HomeMy WebLinkAboutRP 06-03; Roosevelt Center; Redevelopment Permits (RP) (3)ENVIRONMENTAL IMPACTS
STATE CEQA GUIDELINES, Chapter 3, Article 5, Section 15063 requires that the City conduct an Environmental
Impact Assessment to determine if a project may have a significaat effect on the environment. The Environmental
Impact Assessment appears in the following pages in the form of a checklist. This checklist identifies any physical,
biological and human factors that might be impacted by the proposed project and provides the City with information
to use as the basis for deciding whether to prepare an Environmental Impact Report (EIR), Negative Declaration, or
to rely on a previously approved EIR or Negative Declaration.
• A brief explanation is required for all answers except ''No Impact" answers that are adequately supported
by an information source cited in the parentheses following each question. A "No Impact" answer is
adequately supported if the referenced information sources show that the impact simply does not apply to
projects like the one involved. A "No Impact" answer should be explained when there is no source
document to refer to, or it is based on project-specific factors as well as general standards.
• "Less Than Significant Impact" applies where there is supporting evidence that the potential impact is not
significantiy adverse, and the impact does not exceed adopted general standards and policies.
• "Potentially Significant Unless Mitigation Incorporated" applies where the incorporation of mitigation
measures has reduced an effect fi-om "Potentially Significant Impact" to a "Less Than Significant Impact."
The developer must agree to the mitigation, and the City must describe the mitigation measures, and briefly
explain how they reduce the effect to a less than significant level.
• "Potentially Significant Impact" is appropriate if there is substantial evidence that an effect is significantly
adverse.
• Based on an "EIA-Part I", if a proposed project could have a potentially significant adverse effect on the
environment, but all potentially significant adverse effects (a) have been analyzed adequately in an earlier
EIR or Mitigated Negative Declaration pursuant to applicable standards and (b) have been avoided or
mitigated pursuant to that earlier EIR or Mitigated Negative Declaration, including revisions or mitigation
measures that are imposed upon the proposed project, and none of the circumstances requiring a
supplement to or supplemental EIR are present and all the mitigation measures required by the prior
environmental document have been incorporated into this project, then no additional environmental
document is required.
• When "Potentially Significant Impact" is checked the project is not necessarily required to prepare an EIR
if the significant adverse effect has been analyzed adequately in an earlier EIR pursuant to applicable
standards and the effect will be mitigated, or a "Statement of Overriding Considerations" has been made
pursuant to that earlier EIR.
• A Negative Declaration may be prepared if the City perceives no substantial evidence that the project or
any of its aspects may cause a significant adverse effect on the environment.
• If there are one or more potentially significant adverse effects, the City may avoid preparing an EIR if there
are mitigation measures to clearly reduce adverse impacts to less than significant, and those mitigation
measures are agreed to by the developer prior to public review. In this case, the appropriate "Potentially
Significant Impact Unless Mitigation Incorporated" may be checked and a Mitigated Negative Declaration
may be prepared.
^ ' 3 Rev. 07/26/02
An EIR must be prepared if "Potentially Sigmficant Impact" is checked, and including but not limited to
the following circumstances: (1) the potentially significant adverse effect has not been discussed or
mitigated in an earlier EIR pursuant to applicable standards, and the developer does not agree to nutigation
measures tiiat reduce tiie adverse impact to less than significant; JZ) a "Statement of Ovemdmg
Considerations" for tiie sigmficant adverse impact has not been made pursuant to an earlier EIR; (3)
proposed mitigation measures do not reduce tiie adverse impact to less tiian significant; or (4) tiirough tiie
EL\-Part I analysis it is not possible to determine the level of significance for a potentially adverse eflfect,
or detemiine the effectiveness of a mitigation measure in reducing a potentially significant effect to below a
level of significance.
A discussion of potential impacts and tiie proposed mitigation measures appears at tiie end of the forai under
DISCUSSION OF ENVIRONMENTAL EVALUATION. Particular attention should be given to discussing
mitigation for impacts, which would otherwise be detennined significant.
Rev. 07/26/02
Issues (and Supporting Information Sources).
(Supplemental documents may be referred to and attached.')
I. AESTHETICS - Would the project:
a) Have a substantial adverse effect on a scenic vista?
b) Substantially damage scenic resources, including but
not limited to, trees, rock outcroppings, and historic
buildings within a State scenic highway?
c) Substantially degrade the existing visual character or
quality of the site and its surroundings?
d) Create a new source of substantial light and glare,
which would adversely affect day or nighttime views
in the area?
II. AGRICULTRAL RESOURCES - (In detennining
whether impacts to agricultural resources are significant
environmental effects, lead agencies may refer to the
California Agricultural Land Evaluation and Site
Assessment Model-1997 prepared by the Califomia
Department of Conservation as an optional model to use
in assessing impacts on agriculture and farmland.) Would
the project:
a) Convert Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance (Farmland), as
shown on the maps prepared pursuant to the
Farmland Mapping and Monitoring Program of the
Califomia Resources Agency, to non-agricultural
use?
b) Conflict with existing zoning for agricultural use, or
a Williamson Act contract?
c) Involve other changes in the existing environment,
which, due to their location or nature, could result in
conversion of Farmland to non-agricultural use?
III. AIR QUALITY - (Where available, the significance
criteria established by the applicable air quality
management or air pollution control district may be relied
upon to make the following determinations.) Would the
project:
a) Conflict with or obstruct implementation of the
applicable air quality plan?
b) Violate any air quality standard or contribute
substantially to an existing or projected air quality
violation?
Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
• • •
• • • 0
• • • •
• • 0 •
• • • 0
•
•
•
•
•
•
•
•
• 0
• 0'
•0 •
Rev. 07/26/02
Issues (and Supporting Information Sources).
(Supplemental documents may be referred to and attached.)
c) Result in a cumulatively considerable net increase of
any criteria pollutant for which the project region is
in non-attainment under an applicable federal or state
ambient air quality standard (including releasing
emissions which exceed quantitative thresholds for
ozone precursors)?
d) Expose sensitive receptors to substantial pollutant
concentrations?
e) Create objectionable odors affecting a substantial
number of people?
IV. BIOLOGICAL RESOURCES - Would the project:
a) Have a substantial adverse effect, either directly or
through habitat modifications, on any species
identified as a candidate, sensitive, or special status
species in local or regional plans, policies, or
regulations, or by California Department of Fish and
Game or U.S. Fish and Wildlife Service?
b) Have a substantial adverse effect on any riparian,
aquatic or wetland habitat or other sensitive natural
community identified in local or regional plans,
policies, or regulations or by California Department
of Fish and Game or U.S. Fish and Wildlife Service?
c) Have a substantial adverse effect on federally
protected wetlands as defined by Section 404 of the
Clean Water Act (including but not limited to marsh,
vemal pool, coastal, etc.) through direct removal,
filing, hydrological interruption, or other means?
d) Interfere substantially with the movement of any
native resident or migratory fish or wildlife species
or with established native resident or migratory
wildlife corridors, or impede the use of native
wildlife nursery sites?
e) Conflict with any local policies or ordinances
protecting biological resources, such as a tree
preservation policy or ordinance?
f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation
Plan, or other approved local, regional, or state
habitat conservation plan?
g) Impact tributary areas that are enviiomiientaliy
sensitive?
Potentially
Significant
Potentially Unless Less Than
Significant Mitigation Significant No
Impact Incorporated Impact Impact
• • 0 Q
•
•
•
•
•
•
•
0 •
\2 •
• • • J2
• • • 0
• • • IZf
• • • 0
Rev. 07/26/02
Issues (and Supporting Information Sources).
(Supplemental documents may be referred to and attached.)
V. CULTURAL RESOURCES - Would tiie project:
a) Cause a substantial adverse change in the
significance of a historical resource as defined in
§15064.5?
b) Cause a substantial adverse change in the signifi-
cance of an archeological resource pursuant to
§15064.5?
c) Directiy or indirectiy destroy a unique paieontologi-
cal resource or site or unique geologic feature?
d) Disturb any human remains, including those interred
outside of formal cemeteries?
VI. GEOLOGY AND SOILS - Would tiie project:
a) Expose people or structures to potential substantial
adverse effects, including the risk of loss, injury or
death involving:
i. Rupture of a known earthquake fault, as
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map issued by the
State Geologist for the area or based on other
substantial evidence of a known fault? Refer to
Division of Mines and Geology Special
Publication 42.
ii. Strong seismic ground shaking?
iii. Seismic-related ground failure, including
liquefaction?
iv. Landslides?
b) Result in substantial soil erosion or the loss of
topsoil?
c) Be located on a geologic unit or soil that is unstable,
or that would become unstable as a result of the
project, and potentially result in on- or off-site
landslide, lateral spreading, subsidence, liquefaction,
or collapse?
d) Be located on expansive soils, as defined in Table 18
- 1-B of tiie Uniform Building Code (1997), creating
substantial risks to life or property?
Potentially
Significant
Potentially Unless Less Than
Significant Mitigation Significant No
Impact Incorporated Impact Impact
• • • 0
• • • 0
• • •
• • • 0
• • • 0
• • • 0
• • • 0
• • • Zf
• • • 0
• • • 0
• • •
Rev. 0-7/26/02
Issues (and Supporting Information Sources).
(Supplemental documents may be referred to and attached.)
e) Have soils incapable of adequately supporting the
use of septic tanks or altemative wastewater disposal
systems where sewers are not available for the
disposal of wastewater?
HAZARDS AND HAZARDOUS MATERIALS -
Would the project:
VII.
a) Create a significant hazard to the public or the
environment through the routine transport, use, or
disposal of hazardous materials?
b) Create a significant hazard to the public or
environment through reasonably foreseeable upset
and accident conditions involving the release of
hazardous materials into the environment?
c) Emit hazardous emissions or handle hazardous or
acutely hazardous materials, substances, or waste
within one-quarter mile of an existing or proposed
school?
d) Be located on a site which is included on a list of
hazardous materials sites compiled pursuant to
Govemment Code Section 65962.5 and, as a result,
would it create a significant hazard to the public or
environment?
e) For a project within an airport land use plan, or
where such a plan has not been adopted, within two
miles of a public airport or public use airport, would
the project result in a safety hazard for people
residing or working in the project area?
f) For a project within the vicinity of a private airstrip,
would the project result in a safety hazard for people would the project result in a safety hazard for people
residing or working in the project area?
g) Impair implementation of or physically interfere with
an adopted emergency response plan or emergency
evacuation plan?
h) Expose people or structures to a significant risk of
loss, injury or death involving wildland fires,
including where wildlands are adjacent to urbanized
areas or where residences are intermixed with
wildlands?
Vni. HYDROLOGY AND WATER QUALITY - Would the
project:
a) Violate any water quality standards or waste
discharge requirements?
Potentially
Significant
Impact
•
•
•
•
•
Potentially
Significant
Unless
Mitigation
Incorporated
Less Than
Significant No
Impact Impact
• • • •• ^
•
•
•
•
•
• 0
• 0
• • • 0
• • • 0
• • • 0
• 0
• 0
• £]
• • jZ 'D
Rev. 07/26/02
Issues (and Supporting Infofmation Sources).
(Supplemental documents may be referred to and attached.)
b) Substantially iplete groundwater supplies or
interfere substantially with ground water recharge
such that there would be a net deficit in aquifer
volume or a lowering of the local groimd water table
level (i.e., the production rate of pre-existing nearby
wells would drop to a level which would not support
existing land uses or planned uses for which permits
have been granted)?
c) Impacts to groundwater quality?
d) Substantially alter the existing drainage pattem ofthe
site or area, including through the alteration of the
course of a stream or river, in a manner, which would
result in substantial erosion or siltation on- or off-
site?
e) Substantially alter the existing drainage pattem of the
site or area, including through the alteration of the
course of a stream or river, or substantially increase
the flow rate or amount (volume) of surface mnoff in
a manner, which would result in flooding on- or oflf-
site?
f) Create or contribute runoff water, which would
exceed the capacity of existing or planned
stormwater drainage systems or provide substantial
additional sources of polluted runoff?
g) Otherwise substantially degrade water quality?
h) Place housing within a 100-year flood hazard area as
mapped on a Federal Flood Hazard Boundary or
Flood Insurance Rate Map or other flood delineation
map?
i) Place within 100-year flood hazard area structures,
which would impede or redirect flood flows?
j) Expose people or structures to a significant risk of
loss injury or death involving flooding, including
flooding as a result ofthe failure of a levee or dam?
k) Inundation by seiche, tsunami, or mudflow?
1) Increased erosion (sediment) into receiving surface
waters.
m) Increased pollutant discharges (e.g., heavy metals,
pathogens, petroleum derivatives, synthetic organics,
nutrients, oxygen-demanding substances and trash)
into receiving surface waters or other alteration of
receiving surface water quality (e.g., temperature,
dissolved oxygen or turbidity)?
Potentially
Significant
Potentially Unless Less Than
Significant Mitigation Significant No
Impact Incorporated Impact Impact
• • • 0
• • • 0
• • • 0'
• • • 0
• • • 0
• • • 0
• • • 0
• • •
• • • 0
• • • 0
• • • z\
• n • Ef
Rev. 07/26/02
Issues (and Supporting Information Sources).
(Supplemental documents may be referred to and attached.)
'* n) Changes to receiving water quality (marine, fi-esh or
wetland waters) during or following constmction?
o) Increase in any pollutant to an akeady impaired
water body as listed on the Clean Water Act Section
303(d) list?
p) The exceedance of applicable surface or groundwater
receiving water quality objectives or degradation of
beneficial uses?
rx. LANDUSE AND PLANNING - Would the project:
a) Physically divide an established community?
b) Conflict with any applicable land use plan, policy, or
regulation of an agency with jurisdiction over the
project (including but not limited to the general plan,
specific plan, local coastal program, or zoning
ordinance) adopted for the purpose of avoiding or
mitigating an environmental effect?
c) Conflict with any applicable habitat conservation
plan or natural community conservation plan?
X. MINERAL RESOURCES - Would the project:
a) Result in the loss of availability of a known mineral
resource that would be of future value to the region
and the residents of the State?
b) Result in the loss of availability of a locally
important mineral resource recovery site delineated
on a local general plan, specific plan, or other land
use plan?
XI. NOISE - Would the project result in:
a) Exposure of persons to or generation of noise levels
in excess of standards established in the local general
plan or noise ordinemce or applicable standards of
other agencies?
b) Exposure of persons to or generation of excessive
groundboume vibration or groundboume noise
levels?
c) A substantial permanent increase in ambient noise
levels in the project vicinity above levels existing
without the project?
d) A substantial temporary or periodic increase in
ambient noise levels in the project vicinity above
levels existing without the project?
Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
• • 0 •
• • • 0
• • •
• • • 0
• • • 0
• • • 0
• • • 0'
• • • R
• • • 0
• • • 0
• • 0 •
• • 0 •
10 Rev. 07/26/02
Issues (and Supporting Information Sources). -
(Supplemental documents may be referred to and attached.)
e) For a project located within an airport land use plan
or, where such a plan has not been adopted, within 2
miles of a public airport or public use airport, would
the project expose people residing or working in the
project area to excessive noise levels?
f) For a project within the vicinity of a private airstrip,
would the project expose people residing or working
in the project area to excessive noise levels?
XII. POPULATION AND HOUSING - Would tiie project:
a) Induce substantial growth in an area either directly
(for example, by proposing new homes and
businesses) or indirectly (for example, through
extension of roads or other infrastructure)?
b) Displace substantial numbers of existing housing,
necessitating the constmction of replacement housing
elsewhere?
c) Displace substantial numbers of people, necessitating
the construction of replacement housing elsewhere?
Xni. PUBLIC SERVICES
•
^^e 'otentially
Significant
Potentially Unless Less Than
Significant Mitigation Significant No
Impact Incorporated Impact Impact
• • • 0
• • • 0
• 0 •
• • • 0
• • • \Z
a) Would the project result in substantial adverse
physical impacts associated with the provision of
new or physically altered govemment facilities, a
need for new or physically altered govemment
facilities, the constmction of which could cause
significant environmental impacts, in order to
maintain acceptable service ratios, response times, or
other performance objectives for any of the public
services:
i) Fire protection? • • 0* •
ii) Police protection? • • 0 •
iii) Schools? • • • 0
iv) Parks? • • • El
v) Other public facilities? • • 0 n xrv. RECREATION
a) Would the project increase the use of existing
neighborhood and regional paiks or oilier
recreational facilities such that substantial physical
deterioration of the facility would occur or be
accelerated?
U U U 0
11 Rev. 07/26/02
Issues (and Supporting Information Sources).
(Supplemental documents may be referred to and attached.)
b) Does the project include recreational facilities or
require the construction or expansion of recreational
facilities, which might have an adverse physical
effect on the environment?
XV. TRANSPORTATION/TRAFFIC
a)
b)
c)
Would the project:
Cause an increase in traffic, which is substantial in
relation to the existing traffic load and capacity of the
street system (i.e., result in a substantial increase in
either the number of vehicle trips, the volume to
capacity ratio on roads, or congestion at
intersections)?
Exceed, either individually or cumulatively, a level
of service standard established by the county
congestion management agency for designated roads
or highways?
Result in a change in air traffic pattems, including
either an increase in traffic levels or a change in
location that results in substantial safety risks?
d) Substantially increase hazards due to a design feature
(e.g., sharp curves or dangerous intersections) or
incompatible uses (e.g., farm equipment)?
e) Result in inadequate emergency access?
f) Result in insufficient parking capacity?
g) Conflict with adopted policies, plans, or programs
supporting altemative transportation (e.g., bus tum-
outs, bicycle racks)?
XVI. UTILITIES AND SERVICES SYSTEMS - Would tiie
project:
a) Exceed wastewater treatment requirements of the
applicable Regional Water Quality Control Board?
b) Require or result in the constmction of new water or
wastewater treatment facilities or expansion of
existing facilities, the constmction of which would
cause significant environmental effects?
c) Require or result in the constmction of new storm
water drainage facilities or expansion of existing
facilities, the constmction of which could cause
significant environmental effects?
d) Have sufficient water supplies available to serve the
project from existing entitlements and resources, or
are new or expanded entitlements needed?
Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less Than
Significant No
Impact Impact
• 0' •
• • 0 •
• • •
• • 0 •
• , • • 0
• • • 0
• 0 • •
• • 0 •
• • • 0
• • 0 0
• • •
• • •
12 Rev. 07/26/02
Issues (and Supporting Information Sources).
(Supplemental documents may be referred to and attached.)
e) Result in a determination by the wastewater
treatment provider, which serves or may serve the
project that it has adequate capacity to serve the
project's projected demand in addition to the
provider's existing commitments?
f) Be served by a landfill with sufficient permitted
capacity to accommodate the project's solid waste
disposal needs?
g) Comply with federal, state, and local statutes and
regulations related to solid waste?
XVH. MANDATORY FINDINGS OF SIGNIFICANCE
a) Does the project have the potential to degrade the
quality of the environment, substantially reduce the
habitat of a fish or wildlife species, cause a fish or
wildlife population to drop below self-sustaining
levels, threaten to eliminate a plant or animal
community, reduce the number or restrict the range
of a rare or endangered plant or animal or eliminate
important examples of the major periods of
Califomia history or prehistory?
b) Does the project have impacts that are individually
limited, but cumulatively considerable? ("Cumula-
tively considerable" means that the incremental
effects of a project are considerable when viewed in
connection with the effects of past projects, the
effects of other current projects, and the effects of
probable fiiture projects?)
c) Does the project have environmental effects, which
will cause the substantial adverse effects on human
beings, either directiy or indirectly?
XVIII. EARLIER ANALYSES
i'otentiaJly
Significant
Potentially Unless Less Than
Significant Mitigation Significant No
Impact Incorporated Impact Impact
• 0 •
•
•
•
•
•
0 •
0 •
• • • 0
• 0 •
• • • 0
Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, one or
more effects have been adequately analyzed in an earlier EIR or negative declaration. Section
15063(c)(3)(D). In this case a discussion should identify the foUowing on attached sheets:
a) Earlier analyses used. Identify earlier analyses and state where they are available for review.
b) Impacts adequately addressed. Identify which effects from the above checklist were within the
scope of and adequately analyzed in an earlier document pursuant to applicable legal standards,
and state whether such effects were addressed by mitigation measures based on the earlier
analysis.
c) Mitigation measures. For effects that are "Less Than Significant with Mitigation Incorporated,"
describe the mitigation measures, which were incorporated or refined from the earlier document
and the extent to which they address site-specific conditions for the project.
13 Rev. 07/26/02