HomeMy WebLinkAboutRP 01-11; Carlsbad Inn Nextel Cell Site; Redevelopment Permits (RP) (4)ENVIRONMENTAL IMPACT ASSESSMENT FORM - PART I
(TO BE COMPLETED BY THE APPLICANT)
CASE NO: gPO\
DATE RECEIVED: ^lioln\
(To be completed by staff)
BACKGROUND
CASE NAME: ^CXMveer It
2. APPLICANT: U-f.^k>i CX>VUVVUM^AXXL^IrW
3. ADDRESS AND PHONE NUMBER OF APPLICANT: "Sl LP \ COp [tX^^^ ^hZ\ /
4. PROJECT DESCRIPTION: \ZZ{\iKMxMwA 4cJUx.OAA-lAAUJUAJ.(>J^/l<:
SUMMARY OF ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED:
Please check any of the environmental factors listed below that would be potentially affected by this
project. This would be any environmental factor that has at least one impact checked "Potentially
Significant Impact," or "Potentially Significant Impact Unless Mitigation Incorporated" in the checklist
on the following pages.
I I Land Use and Planning Transportation/Circulation Public Services
I I Population and Housing CJ Biological Resources Utilities & Service Systems
I I Geological Problems Energy & Mineral Resources CH Aesthetics
I I Water CH ^^^^^s Q] Cultural Resources
CH Air Quaiity CH Noise Q Recreation
I I Mandatory Fmdings of Significance
1 Rev. 03/28/96
ENVIRONMENTAL IMPACTS
STATE CEQA GLTIDELINES, Chapter 3, Article 5, Section 15063 requkes that the City
conduct an Environmental Impact Assessment to determine if a project may have a significant
effect on the environment. The Environmental Impact Assessment appears in the following
pages in the form of a checklist. This checklist identifies any physical, biological and human
factors that might be impacted by the proposed project and provides the City with information to
use as the basis for deciding whether to prepare an Environmental Impact Report (EIR), Negative
Declaration, or to rely on a previously approved EIR or Negative Declaration.
• A brief explanation is required for all answers except "No Impact" answers that are
adequately supported by an information source cited in the parentheses following each
question. A "No Impact" answer is adequately supported if the referenced information
sources show that the impact simply does not apply to projects like the one involved. A
"No Impact" answer should be explained when there is no source document to refer to, or
it is based on project-specific factors as weU as general standards.
• "Less Than Significant Impact" applies where there is supporting evidence that the
potential impact is not adversely significant, and the impact does not exceed adopted
generai standards and policies.
• "Potentially Significant Unless Mitigation Incorporated" applies where the incorporation
of mitigation measures has reduced an effect firom "Potentially Significant Impact" to a
"Less Than Significant Impact." The developer must agree to the mitigation, and the
City must describe the mitigation measures, and briefly explain how they reduce the
effect to a less than significant levei.
• "Potentially Significant Impact" is appropriate if there is substantial evidence that an
effect is significant.
Based on an "EIA-Part II", if a proposed project could have a potentially significant
^ effect on the environment, but ail potentially significant effects (a) have been analyzed
adequately in an earlier EIR or Mitigated Negative Declaration pursuant to applicable
standards and (b) have been avoided or mitigated pursuant to that earlier EIR or Mitigated
Negative Declaration, inciuding revisions or mitigation measures that are imposed upon
the proposed project, and none of the circumstances requiring a supplement to or
supplemental EIR are present and all the mitigation measures required by the prior
environmental document have been incorporated into this project, then no additional
environmental document is required (Prior Compliance).
When "Potentially Significant Impact" is checked the project is not necessarily required
to prepare an EIR if the significant effect has been analyzed adequately in an eariier EIR
pursuant to applicable standards and the effect will be mitigated, or a "Statement of
Overriding Considerations" has been made pursuant to that earlier EIR.
A Negative Declaration may be prepared if the City perceives no substantial evidence that
the project or any of its aspects may cause a significant effect on the environment.
Rev. 03/28/96
• If there are one or more potentially significant effects, the City may avoid preparing an
EIR if there are mitigation measures to clearly reduce impacts to less than significant, and
those mitigation measiures are agreed to by the developer prior to public review. In this
case, the appropriate "Potentially Significant Impact Unless Mitigation Incorporated"
may be checked and a Mitigated Negative Declaration may be prepared.
• An EIR must be prepared if "Potentially Significant Impact" is checked, and includmg
but not limited to the follov^dng circumstances: (1) the potentially significant effect has
not been discussed or mitigated in an Earlier EIR pursuant to applicable standards, and
the developer does not agree to mitigation measures that reduce the impact to less than
significant; (2) a "Statement of Overridmg Considerations" for the significant impact has
not been made pursuant to an earlier EIR; (3) proposed mitigation measures do not reduce
the impact to less than significant, or; (4) through the EIA-Part II analysis it is not
possible to detennine the level of significance for a potentially adverse effect, or
determine the effectiveness of a mitigation measure in reducing a potentially significant
effect to below a level of significance.
A discussion of potential impacts and the proposed mitigation measures appears at the end of the
fonn under DISCUSSION OF ENVIRONMENTAL EVALUATION. Particular attention
should be given to discussing mitigation for impacts which would otherwise be determined
significant.
Rev. 03/28/96
Issues (and Supporting Information Sources):
{^Supplem^rimiWcmen^
I. LAND USE AND PLANNING. Would the proposal:.
a) Conflict with general plan designation or zoning?
(Source #(s): ( )
b) Conflict with applicable environmental plans or
policies adopted by agencies with jurisdiction over the
project? ( )
c) Be incompatible with existing land use in the vicinity?
( )
d) Affect agricultural resources or operations (e.g. impacts
to soils or farmlands, or impacts from incompatible
land uses? ( )
e) Disrupt or divide the physical arrangement of an
established community (including a low-income or
minority community)? ( )
IL POPULATION AND HOUSING. Would the proposal:
a) Cumulatively exceed official regional or local
population projections? ( )
b) Induce substantial growth in an area either directly or
indirectly (e.g. through projects in an undeveloped area
or extension of major infrastructure)?
( )
c) Displace existuig housing, especially affordable
housing? ( )
III. GEOLOGIC PROBLEMS. Would the proposal result in or
expose people to potential impacts involving:
a) Fault rupture? ( )
b) Seismic ground shaking? ( )
c) ^Seismic ground failure, including liquefaction?
( )
d) Seiche, tsunami, or volcanic hazard?
( )
e) Landslides or mudflows? ( )
f) Erosion, changes in topography or unstable soil
condidons from excavahon, grading, or fill?
( )
g) Subsidence of the land? ( )
h) Expansive soils? ( )
i) Unique geologic or physical features?
( )
IV. WATER. Would the proposal result in:
a) Changes in absorption rates, drainage pattems, or the
rate and amount of surface mnoff? ( )
b) Exposure of peopie or property to water related hazards
such as flooding? ( )
Potentially Potentially Less Than
Significant Significant Significan
Impact Unless t Impact
Mitigation
Incoqjorated
No
Impact
• • • 0
• • • 0
• • •
• • •
• • •
• • • 0
• • •
• • •
• • •
• • •
• • • &
• • •
• •
• • •
• • •
• • •
• • • .
• • • \Z
• • •
Rev. 03/28/96
Issues (and Supporting Information Sources):
c) Discharge into surface waters or other alteration of
surface water quality (e.g. temperamre, dissolved
oxygen or turbidity)? ( )
d) Changes in the amount of surface water in any water
body? ( )
e) Changes in currents, or the course or direction of water
movements? ( )
f) Changes in the quantity of ground waters, either
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations or
through substantial loss of groimdwater recharge
capability? ( )
g) Altered direction or rate of flow of groundwater?
( • )
h) Impacts to groundwater quality? ( )
0 Substantial reduction in the amount of groundwater
otherwise available for public water supplies?
( )
V. AIR QUALITY. Would the proposal:
a) Violate any air quality standard or contribute to an
existing or projected air quality violation?
( )
b) Expose sensitive receptors to pollutants?
( )
c) Alter air movement, moisture, or temperature, or cause
any change in climate? ( - )
d) Create objectionable odors? ( )
VL TRANSPORTATION/CIRCULATION.
^ proposai result in:
Would the
a) Increased vehicle trips or traffic congestion?
( )
b) Hazards to safety from design features (e.g. sharp
curves or dangerous intersections) or incompatible uses
(e.g. farm equipment)? ( )
c) Inadequate emergency access or access to nearby uses?
( )
d) Insufficient parking capacity on-site or off-site?
( )
e) Hazards or barriers for pedestrians or bicyclists?
( )
f) Conflicts with adopted policies supporting altemative
transportation (e.g. bus mmouts, bicycle racks)?
( )
g) Rail, waterbome or air traffic impacts?
( )
Potentially
Significant
Impact
•
Potentially Less Than
Significant Significan
Unless t Impact
Mitigation
Incorporated
• •
No
Impact
• • •
• • •
• • • &
• • •
• • • 0^
• • •
• • • 0-
• • •
• • •
• • •
• • •
• • •
•
i.
• •
• • •
• • •
• • •
• • •
Rev. 03/28/96
Issues (and Supporting Information Sources):
i^^!pplmienl!3
VII. BIOLOGICAL RESOURCES. Would the proposal result
in impacts to:
a) Endangered, threatened or rare species or their Jiabitats
(including but not limited to plants, fish, insects,
animals, and birds? ( )
b) Locally designated species (e.g. heritage trees)?
( )
c) Locally designated namral communities (e.g. oak
forest, coastal habitat, etc.)? ( )
d) Wetiand habitat (e.g. marsh, riparian and vemal pool)?
( )
e) Wildlife dispersal or migration corridors?
( )
VIIL ENERGY AND MINERAL RESOURCES. Would the
proposal?
a) Conflict with adopted energy conservation plans?
( )
b) Use non-renewable resources in a wastefiil and
inefficient manner? ( )
c) Result in the loss of availability of a known mineral
resource that would be of future value to the region and
the residents of the State? ( )
IX. HAZARDS. Would the proposal involve:
a) A risk of accidental explosion or release of hazardous
substances (including, but not limited to: oil, pesticides,
chemicals or radiation)? ( )
b) Possible interference with an emergency response plan
or emergency evacuation plan? ( )
c) The creation of any health hazard or potential health
1^ hazards? ( )
d) Exposure of people to existing sources of potential
health hazards? ( )
e) Increase fire hazard in areas with flammable brush,
grass, or trees? ( )
X. NOISE. Would the proposai result in:
a) Increases in existing noise levels? ( )
b) Exposure of people to severe noise levels?
( )
XI. PUBLIC SERVICES. Would the proposal have an effect
upon, or result in a need for new or altered govemment
services in any of the following areas:
a) Fire protection? ( )
b) Police protection? ( )
c) Schools? ( )
Potentially Potentially Less Than
Significant Significant Significan
Impact Unless t Impact
Mitigation
Incorporated
No
Impact
• • • 0^
• • • 0'
• • •
• • • H'
• • • 0^
• • • 0"
• • • 0^
• • • 0^
• • • 0^
• • • 0-
• • • 0
• • • Q-
• • • 0"
• • • 0"
• • • 0^
• • •
• • • 0-
• • • 0"
Rev. 03/28/96
Issues (and Supporting Information Sources):
d) Maintenance of public facilities, including roads'?
( )
e) Other govemmental services? ( )
XII. UTILITIES AND SERVICES SYSTEMS. Would the
proposal result in a need for new systems or supplies,
or substantial alterations to the following utilities:
a) Power or natural gas? ( )
b) Communications systems? ( )
c) Local or regional water treatment or distribution
facilities? ( )
d) Sewer or septic tanks? ( )
e) Storm water drainage? ( )
f) Solid waste disposal? ( )
g) Local or regional water supplies? ( )
Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less Than No
Significan Impact
t Impact
• • • 0
• • o 0^
• • 0
•
• • 0^
• 0 • 0
• • 0 0'
• •
• • • \Z
XIIL AESTHETICS. Would the proposai:
a) Affect a scenic or vista or scenic highway?
( )
b) Have a demonstrate negative aesthetic effect?
( )
c) Create light or glare? ( )
xrv. CULTURAL RESOURCES. Would the proposal:
a) Dismrb paieontological resources? ( )
b) Disturb archaeological resources? ( )
c). Affect historical resources? ( )
d) Have the potential to cause a physical change which
would affect unique ethnic cultural values?
( )
e) Restrict existing religious or sacred uses within the
potential impact area? ( )
XV. RECREATIONAL. Would the proposal:
a) Increase the demand for neighborhood or regional
parks or other recreational facilities?
( )
b) Affect existing recreational oppormnities?
( )
• 0 o
• o o [Z
• • o 0^
• • • 0"
• • o • o or • • •
• D o {Z
• • o
• • • \Z
Rev. 03/28/96
Issues (and Supporting Information Sources):
XVL MANDATORY FINDINGS OF SIGNIFICANCE.
a) Does the project have the potential to degrade the
quality of the environment, substantially reduce the
habitat of a fish or wildlife species, cause a fish or
wildlife population to drop below self-sustaining levels,
threaten to eluninate a plant or animal community,
reduce the number or restrict the range of a rare or
endangered plant or animal or eliminate important
examples of the major periods of Califomia history or
prehistory?
b) Does the project have impacts that are individually
limited, but cumulatively considerable?
("Cumulatively considerable" means that the
incremental effects of a project are considerable when
viewed in connection with the effects of past projects,
the effects of other current projects, and the effects of
probable fumre projects)?
c) Does the project have environmental effects which will
cause the substantial adverse effects on human beings,
either directly or indirectly?
Potentially
Significant
Impact
O
O
Potentially
Significant
Unless
Mitigation
Incorporated
O
Less Than
Significan
t Impact
No
Impact
• 0^
XVII. EARLIER ANALYSES.
Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA
process, one or more effects have been adequately analyzed in an earlier EIR or negative
declaration. Section 15063(c)(3)(D). In this case a discussion should identify tiie
following on attached sheets:
a) Earlier analyses used. Identify earlier analyses and state where they are available
for review.
h
b) Impacts adequately addressed. Identify which effects from the above checklist
were within the scope of and adequately analyzed in an earlier document pursuant
to applicable legal standards, and state whether such effects were addressed by
mitigation measures based on the earlier analysis.
c) Mitigation measures. For effects that are "Less tiian Significant with Mitigation
Incorporated," describe the mitigation measures which were incorporated or
refined from the earlier document and the extent to which they address site-
specific conditions for the project.
Rev. 03/28/96
DISCUSSION OF ENVIRONMENTAL EVALUATION
Please use tiiis area to discuss any of the environmental factors that were checked "No impact"
yet lack any information citations and any factors tiiat were checked "Potentially Significant
Impacf or "Potentially Significant Impact Unless Mitigation Incorporated." The City has
adopted a "Statement of Overriding Consideration" with regard to air quality and circulation
impacts resulting from the normal buildout according to the General Plan. The following sample
text is intended to guide your discussion of the impacts to these environmental factors.
AIR OUALITY:
The implementation of subsequent projects that are consistent with and uicluded in the updated
1994 General Plan will result in increased gas and electric power consumption and vehicle miles
traveled. These subsequently result in increases in the emission of carbon monoxide, reactive
organic gases, oxides of nitrogen and sulfur, and suspended particulates. These aerosols are the
major contributors to air pollution in the City as well as in the San Diego Air Basin. Since the
San Diego Air Basin is a "non-attainment basin", any additional air emissions are considered
cumulatively significant: therefore, continued development to buildout as proposed in tiie
updated General Plan will have cumulative significant impacts on the air quality ofthe region.
To lessen or minimize the impact on air quality associated with General Plan buildout, a variety
of mitigation measures are recommended in the Final Master EIR. These include: 1) provisions
for roadway and intersection improvements prior to or concurrent with development; 2) measures
to reduce vehicie trips through the implementation of Congestion and Transportation Demand
Management; 3) provisions to encourage ahemative modes of transportation including mass
transit services; 4) conditions to promote energy efficient building and site design; and 5)
participation in regional growth management strategies when adopted. The applicable and
appropriate General Plan air quality mitigation measures have either been incorporated into the
design of the project or are included as conditions ofproject approvai.
Operation-related emissions are considered cumulatively significant because the project is
locatec! within a "non-attainment basin", therefore, the "Initial Study" checklist is marked
"Potentially Significant Impact". This project is consistent with the General Plan, therefore, tiie
preparation of an EIR is not required because the certification of Finai Master EIR 93-01, by City
Council Resolution No. 94-246, included a "Statement Of Overriding Considerations" for air
quality impacts. This "Statement Of Overriding Considerations" appiies to all subsequent
projects covered by the General Plan's Final Master EIR, including this project, therefore, no
further enviromnental review of air quality impacts is required. This document is available at the
Planning Department.
CIRCULATION:
The implementation of subsequent projects that are consistent with and included in the updated
1994 General Plan will result in increased traffic volumes. Roadway segments will be adequate
to accommodate buildout traffic; however, 12 frill and 2 partial intersections will be severely
impacted by regional through-traffic over which the City has no jurisdictional control. These
generally inciude ail freeway interchange areas and major intersections along Carisbad
Boulevard. Even with ihe implementation of roadway improvements, a number of intersections
9 Rev. 03/28/96
are projected to fail tiie City's adopted Growth Management performance standards at buildout.
To lessen or minimize the impact on circulation associated with General Plan buildout, numerous
mitigation measures have been recommended in the Final Master EIR. These include 1)
measiures to ensure the provision of circulation facilities concurrent with need; 2) provisions to
develop altemative modes of transportation such as trails, bicycle routes, additional sidewalks,
pedestrian linkages, and commuter rail systems; and 3) participation in regional circulation
strategies when adopted. The diversion of regional through-traffic from a failing Interstate or
State Highway onto City streets creates unpacts that are not within the jurisdiction of the City to
control. The applicable and appropriate General Plan circulation mitigation measures have either
been incorporated into the design ofthe project or are included as conditions of project approval.
Regional related circulation impacts are considered cumulatively significant because of the
failure of intersections at buildout of the General Plan due to regional through-traffic, therefore,
tiie "Initial Study" checklist is marked "Potentially Significant Impact". This project is
consistent with the General Plan, therefore, the preparation of an EIR is not required because the
recent certification of Fmal Master EIR 93-01, by City Council Resolution No. 94-246, included
a "Statement Of Overriding Considerations" for circulation impacts. This "Statement Of
Overriding Considerations" applies to all subsequent projects covered by the General Plan's
Master EIR, including this project, therefore, no further environmental review of circulation
impacts is required.
LIST OF MITIGATING MEASURES gP APPLICABLE^
ATTACH MITIGATION MONITORING PROGRAM (IF APPLICABLE)
10 Rev. 03/28/96
PART I EIA
NEXTEL - BUCCANEER
LAND USE PLANNING
a) No impact. The proposed project is in conformance with the general plan and zoning
designation for the property.
b) No impact. The proposed project will conform with applicable environmental plans and
policies adopted by agencies with jurisdiction over the project.
c) No impact. The project is compatible with the existing land use in the vicinity.
d) No impact. The project will not affect agricultural resources or operations since the site
has not been used for agricultural purposes.
e) No impact. The proposed project will not disrupt or divide the physical arrangement of
any established communities. The proposed project consists ofthe installation of 3
antenna arrays within the existing development with two antennas per array.
II. POPULATION AND HOUSING
a) No impact. Since the proposed project consists of an addition within an existing building,
it will not alter the planned distribution or housing in the area.
b) No impact. The proposed project will not induce substantial growth in the area.
c) No impact. The site for the proposed project will not displace existing housing since
the site already contains existing buildings, and the location ofthe equipment is in
non-residential use areas of the development.
III. GEOLOGICAL PROBLEMS
a) No impact. The site is not located near active faults and no geologic conditions exist
that could constrain development of the property or increase the exposure of people or
property to geologic hazards. (1)
b) No impact. Due to the distance from known active faults from the sites, the proposed
project will not expose people to significant seismic ground shaking. (1)
c) No impact. This project will not expose people to seismic ground failure including
liquefaction, due to the distance ofthe know active faults from the site.
d) No impact. The site is not located in an area of volcanic activity and does not have a
history of seiche or tsunami hazards. Therefore, the proposed project will not expose
people to impacts involving seiche, tsunami or volcanic hazards.
e) No impact. The project site is not located within an area of landslides or mudflows. (1)
f) No impact. The site was already mass graded when the existing buildings were
constructed.
g) No impact. The project site is not located in an area known for subsidence and is not
expected to result in or expose people to potential impacts involving subsidence of the
land. (1)
h) No impact. The proposed project will not result in or expose people to potential
impacts involving expansive soils. The property is not located in an area known to have
expansive soils. (1)
i) No impact. No unique geologic or physical features are known to exist at the project
site. (1)
IV. WATER
a) No impact. The project will have no impact on absorption rates, drainage patterns, or
amount of surface runoff. The antennas are proposed on top of an existing structure.
b) No impact. The site is not in an area that is prone to flooding or other water hazards. (1)
c) No impact. The project will not alter the quality of any surface water body.
d) No impact. The project will not significantly affect the amount of surface water in any
water body since no storm water will discharge directly into any water body. (1)
e) No impact. The proposed project will not significantly affect currents or the course or
direction of water movements. (1)
f) No impact. The project will not affect the quantity or the quality of ground waters either
through direct additions or withdraws or through interception of an aquifer by cuts or
excavations or through substantial loss of recharge capability. (1)
g) No impact. Since the proposed project does not use groundwater, the project will not
alter direction of the rate of flow of groundwater. (1)
h) No impact. The project will not significantly impact groundwater quality, since there will
be no direct infiltration into any known groundwater supply. (1)
i) No impact. The proposed project will not cause a substantial reduction in the amount of
groundwater otherwise available for public water supplies since the project will not use
groundwater nor impact a significant area otherwise available for groundwater percolation.
(1)
AIR QUALITY
a) No impact. The project will have no affect upon air quality.
b) No impact. The project will not expose sensitive receptors to pollutants.
c) No impact. The proposed project will not alter air movement, moisture, temperature or
cause a change in climate.
d) No impact. The proposed project will not create objectionable odors.
VI. TRANSPORTATION/ CIRCULATION
a) No impact. The project will not increase ADT.
b) No impact. The project will not result in hazards to safety from design features. (1)
c) No impact. The proposed project will not affect access.
d) No impact. The proposed project will not affect parking.
e) No impact. The project will not produce any hazards or barriers for pedestrians or
bicyclists.
f) No impact. The proposed project will conform with adopted policies supporting alternative
transportation.
g) No impact. No impacts to or from the railroad will result. No waterbome traffic occurs in
the vicinity.
VII. BIOLOGICAL RESOURCES
a) No impact. The site does not have any endangered, threatened or rare species or their
habitats. It is a developed site.
b) No impact. The site does not contain locally designated species.
c) No impact. The site does not contain locally designated communities.
d) No impact. The proposed project is not located on wetland habitat, so it will not impact
wetland habitat.
e) No impact. There will be no impacts to wildlife dispersal or migration corridors.
VIII. ENERGY AND MINERAL RESOURCES
a) No impact. The proposed project will conform with adopted energy conservation plans.
b) No impact. The proposed project will not use non-renewable resources in a wasteful
inefficient manner
c) No impact. The proposed project will not result in the loss of availability of a known
mineral resource that would be of future value to the region and the loss of availability
of a known mineral resource that would be of future value to the region and the residents
of the State.
IX. HAZARDS
a) No impact. The proposed project will not involve the storage, application, use or disposal
of hazardous materials or substances and therefore will not involve a risk of accidental
explosion or release of hazardous substances.
b) No impact. The proposed project will be designed so as not to interfere with any
emergency response or evacuation plans. The project's circulation system will be
reviewed by all pertinent City departments to ensure that there will be no impacts to any
emergency response procedures or evacuation plans.
c) No impact. The project will not create any health hazards or any potential health
hazards.
d) No impact. There are no existing health hazards on the site.
e) No impact. The project will be constructed in compliance with all applicable City
policies and codes regarding fire suppression and low fuel planting.
X. NOISE
a) No impact. Development of the site will not substantially increase noise levels beyond
the short term construction noise impacts.
b) No impact. The project will not involve exposure of people to severe noise levels beyond
the short term construction noise impacts.
XI. PUBLIC SERVICES
a) No impact. The project is located within the five minute response time for fire protection.
b) No impact. Police protection is provided by the City of Carlsbad and demand for
additional police services beyond the demand created by a typical commercial
development of this site is not anticipated.
c) No impact. The proposed project will not have an effect upon or result in a need for new
schools.
d) No impact. The proposed project will pay appropriate public facilities fees as dictated by
the City.
e) No impact. The proposed project will pay appropriate public facilities fees as dictated by
the City.
XII. UTILTITES AND SERVICES SYSTEMS
a) No impact. The majority of utitlities have already been established for the existing
structures.
b) No impact. The proposed project is not anticipated to create significant new demand for
major facilities of communication or cable nor will it require substantial alteration to
existing faciiities.
c) No impact. The proposed project is in conformance with the EIR 93-01 for the site and
no potentially significant impacts are anticipated.
d) No impact. The proposed project is in conformance with the EIR 93-01 for the site and
no significant impacts to the City's sewer or septic tanks are anticipated.
e) No impact. The proposed project is in conformance with the EIR 93-01 for the site and
no significant impacts to the City's storm drainage system is anticipated.
f) No impact. The proposed project is in conformance with the EIR 93-01 for the site and
no significant impacts to the City's solid waste disposal system is anticipated.
g) No impact. The proposed project is in conformance with the EIR 93-01 for the site and
no significant impacts to the City's local or regional water supplies are anticipated.
Xlll. AESTHETICS
a) No impact. The proposed project will not affect a scenic highway or vista. All antennas
will be screened from public view.
b) No impact. The proposed project will not have a negative aesthetic effect. All antennas
wiil be screened from public view.
c) No impact. The project will be designed in such a manner as to not create significant off-
site light or glare.
XIV. CULTURAL RESOURCES
a) No impact.
buildings.
b) No impact.
buildings.
c) No impact.
d) No impact.
e) No impact.
XV. RECREATION
a) No impact. The proposed project is non-residential, so no impact to park facilities are
anticipated.
b) No impact. The project will not affect recreational activities.
XVI. MANDATORY FINDINGS OF SIGNIFICANCE
a) No impact. The proposed project will not degrade the quality of the environment,
substantially reduce the habitat of fish or wildlife species, cause fish or wildlife population
to drop below self-sustaining levels, threaten to eliminate a plant or animal community,
reduce the number or restrict the range of a rare or endangered plant or animal or eliminate
important examples ofthe major periods of California history or prehistory.
b) No impact. The project will contribute to cumulative air quality impacts, however, a
statement of overriding consideration was adopted for this cumulative impact.
c) No impact. The proposed site will not cause substantial adverse effects on human
beings.
XVII. Earlier Analysis
a) Source documents are on file in the Planning Department located at 2075 Las Palmas
Drive, Carlsbad, Phone (760) 438-1161.
1. "Final Master EIR forthe City ofCarlsbad General Plan Update", March 1994.
NEXTEL COMMUNICATIONS, INC.
DESCRIPTION OF PROPOSED PROJECT
SITE CA6-404L / Buccaneer
APN 203-252-06
The proposed communications site is located at 3001 Carlsbad Blvd., Carlsbad, CA 92008.
Nextel Communications, Inc. and the owner (Carlsbad Inn LLC) have entered into a lease agreement for
the placement of a communications facility at this location.
Nextel proposes to constmct, operate and maintain an unmanned, Enhanced Specialized Mobile
Radio (ESMR) communications facility. This facility will consist of six (6) panel antennas, measuring one
foot wide and four feet in length. The panel antennas will be mounted within extensions of existing false
chimneys. The additional exterior fmish will be fiberglass screening painted and textured to match the
existing chimney walls. Nextel will also install radio equipment in new room within the attic space of the
existing building. This proposed facility would be unmanned, operating 24 hours a day. The only visits to
the site will consist of any emergency calls as well as regular maintenance visits once every four to six
weeks.
SYSTEM BACKGROUND INFORMATION
Nextel Communications, Inc. has been authorized by the Federal Communications Commission
(FCC) to constmct and operate the first multi-purpose enhanced specialized mobile radio system (ESMR)
in the United States. The system will provide superior service to the public in several ways: 1) it will be a
hilly digital altemative to current "cellular" telephone systems; 2) it will provide digital dispatch services to
large fleet users (this "dispatch" service will make the system able to handle a one-to-many form of
communications wherein one dispatcher can contact numerous mobile parties simultaneously); 3) it will
provide traditional paging services; 4) it will provide wireless data transmission. All of these functions will
be available in one hand-held unit.
HOW THE SYSTEM WORKS
The service area is divided into a grid of theoretically hexagonal geographic areas. At the center
of each area is a low power unmanned radio repeater station, which handles the calls to and from mobile
customers within the area. As a mobile customer moves from one area to another with a call in progress,
the call is automatically 'handed off to the next repeater station, without intermption. Telephone line
connections between repeater sites and the switching office, and from the switching office to the telephone
company central office permit mobile customers within the serving area to utilize their mobile phones just
as they would a home or office telephone, with direct dialing.
SITE SUITABILITY
This specific site was chosen based on its ability to provide needed wireless telecommunications
coverage in the downtown Carlsbad area. This site is necessary to provide uninterrupted service to mobile
radio customers traveling from one area to another.
PROPOSED USE OF FACILITY
The project site location is in the C-2 zone of the City of Carlsbad. Application is made pursuant
to the City's General Plan and consistent with the Zoning Ordinance requirements. The proposed use of
this communications facility will fulfill Nextel's and the community's need for digital mobile radio
communication service in this area. This project will not adversely impact the community.
Page 2
Nextel Communications
Description of Proposed Project
CA6-404L / Buccaneer
HEALTH AND SAFETY
The proposed use of this project will not be defrimental to the health, safety and general welfare of
persons residing or working in the area and will not adversely affect other property in the vicinity.
BENEFITS TO THE CITY OF CARLSBAD
Enhanced Specialized Mobile Radio (ESMR) provides better quality dispatch service through
both its interconnect abilities and digital efficiencies. As discovered in the aftermath of the Northrldge
earthquake, the wireline telephones had inadequate capacity to serve the emergency crews. Nextel
provided radios and service to the Red Cross to assist their operation in sheltering and feeding the families
whose homes were damaged.
ESMR provides emergency contact to 911; has authorization to provide emergency services
during periods in which normal communications facilities are disrupted as a resuh of hurricane, flood,
earthquake or similar disaster; and is authorized to transmit communications necessary for the
implementation of civil defense activities as assigned by local civil defense authorities.