HomeMy WebLinkAboutRP 85-19; SEA HORSE INVESTMENT; Redevelopment Permits (RP) (2)Caiifotuia Suiidez^^
P.O. Box 142
Carlsbad, California 92008
434-3125
March 23, 1988
City of Carlsbad
Chris Salomone
Community Redevelopment Manager
2965 Roosevelt Street, Suite B
Carlsbad, CA 92008
RE: Carlsbad Boulevard Hotel
Dear Chris,
I would like to bring to your attention the two enclosed letters
dated 1-27-87 and 4-1-87.
As you know our building permit extension expires on March 25, 1988.
We have not received the building permit and therefore, ask for
another extension until the parking issue is resolved.
Consequently, as soon as we receive the building permit we would ask
that the coastal permit be made available at that time.
Thank you for your attention to this matter. If there are further
questions, please do not hesitate to call.
Sin<jerely/W>^
Charles F. Rowe End.
CFR:kc
2075 LAS PALMAS DRIVE
CARLSBAD, CA 92009-4859
(Eitu 0f (EarlHbab
PLANNING DEPARTMENT '• -
TELEPHONE
(619) 438-1161
May 10, 1988
MAY 1 2 1988
City of Carlsbad
Housing and
Redevetopment
C. Rowe, President
Carlsbad Boulevard Hotel
General Partnership
P.O. Box 142
Carlsbad, CA 92008
The Planning Department of the City of Carlsbad has reviewed your
Amendment to Redevelopment Permit, application no. RP 85-19(A),
as to its completeness for processing.
The subject application is incomplete, as submitted. Attached is
a list of information which must be provided to complete your
application. You should be aware that no processing of your
application can occur until it is determined to be complete.
Please contact Murray Fulford, at (619) 438-1161, if you have
questions or wish to obtain additional information.
Sincerely,
MICHAEL J. HOLZMILLER
Planning Director
MJH:MF/af
c: Charlie Grimm
Gary Wayne
Chris Salomone
Dave Hauser
LIST OF ITEMS NEEDED
TO COMPLETE APPLICATION:
An amendment to an existing plan requires a complete submittal
for review. To make this submittal complete, please supply 15
copies of the following:
a) Site plan, including additional parking area.
b) Elevations, showing requested changes to window
treatments, and existing grade elevations.
c) Revised underground parking area with spaces marked.
To avoid a confusion of plans, please submit this material in a
complete plan set which includes revised floor plans.
Issues
Reauired Parkinq:
a) Original plan was approved with parking ratio of 1.2
spaces per room. (See attached).
b) New parking required as follows:
88 rooms § 1.2:1 105.6
Commercial @ 1:300 sq. ft.
(9198.3 sq. ft.) 30.6
Total Required = 137
New Parkinq Lot:
a) Additional parking area to provide the required spaces
must be secured by a lease in perpetuity or an easement
that runs with the land.
b) It appears from plan that current owner cannot use his
garage, which makes the house non-conforming. Parking
area must allow clear access to the garage.
c) Parking spaces may not back into access driveway.
d) If additional parking area is for guests, it must be
integrated with existing parking and access to hotel,
and shown on plan. If it is for employees only,
signage must be included.
Elevations
Elevations should reflect changes to window treatment as
previously requested and approved.
RP 85-19(A) (Continued)
4. Heiqht
To show conformance with the City's building height limit,
the existinq grade must be shown on the building elevations.
(See attached excerpt from zoning code.) Please include on
plans cross-sections of building at highest and lowest
existing elevations to graphically show how building height
is measured
5. Enqineerinq Department
Show all revisions to drive and underground parking, per
conversation Dave Hauser/Charlie Rowe May 5.
Note:
Proposed amendment project, as well as approved project,
must conform to City standards regarding off-street parking
and building height requirements in order to qualify for a
Coastal Development Permit.
MF:af
-2-
ZONING SUMMARY
LOT SIZE
EXISTiNG ZONE
EXISTING G.P.
BUILDING HEIGHT
BUILDING COVERAGE
PAVING
LANDSCAPING
1.15 ACRES = 50,530 S.F.
C.T.
C.B.D. . '
35',
31,680 S.F. = 63%
1,240 S.F.^= 2.5%
17,433 S,F. = 34.5%
BUILDING AREAS
BASEMENT
LOBBY
RETAIL
HOTEL
ROOF SUN DECK
TOTAL
PARKING
43,236 S.F.
2,944 S.F.
9,620 S.F.
51,670 S.F.
RETAIL:
HOTEL :
TOTAL :
MINIMUM
9,620 S.F. @ 1 CAR/300 S.F. =
70 ROOMS @ 1.2 CARS/ROOM
32 CARS
84 CARS
116 CARS
PROPOSED
36 CARS
84 CARS
120 CARS
Mi
December 1, 1988
TO: Bob Wojcik/"^Senior Engineer
FROM: Gary Kellison, Project Manager
RE: Carlsbad Boulevard Streetscape, Project No. 3288
Carlsbad Boulevard Hotel (Charles Rowe's Development)
Construction of Phase II of the downtown streetscape program,
which includes the frontage to Charlie Rowe's proposed hotel
development, should begin in late spring of 1989. Because of the
uncertainty of the timing of the hotel development, curb cuts
and driveway aprons are not presently included in the
streetscape construction.
However, the following water services will be extended to the
parcel's property line at the time of the streetscape
construction:
6" fire service $ 2,500
Fire hydrant assembly 2,500
Three 2" water services 3,000
Total $ 8,000
The above costs are the Costa Real Municipal Water District's
estimated work order charges that will be billed to the City at
the time of construction. Costa Real's charges for plan checking
and inspection are not included.
These water services should be constructed with streetscape
because they will eventually be needed no matter how the parcel
develops. It would require removal of the streetscape curb,
sidewalk, and landscaping to install them later.
Reimbursement of the City's costs for the water service extension
should be added to the conditions of development for this
property. A final estimate of the water service costs will be
available at the time of construction.
GK:tlg
C: Lloyd Hubbs, City Engineer
Chris Salomone, Director of Housing and Redevelopment
John Cahill, Municipal Projects Manager
HOUSING AND REDEVELOPMENT
APRIL 1, 1987
CALIFORNIA BUILDERS
2910 JEFFERSON ST.
SUITE 202
CARLSBAD, CA 92008
Citp of Carlgbab
REDEVELOPMENT OFFICE
2965 Roosevelt Street
Suite B
Carlsbaci, CA 92008
(619) 438-5593
RE: COASTAL PERMIT APPROVAL
RP 85-19
Dear Mr. Rowe:
Per our conversation of April 1, 1987, this is to confirm
that a Coastal permit will be made available upon issuance of
building permits for RP 85-19.
If there are any further questions, please do not hesitate to
call.
Sincerely,
CHRIS SALOMONE
Community Redevelopment Manager
CS:al
HOUSING AND REDEVELOPMENT REDEVELOPMENT OFFICE
2965 Roosevelt Street
Suite B
Carlsbad, CA 92008
(619) 438-5593
Citp of Carlsbab
JANUARY 27, 1987
Charles Rowe
California Builders
P.O. Box 142
Carlsbad, CA. 92008
RE: DESIGN REVIEW BOARD ACTION OF JANUARY 21, 1987
The Design Review board approved RP 85-19 (California
Builders) on March 5, 1986, with the Housing and
Redevelopment Commission approval following on March 25,
198 6. Condition number 5 Design Review Board Resolution No
068 (which approves this project) required building permits
to be issued within one year from the date of project
approval or the approval becomes null and void. At the
January 21, 1987, Design Review Board meeting a one year
extension of that condition until March 25, 1988, was
granted.
Sincerely,
CHRIS SALOMONE
Community Redevelopment Manager
CS:BH:al
ITEM 3
INFORMATION ITEM
DATE: JANUARY 21, 1987
TO: DESIGN REVIEW BOARD
FROM: REDEVELOPMENT OFFICE
SUBJECT: RP 85-19 - CALIFORNIA BUILDERS -Condition
amendment and addition of driveway.
The Design Review Board approved RP 85-19 on March 5, 1986,
with the Housing and Redevelopment Commission approval
following on March 25, 1986. Condition number 5 of Design
Review Board Resolution No. 068 which approves this project
requires building permits to be issued within one year from
the date of project approval or the approval becomes null and
void. The applicant is asking for a one year extension of
the approval to March 25, 1988. The reasons for the request
include the complexity of completing the 57 conditions of
approval to the satisfaction of the City, the pursuit of
proper financial commitments, and a delay of several months
caused by an engineering and planning staff review of a
proposed design change. The proposed change is the addition
of a driveway through the porte cochere. The attached
document from the engineering department refers to that
change. Staff supports the addition of the driveway as
conditioned.
ATTACHMENTS
1. Letter, dated January 6, 1987, from California
Builders
2. Engineering Department memo
QaCifotnia 3ui6dez6
P.O. Box 142
Carlsbaci, California 92008
434-3125
January 6, 1987
RECEWtO RoKlevelopmetti
Otiice
city of Carlsbad
Redevelopment Agency
2965 Roosevelt Street, Suite B
Carlsbad, California 92008
Attention: Mr. Chris Salomone, Manager
Re: Design Review Board Resolution No. 068; Case No. RP-85-19
Dear Mr. Salomone,
California Builders, the applicant on Case No. RP-85-19, does hereby
request a twelve (12) month extension on this project. This project
was approved on March 25, 1986 and approval expires on March 25, 1987.
We have diligently pursued addressing all the conditions as set forth
by the Design Review Board Resolution No. 068. As the expiration date
is rapidly approaching, a twelve (12) month extension will enable us
to complete these conditions to the satisfaction of the Carlsbad
Engineering Department. This extension also would enable us to pursue
proper financial commitments.
Your prompt attention to this request would be greatly appreciated.
CHARLES F. ROWE
CFR/jn
January 14, 1987
TO: ASSISTANT CITY ENGINEER
FROM: PRINCIPAL CIVIL ENGINEER
DRIVEWAY ON CARLSBAD BOULEVARD FOR CARLSBAD BOULEVARD HOTEL
(REDEVELOPNENT PERMIT 85-19)
The developer of the above referenced project is requesting
approval of two (2) driveway cuts on Carlsbad Boulevard as shown
on Improvement Plan Drawing No. 273-1, Sheet 2. These curb cuts
would facilitate a one-way driveway that allows a right turn to
the Hotel site from northbound Carlsbad Boulevard traffic, thus
providing access to the porte cochere serving the Hotel. The
driveway is similar to the one approved for the Tamarack Beach
Resort, also located on Carlsbad Boulevard.
The project was originally conditioned to provide a loading/
unloading zone (white curb) on Carlsbad Boulevard in front of the
Hotel. White curb has a time restriction of three (3) minutes.
City Standards only allows emergency stopping on a major
arterial, which is the classification of Carlsbad Boulevard.
The driveway and porte cochere, as proposed, could be considered
a safety improvement by eliminating the need to stop on Carlsbad
Boulevard. However, the driveway is skewed approximately 45** in
relationship to Carlsbad Boulevard rather than 90° as a standard
driveway would be. Pedestrians would need to cross two (2)
driveway openings with a potential for conflicts between
entering traffic and the pedestrians using the sidewalk.
There are
sidewalk
driveway.
Boulevard,
basically two (2) concepts associated with providing a
for pedestrians in conjunction with the proposed
A sidewalk can be installed parallel to Carlsbad
as shown on the plan, requiring pedestrians to cross
both driveway openings. With the angled driveway approach it can
be expected that traffic will turn from Carlsbad Boulevard at a
slightly higher speed than if the driveway intersected the road
at a 90" angle. The acute angle of the driveway will require
that the pedestrians exercise caution in checking for conflicting
vehicular traffic prior to crossing the driveway.
A second option would be to build a sidewalk parallel to and
between the driveway and the Hotel, thereby routing pedestrians
through the loading/unloading area under the porte cochere. This
Assistant City En^^eer
Driveway on Carlsbad Boulevard
January 14, 1987 Page: 2
has a disadvantage of mixing Hotel patrons with the general
public using the sidewalk. Some pedestrians may choose not to
use the sidewalk and thus be forced to walk in the street. In
that case, there is a potential for serious conflicts between
pedestrians and vehicular traffic on Carlsbad Boulevard.
Two sidewalks are proposed for this project. The drawing
provides a sidewalk for Hotel patrons to access the public
sidewalk, thereby keeping Hotel faedestrians out of the driveway.
The sidewalk parallel to the curb and gutter is provided for the
public to use and not be forced into Carlsbad Boulevard. I
discussed this situation with the City Engineer and he approves
the concept shown.
The volume of traffic using the driveway to the porte cochere is
expected to be relatively light. In my opinion, allowing the
driveway would be more desirable than having Hotel patrons park
on Carlsbad Boulevard for a short time to load and unload. Also,
the sidewalks shown on the improvement plans should be approved,
recognizing that either option for the sidewalk has advantages
and disadvantages.
ROBERT T. JOHNSON,^ JR. , P.E.
Principal Civil Engineer
RTJ:lch
c: City Engineer
QaCifotnia 3uiCdet6
P.O. Box 142
Carlsbad, California 92008
434-3125
January 6, 1987
0
j o RECBVffl Re<lever
city of Carlsbad
Redevelopment Agency
2965 Roosevelt Street, Suite B
Carlsbad, California 92008
Attention: Mr. Chris Salomone, Manager
Re: Design Review Board Resolution No. 068; Case No. RP-85-19
Dear Mr. Salomone,
California Builders, the applicant on Case No. RP-85-19, does hereby
request a twelve (12) month extension on this project. This project
was approved on March 25, 1986 and approval expires on March 25, 1987.
We have diligently pursued addressing all the conditions as set forth
by the Design Review Board Resolution No. 068. As the expiration date
is rapidly approaching, a twelve (12) month extension will enable us
to complete these conditions to the satisfaction of the Carlsbad
Engineering Department. This extension also would enable us to pursue
proper financial commitments.
Your prompt attention to this request would be greatly appreciated.
CHARLES F. ROWE
CFR/jn
STATE OF CAUFORNIA—OFFICE OF THE GOVERNOl GEORGE DEUKMEJIAN. Govwnor
OFFICE OF PLANNING AND RESEARCH
1400 TENTH STREET
SACRAMENTO, CA 95814
(916/445-0613)
Adrienne Landers
City of Carlsbad
1200 Elm Avenue
Carlsbad, CA 92008
February 27, 1986
Subject! California Builders
SCH# 86012904
RP 85-19
Dear Ms. Landers:
lhe State Clearln^^use submitted the above named envlronniental document to
selected state agencies for review. The review period Is closed and none- ot
tbe state agencies have conmoits. This letter acknowledges that you have
complied with the State Clearinghouse review requirements for draft
environmental documents, pursi:iant to the California Environmental Quality
Act*
Please call Glenn Stober at 916/445-0613 if you have any questions regarding
the envlroimental review process* When contacting the Clearinghouse in this
matter^ pleaae use the eight digit State Clearinghouse number so that we may
respond promptly.
Sincerely,
John B. Ohanlan
Chief Deputy Dlred
Office of Planning and Research
r
AT & SF RR
LEGEND
PROJECT VOLUME
•X- EXISTINQ VOLUMES
^•^BUILDGUT VOLUMES
o o <
U) o ^
<D COZ
*
UJ > <
z o
UJ
UJ
CQ
WASHINGTON ST
<
z
UJ
co
QC z
o
o o <
O O
a> c9 z
CARLSBAD BLVD
1300
-^84 00
^^21.200
TRIPS GENERATED
Site Acreage 1.16 Ac.
Commercral Trip Generation (CT)
Hotel: 10T/RM
Retail: 40/ 1 OOOSF
70RMS700TR
4000S160TR
TOTAL: 860 Trips
DISTRIBUTION
Blvd North: 20%s1 72
Blvd South: 70%s602
Washington: 10%s8 6
ADT
PK Hr:
Blvd South 60s1 minute
Split to Grand (1 00%)«1 / minute
Split to Elm (80%)s1/1.25 minutes
Split to Tamarack (10%)s1/10 minutes
Approx. one vehicle per
signal cycie-^-INSIGNIFICANT
CALIFORNIA BUILDERS RP 85-19
sin . I.II ACWS • M. IM S.F.
(•IITINS IOM - C.T.
lm>tTll« e>. . c.a.o.
•WdM HCJQHI
• »'
•WCtlHG CMAAM - II,uo t.r. lrt
MVIM I.M* I.'. • I.M
- I».»U %.'. • M.Sl
mmaim *MA*
•MtMNf . 41,t.r.
- «,*» s.>.
•mni. - »!,»» mer SJN OCCK - I.OM s.».
MTM. .io.,>M i.r.
ptmim
WT.IL: t,UO S.F • 1 CAH/JOO S.F. -U CAW
•ariL: n mOMS • I.I CAM/MXW M CAMS
nXM.: lit CARS
Crrir)
CARLSBAO BLVa HOfTEL
FIRST FLOOR
HOTEL LOBBY / STREET LEVEL FLOOR PLAN
CARLSIAD • LIVATION
CARLSBAD BOULE^i^RD HOTEL
THIRD FLOOR :
BLOa A FLOOR PLAN
SECOND FLOOR :
BLDG. A FLOOR PLAN &
BLDQ. B SUN DECKA.EVEL
FLOOR PLAN
DEVELOPMENTAL
SERVICES
LAND USE PLANNINQ OFFICE
Citp of Cartebab
February 19, 1986
1200 ELM AVENUE
CARLSBAD, CA 92008-1989
(619) 438-5591
Ay
SEA HORSE INVESTMENTS
c/o Charles F. Rowe
P. 0. Box 142
3138 Roosevelt Street, Ste K
Carlsbad, CA 92008
SUBJECT: RP 85-19 CALIFORNIA BUILDERS Preliminary Staff Report
The preliminary staff report for the above referenced project
will be available for you to pick up on Friday, February 21,
1986, after 4 p.m. This preliminary report will be discussed by
staff at the Development Coordinating Committee (D.C.C.) meeting
which will be held on February 25, 1986. A twenty (20) minute
appointment has been set aside for you at 9:00 a.m. If you have
any questions concerning your project, you should attend the
D.C.C. meeting.
It is necessary that you bring yoar required colored exhibit(s)
witJi you to tihis neeting in order for your project to go forward
to Planning Coaussion. If you do not plan to attend tJiis
meeting, please make arrangements to have your colored exhibit(s)
here by the scheduled time above.
If you need additional information concerning this matter, please
contact the Planning Department at 438-5591.
CITY OF CARLSBAD
MICHAEL J. HOLZMILLER
Planning Director
Planning Dep>w^tmentJ
MJH:bn
JANUARY 21, 1986
TO: DEE LANDERS
FROM: MARTY BOUMAN
COMMENTS RE: CALIFORNIA BUILDERS
The project has no significant adverse traffic impact. It's
typical peak hour traffic generation does not coincide with
normal street peak traffic hours, thus it's primary traffic
distribution southerly on Carlsbad Boulevard can be efficiently
absorbed through the traffic signals at Carlsbad and Grand,
Carlsbad and ELm and Carlsbad and Tamarack.
The driveway entrance on Beech Street is closer to the corner
than is desirable, but Beech is a lightly traveled street,
extending only one block easterly from Carlsbad Boulevard, dTven
though the developer's frontage on Beech Street is only 95 feet
wide, a driveway there is a fair trade-off for not having any
driveway access to the property from Carlsbad Boulevard.
On both Beech Street and Christiansen Way, the design of the up
and down-ramps to the offstreet parking levels must be such as
to limit the gradient to 14%. Grades in excess of 14% will
cause vehicles to "bottom out".
At the corner of Carlsbad Boulevard and Christiansen Way there is
an existing 95' x 100' parcel which is not a part of the
project. The developer is proposing to build curb, gutter and
sidewalk only on his project frontage, and transition to the
existing pavement edge on the "missing parcel" with 6 inch A.C.
berms on each street. From the standpoint of drainage, traffic
safety and esthetics, such would be undesirable. The curb and
gutter (if not the sidewalk) should be connected around the
corner along the "missing parcel" frontage.
MB:bn
DEVELOPMENTAL
SERVICES
LAND USE PLANNINQ OFFICE
1200 ELM AVENUE
CARLSBAD, CA 92008-1989
(619) 438-5591
Citp of CarliSbab
October 29, 1985
California Builders
P. 0. Box 142
Carlsbad, California 92008
RE: RP 85-19 - CALIFORNIA BUILDERS
The Director of Building and Planning, the City Engineer
and the Land Use Planning Manager have reviewed the application
you submitted for the above-referenced project. Based upon this
review, it has been determined that there are major problems
associated with your application which must be addressed before
this application can be scheduled for a Planning Commission
hearing. The problems or issues are listed below. Also, the
name of the project planner and project engineer is provided.
You should set-up a meeting to discuss the issues with the
appropriate staff member. Once the problems/issues have been
addressed, your application will then be scheduled for a
hearing.
Problems/Issues
1 . Intensity of use
2. Circulation and access
3. Drainage
information
Project Planner
Adrienne Landers
4. Insufficient engineering
Project Engineer
Voltaire Domingo
5. Appearance of building
<?'^X% Costa Real
VMVJ Municipal Water District
^^^j^^^^^ 5950 El Camlno Real, Carlsbad, CA 92008
Telephone: (619)438-2722
DATE: October 3, 1985
TO: City of Carlsbad
Land Use Planning Department
Carlsbad, California 92008
ATTN: Dee Landers
SUBJ: R.P. 85-19, Ca. Builders., E/S Blvd. Between
Beech & Cedar, CRMWD 85-601.140
The subject project has been reviewed by the District's
Engineering Department to determine extent of District's
involvement regarding existing and proposed water system to serve
proposed project as follows:
YES NO
Are there transmission lines that affect project? ( ) (X)
Are there existing facilities that will have to be
reconstructed? ( ) (X)
Are there new facilities that will have to be
constructed? ( ) (X)
Are there existing District agreements that have
financial impact on the project? ( ) (X)
We have the following specific recommendations:
1. The entire water system for subject project be evaluated
in detail to insure adequate capacity for domestic,
landscaping and fire flow demands.
2. The developer and his engineer schedule a meeting with
the District Engineer and establish water system layout
prior to the water system improvement plans being drawn.
3. The project currently has an existing 8" water main in
Carlsbad Boulevard.
Regarding fees and deposits: The developer will be responsible
for the major facility charge which will be collected at time of
issuance of building permit. Please contact Mr. Bob Wade if you
have any questions regarding this project.
William E. Blakesley /
Deputy District Engin,^r
WEB:sja
cc: Fire Marshal
Sea Horse Investments
CMWD 85-601.140