HomeMy WebLinkAboutRP 07-07; STUDIO Z; Redevelopment Permits (RP) (2)Citv of Carlsbad
Housing & Redevelopment Departinent
February 22, 2008
Subject: Studio Z Hair Salon, Administrative Redevelopment Permit
RP 07-07/CDP 07-17
Dear Mr. Zamora:
Thank you for applying for a Redevelopment Permit in the City of Carlsbad. The
Housing and Redevelopment Department together with other appropriate City
departments, has reviewed your Administrative Redeveiopment Permit as to its
completeness for processing.
The application is incomplete, as submitted. The attached list includes information that
must be submitted to complete your application. This list of items must be submitted
directly to the Housing & Redevelopment Office. All list items must be submitted
simultaneously and a copy of this list must be included with your submittal. No
processing of your application can occur until the application is determined to be
complete. When all required materials are submitted to the. Redevelopment Office, the
City has an additional thirty (30) days to make a determination of comjDieteness. If the
application is determined to be complete, processing for a decision on the application
will be initiated. Failure to resubmit the application or to submit the materials necessary
to determine your application complete shall be deemed to constitute withdrawal of the
application. If an application is withdrawn or deemed withdrawn, a new application must
be submitted.
Please contact my office at (760) 434-2810 ext 5017, if you have any questions or wish
to set up a meeting to discuss the application.
Sincerely,
LAURA ROBINS
Planning Technician
c: File
Greg Ryan, Fire Department
Steve Bobbett, Engineering Department
Debbie Fountain, Housing and Redevelopment Director
2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2335 • (760) 434-2810/2811 • FAX (760) 720-2037
02/22/2008 11:35:00 AM
4**^ Review of RP 07-07 site plan. Applicant: Paul Zamora
Housing & Redevelopment:
• Please provide 3 copies of a 24" x 36" site plan/floor plan to scale with the
following information:
i. Please fix the discrepancy in measured square footage, based on
the scale provided, and listed square footage for both businesses
shown on the site plan.
• Based on the uses listed on the site plan, it does not appear that there is
adequate parking for this project. See calculations below:
A- (880 sq. ft. salon) = 3 spaces
B- (525 sq. ft. ceiling business) = 2 spaces
C- Studio = 1.5+ 0.5 guest
D-Studio = 1.5+ 0.5 guest
E-Studio = 1.5+ 0.5 guest
F- Studio = 1.5 + 0.5 guest
G- Studio = 1.5+ 0.5 guest
H- Trailer = 2 spaces
I - Studio = 1.5 + 0.5 guest
J- Studio = 1.5 + 0.5 guest
ADA requirement = 1 space
Total Required Parking = 22 spaces
Fire:
• Fire Department has reviewed this project as requested and would
comment or question how the onsite parking for this commercial location
will affect FD access to the multi-family residence located to the rear
(east) of this location. Fire Department access is already challenging
given how many buildings are situated on the two lots and there is
currently no provision for a FD turnaround. Given that the inclusion of
commercial use on this property negates the applicants ability to claim
that this is a non-conforming use, and FD would likely require ful!
compliance with all Fire Code provisions.
Regarding any comments from the Fire Department, please contact Greg Ryan at 760-
602-4663.
Engineering:
• Submit three (3) copies of a preliminary title report current within the last
six months. This is required to confirm that sufficient right of way for
Carlsbad Blvd.
The following Engineering issues need to be resolved prior to the next submittal:
1. Revise the site plan and relocate the required parking to provide a minimum drive
aisle width of 14'. The drive aisle width between the existing building and parking
spaces # 2 and 3 scales 11' on the site plan and does not provide adequate
vehicular access to and from the existing residential uses located on the eastern
02/22/2008 11:35:00 AM
portion of the site. A 14ft width is needed to maintain emergency vehicle access
to the existing residential uses located on the eastern portion of the site.
2. Revise the plans to include an onsite vehicular turn-around or callout an area
where a 3-point turn can be performed for a standard passenger vehicle. Staff is
concerned with vehicles backing out into Carlsbad Blvd. In accordance with
engineering standards, driveways having an ADT greater than 40 or more than
four (4) units shall provide an approved turn-around or internal circulation to
preclude vehicles backing onto a public street.
3. Revise the plans to include an onsite vehicular turn-around to accommodate a
trash truck using CALTRANS Highway Design Manual, Figure 407E. The Site
Plan should show inside and outside turning radii. This 407E turn-around around
may satisfy the vehicular turn above around since it exceeds the passenger car
vehicle turning radii.
4. Provide parking requirement calculations for the proposed hair salon, the existing
ceiling business, and for all of the existing residential uses. Please include the
square footage for all commercial uses and number of bedrooms for the
residential uses.
5. Show the locations of the required parking on the site plan to demonstrate that
parking for all existing and proposed uses can be provided without encroaching
into the required turn-around space.
6. There is only room for one standard (20 ft x 8.5 ft) parking space and one ADA
(20 ft x 17 ft) space in front of the proposed salon business. The other required
standard space must be located elsewhere on the property.
7. Include information (drainage direction, arrows, slopes, etc.) on the Site Plan that
demonstrates how the project site drains.
8. Show location of existing water meters, and sewer service laterals for all existing
uses. Provide evidence that these facilities are sized adequately to serve both
the existing and proposed uses.
9. This review does not constitute a complete review of the proposed project.
Additional items of concern as well as comments on technical and design
aspects of the proposal will be identified upon re-submittal.
Regarding any comments from the Engineering Department, please contact Steve
Bobbett, Associate Engineer, at 760-602-2747.
01/24/2008 9:53:00
3^^ Preliminary review of RP 07-07 site plan. Applicant: Paul Zamora
Housing & Redevelopment:
• Please provide 3 copies of a 24" x 36" site plan/floor plan to scale with the
following infonnation:
i. Lot dimensions and location (building footprint) of all buildings on
the site.
ii. A complete key to identify the use of each building on site.
Fire:
• Fire Department has reviewed this project as requested and would
comment or question how the onsite parking for this commercial location
will affect FD access to the multi-family residence located to the rear
(east) of this location. Fire Department access is already challenging
given how many buildings are situated on the two lots and there is
currently no provision for a FD turnaround. Given that the inclusion of
commercial use on this property negates the applicants ability to claim
that this is a non-conforming use, and FD would likely require full
compliance with all Fire Code provisions.
Regarding any comments from the Fire Department, please contact Greg Ryan at 760-
602-4663.
Engineering:
• Submit three (3) copies of a preliminary title report current within the last
six months. This is required to confirm that sufficient right of way for
Carlsbad Blvd.
The following Engineering issues need to be resolved prior to the next submittal:
1. Revise the site plan and relocate the required parking to provide a minimum drive
aisle width of 20'. The drive aisle width between the existing building and parking
spaces # 2 and 3 scales 11' on the site plan and does not provide adequate
vehicular access to and from the existing residential uses located on the eastern
portion of the site. A 20-ft width is needed to maintain emergency vehicle access
to the existing residential uses located on the eastern portion of the site.
2. Revise the plans to include an onsite vehicular turn-around or callout an area
where a 3-point turn can be performed for a standard passenger vehicle. Staff is
concerned with vehicles backing out into Carlsbad Blvd. In accordance with
engineering standards, driveways having an ADT greater than 40 or more than
four (4) units shall provide an approved turn-around or internal circulation to
preclude vehicles backing onto a public street.
3. Revise the plans to include an onsite vehicular turn-around to accommodate a
trash truck using CALTRANS Highway Design Manual, Figure 407E. The Site
Plan should show inside and outside turning radii. This 407E turn-around around
may satisfy the vehicular turn above around since it exceeds the passenger car
01/24/2008 9:53:00
vehicle turning radii.
4. Provide parking requirement calculations for the proposed hair salon, the existing
ceiling business, and for all of the existing residential uses. Please include the
square footage for ali commercial uses and number of bedrooms for the
residential uses.
5. Show the locations of the required parking on the site plan to demonstrate that
parking for all existing and proposed uses can be provided without encroaching
into the required turn-around space.
6. There is only room for one standard (20 ft x 8.5 ft) parking space and one ADA
(20 ft X 17 ft) space in front of the proposed salon business. The other required
standard space must be located elsewhere on the property.
7. Include information (drainage direction, arrows, slopes, etc.) on the Site Plan that
demonstrates how the project site drains.
8. Show location of existing water meters, and sewer service laterals for all existing
uses. Provide evidence that these facilities are sized adequately to serve both
the existing and proposed uses.
9. This review does not constitute a complete review of the proposed project.
Additional items of concern as well as comments on technical and design
aspects of the proposal will be identified upon re-submittal.
Regarding any comments from the Engineering Department, please contact Steve
Bobbett, Associate Engineer, at 760-602-2747.
Citv of Carlsbad
IHousing & Redevelopment Department
December 26, 2007
Subject: Studio Z Hair Salon, Administrative Redevelopment Permit
RP 07-07/CDP 07-17
Dear Mr. Zamora:
Thank you for applying for a Redevelopment Permit in the City of Carlsbad. The
Housing and Redevelopment Department together with other appropriate City
departments, has reviewed your Administrative Redevelopment Permit as to its
completeness for processing.
The application is incomplete, as submitted. The attached list includes information that
must be submitted to complete your application. This list of items must be submitted
directly to the Housing & Redevelopment Office. All list items must be submitted
simultaneously and a copy of this list must be Included with your submittal. No
processing of your application can occur until the application is determined to be
complete. When all required materials are submitted to the Redevelopment Office, the
City has an additional thirty (30) days to make a determination of completeness. If the
application is determined to be complete, processing for a decision on the application
will be initiated. Failure to resubmit the application or to submit the materials necessary
to determine your application complete shall be deemed to constitute withdrawal of the
application. If an application is withdrawn or deemed withdrawn, a new application must
be submitted.
Please contact my office at (760) 434-2813, if you have any questions or wish to set up
a meeting to discuss the application.
Sincerely,
AUSTIN SILVA
Assistant Planner
c: File
Greg Ryan, Fire Department
Steve Bobbett, Engineering Department
Debbie Fountain, Housing and Redevelopment Director
2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2335 • (760) 434-2810/2811 • FAX (760) 720-2037
Studio Z Hair Salon ^ 12/27/2007 ^ Page 2 of 3
LIST OF ITEMS NEEDED
TO COMPLETE THE APPLICATION
RP 07-07/CDP 07-17
Staff has completed a review of the subject project for application completeness. The
applications and plans submitted for this project are incomplete at this time. Please
resubmit 3 sets of plans addressing the following incomplete items:
Housing & Redevelopment:
• Please provide 3 copies of a 24" x 36" site plan/floor plan to scale with the
following information:
i. Lot dimensions and location (building footprint) of all buildings on
the site.
Fire:
• Fire Department has reviewed this project as requested and would
comment or question how the onsite parking for this commercial location
will affect FD access to the multi-family residence located to the rear
(east) of this location. Fire Department access is already challenging
given how many buildings are situated on the two lots and there is
currently no provision for a FD turnaround. Given that the inclusion of
commercial use on this property negates the applicants ability to claim
that this is a non-conforming use, and FD would likely require full
compliance with all Fire Code provisions.
Regarding any comments from the Fire Department, please contact Greg Ryan at 760-
602-4663.
Engineering:
• Submit three (3) copies of a preliminary title report current within the last
six months. This is required to confirm that sufficient right of way for
Carlsbad Blvd.
The following Engineering issues need to be resolved prior to the next submittal:
1. Revise the site plan and relocate the required parking to provide a minimum drive
aisle width of 20'. The drive aisle width between the existing buikling and parking
spaces # 2 and 3 scales 11' on the site plan and does not provide adequate
vehicular access to and from the existing residential uses located on the eastern
portion of the site. A 20-ft width is needed to maintain emergency vehicle access
to the existing residential uses located on the eastern portion of the site.
2. Revise the plans to include an onsite vehicular turn-around or callout an area
where a 3-point turn can be performed for a standard passenger vehicle. Staff is
concerned with vehicles backing out into Carisbad Blvd. In accordance with
engineering standards, driveways having an ADT greater than 40 or more than
four (4) units shall provide an approved turn-around or internal circulation to
Studio Z Hair Salon ^ 12/27/2007 ^ Page 3 of 3
preclude vehicles backing onto a public street.
3. Revise the plans to include an onsite vehicular tum-around to accommodate a
trash truck using CALTRANS Highway Design Manual, Figure 407E. The Site
Plan should show inside and outside turning radii. This 407E turn-around around
may satisfy the vehicular turn above around since it exceeds the passenger car
vehicle turning radii.
4. Provide parking requirement calculations for the proposed hair salon, the existing
ceiling business, and for all of the existing residential uses.
5. Show the locations of the required parking on the site plan to demonstrate that
parking for ail existing and proposed uses can be provided without encroaching
into the required turn-around space.
6. Include information (drainage direction, arrows, slopes, etc.) on the Site Plan that
demonstrates how the project site drains.
7. Show location of existing water meters, and sewer service laterals for all existing
uses. Provide evidence that these facilities are sized adequately to serve both
the existing and proposed uses.
8. This review does not constitute a complete review of the proposed project.
Additional items of concern as well as comments on technical and design
aspects of the proposal will be identified upon re-submittal.
Regarding any comments from the Engineering Department, please contact Steve
Bobbett, Associate Engineer, at 760-602-2747.
Citv of Carlsbad
Housing & Redevelopment Department
September 6, 2007
Subject: Studio Z Hair Salon, Administrative Redevelopment Permit
RP 07-07/CDP 07-17
Dear Mr. Zamora:
Thank you for applying for a Redevelopment Permit in the City of Carisbad. The
Housing and Redevelopment Department together with other appropriate City
departments, has reviewed your Administrative Redevelopment Permit as to its
completeness for processing.
The application is incomplete, as submitted. The attached list includes information that
must be submitted to complete your application. This list of items must be submitted
directly to the Housing & Redevelopment Office. All list items must be submitted
simultaneously and a copy of this list must be included with your submittal. No
processing of your application can occur until the application is determined to be
complete. When all required materials are submitted to the Redevelopment Office, the
City has an additional thirty (30) days to make a determination of completeness. If the
application is determined to be complete, processing for a decision on the application
will be initiated. In addition, please note that you have six months from the date the
application was initially filed, June 25, 2007 to either resubmit the application or submit
the required information. Failure to resubmit the application or to submit the materials
necessary to determine your application complete shall be deemed to constitute
withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new
application must be submitted.
Please contact my office at (760) 434-2810 ext 5017, if you have any questions or wish
to set up a meeting to discuss the application.
Sincerely,
LAURA ROBINS
Planning Technician
c: File
2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2335 • (760) 434-2810/2811 • FAX (760) 720-2037 @
Studio Z Hair Salon ^ 09/10/2007 ^ Page 2 of 2
LIST OF ITEMS NEEDED
TO COMPLETE THE APPLICATION
RP 07-07/CDP 07-17
Staff has completed a review of the subject project for application completeness. The
applications and plans submitted for this project are incomplete at this time. Please
resubmit 3 sets of plans addressing the following incomplete items:
Housing & Redevelopment:
• Please provide 3 copies of a 24" x 36" site plan/floor plan to scale with the
following information:
i. Name and address of applicant.
ii. Location and dimension of vehicular access and all off-street
parking.
iii. Lot dimensions and location (building footprint) of all buildings on
the site.
iv. Distance between buildings and/or structures.
V. Building setbacks (front, rear, and sides).
vi. A summary table which includes the following information: lot area
(total acres or square feet); existing zoning and land use district;
total building coverage; building square footage; number of
parking spaces.
vii. North arrow and scale
Building:
During the building permit plan check process, it must be demonstrated
that Studio Z is fully accessible to the disabled. This includes access
from public way, parking, and restrooms.
Regarding any comments from the Building Department, please contact Will Foss,
Building and Code Enforcement Manager, at 760-602-2716.
Engineering:
• Please Include the existing residential and commercial uses in the land
use table of the site plan.
• Provide parking requirement calculations for the existing uses and show
required parking on site plan.
Regarding any comments from the Engineering Department, please contact Steve
Bobbett, Associate Engineer, at 760-602-2747.
Citv of Carlsbad
Housing & Redevelopment Department
June 27, 2007
Subject: Studio Z Hair Salon, Administrative Redevelopment Permit
RP 07-07/CDP 07-17
Dear Mr. Zamora:
Thank you for applying for a Redevelopment Permit in the City of Carisbad. There are
some items that need to be submitted in order to receive comments from other City
departments. The attached list includes information that must be submitted to complete
your application. This list of items must be submitted directly to the Housing &
Redevelopment Office. All list items must be submitted simultaneously and a
copy of this list must be included with your submittal. No processing of your
application can occur until the application is determined to be complete. When all
required materials are submitted to the Redevelopment Office, the City has an additional
thirty (30) days to make a determination of completeness. If the application is
determined to be complete, processing for a decision on the application will be initiated.
In addition, please note that you have six months from the date the application was
initially filed, June 25, 2007 to either resubmit the application or submit the required
information. Failure to resubmit the application or to submit the materials necessary to
determine your application complete shall be deemed to constitute withdrawal of the
application. If an application is withdrawn or deemed withdrawn, a new application must
be submitted.
Please contact my office at (760) 434-2815 ext 5017, if you have any questions or wish
to set up a meeting to discuss the application.
Sincerely,
LAURA ROBINS
Planning Technician
c: File
2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2389 • (760) 434-2810/2811 • FAX (760) 720-2037 ^
Studio Z Hair Salon M 06/27/2007 W Page 2 of 2
LIST OF ITEMS NEEDED
TO COMPLETE THE APPLICATION
RP 07-07/CDP 07-17
Staff has completed a review of the subject project for application completeness. The
applications and plans submitted for this project are incomplete at this time. Please
resubmit 4 sets of plans addressing the following incomplete items:
Housing & Redevelopment:
• Please provide 4 copies of a 24" x 36" site plan/floor plan to scale with the
following information:
i. Name and address of applicant.
ii. Location and dimension of vehicular access and all off-street
parking.
iii. Lot dimensions and location (building footprint) of all buildings on
the site.
iv. Distance between buildings and/or structures.
V. Building setbacks (front, rear, and sides).
vi. A summary table which includes the following information: lot area
(total acres or square feet); existing land use district; total building
coverage; building square footage; number of parking spaces.
vii. North arrow and scale
• Please provide 1 copy of an 8 1/2" x 11" location map.
• Submit the Administrative Redevelopment Permit Public Notification
Package according to the guidelines provided. Please see the
attachment.
• Please complete the Environmental Information Form
Memorandum DRAFT
TO: Laura Robins - Redevelopment Planner
FROM: Stephen Bobbett - Project Engineer
DATE: December 12, 2007
RP 07-07/CDP 07-17
STUDIO Z
COMPLETNESS AND ISSUES REVIEW
Engineering Department staff has completed a second review of the above-referenced
project for application completeness. The application and plans submitted for this
proposed project are, from an Engineering perspective, considered incomplete with
issues to be resolved prior to support of the application(s).
The following needs to be completed in order for the application to be complete:
1. A Submit a site plan. A site plan is required by the Carlsbad Redevelopment
^ Agency Administrative Permit Application for all projects which involve interior
improvements and/or changes in land use. A copy is included for your
reference, "if^
2. ^ Submit three (3) copies a preliminary title report current within the last six (6)
months. This is required to confirm that sufficient right of way for Carlsbad Blvd.
has been previously granted to the City of Carlsbad.
Unless otherwise noted, the following issues need to be resolved priorto re-submittal:
1 Jl The driveway width between the existing building and parking spaces # 2 and 3
scales 11,' on the site plan and provides two-way access to and from the existing
residential uses located on the eastern portion of the site. Please revise the site
plan and relocate the required parking to provide a minimum driveway width of
20'. This width is needed to maintain emergency vehicle access to the existing
residential uses located on the eastern portion of the site.
2^ Circulation within the parking area must be such that a car need not enter a
public street backwards and, driveways having an ADT greater than 40 or more
than four (4) units shall provide an approved turn-around or internal circulation to
preclude vehicles backing onto a public street. Show a turn-around space on the
site plan to accommodate a 3-point turn for a standard passenger vehicle.
All projects shall provide access and circulation to trash enclosures. The design
vehicle parameters and turning radius for a trash truck shall per the CALTRANS
Highway Design Manual, Figure 407E. Show a turn-around space on a site plan
to accommodate this standard.
4. Provide parking requirement calculations forthe proposed hair salon, the existing
ceiling business, and for all of the existing residential uses. Show the locations
of the required parking on the site plan to demonstrate that parking for all
existing and proposed uses can be provided without encroaching into the
required turn-around space.
5. Demonstrate how the project site drains.
6. Show location of existing water meters, and sewer service laterals for all existing
uses. Provide evidence that these facilities are sized adequately to serve both
the existing and proposed uses.
7. Prior to conditioning this project, Code Violation CV 07 1261 opened November
27, 2007 must be satisfactorily resolved and closed.
8. This review does not constitute a complete review of the proposed project.
Additional items of concern as well as comments on technical and design
aspects ofthe proposal will be identified upon re-submittal.
All project review comments are listed above. If you have any questions call me at 760-
602-2747
Stephen Bobbett
Associate Engineer
Cc: Jeremy Riddle
Project File
%
REDEVELOPMENT PERMIT
2"" REVIEV^ AND COMMENT REOUEST
Date: November 27, 2007
Planning Department -W^ater District
Engineering Department -S. BOBBETT Police Department
Building Department -W. FOSS School District
Fire Department - G. RYAN North County Transit District
Landscape Plancheck Consultant City Attorney
To Departments: Subject: RP 07-07/CDP 07-17
The attached plans and corresponding application for an Administrative Redevelopment
Permit have been submitted for property located at 3162 Carlsbad Boulevard #A. Please
review the attached plans and additional information provided by the applicant and forward
your comments to my office by Thursday, December 27, 2007. Thank you for your
assistance.
Project Title:
Permit No.:
Applicant:
Studio Z
RP 07-07
Paul Zamora
Brief Description of Proposal: The suite was previously used as a residential unit and is
located in the western most portion of the building on the lot fronting Carlsbad Boulevard.
The applicant is requesting permission to operate a hair salon at the location. Applicant
prefers not to submit plans for the tenant improvement at this time until the Redevelopment
Permit is approved.
Assigned staff member: Laura Robins
Comments: (Please e-mail/send comments to Laura Robins in the Housing & Redevelopment
Depanment.) jCi^^^^^^ ^^^^^
Memorandum
TO: Laura Robins - Redevelopment Planner
FROM: Stephen Bobbett - Project Engineer
DATE: December 19, 2007
RP 07-07/CDP 07-17
STUDIO Z
COMPLETNESS AND ISSUES REVIEW
Engineenng Department staff has completed a second review of the above-referenced
project for application completeness. The application and plans submitted for this
proposed project are, from an Engineering perspective, considered incomplete with
issues to be resolved pnor to support of the application(s).
The following needs to be completed in order for the application to be complete:
1. Submit a complete site plan. A site plan is required by the Cartsbad
Redevelopment Agency Administrative Permit Application for all projects which
involve interior improvements and/or changes in land use. A copy is
included for your reference.
2. Submit three (3) copies a preliminary title report current within the last six (6)
months. This is required to confirm that sufficient right of way for Cartsbad Blvd.
has been previously granted to the City of Carlsbad and that there are no
existing easements that affect the proposed use and required parking.
The following issues need to be resolved prior to re-submittal or as otherwise noted:
1. Pnor to conditioning this project. Code Violation CV 07 1261 opened November
27, 2007 must be satisfactorily resolved and closed. Please contact code
enforcement to resolve this issue.
2. Revise the site plan and relocate the required parking to provide a minimum
drive aisle width of 20'. The drive aisle width between the existing building and
parking spaces # 2 and 3 scales 11' on the site plan and does not provide
adequate vehicular access to and from the existing residential uses located on
the eastern portion of the site. A 20-ft width is needed to maintain emergency
vehicle access to the existing residential uses located on the eastern portion of
the site.
3. Revise the plans to include an onsite vehicular turn-around or callout an area
where a 3-point turn can be performed for a standard passenger vehicle. Staff is
concerned with vehicles backing out into Carlsbad Blvd. In accordance with
engineenng standards, driveways having an ADT greater than 40 or more than
four (4) units shall provide an approved turn-around or internal circulation to
preclude vehicles backing onto a public street.
4. Revise the plans to include an onsite vehicular turn-around to accommodate a
trash truck using CALTRANS Highway Design Manual, Figure 407E. The Site
Plan should show inside and outside turning radii. This 407E turn-around around
may satisfy the vehicular turn above around since it exceeds the passenger car
vehicle turning radii.
5. Provide parking requirement calculations for the proposed hair salon, the existing
ceiling business, and for all of the existing residential uses.
6. Show the locations of the required parking on the site plan to demonstrate that
parking for all existing and proposed uses can be provided without encroaching
into the required turn-around space.
7. Include information (drainage direction, arrows, slopes, etc.) on the Site Plan that
demonstrates how the project site drains.
8. Show location of existing water meters, and sewer service laterals for ali existing
uses. Provide evidence that these facilities are sized adequately to serve both
the existing and proposed uses.
9. This review does not constitute a complete review of the proposed project.
Additional items of concern as well as comments on technical and design
aspects ofthe proposal will be identified upon re-submittal.
All project review comments are listed above. If you have any questions call me at 760-
602-2747
Stephen Bobbett
Associate Engineer
Cc: Jeremy Riddle
Project File
CARLSBAD FIRE DEPARTMENT
Fire Protection Services
PROJECT REVIEW REPORT
PROJECT NAME:
Date:
Project number:
Staff Planner:
Studio Z
08/10/07
RP 07-07 / CDP 07-17
L. Robins Engineer:
Initial review: (Note: This report identifies fire protection issues associated with the project,
and/or prescribes specific corrections or information needed to achieve Fire Department
approval.)
Fire Department has reviewed this project as requested and would comments or question
how the onsite parking for this commercial enterprise will affect FD access to the multiple
residence located to the rear (East) of this location. Fire Department access is already
challenging given how the many buildings are situated on the two lots and there is
currently no provision for a FD turnaround. Given that the inclusion of Commercial use
on this property negates the applicants ability to claim that this is an existing non-
conforming use, and Fire would likely require full compliance with all Fire Code
provisions.
GR
REDEVELOPMENT PERMIT
2"" REVIEW AND COMMENT REOUEST
Date: November 27, 2007
Planning Department -W^ater District
V Engineering Department -S. BOBBETT Police Department
V Building Department -W. FOSS School District
Fire Department - G. RYAN North County Transit District
Landscape Plancheck Consultant City Attorney
To Departments: Subject: RP 07-07/CDP 07-17
The attached plans and corresponding application for an Administrative Redevelopment
Permit have been submitted for property located at 3162 Carlsbad Boulevard #A. Please
review the attached plans and additional information provided by the applicant and forward
your comments to my office by Thursday, December 27, 2007. Thank you for your
assistance.
Project Title:
Permit No.:
Applicant:
Studio Z
RP 07-07
Paul Zamora
Brief Description of Proposal: The suite was previously used as a residential unit and is
located in the western most portion of the building on the lot fronting Carlsbad Boulevard.
The applicant is requesting permission to operate a hair salon at the location. Applicant
prefers not to submit plans for the tenant improvement at this time until the Redevelopment
Permit is approved.
Assigned staff member: Laura Robins
Comments: {Please e-mail/send comments to Laura Robins in the Housing & Redevelopment
Department.)
0:^n^e^'r^ o*^iLl. />e^e^^ f^/<ci/^dSi^J TrT, .
yymSTIi(f .f^^^"^^^ ^-^"^
REDEVELOPMENT PERMIT
REVIEW AND COMMENT REOUEST
Date: August 28, 2007
Planning Department -Water District
V Engineering Department - J.
O'DONNELL
Police Department
Building Department -W. FOSS School District
Fire Department - G. RYAN North County Transit District
Landscape Plancheck Consultant City Attomey
To Departments: Subject: RP 07-07/CDP 07-17
The attached plans and corresponding application for an Administrative Redevelopment
Permit have been submitted for property located at 3162 Carlsbad Boulevard #A. Please
review the attached plans and additional information provided by the applicant and forward
your comments to my office by Tuesday, September 4, 2007. Thank you for your assistance.
Project Title:
Permit No.:
Applicant:
Studio Z
RP 07-07
Paul Zamora
Brief Description of Proposal: The suite was previously used as a residential unit and is
located in the western most portion of the building on the lot fronting Carlsbad Boulevard.
The applicant is requesting permission to operate a hair salon at the location. Applicant
prefers not to submit plans for the tenant improvement at this time until the Redevelopment
Permit is approved.
Assigned staff member: Laura Robins
Comments: {Please e-mail/send comments to Laura Robins in the Housing & Redevelopment
Department.)
HM^ WW<7/^Lm^ 725 m/AU/fi^.m ^/?<F
cmm/^rn:^, o^t/i^'^(^ ptc^f/yn "i^-^"I^^^^^^
/fiLc^iT^r <f*^ Tmi^mc^ c?(rs/6r7</prz/i^'m/^r/^<^^
(2.€y/eHy ^fTUic-Turz^'f ^IJP'fm. Issues,
13 * )^
REDEVELOPMENT PERMIT
REVIEW AND COMMENT REOUEST
Date: August 28, 2007
V
Planning Department -
Engineering Department - J. ^f^Pf^/^
O'DONNELL/7/W^ ^MrZ^S^^d^
Building Department -W. FOSS
Fire Department - G. RYAN
Landscape Plancheck Consultant
Water District
Police Department
School District
North County Transit District
City Attorney
To Departments: Subject: RP 07-07/CDP 07-17
The attached plans and corresponding application for an Administrative Redevelopment
Permit have been submitted for property located at 3162 Carlsbad Boulevard #A. Please
review the attached plans and additional information provided by the applicant and forward
your comments to my office by Tuesday, September 4, 2007. Thank you for your assistance.
Project Title:
Permit No.:
Applicant:
Smdio Z
RP 07-07
Paul Zamora
Brief Description of Proposal: The suite was previously used as a residential unit and is
located in the western most portion of the building on the lot fronting Carlsbad Boulevard.
The applicant is requesting permission to operate a hair salon at the location. Applicant
prefers not to submit plans for the tenant improvement at this time until the Redevelopment
Permit is approved. l>''^^
Assigned staff member: Laura Robins 7 - / S
Comments: {Please e-mail/send comments to Laura Robins in the Housing & Redevelopment
Department.)
0?^
r
a?
Memorandum
TO: Laura Robins, Planner ^.
FROM: Stephen Bobbett, Associate Engineer '
DATE: September 4, 2007
RP 07-07/CDP 07-17
STUDIO Z
COMPLETENESS & ISSUES REVIEW
Engineering Department staff has completed a seeend review of the above-referenced project
for application completeness. The application and plans submitted for this proposed project are
from an Engineering perspective considered incomplete with issues to be resolved prior to
support of the application(s).
The following needs to be completed in order for the application to be complete:
1. Submit a site plan. Attached are copies of the City's Application Requirements and
the Engineering Development Services Division Completeness Checklist for your
use.
2. Submit a Storm Water Management Plan.
3. Submit a preliminary title report.
The following issues need to be resolved prior to re submittal:
Include the existing residential and commercial uses in the land use table of the site
plan.
Provide parking requirement calculations for the existing uses and show required
parking on site plan.
6. Provide a turn around area to eliminate the need for vehicles to back into the street
to exit.
7. Demonstrate how the project site drains.
8. Show location of existing water and sewer connections for all existing uses. Are the
facilities sized properiy for the proposed land use?
9. Insufficient information was submitted for a complete review of the application. This
review does not constitute a complete review of the proposed project. Additional
items of concern as well as comments on technical and design aspects of the
proposal will be identified upon submittal of the above items.
All project review comments are listed above. If you have any questions, call me at 760-602-
2747
Stephen Bobbett
Associate Engineer
cc: John O'Donnell, Development Services.
Project File
REDEVELOPMENT PERMIT
REVIEW AND COMMENT REQUEST
Date: August 28, 2007
Planning Department -Water District
Engineering Department - J.
O'DONNELL
Police Department
Building Department -W. FOSS School District
Fire Department - G. RYAN North County Transit District
Landscape Plancheck Consultant City Attorney
To Departments: Subject: RP 07-07/CDP 07-17
The attached plans and corresponding application for an Administrative Redevelopment
Permit have been submitted for property located at 3162 Carlsbad Boulevard #A. Please
review the attached plans and additional information provided by the applicant and forward
your comments to my office by Tuesday, September 4, 2007. Thank you for your assistance.
Project Title:
Permit No.:
Applicant:
Studio Z
RP 07-07
Paul Zamora
Brief Description of Proposal: The suite was previously used as a residential unit and is
located in the western most portion of the building on the lot fronting Carlsbad Boulevard.
The applicant is requesting permission to operate a hair salon at the location. Applicant
prefers not to submit plans for the tenant improvement at this time until the Redevelopment
Permit is approved.
Assigned staff member: Laura Robins
Comments: {Please e-mail/send comments to Laura Robins in the Housing & Redevelopment
Department.)
Hfd^ TWll^<^^/^ 725 ^HupTTT. m /7t£)e
Cmt'l^/me', 0^//i^^(^ ptQ)!^''^}^-'^'^/^IP£^^rr/K,
Ji> C4nM^e/2^f3^ "Z^" 6<:^^rf4A/o^ /z-F^(/f/^-eS
/tii.cHir^r ^ 7^t^mc4f^ (p<rs/&7^/i^'Q^r/^^^
Sm>ufO fz^y/a^ 9j7LMCJua^ ^ 7 iTB^ ffK c^n^^ /£Su^,
13 f
REDEVELOPMENT PERMIT
REVIEW AND COMMENT REOUEST
Date: August 28, 2007
Planning Department -
Engineering Department - J. ^/^/*f^/^.
O'DOIVNELL/^/i^y^tf^ ^^i/Sf^S^/M^
Building Department -W. FOSS
Fire Department - G. RYAN
Landscape Plancheck Consultant
Water District
Police Department
School District
North County Transit District
City Attorney
To Departments: Subject: RP 07-07/CDP 07-17
The attached plans and corresponding application for an Administrative Redevelopment
Permit have been submitted for property located at 3162 Carlsbad Boulevard #A. Please
review the attached plans and additional information provided by the applicant and forward
your comments to my office by Tuesday, September 4, 2007. Thank you for your assistance.
Project Title:
Permit No.:
Applicant:
Studio Z
RP 07-07
Paul Zamora
Brief Description of Proposal: The suite was previously used as a residential unit and is
located in the western most portion of the building on the lot fronting Carlsbad Boulevard.
The applicant is requesting permission to operate a hair salon at the location. Applicant
prefers not to submit plans for the tenant improvement at this time until the Redevelopment
Permit is approved. ^^,^M/9< /^'^^
Assigned staff member: Laura Robins 7 -/ )
Comments: {Please e-mail/send comments to Laura Robins in the Housing & Redevelopment
Department.)
S^7
r
?/3 ^Jy " ^
^'7t
J
t
Memorandum
TO: Laura Robins, Planner .
FROM: Stephen Bobbett, Associate Engineer '
DATE: September 4, 2007
RP 07-07/CDP 07-17
STUDIO Z
COMPLETENESS & ISSUES REVIEW
Engineering Department staff has completed a sejaeftd review of the above-referenced project
for application completeness. The application and plans submitted for this proposed project are
from an Engineering perspective considered incomplete with issues to be resolved prior to
support of the application(s).
The following needs to be completed in order for the application to be complete:
1. Submit a site plan. Attached are copies of the City's Application Requirements and
the Engineering Development Services Division Completeness Checklist for your
use.
2. Submit a Storm Water Management Plan.
3. Submit a preliminary title report.
The following issues need to be resolved prior to re submittal:
4. Include the existing residential and commercial uses in the land use table of the site
plan.
5. Provide parking requirement calculations for the existing uses and show required
parking on site plan.
6. Provide a turn around area to eliminate the need for vehicles to back into the street
to exit.
7. Demonstrate how the project site drains.
8. Show location of existing water and sewer connections for all existing uses. Are the
facilities sized properiy for the proposed land use?
9. Insufficient information was submitted for a complete review of the application. This
review does not constitute a complete review of the proposed project. Additional
items of concern as well as comments on technical and design aspects of the
proposal will be identified upon submittal of the above items.
All project review comments are listed above. If you have any questions, call me at 760-602-
2747
Stephen Bobbett
Associate Engineer
cc: John O'Donnell, Development Services.
Project File
CARLSBAD FIRE DEPARTMENT Tttf^CMNBIXK
Fire Protection Services flffff^A"^ 11
PROJECT REVIEW REPORT
PROJECT NAME: Studio Z
Date: 08/10/07
Project number: RP 07-07 / CDP 07-17
Staff Planner: L.Robins Engineer:
Initial review: (Note: This report identifies fire protection issues associated with the project,
and/or prescribes specific corrections or information needed to achieve Fire Department
approval.)
Fire Department has reviewed this project as requested and would comments or question
how the onsite parking for this commercial enterprise will affect FD access to the multiple
residence located to the rear (East) of this location. Fire Department access is already
challenging given how the many buildings are situated on the two lots and there is
currently no provision for a FD turnaround. Given that the inclusion of Commercial use
on this property negates the applicants ability to claim that this is an existing non-
conforming use, and Fire would likely require full compliance with all Fire Code
provisions.
GR