HomeMy WebLinkAboutRP 06-01; Laguna Condominiums; Redevelopment Permits (RP) (2)4~_A. C I T Y 0 f
VcARLSBAD
Planning Division www.carlsbadca.gov
December 19, 2012
Rudy & Cheryl Zavalani
1868 Crest Drive
Encinitas, CA 92024
RE: CT 06-01/RP 06-01 -LAGUNA CONDOMINIUMS MAP AND PERMIT EXTENSION
Dear Rudy and Cheryl:
I sent you a letter on January 11, 2011 regarding the expiration date for a Tentative Tract Map
(CT 06-01) and Major Redevelopment Permit (RP 06-01 ). In the letter, I had explained that the
expiration date of the Tentative Tract Map and Major Redevelopment Permit was January 16,
2012. On July 13, 2011, the Governor approved Assembly Bill No. 208 which extended the
expiration date by 24 months of any approved tentative map that was not expired as of July 13,
2011 and will expire prior to January 1, 2014. Because the Tentative Tract Map has an
expiration date of January 16, 2012, it and the associated Major Redevelopment Permit qualify
for an automatic 24 month extension making the new expiration date January 16, 2014. There
isn't anything required of you to keep the tentative tract map and Major Redevelopment Permit
active.
I hope this correspondence did not cause any confusion for you. If you have any questions
regarding the information contained in this letter, please contact me at (760) 602-4631.
~£.
Assistant Planner
T 760-602-4600 F 760-602-8559 ®
January 11, 2011
RUDY & CHERYL ZAVALANI
1868 CREST DRIVE
ENCINITAS, CA 92024
Re: Permit Extension
Dear Rudy and Cheryl:
e
Cit
You recently inquired about the expiration dates for a Tentative Tract Map (CT 06-01) and Major
Redevelopment Permit (RP 06-01) for approved for your property at 735 laguna Drive. On January 16
2007, the Housing and Redevelopment Commission approved the Tentative Tract Map and Major
Redevelopment Permit which was good for 24 months (January 16, 2009). However, due to the economic
conditions, the state passed SB 1185, which provided a one-year extension to all tentative map approvals
that were still valid on July 15, 2008 and would have expired before January 1, 2011 making the new
expiration date January 16, 2010. In addition, the state passed AB 333, which provided a two-year
extension to all tentative map approvals that would have expired before January 1, 2012, making the new
expiration date January 16, 2012.
When SB 1185 was passed on July 15, 2008, the City of Carlsbad subsequently passed an ordinance to
automatically extend any city-issued permits to run concurrent with the extended life of a tentative map.
The city also extended any city-issued permits to run longer if the state legislature passed any new laws
further extending the one year period provided for in SB 1185 (CMC 21.12.110 (a)(2)(i)(ii). The state
legislature did so when it extended tentative maps for an additional two years through AB 333. Therefore
the Major Redevelopment Permit (RP 06-01) also has an expiration date of January 16, 2012.
I hope this correspondence answers the questions you had related to the expiration date of the entitlements
on your property. If you have any questions regarding the information contained in this letter, please
contact me at (760) 434-2813.
4Uc
Austin Silva
Assistant Planner
C: Bob Dulich, Architect
2965 Roosevelt St., Ste. B • Carlsbad CA 92008-2389 • {760) 434-2810/2811 • FAX (760) 720-2037
e e
Cit of Carlsbad ------------~ ... ~~~
May 12, 2009
Laguna Breeze Condominiums, LLC
4516 Salisbury Drive
Carlsbad, CA 92010
COMPLETION OF GRADING PLANCHECK
PROJECT 10: CT 06-01 I RP 06-01 DWG NO.: ..;..;45=5.....,-3=A_,__ _______ _
GR NO.: .=.:08:::...-...:..:10=----------
PROJECT NAME: Laguna Condominiums
The Grading Plancheck process has been completed for the project noted above. The following
information will assist you in completing the next steps in obtaining the required grading permit.
Our records indicate your project is clear for grading permit issuance provided the following items
are completed to the satisfaction of the City Engineer. If you have not already done so, please
submit these items to the Engineering Development Services counter at 1635 Faraday Avenue.
1. Grading permit application (enclosed) submitted within 12 months of the date of mylar
signing (see www.carlsbadca.gov/engineering for current version of forms). If application is
submitted later than 12 months, an additional plancheck and fee may be required.
2. Four copies (two full size and two 11" x 17") of the approved grading plans
3. Verification of a valid Coastal Development Permit from the California Coastal
Commission
4. Verification of Council approval of final map
5. Verification of the submittal of a building permit application
6. A copy of this letter
7. Payment of the grading permit fee in the amount of: ($ 4.983 pd 12-23-08)
Since permit fees are subject to change, you may wish to verify the permit fee amount prior to
applying for your permit.
After complying with the requirements listed above, you will be provided with contact information
for scheduling the preconstruction meeting with a Public Works Inspector. The Inspector will
give you your copy of the grading permit at the preconstruction meeting.
Please do not begin construction until vou have received your permit from the Public
Works Inspector.
Additionally, the following items may be required during the construction of your project. Please
coordinate the timing of these items with your Inspector.
Doc ER-o2-04
05122/2008
1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-2720 • FAX (760) 602-8562 <!)
• ' ..
Laguna Breeze condos
May 12,2009
Page 2 of2
1. An approved haul route permit prior to hauling any construction equipment or materials
onsite or offsite
2. An approved traffic control plan and a valid right-of-way permit prior to performing any
work in the public right of way (allow two weeks for approval)
3. A retaining wall permit from the Building Department
As part of the Grading Plancheck process, the City Engineer signed the grading plans for the
project noted above. These plans are now the property of the City of Carlsbad and have been
filed for permanent record with this office. You may obtain copies and other reproductions at
your cost through one of several bonded reprographic firms in the area.
Approval of these plans by the City of Carlsbad does not authorize the applicant to violate any
federal, state, or city laws, ordinances, regulations, or policies.
Also, issuance of your grading permit is subject to the limitations and requirements of City
ordinances, policies, and regulations; your conditions of approval, if any; and all required state
and federal agency permits and approvals including, but not limited to, the California Department
of Fish and Game, United States Fish and Wildlife Service, California Coastal Commission, and
San Diego Regional Water Quality Control Board.
Thank you for your cooperation and assistance. It has been a pleasure working with you
through the plancheck process. If you have any questions, please contact me at 760-602-2747
or via email at Steve.Bobbett@carlsbadca.gov.
Respectfully,
Stephen Bobbett
Associate Engineer
Enclosures: Grading Permit Application
Right of Way Permit Application Package
cc: Engineer of Work: Gary Lipska
Project Planner: Austin Silva
Inspection: Office Specialist
Engineering Counter
File
DocER-02..()4
0512212008
e e
Cit of Carlsbad ----------~~,.~~~
May 12, 2009
Laguna Breeze Condominiums, LLC
4516 Salisbury Drive
Carlsbad, CA 92010
COMPLETION OF IMPROVEMENT PLANCHECK
PROJECT 10: CT 06-01 I RP 06-01 DWG NO.: -"'45=5:....;-3=----------
PROJECT NAME: Laguna Condominiums
The Improvement Plancheck process has been completed for the project noted above. The
improvements reflected on these improvement plans indicate that you must obtain a right-of-way
permit prior to initiating your construction activities. The following information will assist you in
obtaining this no-fee right-of-way permit.
Please do not begin construction until you have received your right-of-way permit from
the Public Works Inspector.
Prior to issuing a right-of-way permit, the City must approve the following items. If you have not
already done so, please submit these items to the Engineering Development Services counter at
1635 Faraday Avenue.
1. Completed right-of-way permit application package (enclosed) submitted within 18
months of the date of mylar signing (see www.carlsbadca.gov/engineering for current version
of forms). Requirements for completing the application package include:
a. Contractors state license number and class
b. City of Carlsbad business license number
c. Certificate of insurance as described in the application package
d. Traffic control plan (if not included in the improvement plans)
2. Five copies (three full-size and two 11" x 17") of the signed improvement plans
3. Verification of the submittal of a building permit application
4. A copy of this letter
In addition to the requirements listed above, if your project requires a grading permit, you
must complete the items listed on the Completion of Grading Plancheck letter and receive
approval for a grading permit prior to or concurrently with the issuance of the right-of-way
permit.
After complying with the requirements listed above, you will be provided with contact information
for scheduling the preconstruction meeting with a Public Works Inspector. The Inspector will
give you your copy of the right-of-way permit at the preconstruction meeting.
Doc ER-03-04
04/1712008
"1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-2720 • FAX (760) 602-8562 (!}
Laguna Breeze Condos
May 12, 2009
Page 2 of2
The following additional items may be required during the construction of your project. Please
coordinate the timing of these items with your Inspector.
1. Application with the appropriate utilities department(s) to tap into sewer, water, and/or
reclaimed water lines
2. An approved Haul Route Permit prior to hauling any construction equipment or materials
onsite or offsite
3. A Retaining Wall Permit from the Building Department
As part of the Improvement Plancheck process, the City Engineer signed the improvement plans
for the project noted above. These plans are now the property of the City of Carlsbad and have
been filed for permanent record with this office. You may obtain copies and other reproductions
at your cost through one of several City-approved reprographic firms in the area.
The approval of these plans by the City of Carlsbad does not authorize the applicant to violate
any federal, state, or city laws, ordinances, regulations, or policies.
Also, issuance of your right-of-way permit is subject to the limitations and requirements of City
ordinances, policies, and regulations; your conditions of approval, if any; and all permits and
approvals required by state and federal agencies including, but not limited to, the California
Department of Fish and Game, United States Fish and Wildlife Service, California Coastal
Commission, and San Diego Regional Water Quality Control Board.
Thank you for your cooperation and assistance. It has been a pleasure working with you
through the plancheck process. If you have any questions, please contact me at 760-602-2747
or via email at Steve.Bobbett@carlsbadca.gov.
Respectfully,
f:t?~
Steve Bobbett
Associate Engineer
Enclosure: Right of Way Permit Application Package
cc: Engineer of Work: Gary Lipska
Project Planner: Austin Silva
Inspection: Office Specialist
Engineering Counter
File
Doc ER-03-04
04/1712006
June 26, 2008
ROBERT DULICH
W. CIRCLE DR.
SOLANA BEACH, CA 92075
SUBJECT: Laguna Condos (RP 06-01/CT 06-01)
APN: APN 203-110-42 & 43
Dear Bob:
In accordance with the conditions of approval for the above referenced project, prior to
the issuance of the building permit, the developer must submit a Notice of Restriction to
be filed in the office of the County Recorder notifying all interested parties and
successors in interest that the City of Carlsbad has issued a Major Redevelopment
Permit on the real property. I have enclosed said notice which must be signed and
notarized according to the directions contained on the signature page. Please sign the
enclosed document and return to me for processing and recordation.
Please contact my office at (760) 434-2813, if you have any questions regarding the
information contained in this letter.
:W4
AUSTIN SILVA
Assistant Planner
2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2335 • (760) 434-2810/2811 • FAX (760) 720-2037 (!}
..
April18,2007
ROBERT DULICH
675 W. CIRCLE DR.
SOLANA BEACH CA 92075
Re: County Clerk Filing Fee (RP 06-01/ CT 06-01)
Dear Mr. Dulich:
As you are aware, on January 16, 2007 the Housing and Redevelopment Commission
conditionally approved Major Redevelopment Permit No. RP 06-01 and Tentative
Tract Map CT 06-01 for property located at 735 Laguna Drive. An environmental
review is required for all land use permit applications, in which this project was exempt
from any CEQA (California Environmental Quality Act) review. As part of the exemption
process, the lead agency (City of Carlsbad) is required to file a Notice of Exemption
with the San Diego County Clerk. As of January 1, 2007, the County Clerk is now
charging a documentary handling fee of $50. According to our records, we have not
collected the $50 for the County Clerk documentary filing fee. Until the fee is collected
and the Notice of Exemption can be filed, any local permits issued for the project are
invalid. Please send a check made out to the San Diego County Clerk in the amount of
$50 to the Housing and Redevelopment office in order for us to resend the Notice of
Exemption to be recorded and filed. I apologize for any inconveniences.
I have attached a copy of the letter from the office of the San Diego County Clerk as
well as the Notice of Exemption. If you have any questions regarding the information
contained in this letter, please contact my office at (760) 434-2813.
Sincerely,
Pd
AUSTIN SILVA
Assistant Planner
2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2389 • (760) 434-2810/2811 • FAX (760) 720-2037 (i)
January 22, 2007
ROBERT DULICH
675 W. CIRCLE DR.
SOLANA BEACH CA 92075
SUBJECT: Laguna Condominiums (RP 06-01/CT 06-01)
APN: 203-110-42, 43
Dear Mr. Dulich:
As you are aware, on January 16, 2007 the Housing and Redevelopment Commission
conditionally approved Major Redevelopment Permit No. RP 06-01 and Tentative
Tract Map CT 06-01 for property located at 735 Laguna Drive. Enclosed please find a
signed copy of the final resolutions of approval for the proposed condominium project.
The resolutions contain the conditions of approval for the project. I have also enclosed
a stamped set of the approved plans referenced in the resolution as Exhibits A-0.
Your next step is to proceed with the processing of the Final Map and obtain the
appropriate grading and building permits to construct the proposed project. Please
note many of the conditions of approval must be satisfied prior to the issuance of the
grading and building permits.
It has been a very rewarding experience working with you, and the architect Gary Cohn
on this project. I congratulate you and the owners on the approval of the project and I
wish you much success in your future endeavors. If you have any questions and/or
comments regarding this correspondence, please contact my office at (760) 434-2813.
Sincerely,
~
. CLIFF JONES
Assistant Planner
Enclosures
C: Gary Cohn, Architect
Mike Peterson, Building
Glen Van Peski, Engineering
Greg Ryan, Fire
Landscape Consultant
2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2389 • (760) 434-2810/2811 • FAX (760) 720-2037 (i}
.----------------------~--
,•
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
DEVELOPMENT SERVICES
October 3, 2006
TO: PROJECT PLANNER-Cliff Jones
FROM: Consultant Project Engineer-Development Services Division
LAGUNA CONDOMINIUMS
CT 06-01/RP 06-01
PROJECT REPORT AND CONDITIONS TRANSMITTAL
Engineering Department staff has completed the review of the above-referenced project and are
recommending:
_x__ That the project be approved subject to the conditions as listed on the attached sheet.
That the project be denied for the following reasons:
_x__ The following is a final Land Development Section project report for inclusion in the staff
report for this project.
LAND DEVELOPMENT SECTION
Project Report
PROJECT ID: CT 06-01/RP 06-01
PROJECT NAME: LAGUNA CONDOMINIUMS
LOCATION: Southeast corner Laguna Drive and Madison Street.
LEGAL: Portion of Lot 46 of Seaside Lands, per Map No. 1722, filed July 28, 1922,
in the City of Carlsbad, County of San Diego, State of California.
APN 203-11 0-42, 203-11 0-43
DESCRIPTION: Demolition of an existing one story single family residence and
construction of five residential condominium units, in three stories over a
subterranean parking garage.
1
TRAFFIC AND CIRCULATION:
Projected Average Daily Trips (ADT): 40
Comment: Project generates minimal traffic, and does not trigger a requirement for a
traffic study. The project is served by a single driveway off Madison Street to the
subterranean parking garage.
SEWER:
Sewer: City of Carlsbad
Sewer EDU's Estimated I Required: 5 EDU
Comment: A new sewer lateral to serve each residential unit will be constructed
from the existing 1 0" public sewer in Laguna Drive.
WATER:
Water District: Carlsbad Municipal Water District
GPD Required: 1,250 GPD
Comment: Project will a new water meter for each proposed unit. Two connections
will be made to the existing 6" water main in Madison Street. Each water service will
be manifolded to three meters, one meter for each residential unit, and one meter
with a backflow preventer for irrigation of the common area.
SOILS & GRADING:
Quantities:
Cut: 2,830 cy Fill: 5 cy Import I Export: 2,825 cy
Area of Excavation: 0.3 acres
Permit required: Yes, unless waived by the City Engineer
Off-site approval required: No
Hillside grading requirements met: NIA
Comment: Proposed grading is almost exclusively for excavation of the underground
parking.
DRAINAGE AND EROSION CONTROL:
Drainage basin: A (Buena Vista Watershed)
Preliminary hydrology study performed by: Aquaterra Engineering, Inc.
2
Erosion Potential: low
Comment: The Preliminary Hydrology Report calculates a pre-development peak
100-yr. runoff of 0.67 c.f.s. and a post-development peak 100-yr. runoff of 1.03 c.f.s.
The resultant increase in peak runoff of 0.36 c.f.s. is minimal. Since the project is at
the lower end of the Buena Vista Watershed, the small increase is not expected to
have any affect on the watershed peak flow, and will not cause any downstream
erosion. The City Master Drainage Plan shows that the existing 30" storm drain in
Laguna Drive should be replaced with a 45" storm drain. This project will pay into the
Planned Local Drainage Area (PLDA) funds towards required storm drain upgrades.
WATER QUALITY I NPDES:
Receiving Water: Buena Vista Lagoon (SDRWQCB Watershed Basin 4.21)
Receiving Water Body 303(d) impaired: Yes (Bacterial Indicators, Sedimentation I
Siltation, Nutrient.
Priority project per Order 2001-01: No
Best Management Practices shown: Grass swales, covered parking.
Comment: The project storm water runoff discharges into storm drains which outlet
into Buena Vista Lagoon. The project has prepared a Preliminary Storm Water
Management Plan (SWMP), and has been conditioned to prepare a Final SWMP
with an standard level of Best Management Practices (BMPs). The project design
incorporates vegetated swales to treat runoff from paved areas before it enters the
storm drain system, includes covered parking which will prevent rainwater from
coming into contact with parking surfaces, and indicates a filtration device will be
utilized on the sump pump drain for the parking garage.
LAND TITLE:
Conflicts with existing easement: No
Easements/dedication required: Yes
Site boundary coincides with land title: Yes
Comment: Project will dedicate an additional 1 0 feet of right of way on both Madison
Street and Laguna Drive to create a half-street right of way of 30 feet.
IMPROVEMENTS:
Project will widen Madison Street and construct curb, gutter and sidewalk.
Relocation will be required for an existing fire hydrant, storm drain inlet, and power
pole. Laguna Drive is an Alternative Design street, so the developer is conditioned to
execute a Neighborhood Improvement Agreement for future possible improvements.
The project is proposing enhanced concrete within the public right of way, which, if
allowed by the City Engineer, will require an encroachment agreement.
3
ENGINEERING CONDITIONS
ENGINEERING CONDITIONS
General
7. Prior to hauling dirt or construction materials to or from any proposed construction site within this
project, Developer shall apply for and obtain approval from, the City Engineer for the proposed
haul route.
11. Developer shall provide to the City Engineer, an acceptable means, CC&Rs and/or other recorded
document, for maintaining the private easements within the subdivision and all the private
improvements: streets, sidewalks, street lights, storm drain and water quality facilities located
therein and to distribute the costs of such maintenance in an equitable manner among the owners
of the properties within the subdivision.
13. There shall be one Final Map recorded for this project.
16. Developer shall install sight distance corridors at all street intersections in accordance with
Engineering Standards. The limits of these sight distance corridors shall be reflected on any
improvement, grading, or landscape plan prepared in association with this development.
F eesl Agreements
19. Developer shall cause property owner to execute and submit to the City Engineer for recordation
the City's standard form Drainage Hold Harmless Agreement regarding drainage across the
adjacent property.
xx. Developer shall cause property owner to execute and submit to the City Engineer for
recordation the City's standard Encroachment Agreement for any enhanced concrete within
the public right-of-way.
22. Developer shall cause property owner to enter into a Neighborhood Improvement Agreement with
the City for the future public improvement of Laguna Drive along the subdivision frontage for a
half street width of 30 feet. Public improvements shall include but are not limited to paving, base,
sidewalks, curb and gutters, grading, clearing and grubbing, undergrounding or relocation of
utilities.
23. Prior to approval of any grading or building permits for this project, Developer shall cause Owner
to give written consent to the City Engineer to the annexation of the area shown within the
boundaries of the subdivision into the existing City of Carlsbad Street Lighting and Landscaping
District No. 1 and/or to the formation or annexation into an additional Street Lighting and
Landscaping District. Said written consent shall be on a form provided by the City
Engineer.
Grading
28. Based upon a review of the proposed grading and the grading quantities shown on the Tentative
Map, a grading permit for this project is required. Developer shall apply for and obtain a grading
C:\DOCUME-1 \cjones\LOCALS-1 \Temp\ENG COND.doc
Last printed 10/03/2006 8:35:00 AM
Page: 1
permit from the City Engineer.
Dedications/Improvements
32. Developer shall cause Owner to make an irrevocable offer of dedication to the City and/or other
appropriate entities for all public streets and other easements shown on the Tentative Map. The
offer shall be made by a certificate on the fmal map. All land so offered shall be offered free and
clear of all liens and encumbrances and without cost. Streets that already public are not required to
be rededicated.
34. Developer shall provide the design of all private streets and drainage systems to the satisfaction of
the City Engineer. The structural section of all private streets shall conform to City of Carlsbad
Standards based on R-value tests. All private streets and drainage systems shall be inspected by the
City. Developer shall pay the standard improvement plan check and inspection fees.
35. Developer shall execute and record a City standard Subdivision Improvement Agreement to install
and secure with appropriate security as provided by law, public improvements shown on the
Tentative Map and the following improvements including, but not limited to paving, base, signing
and striping, sidewalks, curbs and gutters, grading, clearing and grubbing, undergrounding or
relocation of utilities, sewer, water, fire hydrants, and street lights, to City Standards to the
satisfaction of the City Engineer. The improvements are:
a) Half-street improvements to Madison Street as shown on the Tentative Map.
b) Stripe the intersection of Madison Street and Laguna Drive to create a right
angle intersection to the satisfaction of the City Engineer.
A list of the above shall be placed on an additional map sheet on the Final Map per the provisions
of Sections 66434.2 of the Subdivision Map Act. Improvements listed above shall be constructed
within 18 months of approval of the subdivision or development improvement agreement or such
other time as provided in said agreement.
36. Developer shall cause Owner to waive direct access rights on the fmal map for all lots abutting
Laguna Drive.
38. Laguna Drive and Madison Street shall be dedicated by Owner along the project frontage based
on a center line to right-of-way width of 30 feet and in conformance with City of Carlsbad
Standards. No interlocking pavers will be constructed within the right-of-way.
XX. Developer shall coordinate with the City of Carlsbad Streets Department and comply with
the City tree policy regarding any removals of trees within public right-of-way.
40. Developer shall have the entire drainage system designed, submitted to and approved by the City
Engineer, to ensure that runoff resulting from 10-year frequency storms of 6 hours and 24 hours
duration under developed conditions, are equal to or less than the runoff from a storm of the same
frequency and duration under existing developed conditions. Both 6 hour and 24 hour storm
durations shall be analyzed to determine the detention basin capacities necessary to accomplish the
desired results.
C:\DOCUME-1\cjones\LOCALS-1\Temp\ENG COND.doc
Last printed 10/03/2006 8:35:00 AM
Page: 2
43. Prior to the issuance of grading permit or building permit, whichever occurs ftrst, Developer shall
submit for City approval a "Storm Water Management Plan (SWMP)." The SWMP shall
demonstrate compliance with the City of Carlsbad Standard Urban Storm water Mitigation Plan
(SUSMP), Order 2001-01 issued by the San Diego Region of the California Regional Water
Quality Control Board and City of Carlsbad Municipal Code. The SWMP shall address measures
to avoid contact or ftlter said pollutants from storm water, to the maximum extent practicable, for
the post-construction stage of the project. At a minimum, the SWMP shall:
a. identify existing and post-development on-site pollutants-of-concern;
b. identify the hydrologic unit this project contributes to and impaired water bodies that could be
impacted by this project;
c. recommend source controls and treatment controls that will be implemented with this project
to avoid contact or ftlter said pollutants from storm water to the maximum extent practicable
before discharging to City right-of-way;
d. establish specific procedures for handling spills and routine clean up. Special considerations
and effort shall be applied to resident education on the proper procedures for handling clean
up and disposal of pollutants;
e. ensure long-term maintenance of all post construct BMPs in perpetuity; and
f. identify how post-development runoff rates and velocities from the site will not exceed the
pre-development runoff rates and velocities to the maximum extent practicable.
Final Map Notes
49. Developer shall show on Final Map the net developable acres for each parcel.
50. Note(s) to the following effect(s) shall be placed on the map as non-mapping data:
A. All improvements are privately owned and are to be privately maintained with the exception
of the following:
1. Public street, sewer and water improvements.
B. Building permits will not be issued for development of the subject property unless the
appropriate agency determines that sewer and water facilities are available.
C. The owner of this property on behalf of itself and all of its successors in interest has agreed to
hold harmless and indemnify the City of Carlsbad from any action that may arise through any
geological failure, ground water seepage or land subsidence and subsequent damage that may
occur on, or adjacent to, this subdivision due to its construction, operation or maintenance.
Special Conditions
53. The Average Daily Trips (ADT) and floor area contained in the staff report and shown on
the Tentative Map are for planning purposes only. Developer shall pay traffic impact and
sewer impact fees based on Section 18.42 and Section 13.10 of the City of Carlsbad
Municipal Code, respectively.
C:\DOCUME-1 \cjones\WCALS-1 \Temp\ENG COND.doc
Last printed 10/03/2006 8:35:00 AM
Page: 3
Sewer/Water
54. Prior to approval of improvement plans or fmal map, Developer shall meet with the Fire Marshal
to determine if fire protection. measures (fire flows, fire hydrant locations, building sprinklers) are
required to serve the project. Fire hydrants, if proposed, shall be considered public improvements
and shall be served by public water mains to the satisfaction of the District Engineer.
56. Prior to issuance of building permits, Developer shall pay all fees, deposits, and charges for
connection to public facilities. Developer shall pay the San Diego County Water Authority
capacity charge(s) prior to issuance of Building Permits.
59. The Developer shall install (potable water and/or recycled water services) and meters at a location
approved by the District Engineer. The locations of said services shall be reflected on public
improvement plans.
60. The Developer shall install sewer laterals and clean-outs at a location approved by the District
Engineer. The locations of sewer laterals shall be reflected on public improvement plans.
61. The Developer shall design and construct public water, sewer, and recycled water facilities
substantially as shown on the Tentative Map to the satisfaction of the District Engineer. Proposed
public facilities shall be reflected on public improvement plans.
62. The Developer shall provide separate potable water meters for each separately owned unit.
63. This project is approved upon the express condition that building permits will not be issued for the
development of the subject property, unless the District Engineer has determined that adequate
water and sewer facilities are available at the time of occupancy. A note to this effect shall be
placed on the Final Map, as non-mapping data.
64. Prior to Final Map approval or issuance of building permits, whichever is first, the entire potable
water, recycled water, and sewer system shall be evaluated in detail to ensure that adequate
capacity, pressure, and flow demands can be met to the satisfaction of the District Engineer.
66. The Developer shall coordinate with the District Engineer regarding the looped system and
easements.
67. Prior to Final Map approval, Developer shall install potable water meter(s) for residential use and
1 irrigation meter to irrigate the common areas (Homeowner's Association).
Code Reminder
The project is subject to all applicable provisions of local ordinances, including but not limited to the
following:
A. The tentative map shall expire twenty-four (24) months from the date this tentative map approval
becomes fmal.
B. Developer shall exercise special care during the construction phase of this project to prevent
offsite siltation. Planting and erosion control shall be provided in accordance with Carlsbad
Municipal Code Chapter 15.16 (the Grading Ordinance) to the satisfaction of the City Engineer.
C:\DOCUME-1 \cjones\LOCALS-1 \Temp\ENG COND.doc
Last printed 10/03/2006 8:35:00 AM
Page: 4
~i
September 27, 2006
ROBERT DULICH
675 W. CIRCLE DR.
SOLANA BEACH CA 92075
Subject:
Dear Robert:
Laguna Condominiums, Major Redevelopment Permit
RP 06-01/ CT 06-01
The purpose of this letter is to address issues of concern raised by the Housing &
Redevelopment Department following a review of the revised plans submitted on August
29, 2006. The issues of concern are attached for your review. These issues must be
addressed prior to staff making a formal recommendation on the project.
Please contact my office at (760} 434-2813, if you have any questions or wish to set up
a meeting to discuss the application.
Sincerely,
4f/~
Cliff Jones
Assistant Planner
c: File
Enclosures
2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2389 • (760) 434-2810/2811 • FAX (760) 720-2037 (i)
Laguna Condominiums A
09/27/2006 ..
Page 2 of2
ISSUES OF CONCERN
No. RP 06-01, CT 06-01
Staff has completed a review of the subject project for issues of concern. The following
items need to be resolved or adequately addressed prior to staff making a final
determination on the proposed project: (Please note, the issues are listed under the
department which identified them as an area of concern.)
Housing & Redevelopment:
1. The color & materials board originally submitted needs to be updated reflecting the
revised elevations, the new slate roof material proposed, the doors proposed to
residential entries, and the wrought iron work (stairs, entries). The color & materials
board has been enclosed for convenience.
2. Staff still has concerns regarding the upper levels of the east elevation being
relatively flat and unarticulated (refer to attached redlines). Staff recommends some
type of banding, varied surface treatment, varied building color, awnings, or exterior
lighting to help break up the massing of the building as viewed from the east. Staff
has the same concern of the lower building wall as viewed from Madison Street
(refer to attached redlines). This wall could benefit from some type of building
ornamentation (i.e. shutters) or decorative lighting.
3. Staff suggests the applicant consider a decorative wrought iron entry gate to the
residences from Madison Street. This will help the overall appearance of the building
from this elevation and will compliment the decorative wrought iron proposed along
stairways and decks.
Building:
The Building Department has completed its review of this project and does not have any
comments.
Fire:
The Fire Department has completed its review of this project and does not have any
comments.
Engineering:
The Engineering Department has completed its review of this project and does not have
any comments.
Landscape Plan review:
The Landscape Consultant has completed its review of this project and does not have
any comments.
HEI6HT l-IMIT
:>F RID6E
~----
·.· ··.
rn· ·. til ..
I
v y "'-"
V 1111 I
L-METAL. RAil.IN6
~OD PEELER
1.06 COLUMN
/
---as•-on HEI6HT o
6UILDIN6 FAGtE 12 ___ _
SL.OPE~ 6
._ EXISTIN6 6RADE
FINISH 6RADE --.J
.. .. o:n:r·l·· · · · . · · · ·:·· •.. :· ... · · · . · : IF--I .. i ... --·~--~ ~:·.:. .·.:. 1!1: . ·.": .· 1: . . . . . . . . · ..
.. ·. :· .: . ·.·' ·/
L
~~; . :l:i;l:tt ~:~~ . ·1· ~ , ·I,·. : J
~5 ij
APPROX. LINE OF ROAD-
IN FORE6ROUND
'VAT/ON ( AN61.ED VI~ )
65'-o" HEI6HT o ROOF RID6.
.. '
July 13, 2006
ROBERT DULICH
675 W. CIRCLE DR.
SOLANA BEACH CA 92075
Subject:
Dear Robert:
Laguna Condominiums, Major Redevelopment Permit
RP 06-01/ CT 06-01
The items requested from you earlier to make your administrative redevelopment permit
application no. RP 06-01 complete have been received and reviewed by the Housing &
Redevelopment Department and all other appropriate departments. It has been
determined that the application is now complete for final processing. Although the initial
processing of your application may have already begun, the technical acceptance date is
acknowledged by the date of this communication. The City may, in the course of
processing the application, request that you clarify, amplify, correct, or otherwise,
supplement the basic information required for the application.
In an effort to continue to process the application in the most expeditious manner as
possible, a list of issues identified by staff during the project review period has been
included with this correspondence. These issues must be resolved prior to staff making
a final determination on the project.
Please contact my office at (760) 434-2813, if you have any questions or wish to set up
a meeting to discuss the application.
Sincerely,
~~
Cliff Jones
Assistant Planner
c: Glen Van Peski, Engineering Department
Greg Ryan, Fire Department
Pamela Elliott, Landscape Consultant
Enclosures
2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2389 • (760) 434-2810/2811 • FAX (760) 720-2037 @
Laguna Condominiums A
07 I 1312006 W
Page 2 of3
No. RP 06-01, CT 06-01
ISSUES OF CONCERN
Staff has completed a review of the subject project for issues of concern. The following
items need to be resolved or adequately addressed prior to staff making a final
determination on the proposed project: (Please note, the issues are listed under the
department which identified them as an area of concern.)
Housing & Redevelopment:
1. The proposed project will require a noise study due to its proximity to the railroad and
nearby busy streets. A Noise Report Submittal Form has been enclosed for your
convenience. CQJC..fll.-.-~ ~
2. Please provide a sample of the enh~ paM~roposed.
3. The proposed projects architectural design still differs from the design submitted
during preliminary review. Much of the surface ornamentation and architectural
detail (i.e. divided light windows, shudders around windows, etc.) has been
eliminated since formal application submittal. Staff suggest additional building
articulation be provided similar to the submittal reviewed during preliminary review.
Please re_xiew attached redlines for specifics. Return redlines with nexJJ?pQm!ttal . .MJV~ ~7f(YI}~-fl&~~
4. The proposed roof material is inconsistent with the roof materials currently
emphasized within the Village. The Design Review Board has expressed interest in
slate tile roofs. An example of such a roof that received Board recommendation is ':"'bvv..
attached for reference. St.AT-Ei cry{~; nt..e:-f/Si!:P -~ Gl:i511*t~>~S
5. For In-fill residential projects the applicant must provide photo-simulation scaled
representations of the project as viewed from adjacent streets and adjacent
developed single-family residential projects. Once the design of the project is
deemed acceptable these photo-simulations will be requested. ~k~
Fire:
1. The proposed under story parking garage rooms shall be sprinkled, the doors shall
be provided with sight glass and there shall baa barrier (chain-link fence) between
the sprinkler deflector and any possible storage at 16 inches below the deflector. c.ovc,~
2. Provide fire department approved key entry systems at all points of entry into this
building from the public ROW. (.t:j..JCoL
3. Addressing scheme shall be approved by Building and Fire Departments prior to
recording. L/:1VCcL
4. Provide fire sprinkler monitoring system.(!.t:;VC/Jit
To discuss all Fire Department related concerns, please contact Deputy Fire Marshal
Gregory Ryan at (760) 602-4663.
Laguna Condominiums A
07/13/2006 -
Page 3 of3
Engineering:
1. Show all existing/proposed fire hydrants within 300 feet of the project. This can
be on a separate smaller-scale location map.~ ~ 1{/tf •
2. Plot existing easements with a note as to disposition (i.e. to be quitclaimed, to
remain, etc).~ Cf
3. Show alignment of Madison/Laguna intersection to 90 degrees per information
sent previously. 5617 C/
4. Address minor comments on the preliminary hydrology report. ~ -H)It:f<OloGlj ~
5. Address minor comments on the Storm Water Management Plan. ~ S().Jf·f'F
6. The project will be conditioned to post a Neighborhogg_ !Jnprovement Agreement
for frontage improvements to Laguna Drive. (JD/(J(...()ft..
7. The project will be conditioned to coordinate with the General Services
Department regarding removal of trees within the right-of-way. CbVCO/t..
8. Revise the preliminary hydrology report to show that the existing storm drain
facilities have sufficient capacity to accept the project runoff, or show that the ~-_
project will not increase the peak runoff from pre-development conditions. ~ ~ . p.t;1(1Ll _
Red-lined check prints of the tentative map, preliminary hydrology report, and
stormwater management plan are enclosed for use in making the requested revisions.
This check print should be returned with the next submittal to facilitate continued
staff review.
To discuss all Engineering Department related concerns, please contact Glen Van Peski
at (760) 720-0500.
Landscape Plan review:
Please make the following corrections to the plans so that they will meet the
requirements of the City of Carlsbad Landscape Manual:
1. Label Laguna Drive.
2. Reconcile the square footage of landscape area. Sheet L-1 indicates 3,685 SF
and Sheet CS indicates 2,664 SF.
3. Provide street trees or palms on Laguna Drive spaced at 40' O.C.
4. Add three 24' box King Palms in the planting area adjacent to the south property
line.
5. Remove the turf adjacent to Madison Street. Turf is not allowed in areas less
than 6' wide.
For questions regarding Landscape Plan comments, please contact Pamela Elliott at
760-944-1620.
Ahles Landscape Architedure
RP 06-0 1/CT 06-01
City of Carlsbad plan check correction response:
1. Laguna Drive is labeled.
2. Landscape area has been recalculated. Note that these areas include public right
of way areas of landscape, which may result in landscape area indicated in excess
of that calculated within the property boundaries.
3. Street trees (queen palms) have been added along the Laguna Drive frontage.
4. Tree palms have been added along the south property line.
5. Turfhas been removed from Madison Street frontage.
July 5, 2006
TO:
FROM:
VIA:
RE:
e e
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
LAND USE REVIEW
CLIFF JONES, HOUSING & REDEVELOPMENT
Glen Van Peski, Consultant Project Engineer
BOB WOJCIK, DEPUTY CITY ENGINEER • DEVELOPMENT SERVICES
COMPLETENESS AND ISSUES REVIEW
LAGUNA CONDOMINIUMS CT 06-01/RP 06-01
The Engineering Department has completed our review of the above-referenced project for
application completeness and has determined that the application and plans submitted for this
project are complete and suitable for further review. Staff has identified the issues listed below.
ISSUES
1. Show all existing/proposed fire hydrants within 300 feet of the project. This can be on a
separate smaller-scale location map.
2. Plot existing easements with a note as to disposition (i.e. to be quitclaimed, to remain,
etc).
3. Show alignment of Madison/Laguna intersection to 90 degrees per information sent
previously.
4. Address minor comments on the preliminary hydrology report.
5. Address minor comments on the Storm Water Management Plan.
6. The project will be conditioned to post a Neighborhood Improvement Agreement for
frontage improvements to Laguna Drive.
7. The project will be conditioned to coordinate with the General Services Department
regarding removal of trees within the right-of-way.
Red-lined check prints of the tentative map, preliminary hydrology report, and stormwater
management plan are enclosed for the applicants use in making the requested revisions. This
check print should be returned with the next submittal to facilitate continued staff review.
If you or the applicant have any questions, please either see or call me at 760-720-0500, or
email me at gvanp@ci.carlsbad.ca.us.
Glen K. Van Peski, P.E.
Consultant Project Engineer -Development Services
en c.
March 1, 2006
e
Ci
ROBERT DULICH
675 W. CIRCLE DR.
SOLANA BEACH CA 92075
Subject:
Dear Robert:
Laguna Condominiums, Major Redevelopment Permit
RP 06-01/ CT 06-09
This letter is a follow-up to my previous letter to you, dated February 16, 2006, in which
the items necessary to complete your application for a Major Redevelopment Permit
were identified. In addition to the items listed in my previous letter, Engineering
Department's comments and comments on the landscape plans on your proposed
project are as follows:
Engineering:
The Engineering Department has completed our review of the above-referenced project
for application completeness and has determined that the application and plans
submitted for this project are incomplete and unsuitable for a complete review.
Engineering staff has identified some issues that are listed below. Additional issues of
concern may be identified on subsequent reviews with more complete information.
INCOMPLETE ITEMS
1. Add the application numbers in the upper right hand corner of the tentative map.
2. Label the widths of the existing streets. Where the pavement width varies, show
the range in the cross-section.
3. Show existing and proposed sewer laterals. Show one lateral for each unit.
4. Show proposed water services and meters. Show a separate water meter for
each unit, but show them off one or two services to minimize connection points to
the existing main. Existing water services should be utilized unless they conflict
with proposed improvements.
5. Show proposed irrigation service and meter.
6. Provide updated title report, and plot existing easements, or indicate "No
Easements" on the tentative map.
7. Add information re number of lots and units, zoning and general plan shown on
redlined print of tentative map.
8. Provide a preliminary Storm Water Management Plan (SWMP). Project is not
defined as a "priority project" requiring enhanced permanent Best Management
Practice (BMP) requirements, but it does need to meet the standard permanent
BMP requirements. Refer to the City Standard Urban Storm Water Mitigation
2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2389 • (760) 434-2810/2811 • FAX (760) 720-2037 @
Laguna Condominiums e
03/01/2006
Page 2 of3
Plan (SUSMP).
9. Show all existing/proposed fire hydrants within 300 feet of the project.
ISSUES
1. Show location of the proposed detector check valve for fire sprinklers.
Coordinate with the Fire Department.
2. Address drainage discharge. No concentrated flows can be discharged over the
public sidewalk.
3. City standards dictate that curb inlets be located outside of curb returns.
Redesign, and show the extension of the existing storm drain, with approximate
invert elevations.
4. Label proposed street dedications.
5. Show a transition from proposed curb on Madison Street to the the existing
improvements.
6. Revise driveway apron to the new standard, as shown on the redlined print.
7. Show existing driveways across the street on both Madison Street and Laguna
Drive
8. Show proposed relocated locations of existing power poles.
9. Correct utility demand calculations as indicated.
10. Coordinate with landscape architect so that landscape plans reflect BMPs shown
on the tentative map. Also, some areas show as concrete on the tentative map
but trees and shrubs on the landscape plan.
11. Provide a scale profile of the proposed driveway to the basement, including the
line of the building over it, with grades, lengths of vertical curves, etc.
12. Comments will follow regarding the realignment of the Madison/Laguna
intersection.
13. Revise the preliminary hydrology report so calculations conform to the current
County drainage manual. Report needs to show that either no increase in runoff
will be created, or the existing drainage system can handle the proposed
increase.
Please be advised, additional items of concern may be identified after requested
information has been provided. A red-lined check print is enclosed for the applicants
use in making the requested revisions. This check print should be returned with the next
submittal to facilitate continued staff review.
To discuss all Engineering Department related concerns, please contact Glen Van Peski
at 760-720-0500, or email me at gvanp@ci.carlsbad.ca.us.
Landscape Plan review:
The City's Landscape Plan Check consultant has completed the initial review of the
Preliminary Landscape Plan based upon the plans that were submitted. Corrections and
suggestions have been included in red on the Landscape Plan. Please make the
necessary changes to the Preliminary Landscape Plan and resubmit the revised plans to
Laguna Condominiums
03/01/2006
Page 3 of3
the Housing & Redevelopment Department for further review. The enclosed red-lined
plans must be returned with the modified plans to assist staff in its continued review of
the project.
Please contact my office at (760) 434-2813 if you have any questions regarding the
information contained in this letter.
Sincerely,
1f~
Cliff Jones
Assistant Planner
c: Glen Van Peski, Engineering
Enclosures
February 16, 2006
ROBERT DULICH
e
Ci
675 W. CIRCLE DR
SOLANA BEACH CA 92075
Subject:
Dear Robert:
Laguna Condominiums, Major Redevelopment Permit
RP 06-01/ CT 06-09
Thank you for applying for a Land Use Permit in the City of Carlsbad. The Housing and
Redevelopment Department, together with other appropriate City departments, has
reviewed your Redevelopment Permit, application No. RP 06-01, as to its completeness
for processing.
The application is incomplete, as submitted. The attached list includes information that
must be submitted to complete your application. This list of items must be submitted
directly to the Housing & Redevelopment Office. All list items must be submitted
simultaneously and a copy of this list must be included with your submittal. No
processing of your application can occur until the application is determined to be
complete. When all required materials are submitted to the Redevelopment Office, the
City has an additional thirty (30) days to make a determination of completeness. If the
application is determined to be complete, processing for a decision on the application
will be initiated. In addition, please note that you have six months from the date the
application was initially filed, January 17, 2006, to either resubmit the application or
submit the required information. Failure to resubmit the application or to submit the
materials necessary to determine your application complete shall be deemed to
constitute withdrawal of the application. If an application is withdrawn or deemed
withdrawn, a new application must be submitted.
Please contact my office at (760) 434-2813, if you have any questions or wish to set up
a meeting to discuss the application.
Sincerely,
Cliff Jones
Assistant Planner
c: Glen Van Peski, Engineering
Greg Ryan, Fire
Enclosures
2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2389 • (760) 434-2810/2811 • FAX (760) 720-2037 (!)
Laguna Condominiums e
02116/2006
Page 2 of5
LIST OF ITEMS NEEDED
TO COMPLETE THE APPLICATION
No. RP 06-01, CT 06-01
Staff has completed a review of the subject project for application completeness. The
applications and plans submitted for this project are incomplete at this time. Please
resubmit 4 sets of plans addressing the following incomplete items:
Housing & Redevelopment:
1. The proposed project will require a noise study due to its proximity to the railroad and
nearby busy streets. This study should be prepared once the design of the project is
acceptable to staff. A Noise Report Submittal Form has been enclosed for your
convenience.
2. Please complete the Early Public Notification Package. The requirements for the
early public notice package are enclosed.
3. Please provide a color board (no larger then 9" x 12"), showing building materials
and color samples of glass, reveals, aggregate, wood, etc.
4. Please include the following items on the cover sheet: (These items are requested
as part of the application complete checklist)
• Please identify the contact information of the owner including their address.
• Please have the architect sign the plans.
• Please correct Zoning to read "V-R Village Redevelopment, District 8" and
include the general plan information "V, Village" on the cover page.
• Please identify existing and proposed land use on the cover page.
• Please include a short project description.
• Under Project Data please add information on the Required Reviews and
Permits "Major Redevelopment Permit" & "Tentative Tract Map".
• At upper right hand corner include the following permit numbers "RP 06-01"
"CT 06-01".
• Please identify the cubic footage of tenant storage space per each unit under
"Area Calculations."
• Please include the Average Daily Traffic generated by the project on the
cover sheet.
• Please include the name of the sewer, water, and school district providing
service to the project.
• Please include setback range on the cover page for District 8. Note that the
front yard setback is off of Madison Street and the street side yard setback is
off of Laguna Drive. Refer to issues of concern noted below for more.
5. Please include the following items on the plans: (These items are requested as part
of the application complete checklist)
• Please show the location of all major vegetation, showing size and type both
within the project and for a distance of 150 feet on sheet C-1.
• Please identify the distance between adjacent buildings and/or structures.
Laguna Condominiums e
02/16/2006
Page 3 of5
• Please indicate top and bottom elevations for all fences, walls, and retaining
walls. Provide section detail of these walls as it relates to adjacent properties
• Indicate fences, walls, and planters on elevation sheets.
6. Indicate residential visitor parking stalls on the parking plan.
7. Please show setback lines on elevation sheets.
8. Please cleary indicate existing and finished grade on all elevation and section detail
sheets. Please verify that the proposed underground parking meets the basement
definition (21.04.045) and is not calculated a part of building height.
9. Please provide two copies of the Preliminary Title report current within the last six (6)
months.
10. Please provide a signed "Notice of Time Limits on Discretionary Applications" form.
Engineering:
Engineering Department comments are forthcoming and will be sent under a separate
cover.
Laguna Condominiums e
02/16/2006
Page 4 of5
No. RP 06-01, CT 06-01
ISSUES OF CONCERN
Staff has completed a review of the subject project for issues of concern. The following
items need to be resolved or adequately addressed prior to staff making a final
determination on the proposed project: (Please note, the issues are listed under the
department which identified them as an area of concern.)
Housing & Redevelopment:
1. The setbacks are incorrectly identified on the plans. The front yard setback is off of
the shorter street frontage, Madison Street. The side yard setback off of Laguna
Drive of 5 feet is within the permitted range as is the front yard setback of 5 feet.
The rear yard setback range is 5-1 0 feet, therefore the 1 0-foot rear yard setback is at
the maximum of the permitted range. However the side yard setback is required to
be 10% of the lot width. The lot width is calculated according to CMC 21.04.265 and
is 9'-7". The proposed 5-foot side yard setback is unacceptable and must be
changed to the permitted setback of 9'-7" or support must be provided for a variance
according to CMC 21.35.130.
2. As mentioned within the preliminary review, the proposed 20-foot driveway is
required to be 24-feet wide according to CMC 21.45.060. Staff felt as though they
could support a 20-foot drive entrance off Madison Street however the applicant
must request a variance and provide the necessary justification. The justification
should address the variance findings contained within CMC 21.35.130 and the
findings contained within the Carlsbad Village Redevelopment Master Plan
(enclosed).
3. The proposed projects architectural design differs from the design submitted during
preliminary review. Much of the surfaced ornamentation and architectural detail (i.e.
divided light windows, shudders around windows, etc.) has been eliminated with the
formal application. Staff suggest additional building articulation be provided similar
to the submittal reviewed during preliminary review.
4. Please provide vehicle turning radius demonstrations on sheet A2.
5. The landscape plans shows landscaping around the trash area. Will this be a
conflict when taking out the trash. How will the trash be serviced for the project?
Please revise plans as necessary.
6. Please identify the enhanced paving treatment required for the driveway entrance to
the project as specified within the PO Ordinance (21.45). Please identify this on the
site plan, grading plan, and landscape plan, and provide on the sample materials
board.
7. The peaks of the roof may not exceed the 35-foot height requirement. Please
redesign to comply with building height according to Carlsbad Municipal Code (CMC)
21.04.065 on elevation sheets and section detail sheets. Building height is
Laguna Condominiums e
02/16/2006
Page 5 of5
measured along all points from the lowest of existing or finished grade to the peak of
the roofline.
8. Is rooftop mechanical equipment proposed?
9. Please draw in stairs and related up/down arrows on floor plans. Including up/down
arrows on the plans to the entrances of the buildings.
10. Please identify location of AJC units for the residential units.
11. Please indicate building materials on elevations (i.e. rock, stucco, wood, tile, metal)
and also provide similar information related to building colors.
12. For In-fill residential projects the applicant must provide photo-simulation scaled
representations of the project as viewed from adjacent streets and adjacent
developed single-family residential projects. Once the application is determined to
be complete these photo-simulations will be requested.
Fire:
The Fire Department has completed its review of this project and shall require the
following information and propose the following requirements/changes if applicant
desires to proceed with this application.
1. The proposed location of the Fire Sprinkler system backflow assembly and riser
locations need to be identified. These items also affect placement of fire
hydrants and other utilities, as easements have to be drawn and recorded.
2. Fire Department standards will ask you to provide an area or room for the fire
sprinkler riser that is accessible from the exterior. Garage interiors are
acceptable so along s the riser assembly can be protected form interruptions and
vandalism.
To discuss all Fire Department related concerns, please contact Deputy Fire Marshal
Gregory Ryan at (760) 602-4663.
Engineering:
Engineering Department comments are forthcoming and will be sent under a separate
cover.
Landscape Plan review:
Comments on the Preliminary Landscape Plan based upon the review prepared by the
City's Landscape Plan Check consultant are forthcoming and will be sent under a
separate cover.
Crime Prevention Plan Review:
The City's Crime Prevention Specialist typically reviews plans for larger projects in an
effort to increase security through project design. Project design recommendations have
been enclosed for your review. For questions regarding the attached comments, please
contact Jodee Sasway of the Carlsbad Police Department at 760-931-2195.
LJ~~ . { ''? \
/ # \, :
.\:
,_. ·\', .' .
COHN+ ASSOCIATES -ARCH!TECTVREPLANN~
380STEVENSAVE
SUITE307
SOLANA BEACH, CALIFORNIA 9a775
85&755-7308 FAX 8581755-5889
LAGUNA CONDOMINIUMS
Request for a variance from a 24' wide driveway as required by CMC 21.45.060
to a 20' wide driveway.
VARIANCE JUSTIFICATION
1 ). Special circumstances exist that are applicable to the subject property that
justify granting the requested variance. First the shape of the lot is unusual
due to its "wedged" shape configuration. This shape restricts the design
flexibility and does not allow various options which might allow tor the
complying driveway width.
The second special circumstance is the required dedication of 1 0' along
both laguna Drive and Madison Street. This reduces the lot size
substantially (by approximately 23% ). The reduced lot size also restricts
the workable room on the site further justifying the reduced driveway
width.
Finally the site location at the intersection of laguna Drive and Madison
Street also adds constraints to the site. In particular it restricts the number
of possible driveway locations. Since the driveway needs to be located
a:Nay from the intersection, we do not have the full flexibility of designing
the project in a manner which may have allowed the full driveway width.
\ ) Without granting the variance, this project would have to be reduced from
five units to four units. This strict application of the code would deprive this
project of the same development potential (privileges) as other similar
sized properties located in the middle of the block (same zone and vicinity)
due to its shape, location and required dedications.
! c..: I \
i-···~~-~ (\~ (:.,_
!
2). This variance would not constitute a grant of special privileges. Due to the
unique circumstances outlined above, the requested variance would allow
the subject property to be on par with other properties in its local vicinity
and zone.
3). The requested variance does not authorize a use or activity which is not
otherwise expressly authorized by the zone regulation governing the
subject property. It allows us to develop the site with the use intended for
this location by the zoning ordinance.
4). The requested variance in no way changes the use or development of the
site in a manner that is inconsistent with the general purpose and intent of
the General Plan, Carlsbad Village Area Redevelopment Plan, and the
Carlsbad Village Redevelopment Master Plan and Design Manual.
e e
City of Carlsbad
I@ I ki:W •X4 ·til II .14 ,J I
Date: February 3, 2006
To: Cliff Jones-Planning Department
From: J. Sasway, CPS-Police Department
Subject: RP 06-01 I CT 06-01 -Laguna Condominiums
Plan Review Recommendations
The following recommendations are optimal security suggestions utilizing Crime Prevention
Through Environmental Design (CPTED) and are provided by Carlsbad Police Department's
Crime Prevention Unit. The purpose of this document is to safeguard property and public
welfare by reviewing and regulating the design, construction, quality of materials, use and
occupancy, location, and maintenance of all buildings and structures. The Crime Prevention
Unit presents recommendations in two sections, site considerations and building
recommendations.
Site Considerations
Create Defensible Space
Strategies to consider:
Provide clearly defined transitions from public to private space. Use landscaping, fencing and
ground cover to create territoriality and an identity for the property.
Use natural barriers to designate space and separate activities that may conflict.
Design space to increase the perception of natural surveillance.
Design the space to direct the flow of people in the manner intended, preventing people from
entering unauthorized space.
Consider that if people feel comfortable and safe in all areas, they are more likely to use the
areas.
Lighting
All vehicular drive surfaces, open parking areas and carports should be illuminated with a
minimum maintained 1 foot-candle of light at ground level during the hours of darkness.
All exterior common area pedestrian walkways and recreation areas should be illuminated with
a minimum maintained 0.25 foot-candle of light at ground level during the hours of darkness.
Open stairways and enclosed common area corridors should be illuminated with a minimum
maintained 0.5 foot-candle of light on all landings and stair treads during the hours of
darkness. ·
Enclosed stairways shall be illuminated at all times with a minimum maintained 1 foot-candle
of light on all landings and stair treads.
Cluster mailboxes and trash enclosures located on the exterior should be illuminated with a
minimum maintained 1 foot-candle of light, measured within a five-foot radius at ground level,
2560 Orion Way • Carlsbad, CA 92010-7240 • (760) 931-2100 • FAX (760) 931-8473 <!)
during the hours of darkness.
Recessed areas of building or fences, which have a minimum depth of two feet, a minimum
height of five feet, and do not exceed 6 feet in width and are capable of human concealment,
shall be illuminated with a minimum maintained 0.25 foot-candles of light at ground level
during the hours of darkness. This requirement applies to defined recessed areas that are
within 6 feet of the edge of designated walking surface with an unobstructed pathway to it, not
hindered by walls or hedgerow landscaping a minimum of two feet in height.
Accessible luminaries utilized to meet the requirements of this section shall have vandal
resistant light fixtures and be not less than three feet in height from the walking surface when
used to illuminate walkways and a minimum of 78 inches in height above the driving surface
when illuminating surfaces associated with vehicles. Light fixtures shall be deemed accessible if
mounted within 15 feet vertically or 6 feet horizontally from any accessible surface or any
adjoining roof, balcony, landing, stair tread, platform or similar structure.
The light source utilized to comply with this section to meet parking and drive surface lighting
shall have a rated average bulb life of not less than 10,000 hours.
Landscaping
For surveillance and security,
Tree canopies should not be lower than 5 feet.
Do not allow trees to provide access to roofs or balconies.
Let landscaping augment, not deter from lighting.
Plant low profile shrubs, below three feet
Apply security plants where necessary to prevent loitering and tampering
Install walls and fences that are see through for surveillance.
Lock gates and install gates that allow surveillance.
Addressing
Each individual unit within the complex should display a prominent identification number not
less than 4 inches in height, contrasting in color to the background to which it is affixed and
clearly visible to approaching vehicles and/ or pedestrians. Numerals should be no less than 4
inches in height and illuminated during the hours of darkness.
Entrances
Keep entranceways clear of clutter.
Ensure you allow vision from the front access street to front door entrance.
Parking Structures
It is recommended that the entrance to the underground parking be gated for protection of the
vehicles and personal safety of the residents.
Lighting
Lighting is the most important security feature in a parking facility. Vertical illuminance is an
equally important consideration in parking facility lighting. Uniformity is also critical. The
minimum illuminances in any one point should be 2 foot-candles. Position lights over vehicles
or near beams rather than in drive aisles to reduce glare. Or choose fixtures with built in
shields to reduce glare.
Natural Surveillance
Natural surveillance is the next most critical parking facility design issue after lighting. Long-
span construction and high ceiling create openness and aid lighting the facility. Dead end
parking and nooks and crannies should be avoided.
Elevators
Elevator cabs, the interiors of which are not completely visible when the door is open from a
point centered on and 36 inches away from the door, shall have shatter resistant mirrors or
other equally reflective material so placed as to make visible the entire elevator cab from this
point. The elevator cab shall be illuminated at all times with a minimum maintained two foot-
candles of light at floor level.
Stairways
Interior doors shall have glazing panels a minimum of flve inches wide and 20 inches in height
and meet requirements of the Uniform Building Code.
Areas beneath stairways at or below ground level shall be fully enclosed or access to them
restricted.
Stair towers and elevators have been the highest risk for personal injury as they are typically
enclosed. Stairways shall be designed to be completely visible from either the interior or
exterior or both, unless mandated by the Uniform Building Code to be enclosed.
Fully enclosed interior or exterior stairways with solid walls, when required, shall have shatter
resistant mirrors or other equally reflective material at each level and landing and be designed
or placed in such a manner as to provide visibility around corners.
Parking Storage
Install wooden doors of solid core construction with a minimum thickness of one and three-
fourths (1-3/4) inches.
Equip all doors with a single cylinder dead-bolt lock using a S-pin tumbler. Connect the
dead bolt to the inner portion of the lock by connecting screws. Ensure the lock has a one-inch
throw that can withstand a cutting tool attack. Choose a deadbolt that embeds at least one
inch into the strike plate. ·
Strike plates for deadbolts on all wood framed doors should be constructed of a minimum 16
U.S. gauge steel, bronze, or brass and secure to the jamb by a minimum of two screws, which
should penetrate at least two inches into the solid backing beyond the surface to which the
strike is attached.
Equip all storage doors with a latch cover constructed of steel. Ensure the latch cover is a
minimum of .125 inch thick. Attach the latch cover to the outside by welding or with non-
removable bolts spaced apart on not more than ten-inch centers.
Doors
Install wooden doors of solid core construction with a minimum thickness of one and three-
••
fourths (1-3/4) inches. This includes the garage or any other pedestrian door.
Further, equip all doors with a single cylinder dead-bolt lock using a S-pin tumbler. Connect
the dead bolt to the inner portion of the lock by connecting screws. Ensure the lock has a one-
inch throw that can withstand a cutting tool attack. Choose a deadbolt that embeds at least
one inch into the strike plate.
Arrange all entry and exit doors to dwelling units so that the occupant has a view of the area
immediately outside the door without opening the door. Except doors requiring a fire protection
rating that prohibits them, a door viewer having a field of view of not less than 190 degrees may
provide such a view. Mounting height should not exceed fifty-four inches from the floor.
Further, install no glass panels within forty inches of a locking device.
Doors that are partially glass should have a single cylinder dead-bolt lock. Equip these doors
with a burglar resistant glaze to prevent someone from breaking the glass to enter the home.
Latch covers are suggested on all common area doors or garage area doors.
Strike Plates
Strike plates for deadbolts on all wood framed doors should be constructed of a minimum 16
U.S. gauge steel, bronze, or brass and secure to the jamb by a minimum of two screws, which
should penetrate at least two inches into the solid backing beyond the surface to which the
strike is attached.
Double Doors
When pairs of doors are used, a one-piece assembly attached to the full-length edge of the
inactive door leaf, incorporating an astragal and flush-bolts for the header and threshold, will
take the place of a strike plate, provided the assembly is constructed of aluminum or steel and
is a minimum of one-eighth inch in thickness.
Hinges
Hinges for oust-swinging doors should be equipped with non-removable hinge pins or a
mechanical interlock to preclude removal of the door from the exterior by removing the hinge
pins.
Keying
Upon occupancy by the owner, each single unit in a tract constructed under the same general
plan, should have locks using combinations that are interchange free from locks used in all
other separate dwellings.
Windows
Choose movable windows with security hardware to prevent them from being lifted from the
frame or forced to slide.
MaU Boxes
Mailboxes should be located in highly visible areas adjacent to common areas.
By, Jodeene R. Sasway
Crime Prevention Specialist
Carlsbad Police Department
(619) 931-2195
•
June 24, 2005
ROBERT DULICH
675 W CIRCLE DR
SOLANA BEACH CA 92075
SUBJECT: Preliminary Review for Laguna Condos-PRE 05-38 (APN: 203-110-42 & 203-
110-43)
A preliminary review of your project was completed on June 24, 2005. Listed below are the
issues raised by staff. Please note that the purpose of a preliminary review is to provide you
with direction and comments on the overall concept of your project. The preliminary review
does not represent an In-depth analysis of your proJect. Additional Issues of concern
may be raised after your application is submitted and processed for a more specific and
detailed review.
Housing & Redevelopment and Planning:
Housing & Redevelopment and Planning Department comments on the preliminary review are
as follows:
1. Project Processing:
a. The required land use permit for a project of this size is a Major Redevelopment Permit
and Tentative Tract Map. This will require a public hearing before the Design Review
Board for recommendation and a public hearing before the Housing & Redevelopment
Commission for final decision. The required applications can be acquired from the
Housing & Redevelopment Department.
b. Please submit a fully completed environmental impact assessment form with the formal
application submittal to determine what level of environmental review is required. It is
anticipated that the project will be exempt from environmental review per California
Environmental Quality Act (CEQA) Guidelines.
1. General Comments:
a. Please review the Major Redevelopment Permit Application checklist thoroughly to
make sure that all items are addressed on the plans before formal project submittal.
b. Staff has concerns about the appearance of the east and south elevations. Since these
elevations were not provided, staff could not review the architectural detail of those.
elevations. However, an analysis of the site plan leads staff to believe that little to no
recesses are provided ~long those elevations leaving a large blank wall scaling 30+ feet.
Staff encourages the applicant to consider more attention to design be provided along
those elevations. These elevations should be designed with detail elements that
complement the front elevations of the building to avoid the appearance of a flat building
elevation.
c. Staff has concerns about the massing of the building at the south-west corner. In
addition the unit at the south-west corner lacks the required balcony space (120 s.f. of
balcony space required per CMC 21.45). In order to soften the corner and meet the
requirements of CMC 21.45, staff suggests the applicant consider wrapping the units
balcony along Madison Street allowing the front elevation to be softened by the
recessed balcony space. Staff also suggests that the unit at the southwest be stepped
back at the third level.
2965 Roosevelt St .. Ste. B • Carlsbad, CA 92008-2389 • (760) 434-2810/2811 • FAX (760) 720-2037 (j
· PRE ~5-38 Laguna Condose
06/24/2005
Pa e2 •
d. Staff suggests that the units have mechanical ventilation to allow windows to be closed
during noisy times.
e. Please indicate the locations of water heaters.
f. Please indicate doorways and windows on floor plans.
g. The stairways and entrances should be clear on the plans.
1. Project Density -The Carlsbad Village Redevelopment Master Plan does not establish
specific residential densities within the redevelopment area. In accordance with the Village
Master Plan, the applicable General Plan residential density designation shall be
determined for each project based upon compatibility findings within the surrounding area.
The applicable project density is between 15-23 dwelling units per acre. However, the
Growth Management Control Point restricts the number of dwelling units to 19 per acre. In
order to exceed 19 dwelling units per acre staff will need to make the findings identified in
21.90.045 of the Carlsbad Municipal Code.
Density is calculated based upon gross floor area. Please indicate gross site area on the
site plan and calculate the density based on this number. The project will have to meet the
required development standards mentioned in the Carlsbad Village Redevelopment Master
Plan including the universal development standards and specific development standards
addressed for properties within District 8 and the basic design principles identified within the
Design Guidelines.
2. Building Setbacks:
a. The established range for front setbacks within Land Use District 8 are as follows:
F rent: 5-15 feet.
Side: 5-10 feet street side. 10% of lot width
Rear: 5-1 0 feet.
Provide setback information on site plan. Indicate approximate location of existing
structures within 100 feet.
b. In all cases where a range has been established as the appropriate setback standard
within a given district, the top of the range is considered to be the desired standard. For
an approval of a setback standard, which is above the maximum for the subject land use
district, a variance must be approved by the authorized approving body/official.
Variances shall be granted according to the regulations set forth in Section 21.35.130 of
the Carlsbad Municipal Code. A variance for a setback standard which exceeds the top
of the range, or the individual standards set forth, will be granted only if the project
meets one or more of the following criteria:
• The project is in a location where adjacent building are set back further than
the permitted standard (range), adjacent buildings are likely to remain, and
setting the structure back to the desired standard will maintain and reinforce
the Village character of the area.
• The project is in a location, which is in a transition area to residential
development and where increased setbacks would soften the visual transition
between commercial and residential development or would protect the
livability of the residential development.
c. The west elevation is set back at 4'-2" (setback of front property line to support
columns), The west side yard setback must be setback at a minimum of 5 feet. The
posts should be setback a minimum of 5 feet.
5. Building Coverage: Please show building coverage standard on formal project
submittal. The building coverage standard for projects in Land Use District 8 is 60% to
PRE 05-38 Laguna Condo.
06/24/2005 • Pa e3
80%. Special findings will have to be made if coverage is greater than the maximum
permitted. There are no floor area rations in the City of Carlsbad. Indicate building
coverage on the plans.
6. Building Height: Maximum building height is 35' with a minimum 5:12 roof pitch.
Building height is the vertical distance of a structure measured from the more restrictive
(lowest) of finished or existing grade. The vertical distance is measured from all points
at grade along and within the building coverage to the highest point of the structure
directly above that point of measurement. The applicant shall provide elevations and
sections to show proposed building height. Identify the overall building height on the
plans.
7. Parking: The applicant will be required to satisfy parking for the residential (tenant and
guest) portion of the project on site.
a. The proposed project would require parking for condominium use, which is 2
standard spaces per unit with one being covered, and .5 spaces per unit up to 10
units for guest parking. Water heaters and other projections may not encroach
into the required parking area.
b. Parking spaces are required to be a minimum of 8.5 feet in width and 170
square feet. Therefore, the parking spaces must be either 8.5' x 20' or 9' x 19'.
In addition, two feet of clearance shall also be included where each parking
space abuts a solid wall or posts. A backup distance of 24 feet shall be
maintained in addition to a minimum 5 foot turning bump located at the end of
any stall entries. A maximum of 40% of the total number of parking spaces
provided on-site may be constructed to meet the requirements of a small
compact vehicle. Compact spaces must be a minimum width of eight feet and a
minimum length of fifteen feet with no overhang permitted.
c. Please identify the location of the support columns on the plans. Note that the
support columns may interfere with the parking circulation and/or standards.
d. Please show detailed parking calculations on the site plan.
8. Open Space: Please include an open space calculation on the plans. A minimum of
20% of the site must be maintained as open space. The areas that qualify as open
space include; landscaped planters, open space pockets, balconies, and patios. No
parking spaces or drive aisles are permitted in the open space calculation.
9. Planned Unit Development Ordinance: Condominium projects proposed for individual
ownership is required to meet the development standards of the Village Master Plan.
When not provided for in the Master Plan, the project is also required to meet the
standards of the Planned Unit Development Ordinance (CMC 21.45). A copy of the
Planned Unit Development Ordinance has been included for your use. Pursuant to
Chapter 21.45 of the Zoning Ordinance, following is a list of what will be required:
a. Driveway -Minimum 24 feet wide with no parking permitted in travel way.
b. Storage space is required for each unit. Each unit shall have at least 392 cubic
feet, when provided in one location, or 480 cubic feet when provided in separate
areas. Storage areas shall be separately enclosed for each unit and be
conveniently accessible to the outdoors.
c. For projects of 1-1 0 dwelling units, each unit shall have 15 x 15 of patio space or
120 square feet of balcony area. In order to make balcony areas useable and
functional, provide a 6-foot minimum width.
d. Please show compliance with these requirements on your plans.
PRE 0~-38 laguna Condos e
06/24/2005
Pa e4 •
10. The project is subject to the City's inclusionary housing requirement. Therefore 15% of
the total units must be affordable to low income persons.
11. Indicate on the site plans the proposed trash area. Due to the high visibility of the trash
enclosure, please consider the use of a split face masonry wall or similar material that
will resist graffiti. Engineering must approve location of trash enclosure to insure it does
not impact visibility of driver exiting the site.
12. Conformance with Design Guidelines: The project must be consistent with the design
guidelines set forth for the area. A copy of the Village Design Guidelines has been
included for your use. It is recommended that you reexamine the Design Guidelines set
forth in the Village Master Plan and consider some modifications to the exterior design
of the building. In particular, the design guidelines encourage the following:
a. A variety of setbacks along any street frontage.
b. An abundance of landscaping planted to create an informal character.
c. Treat structures as individual buildings set within a landscaped green space.
d. Emphasize the use of gable roofs with slopes of 5 in 12 or greater -Roof forms
should be prominent and used to integrate commercial and residential structures into
a unified visual environment.
e. Avoid flat roofs -limit flat roofs to minor areas which cannot be easily seen;
f. Emphasize wood and composition shingle roofs.
g. Design visual interest into all sides of the building -front facades facing streets or
public access should receive special design attention. Other facades, which are
visible, should also be visually pleasant.
h. Provide facade projections and recesses.
i. Utilize applied surface ornamentation and other detail elements for visual interest
and scale.
j. Encourage front entry gardens.
k. Emphasize "Cottage" form, scale, and character-The use of gable roofs, varied
roof heights, dormers, interesting details and an informal composition will enhance
the area's Village character and provide a visual relationship between residential and
adjacent commercial buildings.
I. Integrate fences and walls into the building design.
If you have any questions regarding Housing and Redevelopment Department comments
please contact Cliff Jones at 760-434-2813.
Building:
1. The attached State Emergency regulations appear to affect this type of proposed
project. It's likely to become permanent Jaw in California and goes into affect July 1,
2005. Projects for which permits are applied for after that date will need to comply with
these emergency regulations.
2. It is recommended that the applicant meet preliminarily w/ EsGil Corp to review exiting
schemes -the third level exit stairway does not show an exit door, so staff is unsure
where it leads people trying to get away in an emergency.
If you have any questions regarding Building Department comments please contact Pat Kelley
at 760-602-2716.
PRE 05-38 Laguna Condo.
06/24/2005 • Pa e5
Engineering:
Engineering Department staff has completed a preliminary review of the above subject. For the
applicants benefit we have broken down our issues into two sections. The first section identifies
"Significant Issues" and the second section lists "General Issues". Prior to formal application
submittal, it is suggested the following items are adequately resolved/addressed:
Significant Issues
1. Order No. 2001-01 was recently issued by the California Regional Water Quality Control
Board. This action leads to updates in the National Pollution Discharge Elimination
System (NPDES) permit. These new regulations involve significant changes to this
project and other projects processed throughout the San Diego region. In order to
facilitate the compliance of this project, the following are some criteria that should be
incorporated into the design of the project:
a) All efforts should be made to ensure that post development storm run-off flows
and velocities do not exceed pre-development storm run-off flows. This can be
proved via engineering calculations in a project hydrology/hydraulic report. This
report must be submitted as part of the discretionary review application.
b) Revise the plan to incorporate Best Management Practices (BMP's) as outlined in
the California Storm Water Best Management Practice Handbooks, latest edition.
Depending on the anticipated pollutants generated from the site, these measures
may include but are not limited to one or a combination of grass swales, pollution
control basins, inlet filters, oil water separators, etc. Revise the plans to include
measures to capture anticipated pollutants from the project and street. Storm
water from the site must be filtered before being discharged to City right-of-way.
c) Offsite and downstream siltation would not be permitted at any time during the
project (during construction or after).
d) The applicant will be required to submit to the City a Storm Water Pollution
Prevention Plan (SWPPP) that addressed both construction and post-construction
phases of the project. The SWPPP will not be required as part ofthe discretionary
review, but will be required before issuance of development permits (grading
permits, right-of-way permits, building permits, etc.).
We encourage you to revtew the permit requirements
(http://www.swrcb.ca.gov/rwgcb9/Programs/Storm Water/storm water.html) so that you
understand the nature of our comments when they are made on projects.
2. Madison Street is classified as a "Compatible Improvement Street" under the Street and
Sidewalk Policy Committee Report. The project will be required to complete Madison
Street with curb, gutter and sidewalk consistent with current City standards.
3. Laguna Drive across the project frontage is classified as a "Alternative Design Street"
under the Street and Sidewalk Policy Committee Report. The project applicant will
participate in an "alternative design process", facilitated by City Engineering staff,
including notifying surrounding property owners and soliciting input, to determine
appropriate street improvements to the Laguna Drive frontage.
PRE 05-38 Laguna Candee
06/24/2005
Pa e6 •
4. Provide a preliminary hydrology study that identifies the pre-and post-development
discharge flows and shows either a) that no increase in peak runoff is proposed due to
onsite detention, b) that downstream facilities are adequate to handle the increased runoff
with no damage to other properties or increased erosion in natural watercourses, or c) the
design of new drainage facilities to adequately handle the runoff.
5. Identify the existing finished floor elevation of adjacent structures (or elevations just next
to the structures). This requirement demonstrates how the project relates to existing
adjacent development in infill areas. Show any proposed retaining/screen walls with top
of wall, top of retaining, and finished grade elevations.
General Issues
1. Please be advised that in order to make a more in-depth review of the proposed
development, a more complete design of the project is required.
2. A public improvement plan will be required for the public waterline improvements
and any other improvements proposed within City right-of-way or public easements.
3. Provide multiple cross-sections of the site to demonstrate differences in grade,
especially as it relates to adjacent properties.
4. Add symbols to the plans to identify the difference between existing and proposed
improvements. Show the existing structures to be removed.
5. Depict the location of existing adjacent buildings and surface improvements.
6. Please indicate the location and size of all existing and proposed utilities along
Madison Street and Laguna Drive (i.e., storm drain, water, sewer, etc.) that will serve
the development. Indicate gravity flow of sewer facilities via invert elevations.
7. Indicate all existing and proposed surface improvements (curb, gutter, sidewalk,
paving, access-holes, inlets, power poles, street lights, adjacent driveways, vaults,
transformers, etc.) along the property frontages and the opposite sides of fronting
streets, and verify that no conflicts exist.
8. Provide a profile/section for the proposed garage driveway (to scale).
9. The plan should indicate the ADT (traffic), EDU's (sewer), GPM (potable water), and
GPM (reclaimed water) generated or required by the proposed development.
10. Meet with the Fire Department to identify the necessary fire protection measures
required for this project (access, fire hydrants, sprinklering, etc.). All proposed fire
hydrants must be served by public water mains.
11. Show all existing and proposed topography and drainage patterns for the site. Revise
the plans to indicate how on-site surface runoff is controlled. Identify the location,
alignment, and discharge of any proposed drainage system.
12. Indicate the legal description of the proposed development and short legal
descriptions of all adjacent properties.
.PRE 0~-38 Laguna Condos.
06/24/2005
Pa e7
13. Provide a Vicinity Map on the site plan.
•
14. Submit the site plan at an engineering scale (i.e. 1" = 10', or, 1" = 20').
15. Indicate the volume of grading (cut, fill, import, export, remedial) proposed for the
project in cubic yards. There is insufficient information provided to make a clear
determination of whether a grading permit is required.
16. Provide 5' backups adjacent to end parking spaces.
17. Revise the plans to include typical street cross-sections of Madison Street and Laguna
Drive that indicate existing and proposed improvements (pavement, curb, gutter,
sidewalk, centerline, street lights, fire hydrants, etc.).
18. Dimension the site plan, including parking stalls and garage drive aisles. Depict the
location of trash enclosures required to serve the development.
19. A recent Preliminary Title Report (PR) issued within 6 months of formal application
submittal will be required for the proposed project.
20. All easements and encumbrances as identified in Schedule "B" of the PR must be
indicated on the site plan. The future disposition of any easements and encumbrances
must also be identified.
21. Indicate how National Pollutant Discharge Elimination System (NPDES) criteria will
be met. This could include, but not be limited to, doing one or a combination of the
following: directing surface run-off through vegetated swales prior to discharge to a
storm drain or the public right of way, constructing a gravel/sand/fossil filter system,
constructing de-pollutant basins, etc.
22. This preliminary review does not constitute a complete review of the proposed project
and additional items of concern may be identified upon formal project application
submittal.
23. A redlined check print is enclosed for the applicants use in making the requested
revisions. This check print should be returned with the formal application
submittal to facilitate continued staff review.
If you or the applicant have any questions regarding Engineering Department comments please
see or contact Glen Van Peski at 760-720-0500.
1. Fire Department has reviewed the project application and would ask that the applicant
provide additional detail including type of construction, location of nearest fire hydrant,
etc. This information will provide Fire with need information and to what may be
required for the proposed development.
2. Based on the information provided, the applicant shall provide an automatic fire sprinkler
system throughout and shall provide Fire Department approved key switches or key
boxes at all common points of entry and garage.
If you have any questions regarding Fire Department comments please contact Greg Ryan at
760-602-4663.
•
PRE ~5-38 Laguna Condo.
06/24/2005
Pa e 8
Landscaping:
Please provide a landscape plan with formal application submittal.
•
This preliminary review does not constitute a complete review of the proposed project;
additional items of concern may be identified upon formal project application submittal. Please
contact Cliff Jones in the Housing and Redevelopment Department at (760) 434-2813 if you
have any questions regarding the information contained in this letter.
Sincerely,
~/~
CLIFF JONES
Assistant Planner
C: Debbie Fountain, Housing & Redevelopment Director
Glen Van Peski, Engineering Dept.
Greg Ryan, Fire Department
Pat Kelley, Building Dept.
Enclosures