Loading...
HomeMy WebLinkAboutSDP 09-04A; Westfield Carlsbad Phase 2; Site Development Plan (SDP) The City of Carlsbad Planning Division A REPORT TO THE PLANNING COMMISSION Item No. Application complete date: June 6, 2014 P.C. AGENDA OF: October 15, 2014 Project Planner: Christer Westman Project Engineer: Jeremy Riddle SUBJECT: SDP 09-04(A) – WESTFIELD CARLSBAD PHASE 2 – Request for the approval of an addendum to a previously certified Environmental Impact Report EIR 09-02 and approval of a Site Development Plan amendment for the demolition, reconfiguration and/or reconstruction of approximately 65,093 square feet of gross leasable area (GLA) within the Westfield Carlsbad regional shopping center generally located west of El Camino Real and north of Marron Road in Local Facilities Management Zone 1. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7072 APPROVING Site Development Plan Amendment SDP 09-04(A) based on the findings and subject to the conditions contained therein. II. PROJECT BACKGROUND The Plaza Camino Real regional shopping center was built in 1969 with approximately 306,000 square feet of anchor tenant space and approximately 176,000 square feet of retail shops. The most current configuration of the regional center includes 5 anchor tenant buildings and an enclosed two-story mall. Westfield took ownership of the property in 1996 and it was re-named Westfield Carlsbad in 2013. The comprehensive Westfield Carlsbad Specific Plan (SP 09-01) was adopted by the City Council in July 2013 which became the new zoning document for the regional shopping center. The Westfield Carlsbad Specific Plan defines allowed uses and establishes a set of development standards and design guidelines for Westfield Carlsbad as well as implementation procedures to facilitate future redevelopment of the center and ongoing operations. A Site Development Plan (SDP 09-04) approved the Phase 1 redevelopment of the regional center consistent with the Westfield Carlsbad Specific Plan. Table A below includes the General Plan designations, zoning and current land uses of the project site and surrounding properties. TABLE A Location General Plan Designation Zoning Current Land Use Site Regional Commercial (R) General Commercial (C-2) & Westfield Carlsbad Specific Plan [SP 09-01(B)] Regional shopping center North City of Oceanside Special Commercial (SC) And Civic Institutional (CI) City of Oceanside Specialized Commercial- Highway Oriented (CS-HO) and Public & Semi-Public (PS) Parking lot, sewer treatment plant, Buena Vista Creek, South Vista Way, commercial businesses, Haymar Drive and SR-78 2 SDP 09-04(A) – WESTFIELD CARLSBAD PHASE 2 October 15, 2014 Page 2 TABLE A – CONTINUED Location General Plan Designation Zoning Current Land Use South Open Space (OS) and Residential Medium-High Density (RMH) Open Space (OS) and Planned Community (PC) open space and multi- family residential East Local Commercial (L) Local Shopping Center (CL) El Camino Real and Carlsbad Plaza shopping center West Open Space (OS) and Regional Commercial (R) Open Space (OS) and General Commercial (C-2), General Commercial with a Qualified Development Overlay (C-2-Q) North County Plaza shopping center, Buena Vista Creek and Jefferson Street III. PROJECT DESCRIPTION The applicant has proposed a Phase 2 renovation of the regional shopping center that includes the conversion of the retail shops portion in the main building from an enclosed facility to an open-air facility, modification to some vehicular circulation aisles, improved landscaping in the parking lot, the addition of water quality vegetated bio-swales, and addition of landscaping and amenities throughout the newly opened common access areas. The exterior parking lot and landscaping improvements affect 218 parking spaces that will be removed and the addition of 199 relocated/reconfigured/motorcycle parking spaces for a net deletion of 19 parking spaces. The open-air facility will be accomplished through the removal of existing roof structures from the common access areas to provide for an open-air walkway and improvements to the interior facades of the existing retail space. The regional shopping center is described in terms of gross lease area (GLA). Pursuant to the approved Site Development Plan (SDP 09-04), the Phase 1 renovation would result in approximately 1,150,456 square feet of GLA for the main building plus the existing out buildings. The Phase 2 project does not include any change to the existing out-buildings. The main building would be modified through the removal of approximately 65,093 square feet of gross lease area (GLA) and approximately 33,003 of new GLA would be constructed for a total GLA of 1,080,187 square feet. Overall, the removal and reconstruction of new main building areas would result in a net GLA reduction of approximately 32,090 square feet when compared with existing conditions approved by SDP 09-04. The existing Westfield Carlsbad gross floor area (GFA) of 1,348,500 square feet, as compared to the amendment SDP 09-04(A) square footage of 1,348,246, will be reduced by 254 square feet. Thus, the overall floor area of Westfield Carlsbad per the proposed Phase 2 would be below the overall floor area of the existing approved SDP 09-04 project. The proposed design follows the architectural style established by Phase 1 (SDP 09-04) which is under construction. The theme is contemporary, with primary building materials comprised of varying textures of glass, stucco, masonry, stone, concrete, iron, and simulated wood. As illustrated in the proposed elevations, a variety in building mass, form, height, and silhouette is provided along with a variety of rooflines, open air courtyard elements, and pedestrian arcades. All service areas are architecturally integrated into the building design and are not publicly visible. At the ground-level facades, the use of glass is used to visually connect the indoor and outdoor areas. Accent architectural features such as columns, arcades, canopies, and awnings are provided to expand on the concepts of articulation, contrast, and diversity of design. Lighter colored walls and surfaces dominate the overall visual scheme of the building architecture, while accent colors and enhanced building materials are being used in key SDP 09-04(A) – WESTFIELD CARLSBAD PHASE 2 October 15, 2014 Page 3 architectural elements and locations to identify areas of focus and attention. Also proposed is an entirely reworked parking lot and main concourse lighting plan accomplishing architectural detailing, pedestrian comfort, and mall and parking lot safety. In addition to the revised parking lot lighting, the parking lot is proposed to receive limited vehicular drive aisle reconfiguration as well as the addition of landscape planters and vegetated bio-swales. The project includes a revision to the Phase 1/Phase 2 boundaries which result in a larger Phase 2 scope including more mall concourse area as well as more parking lot, circulation, and landscape areas. IV. ANALYSIS The proposed project is subject to the following plans, ordinances, and standards as analyzed within the following sections of this staff report: A. General Plan; B. Westfield Carlsbad Specific Plan (SP 09-01), including recent amendments A-B; C. Growth Management Ordinance. The recommendation of approval for this project was developed by analyzing the project’s consistency with the applicable policies and regulations listed above. The following section discusses compliance with each of these regulations/policies utilizing both text and tables. A. General Plan The project is located within the Regional Commercial (R) Land Use designation of the General Plan. The Land Use Element of the General Plan describes regional commercial centers as those that provide shopping goods, general merchandise, apparel, furniture, and home furnishings in full depth and variety; are anchored by at least two or more department stores with secondary tenants that include a range of specialty retail, restaurants, and entertainment uses; are typically situated on 30 to 100 acre sites in locations that are easily visible, as well as accessible, from interchange points between highways and freeways; and are described as having a GLA that ranges from 300,000 to 1.5 million sq. ft. with a regional trade area focus that draws on customers from outside of the city. The project is consistent with the Land Use Element and the intent and characteristics of the Regional Commercial (R) Land Use designation as described above; and is also consistent with the applicable policies contained within each relevant element of the General Plan as illustrated below in Table B: SDP 09-04(A) – WESTFIELD CARLSBAD PHASE 2 October 15, 2014 Page 4 TABLE B – GENERAL PLAN CONSISTENCY ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM COMPLIANCE Land Use Overall Land Use Pattern, Goal A.2 - Provide for an orderly balance of both public and private land uses within convenient and compatible locations throughout the community. Westfield Carlsbad provides a convenient commercial land use available to the citizens of Carlsbad and neighboring cities. Its location is convenient and compatible with surrounding land uses and contributes to the city’s orderly balance of development. Overall Land Use Pattern, Goal A.3 - Provide for land uses which through their arrangement, location and size, support and enhances the economic viability of the community. Westfield Carlsbad has historically been one of the top commercial revenue sources for the City of Carlsbad. With this renovation, it is expected that revenue generation to the city of Carlsbad will increase. Commercial, Goal A.1 - Achieve a healthy and diverse economic base by creating a climate for economic growth and stability. The renovation of Westfield Carlsbad will not only enhance the existing center and attract new and diverse retail uses within it; the synergy created by a successful regional center will attract more businesses to the general vicinity, which contributes to a healthy and diverse economic base and creates a climate for greater economic growth and stability. Circulation Streets and Traffic Control, Goal A.8 - Provide a circulation system that promotes alternative transportation such as walking, bicycling and public transportation. Streets and Traffic Control, Objective B.1 - Provide an adequate circulation infrastructure concurrent with and prior to the actual demand for such facilities. Westfield Carlsbad includes the NCTD’s regional bus terminal on its site, which promotes alternative transportation throughout the region. In addition, Westfield is committed to installing new bike racks at each of the mall main entrances to further promote bicycling to and from the site through the use of the existing bike lanes running along Marron Road and El Camino Real and connecting throughout Carlsbad. Lastly, Westfield is also promoting pedestrian walkability to and from the site through its enhancements to the sites internal pedestrian circulation system and by providing enhanced sidewalk connections from Marron Road and El Camino Real, which includes but is not limited to wider sidewalks, parkways, enhanced hardscape materials, pedestrian scaled lighting, and enhanced landscaping features, all of which are designed to provide safe and convenient walking throughout the site. Streets and Traffic Control, Objectives B.5 - Provide safe, adequate and attractively landscaped parking facilities. The Westfield Carlsbad Specific Plan (WCSP) established landscape and lighting development standards and guidelines for safe and attractively landscaped parking areas. The project is consistent with the standards and guidelines of the WCSP. SDP 09-04(A) – WESTFIELD CARLSBAD PHASE 2 October 15, 2014 Page 5 TABLE B – GENERAL PLAN CONSISTENCY CONTINUED ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM COMPLIANCE Circulation (continued) Streets and Traffic Control, Implementing Policies and Action Programs C.2 - Establish a network of truck routes throughout the city to provide for the safe movement of trucks into and out of commercial zones while reducing conflicts with traffic in residential, school and recreation areas. The onsite circulation system for Westfield Carlsbad provides for safe and non-conflicting truck routes throughout the site. Westfield Carlsbad’s close proximity to El Camino Real and also SR 78 ensures that the majority of truck traffic entering and exiting the site will not be disruptive to surrounding residential, schools, or recreation areas. Alternative Modes of Transportation, Implementing Policies and Action Programs C.2 - Encourage pedestrian circulation in commercial areas through the provision of convenient parking facilities, increased sidewalk widths, pedestrian-oriented building designs, landscaping, street lighting and street furniture. The project which is designed as an open air mall uses architectural elements to help define a pedestrian scale, such as awnings, canopies, trellises, arcades, and patios; and enhancements to pedestrian walkways in the form of widened sidewalks, textured hardscapes, accent plantings, and pedestrian scaled lighting. Parking spaces are designed to accommodate safe and convenient pedestrian access from car to retail shops and the main building entryways and orientation of retail uses are designed to open up to the pedestrian walkways and parking areas. Alternative Modes of Transportation, Implementing Policies and Action Programs C.3 - Design pedestrian spaces and circulation in relationship to land uses and available parking for all new construction and redevelopment projects. As discussed above, the pedestrian circulation system will be enhanced and improved as part of the project and is designed to interact and relate with the retail shops which are reconfigured in an open air mall. Public Safety Crime Hazards, Goal A - Minimize injury, loss of life, and damage to property resulting from crime. Crime Hazards, Objectives B.4 - Encourage crime prevention through the planning process by establishing specific design criteria and standards to be used in the review of land use development. The project will implement a lighting scheme for the parking lots and pedestrian circulation areas consistent with the Westfield Carlsbad Specific Plan. In addition, the project contains defensible space strategies and landscaping design elements to optimize and promote improved public safety for outdoor areas. The renovation of the mall from an enclosed building design to an open air interior and exterior orientation with restaurants and other retail uses facing out towards the parking lot will further promote safety, as vandalism, theft and assault are less likely to occur in highly visible space. SDP 09-04(A) – WESTFIELD CARLSBAD PHASE 2 October 15, 2014 Page 6 B. Specific Plan The Westfield Carlsbad Specific Plan was adopted in July 2013 and established design guidelines as well as development standards applicable to the proposed regional shopping center remodel. The following Tables C and D list the applicable guidelines and development standards as well as a brief summary of how the proposed project complies. TABLE C DESIGN GUIDELINES GUIDELINE COMPLIANCE Accent architectural features including but not limited to columns, arcades and awnings are required. Arcades are created through the establishment of the second-floor mall deck. Cantilevered awnings are a consistent design element throughout the proposed project. The use of materials such as stucco, masonry, stone, concrete, iron, heavy timber is highly encouraged. These materials are used extensively throughout the proposed project. Architectural elements including but not limited to awnings, canopies, trellises, arcades, and patios that help to create an intimate scale are highly encouraged. Several of the listed elements are incorporated into the external perimeter of the project resulting in a scale that is pedestrian friendly. Primary entrances shall be established using attractive architectural and landscape features, as well as utilizing special entry hardscape, awnings, and/or canopies. Primary entries are distinguished by building elevation changes and/or unique concrete canopies as well as distinctive hardscape and landscape treatments. All rooftop and ground-mounted equipment shall be either integrated into the building and site design or screened. Parapet walls that are at least as tall as the profile of the equipment to be screened and integrated into the building design are permitted. The main concourse building is designed with extended parapets that will serve to screen future roof mounted equipment as tenants occupy the lease space. TABLE D General Development Standards STANDARD COMPLIANCE Parking: Spaces Required Spaces Provided 4 spaces per 1,000 sq. ft. GLA 1,118,366 sq. ft. GLA 4,474 6,057 Up to 25% compact Up to 1,130 Compact Spaces allowed No Compact Proposed 1% minimum motorcycle (MC) parking 45 MC 48 MC Maximum Building Height: 75 feet up to 105.3 feet above Mean Sea Level All buildings adhere to the maximum limitation of 105.3 feet above Mean Sea Level (MSL) Building Setback: Marron Road Minimum: 15 feet Minimum provided: 220 feet SDP 09-04(A) – WESTFIELD CARLSBAD PHASE 2 October 15, 2014 Page 7 C. Growth Management Ordinance (Local Facilities Management Plan Zone 1) The proposed project is located within Local Facilities Management Zone 1 in the northwest quadrant of the City and has been reviewed pursuant to the Growth Management Ordinance, C.M.C. Chapter 21.90. The proposed project, resulting in a net loss of 32,090 sq. ft. of gross leasable area, does not adversely affect any public facilities and no mitigation or special conditions are required of the project. The project’s facility impacts are summarized below in Table E: TABLE E Growth Management FACILITY IMPACTS COMPLY City Administration N/A Yes Library N/A Yes Wastewater Treatment Capacity 0 EDU Yes Parks N/A Yes Drainage 0 CFS (Basin A) Yes Circulation 0 ADT Yes Fire Station 1 Yes Open Space N/A Yes Schools – Carlsbad Unified School District N/A Yes Sewer – Carlsbad Municipal Water District 0 EDU Yes Water – Carlsbad Municipal Water District 0 GPD Yes V. ENVIRONMENTAL REVIEW CEQA Guideline Section 15164 states that “the lead agency…shall prepare an addendum to a previously certified EIR if some changes or additions are necessary but none of the conditions described in Section 15162 calling for the preparation of a subsequent EIR or negative declaration have occurred.” Helix Environmental Planning prepared the project’s Environmental Impact Report (EIR 09-02) certified by the City Council on July 2013. Staff has reviewed the proposed project and found that the project is within the scope of the certified EIR and that none of the requirements in CEQA Guidelines sections 15162 or 15163 for preparation of a supplemental or subsequent EIRs have been triggered. No substantial changes are proposed in the Project which involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects; and there is no new information of substantial importance which shows that the project will have significant effects not previously discussed in the EIR, or substantially more severe than shown in the previous EIR. The Addendum to the previously certified EIR documents the potential impacts related to the project proposed as an amendment to Site Development Plan SDP 09-04. The project does not generate additional Average Daily Trips, reduces impervious surfaces, and reduces gross leasable area building square footage. No new or additional mitigation measures need to be added and there are no mitigation measures previously found not to be feasible that are now found to be feasible that would substantially reduce one or more significant effects of the Project (CEQA Guideline Section 15163). Guideline 15164 provides that an addendum need not be circulated for public review but may be attached to the Final EIR. The Addendum is identified in the project’s public hearing notice and is included in this staff report. SDP 09-04(A) – WESTFIELD CARLSBAD PHASE 2 October 15, 2014 Page 8 ATTACHMENTS: 1. Planning Commission Resolution No. 7072 (SDP) 2. Location Map 3. Disclosure Statements 4. Reduced Exhibits 5. Full Size Exhibits “A” – “YY” dated October 15, 2014 MARRON RD C A R L S B A D O C E AN S ID E JEFFERSON STSR-78 IVY RDPLAZA DR VISTA WY M ARRON RD G U E V A R A R D SOUTH VISTA W YMONROE STHOSP WY WIN T E R GREEN DR EL CAMINO REALSDP 09-04(A) Westfield Carlsbad Phase 2 SITE MAP SITE E L C A MINO REA L LA COSTA AVCOLLEGE BLCARLSBAD B L AVIA RA PY ME LROS E DR Attachment To Disclosure Statement P-l(A) Plaza Camino Real Name and Address of Applicant: Name and Address of Applicant's partners: PLAZA CAMINO REAL 2049 Century Park East, 41" Flooi· Los Angeles, CA 90067 PCRGP,L.P. 2049 Century Park East, 41" Floor Los Angeles, CA 90067 Plaza Camino Real LLC 2049 Century Park East, 41 ''Floor Los Angeles, CA 90067 Westfield America Limited Partnership 2049 Century Park East, 41st Floor Los Angeles, CA 90067 Westfield U.S. Holdings, LLC 2049 Century Park East, 41 '1 Floor Los Angeles, CA 90067 Name and Address of Owner: Same as Applicant above. Name and address of Owner's partners: Same as Applicant above. List of Officer's Names: See Unanimous Consent of the Board of Manager of Westfield Holdings, LLC attached hereto as Exhibit A. Address of all Officers: c/o Westfield, LLC 2049 Century Park East, 41'1 Floor Los Angeles, CA 90067 [Owner/Applicant signature appem-s on next page.] Disclosure Statement P-J(A) Plaza Camino Real April25, 2014 Page2 EXHIBIT A List of Officers