HomeMy WebLinkAboutSDP 02-05; Villages of La Costa RV Storage; Site Development Plan (SDP)CITY COARLSBAD - ENGINEERING DEPAlUhENT
APPLICATION
ENGINEERING PLAN CHECK
Complete all appropriate information. Write N/A when not applicable.
PROJECT NAME: La Costa Oaks DATE: 3/25/04
PROJECT DESCRIPTION: Temporary RV Parking Lot Grading Plan and Erosion Control Plan
PROJECT ADDRESS:
LOTNO(S).: 208.
# LOTS:
Rancho Santa Fe at "H" Street
MAP NO.: 99-04-03 APN(S).:.
NUMBER OF ACRES: 1.7
Real Estate Collateral Management
1903 Wright Place. Suite 180
Carlsbad. CA 92008
OWNER:
Mailing Address:
Phone Number:
Fax Number:
E-Mail:
I certify that I am the legal owner and that all the above
information is true and correct to the best of my knowledge.
760.929.2701
760.929.2701
frschimel@household.com
Signature^^^^J^^..^/^ Date 3/4^7)^
APPLICANT:
Mailing Address:
Phone Number:
Fax Number:
E-Mail:
By Fred Arbuckle
President Mptrdw
As Agent Toi
Signature
Morrow Development. Inc.
1903 Wright Place. Suite 180
Carlsbad. CA 92008
760.929.2701
760.929.2705
farbuckle@morrowdevelopment.com
bpment
EstaJeVollateral Management Company
• • Date 3>'Z^-0^
Raymond L. Martin
San Diego. CA 92121
aVIL ENGINEER:
FIRM:
Mailing Address:
Phone Number:
Fax Number:
E-Mail:
State Registration Number: 48670
Hunsaker & Associates San Diego. Inc.
10179 Huennekens Street
SOILS ENGINEER:
Firm:
Ali Sadr
Geocon Incorporated
Mailing Address: 6960 Flanders Drive
San Diego. CA 92121
858.558.4500
858.558.1414
RMartin@HunsakerSD.com
Phone Number: 858.558.6900
Fax Number: 858.558.6159
E-Mail:
State Registration Number: 22527
asadr@geoconinc.com
ADDinONAL COMMENTS:
IMPROVEMENT VALUATION
1. What water district is the proposed project located in? (check one)?
• Carlsbad Municipal Water District • Olivenhain lEI Vallecitos
2. If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15%
contingency fee, for water and reclaimed water improvements, sewer (for Carisbad Municipal
Water District only), street, public (median) landscape and irrigation, and drainage improvements
(if applicable)? $ N/A
cut 36.800 cy fill 36.800
GRADING QUANTITIES
cy remedial 0 cy import/export N/A cy
Revised 1/14/02
DA:MSOffice g:\michefe\tim\city of carlsbad\ttie oaks\temp rv pat1<ing.dcx: wo ####.#
CARLSBAD - ENGINEERING DE^TMiNT
APPLICATION
ENGINEERING PLAN CHECK
Complete ail appropriate information. Write N/A when not applicable.
APPLICATION FOR
(•all that apply)
SEE REVERSE SIDE
FOR CITY I SE ONLY
APPLICATION FOR
(•all that apply)
PROJECT
I.D.
DRAWING
NUMBER
DEPOSIT/FEES
PAID
COMMENTS
• Adjustment Plat (ADJ)
• Certificate of Compliance (CE)
• Dedication of Easement (PR)
Type:
• Dedication of Easement (PR)
Type:
Type:
Type:
• Encroachment Permit (PR)
• Final Map (FM)
0^ Grading Plancheck (DWG)
• Improvement Plancheck (DWG)
• Parcel Map (PM)
• Quitclaim of Easement (PR)
Type:
• Quitclaim of Easement (PR)
Type:
Type:
Type:
• Reversion to Acreage (RA)
• Street Vacation (STV)
• Tentative Parcel Map (MS)
• Certificate of Correction
(CCOR)
• Covenant for Easement (PR)
• Substantial Conformance Exhibit
(SCE)
• Other
eNGINEEFfjNG
DATE STAMP
APPUCATION RECEIVED
Revised 1/14/02
DA:MSOffice g:\michele\tim\city of carisbadVthe oaksMemp rv parking.doc wo ((###-#
PROJECT PLAN REVISION REVIEW COMPLETION
The following project plan revisions have been reviewed and are recommended for approval:
Project Name:
Project No.:
Dwg.. No.:
Sheet No's.:
VILLAGES OF LA COSTA OAKS NORTH
419-6 A
11 No. of Shts. = 1
DECLARATION OF RESPONSIBLE CHARGE
I liereby declare tliat I have exercised responsible charge over the plan review of this
project as defined In Section 6703 of the Business and Professions Code to determine
that the plans are found to be in substantial compliance with applicable codes and
standards.
Plan review of these project drawings does not relieve the Engineer of Work of the
responsibilities with state and local ordinances.
Signed_
A
/
j
Helming Engineering Co., Inc.
1650 Linda Vista Drive, Suite 202
San Marcos, CA 92078
(760) 744-9801
UJ/): Date
Douglas L. Helming, RCE 23874
Expiration Date 12/31/05
PBS^
An employee-owned company
PROJECT REVIEW COMPLETION
The following project has been reviewed and are recommended for approval:
Project Name: Villages of La Costa, Oaks North, Temporary RV Site
Project No.: SDP 02-05
Document No.: DWG419-6A
Sheets No.: Through: 10
DECLARATION OF RESPONSIBLE CHARGE
I hereby declare that I have exercised responsible charge over the review of this project
as defined in Section 6703 of the Business and Professions Code and have found the
project to be in substantial compliance with applicable codes and standards.
Review of this project does not relieve the Land Surveyor or Engineer of Work of the
responsibilities with state and local ordinances.
Signed C7~Ju t. U. 17—
Charles R. St. John, RCEC57649
Expiration Date 12/31/05
Date
PROJECT REVIEW COMPLETION.doc
175 Calle Magdalena • Encinitas, California 92024 • Telephone: 760753.1120 • Fax: 760753.0730 • www.pbsj.com
Citv of Carlsbad
Public Works — Engineering
September 7, 2004
Tim G'Grady
Morrow Development
1903 Wright Place, Suite 180
Carlsbad CA 92008
COMPLETION OF GRADING PLANCHECK FOR: DWG 419-6A
PROJECT NAME & NO.: Villages of La Costa, Oaks North-Temp RV Site, SDP 02-05
This correspondence is to inform you that the City Engineer has signed the Grading Plans for the
project noted above. These plans are now the property of the City of Carlsbad and have been filed
for permanent record with this office.
Signature of your Grading Plans clears the way for issuance of your grading permit subject to the
limitations and requirements of City Ordinances, your conditions of approval (if any) and all
requirements for outside agency permits such as the Coastal Commission.
The approval of these plans by the City of Carlsbad does not authorize the applicant to violate any
federal, state, or city laws, ordinances, regulations or policies including, but not limited to, the Federal
Endangered Species Act of 1973 and any amendments thereto.
Presently, our records indicate your project is clear for grading permit issuance provided the following
items are completed to the satisfaction of this office:
1. Provide the City with three (3) sets of bluelines [two (2) bluelines and one (1)11 x 17
reduced set] of the approved grading plans.
2. Pay the grading permit fee.
3. Apply for a grading permit within the next one (1) year.
4. Provide the City with a copy of this letter.
5. Complete the Grading Permit Application (Attached).
Provided that all the above requirements have been met, you may now apply for your grading permit.
Please submit all required items to the Engineering Development Services Counter at 1635 Faraday
Avenue. Please be aware that fees are subject to change. You may wish to verify permit fees
before coming in and applying for your permit. You may obtain the blueline sets and any other
reproductions you desire through one of several bonded blueprint firms In the area at your cost.
Your grading permit will be issued when all of the above items have been completed. After permit
issuance, contact the Engineering Inspection Request Line at 438-3891 to set up a preconstruction
meeting with your Inspector. The inspector will bring the permit and give you your copy at the
preconstruction meeting. PLEASE DO NOT BEGIN CONSTRUCTION UNTIL YOU HAVE
RECEIVED YOUR PERMIT FROM YOUR PUBLIC WORKS INSPECTOR.
1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-2720 • FAX (760) 602-8562 ^
Morrow Development
September 7, 2004
Page 2 of 2
In addition the following items will be required during the construction of your project. Coordinate the
timing of these items with your Construction Inspector:
1. An approved Haul Route Permit prior to hauling any construction equipment or
materials onsite or offsite. Allow 2 working days for approval.
2. An approved Traffic Control Plan and a valid Right of Way Permit prior to any work in
the public right of way. Allow one week for approval.
3. Obtain a Retaining Wall Permit from the Building Department, if required.
Thank you for your cooperation and assistance in this matter. It has been a pleasure working with
you through the plancheck process. If you have any questions, please feel free to call me at 760-
602-2747.
Respectfully,
John Maashoff
Associate Engineer
c: Project Planner:
Inspection: Office Specialist
Permit Station - Front Counter
File
Attachments:
Grading Permit Application
Right of Way Permit Packet
SECRETARY'S CERTIFICATE OF
REAL ESTATE COLLATERAL MANAGEMENT COMPANY
THE UNDERSIGNED, the Secretary of Real Estate Collateral Management
Company, a Delaware corporation (the "Corporation"), does hereby certify that the
following is a true and correct copy of the resolutions adopted by the unanimous written
consent of the Board of Directors of the Corporation on December 12,2001 and the same
are in full force and effect as of the date hereof:
RESOLVED, that the Corporation is hereby authorized to enter into all
agreements, indentures, mortgages, deeds, conveyances, licenses, permits, transfers,
contracts, discharges, releases, satisfactions, settlements, petitions, schedules, accounts,
affidavits, bonds in an aggregate amount of up to One Hundred and Thirty Million
Dollars ($130,000,000), undertakings, proxies and other instruments or documents
required or deemed necessary by an Authorized Officer to be delivered in connection
with the development of the property owned by the Corporation and the project known as
thee Villages of La Costa.
FURTHER RESOLVED, that the President or any Vice President of the
Corporation (the "Authorized Officers") are hereby authorized and directed to execute
and deliver on behalf of the Corporation any documents and instmments necessary or
appropriate to effectuate and to perform such other acts as may be deemed necessary and
proper to effectuate the intent and purposes of the foregoing resolution.
FURTHER RESOLVED, the Corporation does hereby ratify and confirm all
actions that have been taken in conjunction with the foregoing resolutions as of the date
hereof.
IN WITNESS WHEREOF, I have hereto set my hand on this U"^ day of
December, 2001.
L.STM^tt^nson,
Secj€tary
REAL ESTATE COLLATERAL MANAGEMENT COMPANY
CERTIFICATE OF INCUMBENCY
I, L. C. Zaremba, the Assistant Secretary of Real Estate Collateral Management
Company, a Delaware corporation, certify that the persons named below are officers of
this corporation, holding the offices set forth opposite their names, and that their
appointments have not been cancelled as of the date hereof
T. P. Shanley
F. R. Schimel
D. A. Watts
L. C. Klug
President
Vice President
Vice President
Vice President
Dated: August 11,2003
L. C. Zaremba,
Assistant Secretary
\\PHILVHCL30_VOL3_SERVER\VOL3\DEPTvHILEGAL\3nlaw\LAW\HCFS\LaCo5la\RECMincumb2003.cei1.doc