Loading...
HomeMy WebLinkAboutRP 85-19; SEA HORSE INVESTMENT; Redevelopment Permits (RP) (2)Caiifotuia Suiidez^^ P.O. Box 142 Carlsbad, California 92008 434-3125 March 23, 1988 City of Carlsbad Chris Salomone Community Redevelopment Manager 2965 Roosevelt Street, Suite B Carlsbad, CA 92008 RE: Carlsbad Boulevard Hotel Dear Chris, I would like to bring to your attention the two enclosed letters dated 1-27-87 and 4-1-87. As you know our building permit extension expires on March 25, 1988. We have not received the building permit and therefore, ask for another extension until the parking issue is resolved. Consequently, as soon as we receive the building permit we would ask that the coastal permit be made available at that time. Thank you for your attention to this matter. If there are further questions, please do not hesitate to call. Sin<jerely/W>^ Charles F. Rowe End. CFR:kc 2075 LAS PALMAS DRIVE CARLSBAD, CA 92009-4859 (Eitu 0f (EarlHbab PLANNING DEPARTMENT '• - TELEPHONE (619) 438-1161 May 10, 1988 MAY 1 2 1988 City of Carlsbad Housing and Redevetopment C. Rowe, President Carlsbad Boulevard Hotel General Partnership P.O. Box 142 Carlsbad, CA 92008 The Planning Department of the City of Carlsbad has reviewed your Amendment to Redevelopment Permit, application no. RP 85-19(A), as to its completeness for processing. The subject application is incomplete, as submitted. Attached is a list of information which must be provided to complete your application. You should be aware that no processing of your application can occur until it is determined to be complete. Please contact Murray Fulford, at (619) 438-1161, if you have questions or wish to obtain additional information. Sincerely, MICHAEL J. HOLZMILLER Planning Director MJH:MF/af c: Charlie Grimm Gary Wayne Chris Salomone Dave Hauser LIST OF ITEMS NEEDED TO COMPLETE APPLICATION: An amendment to an existing plan requires a complete submittal for review. To make this submittal complete, please supply 15 copies of the following: a) Site plan, including additional parking area. b) Elevations, showing requested changes to window treatments, and existing grade elevations. c) Revised underground parking area with spaces marked. To avoid a confusion of plans, please submit this material in a complete plan set which includes revised floor plans. Issues Reauired Parkinq: a) Original plan was approved with parking ratio of 1.2 spaces per room. (See attached). b) New parking required as follows: 88 rooms § 1.2:1 105.6 Commercial @ 1:300 sq. ft. (9198.3 sq. ft.) 30.6 Total Required = 137 New Parkinq Lot: a) Additional parking area to provide the required spaces must be secured by a lease in perpetuity or an easement that runs with the land. b) It appears from plan that current owner cannot use his garage, which makes the house non-conforming. Parking area must allow clear access to the garage. c) Parking spaces may not back into access driveway. d) If additional parking area is for guests, it must be integrated with existing parking and access to hotel, and shown on plan. If it is for employees only, signage must be included. Elevations Elevations should reflect changes to window treatment as previously requested and approved. RP 85-19(A) (Continued) 4. Heiqht To show conformance with the City's building height limit, the existinq grade must be shown on the building elevations. (See attached excerpt from zoning code.) Please include on plans cross-sections of building at highest and lowest existing elevations to graphically show how building height is measured 5. Enqineerinq Department Show all revisions to drive and underground parking, per conversation Dave Hauser/Charlie Rowe May 5. Note: Proposed amendment project, as well as approved project, must conform to City standards regarding off-street parking and building height requirements in order to qualify for a Coastal Development Permit. MF:af -2- ZONING SUMMARY LOT SIZE EXISTiNG ZONE EXISTING G.P. BUILDING HEIGHT BUILDING COVERAGE PAVING LANDSCAPING 1.15 ACRES = 50,530 S.F. C.T. C.B.D. . ' 35', 31,680 S.F. = 63% 1,240 S.F.^= 2.5% 17,433 S,F. = 34.5% BUILDING AREAS BASEMENT LOBBY RETAIL HOTEL ROOF SUN DECK TOTAL PARKING 43,236 S.F. 2,944 S.F. 9,620 S.F. 51,670 S.F. RETAIL: HOTEL : TOTAL : MINIMUM 9,620 S.F. @ 1 CAR/300 S.F. = 70 ROOMS @ 1.2 CARS/ROOM 32 CARS 84 CARS 116 CARS PROPOSED 36 CARS 84 CARS 120 CARS Mi December 1, 1988 TO: Bob Wojcik/"^Senior Engineer FROM: Gary Kellison, Project Manager RE: Carlsbad Boulevard Streetscape, Project No. 3288 Carlsbad Boulevard Hotel (Charles Rowe's Development) Construction of Phase II of the downtown streetscape program, which includes the frontage to Charlie Rowe's proposed hotel development, should begin in late spring of 1989. Because of the uncertainty of the timing of the hotel development, curb cuts and driveway aprons are not presently included in the streetscape construction. However, the following water services will be extended to the parcel's property line at the time of the streetscape construction: 6" fire service $ 2,500 Fire hydrant assembly 2,500 Three 2" water services 3,000 Total $ 8,000 The above costs are the Costa Real Municipal Water District's estimated work order charges that will be billed to the City at the time of construction. Costa Real's charges for plan checking and inspection are not included. These water services should be constructed with streetscape because they will eventually be needed no matter how the parcel develops. It would require removal of the streetscape curb, sidewalk, and landscaping to install them later. Reimbursement of the City's costs for the water service extension should be added to the conditions of development for this property. A final estimate of the water service costs will be available at the time of construction. GK:tlg C: Lloyd Hubbs, City Engineer Chris Salomone, Director of Housing and Redevelopment John Cahill, Municipal Projects Manager HOUSING AND REDEVELOPMENT APRIL 1, 1987 CALIFORNIA BUILDERS 2910 JEFFERSON ST. SUITE 202 CARLSBAD, CA 92008 Citp of Carlgbab REDEVELOPMENT OFFICE 2965 Roosevelt Street Suite B Carlsbaci, CA 92008 (619) 438-5593 RE: COASTAL PERMIT APPROVAL RP 85-19 Dear Mr. Rowe: Per our conversation of April 1, 1987, this is to confirm that a Coastal permit will be made available upon issuance of building permits for RP 85-19. If there are any further questions, please do not hesitate to call. Sincerely, CHRIS SALOMONE Community Redevelopment Manager CS:al HOUSING AND REDEVELOPMENT REDEVELOPMENT OFFICE 2965 Roosevelt Street Suite B Carlsbad, CA 92008 (619) 438-5593 Citp of Carlsbab JANUARY 27, 1987 Charles Rowe California Builders P.O. Box 142 Carlsbad, CA. 92008 RE: DESIGN REVIEW BOARD ACTION OF JANUARY 21, 1987 The Design Review board approved RP 85-19 (California Builders) on March 5, 1986, with the Housing and Redevelopment Commission approval following on March 25, 198 6. Condition number 5 Design Review Board Resolution No 068 (which approves this project) required building permits to be issued within one year from the date of project approval or the approval becomes null and void. At the January 21, 1987, Design Review Board meeting a one year extension of that condition until March 25, 1988, was granted. Sincerely, CHRIS SALOMONE Community Redevelopment Manager CS:BH:al ITEM 3 INFORMATION ITEM DATE: JANUARY 21, 1987 TO: DESIGN REVIEW BOARD FROM: REDEVELOPMENT OFFICE SUBJECT: RP 85-19 - CALIFORNIA BUILDERS -Condition amendment and addition of driveway. The Design Review Board approved RP 85-19 on March 5, 1986, with the Housing and Redevelopment Commission approval following on March 25, 1986. Condition number 5 of Design Review Board Resolution No. 068 which approves this project requires building permits to be issued within one year from the date of project approval or the approval becomes null and void. The applicant is asking for a one year extension of the approval to March 25, 1988. The reasons for the request include the complexity of completing the 57 conditions of approval to the satisfaction of the City, the pursuit of proper financial commitments, and a delay of several months caused by an engineering and planning staff review of a proposed design change. The proposed change is the addition of a driveway through the porte cochere. The attached document from the engineering department refers to that change. Staff supports the addition of the driveway as conditioned. ATTACHMENTS 1. Letter, dated January 6, 1987, from California Builders 2. Engineering Department memo QaCifotnia 3ui6dez6 P.O. Box 142 Carlsbaci, California 92008 434-3125 January 6, 1987 RECEWtO RoKlevelopmetti Otiice city of Carlsbad Redevelopment Agency 2965 Roosevelt Street, Suite B Carlsbad, California 92008 Attention: Mr. Chris Salomone, Manager Re: Design Review Board Resolution No. 068; Case No. RP-85-19 Dear Mr. Salomone, California Builders, the applicant on Case No. RP-85-19, does hereby request a twelve (12) month extension on this project. This project was approved on March 25, 1986 and approval expires on March 25, 1987. We have diligently pursued addressing all the conditions as set forth by the Design Review Board Resolution No. 068. As the expiration date is rapidly approaching, a twelve (12) month extension will enable us to complete these conditions to the satisfaction of the Carlsbad Engineering Department. This extension also would enable us to pursue proper financial commitments. Your prompt attention to this request would be greatly appreciated. CHARLES F. ROWE CFR/jn January 14, 1987 TO: ASSISTANT CITY ENGINEER FROM: PRINCIPAL CIVIL ENGINEER DRIVEWAY ON CARLSBAD BOULEVARD FOR CARLSBAD BOULEVARD HOTEL (REDEVELOPNENT PERMIT 85-19) The developer of the above referenced project is requesting approval of two (2) driveway cuts on Carlsbad Boulevard as shown on Improvement Plan Drawing No. 273-1, Sheet 2. These curb cuts would facilitate a one-way driveway that allows a right turn to the Hotel site from northbound Carlsbad Boulevard traffic, thus providing access to the porte cochere serving the Hotel. The driveway is similar to the one approved for the Tamarack Beach Resort, also located on Carlsbad Boulevard. The project was originally conditioned to provide a loading/ unloading zone (white curb) on Carlsbad Boulevard in front of the Hotel. White curb has a time restriction of three (3) minutes. City Standards only allows emergency stopping on a major arterial, which is the classification of Carlsbad Boulevard. The driveway and porte cochere, as proposed, could be considered a safety improvement by eliminating the need to stop on Carlsbad Boulevard. However, the driveway is skewed approximately 45** in relationship to Carlsbad Boulevard rather than 90° as a standard driveway would be. Pedestrians would need to cross two (2) driveway openings with a potential for conflicts between entering traffic and the pedestrians using the sidewalk. There are sidewalk driveway. Boulevard, basically two (2) concepts associated with providing a for pedestrians in conjunction with the proposed A sidewalk can be installed parallel to Carlsbad as shown on the plan, requiring pedestrians to cross both driveway openings. With the angled driveway approach it can be expected that traffic will turn from Carlsbad Boulevard at a slightly higher speed than if the driveway intersected the road at a 90" angle. The acute angle of the driveway will require that the pedestrians exercise caution in checking for conflicting vehicular traffic prior to crossing the driveway. A second option would be to build a sidewalk parallel to and between the driveway and the Hotel, thereby routing pedestrians through the loading/unloading area under the porte cochere. This Assistant City En^^eer Driveway on Carlsbad Boulevard January 14, 1987 Page: 2 has a disadvantage of mixing Hotel patrons with the general public using the sidewalk. Some pedestrians may choose not to use the sidewalk and thus be forced to walk in the street. In that case, there is a potential for serious conflicts between pedestrians and vehicular traffic on Carlsbad Boulevard. Two sidewalks are proposed for this project. The drawing provides a sidewalk for Hotel patrons to access the public sidewalk, thereby keeping Hotel faedestrians out of the driveway. The sidewalk parallel to the curb and gutter is provided for the public to use and not be forced into Carlsbad Boulevard. I discussed this situation with the City Engineer and he approves the concept shown. The volume of traffic using the driveway to the porte cochere is expected to be relatively light. In my opinion, allowing the driveway would be more desirable than having Hotel patrons park on Carlsbad Boulevard for a short time to load and unload. Also, the sidewalks shown on the improvement plans should be approved, recognizing that either option for the sidewalk has advantages and disadvantages. ROBERT T. JOHNSON,^ JR. , P.E. Principal Civil Engineer RTJ:lch c: City Engineer QaCifotnia 3uiCdet6 P.O. Box 142 Carlsbad, California 92008 434-3125 January 6, 1987 0 j o RECBVffl Re<lever city of Carlsbad Redevelopment Agency 2965 Roosevelt Street, Suite B Carlsbad, California 92008 Attention: Mr. Chris Salomone, Manager Re: Design Review Board Resolution No. 068; Case No. RP-85-19 Dear Mr. Salomone, California Builders, the applicant on Case No. RP-85-19, does hereby request a twelve (12) month extension on this project. This project was approved on March 25, 1986 and approval expires on March 25, 1987. We have diligently pursued addressing all the conditions as set forth by the Design Review Board Resolution No. 068. As the expiration date is rapidly approaching, a twelve (12) month extension will enable us to complete these conditions to the satisfaction of the Carlsbad Engineering Department. This extension also would enable us to pursue proper financial commitments. Your prompt attention to this request would be greatly appreciated. CHARLES F. ROWE CFR/jn STATE OF CAUFORNIA—OFFICE OF THE GOVERNOl GEORGE DEUKMEJIAN. Govwnor OFFICE OF PLANNING AND RESEARCH 1400 TENTH STREET SACRAMENTO, CA 95814 (916/445-0613) Adrienne Landers City of Carlsbad 1200 Elm Avenue Carlsbad, CA 92008 February 27, 1986 Subject! California Builders SCH# 86012904 RP 85-19 Dear Ms. Landers: lhe State Clearln^^use submitted the above named envlronniental document to selected state agencies for review. The review period Is closed and none- ot tbe state agencies have conmoits. This letter acknowledges that you have complied with the State Clearinghouse review requirements for draft environmental documents, pursi:iant to the California Environmental Quality Act* Please call Glenn Stober at 916/445-0613 if you have any questions regarding the envlroimental review process* When contacting the Clearinghouse in this matter^ pleaae use the eight digit State Clearinghouse number so that we may respond promptly. Sincerely, John B. Ohanlan Chief Deputy Dlred Office of Planning and Research r AT & SF RR LEGEND PROJECT VOLUME •X- EXISTINQ VOLUMES ^•^BUILDGUT VOLUMES o o < U) o ^ <D COZ * UJ > < z o UJ UJ CQ WASHINGTON ST < z UJ co QC z o o o < O O a> c9 z CARLSBAD BLVD 1300 -^84 00 ^^21.200 TRIPS GENERATED Site Acreage 1.16 Ac. Commercral Trip Generation (CT) Hotel: 10T/RM Retail: 40/ 1 OOOSF 70RMS700TR 4000S160TR TOTAL: 860 Trips DISTRIBUTION Blvd North: 20%s1 72 Blvd South: 70%s602 Washington: 10%s8 6 ADT PK Hr: Blvd South 60s1 minute Split to Grand (1 00%)«1 / minute Split to Elm (80%)s1/1.25 minutes Split to Tamarack (10%)s1/10 minutes Approx. one vehicle per signal cycie-^-INSIGNIFICANT CALIFORNIA BUILDERS RP 85-19 sin . I.II ACWS • M. IM S.F. (•IITINS IOM - C.T. lm>tTll« e>. . c.a.o. •WdM HCJQHI • »' •WCtlHG CMAAM - II,uo t.r. lrt MVIM I.M* I.'. • I.M - I».»U %.'. • M.Sl mmaim *MA* •MtMNf . 41,t.r. - «,*» s.>. •mni. - »!,»» mer SJN OCCK - I.OM s.». MTM. .io.,>M i.r. ptmim WT.IL: t,UO S.F • 1 CAH/JOO S.F. -U CAW •ariL: n mOMS • I.I CAM/MXW M CAMS nXM.: lit CARS Crrir) CARLSBAO BLVa HOfTEL FIRST FLOOR HOTEL LOBBY / STREET LEVEL FLOOR PLAN CARLSIAD • LIVATION CARLSBAD BOULE^i^RD HOTEL THIRD FLOOR : BLOa A FLOOR PLAN SECOND FLOOR : BLDG. A FLOOR PLAN & BLDQ. B SUN DECKA.EVEL FLOOR PLAN DEVELOPMENTAL SERVICES LAND USE PLANNINQ OFFICE Citp of Cartebab February 19, 1986 1200 ELM AVENUE CARLSBAD, CA 92008-1989 (619) 438-5591 Ay SEA HORSE INVESTMENTS c/o Charles F. Rowe P. 0. Box 142 3138 Roosevelt Street, Ste K Carlsbad, CA 92008 SUBJECT: RP 85-19 CALIFORNIA BUILDERS Preliminary Staff Report The preliminary staff report for the above referenced project will be available for you to pick up on Friday, February 21, 1986, after 4 p.m. This preliminary report will be discussed by staff at the Development Coordinating Committee (D.C.C.) meeting which will be held on February 25, 1986. A twenty (20) minute appointment has been set aside for you at 9:00 a.m. If you have any questions concerning your project, you should attend the D.C.C. meeting. It is necessary that you bring yoar required colored exhibit(s) witJi you to tihis neeting in order for your project to go forward to Planning Coaussion. If you do not plan to attend tJiis meeting, please make arrangements to have your colored exhibit(s) here by the scheduled time above. If you need additional information concerning this matter, please contact the Planning Department at 438-5591. CITY OF CARLSBAD MICHAEL J. HOLZMILLER Planning Director Planning Dep>w^tmentJ MJH:bn JANUARY 21, 1986 TO: DEE LANDERS FROM: MARTY BOUMAN COMMENTS RE: CALIFORNIA BUILDERS The project has no significant adverse traffic impact. It's typical peak hour traffic generation does not coincide with normal street peak traffic hours, thus it's primary traffic distribution southerly on Carlsbad Boulevard can be efficiently absorbed through the traffic signals at Carlsbad and Grand, Carlsbad and ELm and Carlsbad and Tamarack. The driveway entrance on Beech Street is closer to the corner than is desirable, but Beech is a lightly traveled street, extending only one block easterly from Carlsbad Boulevard, dTven though the developer's frontage on Beech Street is only 95 feet wide, a driveway there is a fair trade-off for not having any driveway access to the property from Carlsbad Boulevard. On both Beech Street and Christiansen Way, the design of the up and down-ramps to the offstreet parking levels must be such as to limit the gradient to 14%. Grades in excess of 14% will cause vehicles to "bottom out". At the corner of Carlsbad Boulevard and Christiansen Way there is an existing 95' x 100' parcel which is not a part of the project. The developer is proposing to build curb, gutter and sidewalk only on his project frontage, and transition to the existing pavement edge on the "missing parcel" with 6 inch A.C. berms on each street. From the standpoint of drainage, traffic safety and esthetics, such would be undesirable. The curb and gutter (if not the sidewalk) should be connected around the corner along the "missing parcel" frontage. MB:bn DEVELOPMENTAL SERVICES LAND USE PLANNINQ OFFICE 1200 ELM AVENUE CARLSBAD, CA 92008-1989 (619) 438-5591 Citp of CarliSbab October 29, 1985 California Builders P. 0. Box 142 Carlsbad, California 92008 RE: RP 85-19 - CALIFORNIA BUILDERS The Director of Building and Planning, the City Engineer and the Land Use Planning Manager have reviewed the application you submitted for the above-referenced project. Based upon this review, it has been determined that there are major problems associated with your application which must be addressed before this application can be scheduled for a Planning Commission hearing. The problems or issues are listed below. Also, the name of the project planner and project engineer is provided. You should set-up a meeting to discuss the issues with the appropriate staff member. Once the problems/issues have been addressed, your application will then be scheduled for a hearing. Problems/Issues 1 . Intensity of use 2. Circulation and access 3. Drainage information Project Planner Adrienne Landers 4. Insufficient engineering Project Engineer Voltaire Domingo 5. Appearance of building <?'^X% Costa Real VMVJ Municipal Water District ^^^j^^^^^ 5950 El Camlno Real, Carlsbad, CA 92008 Telephone: (619)438-2722 DATE: October 3, 1985 TO: City of Carlsbad Land Use Planning Department Carlsbad, California 92008 ATTN: Dee Landers SUBJ: R.P. 85-19, Ca. Builders., E/S Blvd. Between Beech & Cedar, CRMWD 85-601.140 The subject project has been reviewed by the District's Engineering Department to determine extent of District's involvement regarding existing and proposed water system to serve proposed project as follows: YES NO Are there transmission lines that affect project? ( ) (X) Are there existing facilities that will have to be reconstructed? ( ) (X) Are there new facilities that will have to be constructed? ( ) (X) Are there existing District agreements that have financial impact on the project? ( ) (X) We have the following specific recommendations: 1. The entire water system for subject project be evaluated in detail to insure adequate capacity for domestic, landscaping and fire flow demands. 2. The developer and his engineer schedule a meeting with the District Engineer and establish water system layout prior to the water system improvement plans being drawn. 3. The project currently has an existing 8" water main in Carlsbad Boulevard. Regarding fees and deposits: The developer will be responsible for the major facility charge which will be collected at time of issuance of building permit. Please contact Mr. Bob Wade if you have any questions regarding this project. William E. Blakesley / Deputy District Engin,^r WEB:sja cc: Fire Marshal Sea Horse Investments CMWD 85-601.140