Loading...
HomeMy WebLinkAboutRP 07-24; Lynn Forbes Gallery; Redevelopment Permits (RP)City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 (760) 602-4610 PLANNING APPLICATION # l2P REC'D BY DATE SIGN FEE -IS-il/f?^o7 oo SIGN PROGRAM FEE RECEIPT NO. REVIEW FOR SIGN PEHMIT Planniiig Depaitment All plans submitted for sign permits/sign programs shall consist of a minimum of a site plan and sign elevations containing the following information: 1. North arrow and scale. 2. Location of existing buildings or structures, parking areas, and vehicular access points to the property. J^, 3. Location of all existing and proposed signs for the property. < - 4. Distance to the property line(s) for all proposed freestanding sign(s). cr : 5. Provide an elevation for all proposed stgn(s) which specifies the following: *Ij A. Dimensions and area fbr all existing and proposed sign(s). B. Materials the sign(s) will be constructed of. — C. Source of Illumination. D. Proposed sign copy. APPLICANT MUST SUBMIT THREE (3) SETS OF SIGN/SITE PLANS, A COMPLETED APPLICATION FORM, AND THE APPLICATION FEE. The application must be submitted prior to 4:00 p.m. Average processing time: 2 weeks NAME OF PROJECT: f^w-W'i (jj^llevT^ /jfc^Vlool 5cc^l\p\'U./'e^ ADDRESS OF PROJECT: 3^^ C/i^CSS<fO U)U^yO^^ ST^./(^O- ASSESSOR PARCEL NUMBER: 2Q3 " 1*^^' ^7 RELATED PLANNING CASE NUMBER(S): TYPE OF DEVELOPMENT: (a) Residential Commercial (c) Office/Industrial (d) Hotel/Motel (e) (f) (g) (h) Service Station (i) Public Park Prof Care (j) Produce Stand Theater (k) Nursery Govt/Church (1) P-U/OSZone SIGN PROGRAM AND/OR SPECIFIC PLAN CRITERIA YesS No • Specific Plan Number VILLAGE REDEVELOPMENT AREA Yesgl No • Requires VR Approval ""^jLQ.^ SIGN ORDINANCE: YesD No^ COASTAL ZONE: Form 10 Revised 12/04 YesD • • « • NogJ • • • « • «*««••«•«••««• Page 1 of 4 EXISTING SIGNS: TYPE NUMBER SIGN AREA SIGN HEIGHT Pole Monument WaU Suspended Directional Canopy Freestanding (Project Identity) PERMITS ISSUED FOR EXISTING SIGNS: Yes • PROPOSED PERMANENT SIGNS: No • Date TYPE MAXIMUM NUMBER ALLOWED NUMBER PROPOSED MAXIMUM SIGN AREA PROPOSED SIGN AREA MAXIMUM SIGN HEIGHT PROPOSED SIGN HEIGHT Pole** Monument** WaU 1 Suspended Y Directional Canopy Freestanding** (Project Identity) PROPOSED TEMPORARY SIGNS: TYPE MAXIMUM NUMBER ALLOWED NUMBER PROPOSED MAXIMUM SIGN AREA PROPOSED SIGN AREA MAXIMUM SIGN HEIGHT PROPOSED SIGN HEIGHT Construction** For Sale** Banner **Prior to approval, aU proposed pole, monument, and freestanding signs must be reviewed for potential sight distance and visibiUty issues. Additional information must supplement this application showing how the proposed signage will not encroach into the public right-of-way or present a traffic hazard. Page 3 of 4 iUustrates an example for what would be required for such proposed signs. Form 10 • • • • • Revised 12/04 Page 2 of4 EXISTING SIGN PROGRAMS OR SPECIFIC PLAN SIGN CRITERIA TOTAL BUILDING STREET FRONTAGE CncA«.') TOTAL SIGNAGE ALLOWANCE EXISTING SIGNAGE (SQ. FT.) REMAINING SIGN ALLOWANCE AT PRESENT PROPOSED SIGNAGE (SQ. FT.) REMAINING SIGN ALLOWANCE AFTER PROPOSED SIGN 23 ft. 23. — I .s^regV Jsq. 41 I V l\ ii n sq. ft. ft. sq. ft. sq. ft. sq. ft. OWNER ^.-^JK APPLICANT NAME (PRINT OR TYPE) / NAME (PRINT OR TYPE) MAILING ADDRESS MAILING ADDRESS CITY AND STATE ZIP TELEPHONE CITY AND STATE ZIP TELEPHONE I CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. I CERTIFY THAT I AM THE REPRESENTATIVE OF THE LEGAL OWNER AND THAT ALL THE ABOVE INFORMA- TION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE SIGM:I:0^E'^^=^6^ / DATE SIGNATURE DATE | PLANNER CHECK LIST: I. 2. 3. 4. 5. 6. Field check by planner. Within maximum length, area. Style consistent with Sign Program and/or Specific Plan criteria, if applicable. Location: • In right-of-way • In visibility triangle at comer Pole and monument signs to be checked by Traffic Engineering, for visibility issues. When approved route copy to Data Entry ^&>Uy^aX /^^n^^q-^ Date: U/l^/07 APPROVED: Planner: Form 10 Revised 12/04 • «••«•« Page 4 of 4