPONSIBILITY AREA (TYP.) STORM DRAIN PIPE TO BE MAINTAINED BY HOME OWNERS ASSOCIATION EASEMENT LINE SIDEWALK LEGEND FENCE UNE UNIT OWNER MAINTENANCE RESPONSIBILITY AREA HOMEOWNER ASSOCIATION MAINTENANCE RESPONSIBILITY AREA HOMEOWNER ASSOCIATION MAINTENANCE RESPONSIBILTY AREA CTYP.) DETAIL - MAINTENANCE RESPONSIBLITY N.T.S. PARKSIDE by UDC SMALL LOT SINGLE FAMILY GUIDELINES 5/6/98 GUIDELINE 1. 2. 3. 4. 5. 6. 7. 8. 9. In projects where there are three 2-story units in a row situated less than 15 feet apart, at least one of the three units shall have a single story building edge. The depth of the single-story edge shall not be less than 10 feet and shall run the length of the building pad, except that courtyards setback a minimum of 15 feet from the property line and which are a minimum 5 feet wide are not required to have a single story building edge. The roof covering the single story element shall be substantially lower than the roof for the 2 story element to the unit (this is not intended to preclude long shed-tupe roofs falling to a single-story element). In projects where there are three 2-story units in a row situated between 15 and 20 feet apart, at (east one of the three units shall have a single story building edge with a depth of not less than 5 feet running the length of the building pad. The roof of the single story element shall be substantially lower than the roof for the two story element of the building (this Is not intended to preclude long shed-type roofs falling to a single-story element). On a project basis, thirty-three percent (33%) of all units shall have a single story edge for forty percent (40%) of the perimeter of the building. For the purpose of this guideline the single story edge shall be a minimum depth of three feet (3'). The units qualifying under the 33% shall be distributed throughout the project. The main purpose of this guideline is to ensure some building relief on the front and sides of each unit. Per project, 50% of all units with a lot frontage greater than 45 feet must have (4) separate building planes on the front elevation. Per project, 50% of all units with a lot frontage greater than 45 feet must have (4) separate building planes on the rear elevation. Per project, 50% of all units shall have one side elevation with a 7 feet average side yard setback. Three-car garages limited to 75% of the total units where average lot size is 5,000 SF or less. Three-car garages shall incorporate a mixture of 2 door, 3 door and offset 2 door designs. 50% of exterior door and window openings shall be projected or recessed a minimum of 2 inches. The predominant roof framing for each floor plan in a project shall exhibit directional variety to the other floor plans and to the street MINIMUM SIANUAKU 1of3 1of3 33% 50% 50% 50% 75% 50% 100% %OF COMPLIANCt 50% 2 Of 4 100% 33% 100% 73% 100% N/A 100% 100% COMMENTS Plans 2 & 4 have a single story building edge which is interrupted by a 30' x 13' courtyard. The average building separation between 1 & 2 and 3 & 4 is approx. 20' (see sldeyard setback guideline 6). Plans 2, 3 & 4 all have single story roof edge. Plan 1 has single story edge at front and rear. All plans have single story edges. Plan 2 has a 44% single story edge and Plan 3-C has a 41% single story edge. Lots 7, 17, 19, 21, 40 and 42 will be plotted with a Plan 3-C which has a single story front and rear porch to accommodate the 33% requirement All Plans/elevations comply for 100%. Exceeds min. standard. fl Plans 1, 2 & 4 comply for 73%. Exceeds min. standard. All Plans exceed the 7' average setback: P1 1 = 12.1 ft, PI 2 = 7.3 ft, PI 3 = 11.5 ft, PI 4 = 9.2 ft. No 3-car garages used; all are 2 car garages. All windows have trim surround. Exceeds min. stnd. White vinyl windows will be used with exterior trim. All elevations have directional and design variety as required on the roof framing. »