HomeMy WebLinkAboutSDP 78-03D; La Costa Towne Center; Site Development Plan (SDP) (5)TRAFFIC IMPACT ANALYSIS
For
THE LA COSTA TOWNE CENTER
Prepared for
EXCEL LA COSTA, LLC
SUBMITTAL: May 17, 2013
RECEIVED
JUL 2 2 2013
CITY OF CARLSBAD
PLANNING DIVISION
© URBAN SYSTEMS ASSOCIATES, INC.
TRAFFIC PLANNING & ENGINEERING, MARKETING & PROJECT SUPPORT
CONSULTANTS TO INDUSTRY AND GOVERNMENT
4540 Kearny Villa Road, Suite 106
SanDiego, CA 92123-1573
(858) 560-4911
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
TRANSPORTATION ANALYSIS
TABLE OF CONTENTS
Section Page
LO INTRODUCTION 1-1
2.0 METHODOLOGY 2-1
3.0 EXISTING CONDITIONS 3-1
4.0 THE PROJECT TRIP GENERATION 4-1
5.0 EXISTING PLUS PROJECT CONDITIONS 5-1
6.0 NEAR TERM WITH & WITHOUT PROJECT CONDITIONS 6-1
7.0 YEAR 2030 WITH & WITHOUT PROJECT CONDITIONS 7-1
8.0 CONCLUSIONS AND RECOMMENDATIONS 8-1
9.0 REFERENCES 9-1
10.0 URBAN SYSTEMS ASSOCIATES, INC. PREPARERS 10-1
APPENDICES
A. City Staff Scoping Meeting
B. Existing Traffic Counts and Level of Service Worksheets
C. Existing Plus Project Synchro Worksheets
D. Other Projects Considered
E. Near Term With and Without Project Synchro Worksheets
F. Year 2030 With and Without Project Synchro Worksheets
002312 ii 002312-Report_C
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
LIST OF FIGURES
Number Page
1 -1 Project Location Map 1-2
1-2 Study Area Boundary / Intersection Key 1-3
3-1 Existing Roadway Classifications 3-3
3-2 Existing Lane Configurations 3-4
3-3 Existing Average Daily Traffic 3-5
3- 4 Existing AM/PM Peak Hour Traffic 3-8
4- 1 Site Plan 4-2
4-2 Project Only Distribution Percentages 4-4
4-3 Project Only Average Daily Traffic 4-6
4- 4 Project Only AM/PM Peak Hour Traffic 4-7
5- 1 Existing Plus Project Average Daily Traffic 5-2
5- 2 Existing Plus Project AM/PM Peak Hour Traffic 5-3
6- 1 Other Project Peak Hour & Daily Traffic Volumes 6-2
6-2 Near Term Without Project Average Daily Traffic 6-3
6-3 Near Term With Project Average Daily Traffic 6-4
6-4 Near Term Without Project AM / PM Peak Hour Traffic 6-8
6- 5 Near Term With Project AM / PM Peak Hour Traffic 6-9
7- 1 Year 2030 Without Project Average Daily Traffic 7-2
7-2 Year 2030 With Project Average Daily Traffic 7-3
7-3 Year 2030 Without Project AM/PM Peak Hour Traffic 7-7
7-4 Year 2030 With Project AM/PM Peak Hour Traffic 7-8
002312 iii 002312-Report_C
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17,2013
LIST OF TABLES
Number Page
3-1 Existing Street Segment Level of Service Summary 3-6
3- 2 Existing Intersection Levels of Service 3-9
4- 1 Project Trip Generation 4-3
5- 1 Existing Plus Project Street Segment Levels of Service Summary 5-4
5- 2 Existing Plus Project Intersection Levels of Service 5-5
6- 1 Near Term Without Project Street Segment Levels of Service 6-5
6-2 Near Term With Project Street Segment Levels of Service 6-6
6-3 Near Term Without Project Intersection Levels of Service 6-10
6- 4 Near Term With Project Intersection Levels of Service 6-11
7- 1 Year 2030 Without Project Street Segment Level of Service Summary 7-4
7-2 Year 2030 With Project Street Segment Level of Service Summary 7-5
7-3 Year 2030 Without Project Intersection Levels of Service 7-9
7- 4 Year 2030 With Project Intersection Levels of Service 7-10
8- 1 Near Term Without & Near Term With Project Intersection Comparison 8-3
8-2 Year 2030 Without & Year 2030 With Project Intersection Comparison 8-4
002312 iv 002312-Report_C
The La Costa Towne Center
Excel La Costa, LLC
' Urban Systems Associates, Inc.
May 17,2013
1.0 INTRODUCTION
Urban Systems Associates, Inc. (USAI) was retained by Excell La Costa, LLC to evaluate possible traffic
impacts from the La Costa Towne Center Project in the City of Carlsbad. Figure 1-1 shows the project
location. Figure 1-2 shows the project study area intersections and street segments
The project consists of renovating existing structures and constructing 60 multi-family dwelling units with
retail on the floor below. Refer to Table 4-1 for a complete breakout of building and associated land
uses.
In order to evaluate possible project traffic impacts. Existing, Existing Plus Project, Plus Other Projects
and Year 2030 Conditions were evaluated. Near Term and year 2030 traffic volumes were estimated
using the San Diego Area of Govemments (SANDAG) Combined North County Transportation Model,
Carlsbad Sub-area, for assumed built-out in Year 2030.
For the purposes of evaluation, the report is divided into the following sections:
1.0 Introduction
2.0 Methodology
3.0 Existing Conditions
4.0 The Project Trip Generation
5.0 Existing Plus Project Conditions
6.0 Near Term With & Without Project Conditions
7.0 Year 2030 With & Without Project Conditions
8.0 Conclusions and Recommendations
002312 002312-Report_C
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
2.0 EVALUATION METHODOLOGY
2.1 REGIONAL CONGESTION MANAGEMENT PROGRAM (CMP)
The Congestion Management Program (CMP) guidelines were developed to provide a set of procedures
for completing enhanced CEQA review for certain projects. The guidelines, prepared by the San Diego
Association of Govemments (SANDAG), stipulate that any development project generating 2,400 or
more average daily trips or 200 or more peak hour trips must be evaluated in accordance with
requirements of the Regional CMP. However, this project will generate only 791 new average daily trips,
46 AM and 75 PM peak hour trips. Project traffic generation is far below the stated thresholds for both
daily and peak traffic therefore, a CMP analysis is not required.
2.2 CITY OF CARLSBAD GROWTH MANAGEMENT PROGRAM GUIDELINES
The City of Carlsbad Growth Management Program circulation standards allow level of service "D" for
street segments and intersections during peak hours and level of service "C" during non-peak hours. This
evaluation is based upon this standard of performance.
2.3 COMPUTER TRAVEL FORECASTS
Computer travel forecasts are typically used for the analysis of Near Term and Long Term Year 2030
conditions. The forecasts are prepared by the City of Carlsbad and SANDAG. The SANDAG
Cities/County Combined North County Year 2030 Transportation Forecast prepared in June 2004 was
002312 2-1 002312-Report_C
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17,2013
used for evaluation of Year 2030 conditions. Appendix A contains the trip generation, distribution, 2030
forecast and study area discussed with City staff as a basis for scoping this study.
2.4 INTERSECTION LEVEL OF SERVICE LOS PROCEDURES
To determine Existing, and Existing Plus Project intersection peak hour Levels of Service (LOS), the
Intersection Capacity Utilization (ICU) method was used. That method was used for the existing
conditions evaluation in the latest (Year 2012) City of Carlsbad Growth Management Program Traffic
Monitoring Report and is used in the City of Carlsbad Growth Management Program.
The Near Term cumulative and Long Term Year 2030 intersection peak hour levels of service were
evaluated using Highway Capacity Manual computer software methodology.
2.5 DETERMINATION OF SIGNIFICANT IMPACTS
At roadway segments, the threshold of significance is an allowable increase in volume to capacity ratio
during the peak hours so that a level of service "D" is not exceeded as included in the City of Carlsbad
Growth Management Program Circulation Performance Standards.
At intersections, a level of service "D" is acceptable during peak hours, and no significant impact occurs
if LOS "D" is maintained, per the City of Carlsbad Growth Management Program Circulation
Performance Standards.
002312 2-2 002312-Report_C
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
If an intersection is at LOS "E" or "F" then the project has a significant impact if the ICU value increases
by more than two percent (0.02) or, when using HCM methods, the average delay increases by more than
two seconds with project traffic added.
002312 2-3 002312-Report_C
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
3.0 EXISTING CONDITIONS
This section of the report evaluates existing average daily traffic (ADT) volumes on study area street
segments (between intersections) and at intersections during AM and PM peak hours. Traffic volumes are
based on recent daily roadway traffic counts and peak period manual traffic counts at intersections.
3.1 STREET SEGMENTS
Figure 3-1 shows existing street classifications. Figure 3-2 shows lane configurations for intersections
within the study area.
Figure 3-3 shows existing average daily traffic volumes on street segments of La Costa Avenue, El
Camino Realm and Levante Street within the study area. These volumes were taken from recent traffic
counts conducted by Transportation Studies, Inc. in August 2012.
El Camino Real is classified as a north-south Prime Arterial. El Camino Real north and south of La Costa
Avenue is a six-lane Prime Arterial with a raised median. Bike lanes exist on both sides of the roadway
and parking is prohibited. The posted speed limit is 55 mph.
La Costa Avenue is classified as a 4-lane Major Arterial west of El Camino Real and a 4-lane Secondary
Arterial east of El Camino Real. From Saxony Road to El Camino Real, LA Costa Avenuw provides bike
lanes on both sides of the roadway and a posted speed limit of 55 mph. From El Camino Real to the
Shopping Center Driveway, La Costa Avenue provides a bike lane on the north side of the roadway and a
bike route on the south side. The posted speed limit on this segment is 35 mph. La Costa Avenue east of
002312 2>-\ 002312-Report_C
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
the Shopping Center Driveway maintains the bike lane in the north side of the roadway. A road diet was
implemented reducing the roadway cross section to one through lane westbound from Levante Street to
Fairway Lane. The posted speed limit is 40 mph.
Levante Street is not a Circulation Element roadway, however, functions as a Collector. Levante Street
primarily serves the residential community and has a posted speed limit of 35 mph.
Table 3-1 includes existing street segment levels of service based on the highest peak hour flow per lane,
taken from intersection peak hour traffic counts, and a per lane capacity of 1,800 VPHPL. As shown, all
street segments of La Costa Avenue, El Camino Real, and Levante Street currently operate acceptably.
002312 3-2 002312-ReportC
The La Costa Towne Center
Excel La Costa, LLC
' Urban Systems Associates, Inc.
May 17, 2013
CD Signalized
s
cu
Signalized © 1
o
Signalized
La Costa Ave. Costa Del Mar
© 1
o
La Costa, Ave.
•8
a;
^ o
to
^ r
Saxony Road at
La Costa Avenue
Costa Del Mar at
El Camino Real
La Costa Avenue at
El Camino Real
(4) g Signalized Signalized © Signalized ( Shopping Ctr. 1 La Costa Ave.
8 cu a;
>
r
La Costa. Toxvne Ctr. Levante Street
o
^^^^ s
Shopping Center Driveway at
La Costa Avenue
La Costa Towne Center at
El Camino Real
Levante Street at
El Camino Real
FIGURE 3-2
Existing Lane Configurations
NO SCALE
002312 3-4 0023I2-Report_C
The La Costa Towne Center
Excel La Costa, LLC
Urban Systems Associates, Lnc.
May 17,2013
TABLE 3-1
Existing Street Segment Level of Service Summary
AM Peak Hour PM Peak Hour
Road Segment D Lanes Capacity PHV V/C (1) LOS PHV V/C (1) LOS
La Costa Avenue Saxony Road to El Camino Real EB 3 5,400 1,282 0.24 A 1,645 0.30 A
WB 3 5,400 1.443 0.27 A 1,377 0.26 A
El Camino Real to Shopping Center Drwy. EB 2 3,600 409 O.H A 970 0.27 A
WB 2 3,600 858 0.24 A 673 0.19 A
Shopping Center Drwy. to Viejo Castilla Way EB 2 3,600 345 0.10 A 930 0.26 A
WB 2 3,600 829 0.23 A 565 0.16 A
EI Camino Real Costa Del Mar to La Costa Ave. NB 3 5,400 1,882 0.35 A 2,302 0.43 A
SB 3 5,400 1,970 0.36 A 2,119 0.39 A
La Costa Ave. to La Costa Towne Center NB 3 5,400 960 0.18 A 1,405 0.26 A
SB 3 5,400 1,449 0.27 A 1,698 0.31 A
La Costa Towne Center to Levante Street NB 3 5,400 927 0.17 A 1,557 0.29 A
SB 3 5,400 1,429 0.26 A 1,401 0.26 A
Levante Street El Camino Real to Falda Place EB 2 3,600 81 0.02 A 308 0.09 A
WB 2 3,600 269 0.07 A 182 0.05 A
Legend:
D = Direction
PHV = Peak Hour Volume
V/C = Volume divided by Capacity
LOS = Level of Service
(1) = Based on 1,800 vehicles per lane per hour
V/C LOS
0.00-0.60 A
0.61-0.70 B
0.71-0.80 C
0.81-0.90 D
0.91-1.00 E
Over l.OC F
002312 3-6 002312-Report_C
The La Costa Towne Center © Urban Systems Associates, Lnc.
Excel La Costa, LLC May 17, 2013
3.2 INTERSECTIONS
Figure 3-4 shows existing AM and PM peak hour traffic volumes at the study area intersections. The
volumes at El Camino Real / La Costa Avenue and El Camino Real / Levante Street were taken from the
City of Carlsbad Year 2011 Traffic Monitoring Program. The four remaining intersection volumes were
taken from recent counts conducted by Transportation Studies, Inc. in August 2012.
Table 3-2 includes the results of the intersection level of service evaluation for existing conditions. The
study area intersections are shown to be operating at acceptable levels of service ("D" or better LOS) for
existing conditions.
Appendix B includes existing conditions traffic counts and levels of service worksheets.
002312 3-7 002312-Report_C
The La Costa Towne Center
Excel La Costa, LLC
' Urban Systems Associates, Inc.
May 17, 2013
1219/1522
102/65
Signalized
1326/1276
117/101
La Costa Ave.
1 f
to CO
LO CM
— T-
o '— CO CO CD
Aug-12
La Costa Ave. / Saxony Road
o o o
CM
CO <N
CN ^
cn cn
T- ID
Signalized
20/83
44/119
Costa Del Mar
tr
CO
00 r-
T— V-
CM ~~ cn
CO r-J
LO T-
Aug-12
El Camino Real / Costa Del Mar
o r-00 CN cn
O T- C35
cn ^ CM
CN ^
m <y> o 1-
r-- t- 1-
m
763/836
269/604
299/321
Signalized
208/185
532/381
118/107
La Costa Ave.
CD CM
0> CD
CM O ^
O ^ CM Csl CS)
CN 1-
Aug-11
La Costa Ave. / El Camino Real
00
CD CN
•<- CD CN
^
CN O in
r- T-
39/59
290/771
70/80
Signalized
82/83
719/462
28/20
La Costa Ave.
® o CD CO
O
T- CO
Mr
CN O |-~-1^ CM CO
lO O
0^1 •<-
to
Aug-12
La Costa Ave. / Shopping Center
Drwy.
Signalized
^ 2/5
20/41
La Costa Towne Cntr.
CN
CO LO
1- |-~
O ^ IO
CO o
^ CO ^ •<1- CO CN
CO T- in
tr
CD CO C-J in
' T—
o
CJ)
Aug-t2
El Camino Real / La Costa Towne
Center
18/31
2/4
5/7
Signalized
126/95
3/0
140/87
Levante Street
ltr o cn h-CM 1-
^ T-
1- h~
O CN
CO
CO
Aug-11
El Camino Real / Levante Street
FIGURE 3-4
Existing AM / PM Peak Hour Traffic
002312 3-8 002312-Report_C
The La Costa Towne Center
Excel La Costa, LLC
' Urban Systems Associates, Inc.
May 17, 2013
TABLE 3-2
Existing Intersection Levels of Service
Number Intersection Controi
AM Peak Hour PMPeak Hour
Number Intersection Controi ICU LOS ICU LOS
1 La Costa Ave. / Sajaany Road Signali2ed 0.57 B 0.63 B
2 El Camino Real / Costa Del Mar Signalized 0.63 B 0.65 C
3 La Costa Ave. / El Camino Real Signalized 0.78 C 0.85 D
4 La Costa Ave. / Shopping Center Drwy. Signalized 0.51 A 0.59 B
5 El Camino Real / La Costa Towne Center Signalized 0.37 A 0.40 A
6 El Camino Real / Levante Street Signalized 0.42 A 0.52 A
Notes:
ICU = Intersection Capacity Utilization
LOS = Level of Service
002312 3-9 002312-ReportC
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
4,0 THE PROJECT TRIP GENERATION
Figure 4-1 shows the project site plan.
4.1 TRIP GENERATION
Table 4-1 shows the vehicle trip generation expected from the La Costa Towne Center Project.
As shown in this table, the expected new average daily traffic (ADT) volume is 791 ADT, with 46
vehicles per hour in the AM peak hour (16 VPH inbound, 30 VPH outbound) and 75 vehicles per hour in
the PM peak hour (44 VPH inbound, 31 VPH outbound).
The existing uses are shown in the top portion of Table 4-1. For the purposes of this study, based on
consultation with City staff only the net new trips were used for this analysis.
4.2 PROJECT TRIP DISTRIBUTION
Figure 4-2 shows project only directional distribution percentages of project traffic onto the adjacent
roadway system. These percentages are based on the patterns of traffic using the adjacent intersections,
and were adjusted based on engineering judgment by City staff.
002312 4-1 002312-Report_C
The La Costa Towne Center
Excel La Costa, LLC
' Urban Systems Associates, Lnc.
May 17, 2013
La Costa Town Center - CarLsbad, CA.
E.XC:KL I.A «KTA t.Lc:
FIGURE 4-1
Site Plan
002312 4-2 002312-Report_C
The La Costa Towne Center
Excel La Costa, LLC
' Urban Systems Associates, Inc.
May 17,2013
TABLE 4-1
Project Trip Generation
Existing Uses
Use Amount Trip ADT AM Peak Hour PMPeak Hour Use Amount Trip ADT %*| # |ln| :|0ut| In | Out %*| # {hi :|0ut| Ll 1 Out
Retail (7710 Bldg) -1 story 31,070 SF 120 /KSF 3,728 4% 149 6 : 4 89 60 10% 373 5 : 5 186 186
Retail (7720 Bldg) - 1st floor 20,813 SF 120 /KSF 2,498 4% 100 6 : 4 60 40 10% 250 5 : 5 125 125
OfBce (7720 Bldg) - 2nd floor 9,405 SF 120 /KSF 1,129 4% 45 6 : 4 27 18 10% 113 5 : 5 56 56
Retail (7740 Bldg) - Istory 15,020 SF 120 /KSF 1,802 4% 72 6 : 4 43 29 10% 180 5 : 5 90 90
Retail (7750 Bldg)-Ist floor 21,737 SF 120 /KSF 2,608 4% 104 6 : 4 63 42 10% 261 5 : 5 130 130
(Mice (7750 Bldg) - 2nd floor 10,563 SF 120 /KSF 1,268 4% 51 6 : 4 30 20 10% 127 5 : 5 63 63
Retail (7760 Bldg) -1 story 4,854 SF 120 /KSF 582 4% 23 6 : 4 14 9 10% 58 5 : 5 29 29
Retail (7770 Bldg)-1st floor 5,312 SF 120 /KSF 637 4% 25 6 : 4 15 10 10% 64 5 : 5 32 32
Office (7770 Bldg) - 2nd floor 5,312 SF 120 /KSF 637 4% 25 6 : 4 15 10 10% 64 5 : 5 32 32
TOTAL 14,890 596 357 238 1,489 745 745
Note: The proposed project is demolishing the 7710 Bldg (31,070 SF),
Existing & Proposed Proiect
lie Amount Trip ADT AM Peak Hour PMPeak Hour lie Amount Trip ADT
%*| # |ln|:{out| ta j Out %*| # |ln|:|0ut| In 1 Out
Retail (7710 Bldg)-1st floor 40,000 SF 120 /KSF 4,800 4% 192 6 : 4 115 77 10% 480 5 : 5 240 240
Multi-Family Residential (7710 Bldg) -
2nd floor 48 DU 6 /DU 288 8% 23 2 : 8 5 18 9% 26 7 : 3 18 8
Retail (7714 Bldg) - 1st floor 9,200 SF 120 /KSF 1,104 4% 44 6 : 4 26 IS 10% no 5 : 5 55 55
Multi-Fanily Residential (7714 Bldg)
2nd floor 12 DU 6 /DU 72 8% 6 2 : 8 1 5 9% 6 7 : 3 5 2
Retail (7720 Bldg) - Ist floor 20,813 SF 120 /KSF 2,498 4% 100 6 ; 4 60 40 10% 250 5 : 5 125 125
Office (7720 Bldg) - 2nd floor 9.405 SF 120 /KSF 1,129 4% 45 6 : 4 27 18 10% 113 5 : 5 56 56
Retail (7750 Bldg)-1st floor 21,737 SF 120 /KSF 2,608 4% 104 6 : 4 63 42 10% 261 5 : 5 130 130
Oflice (7750 Bldg) - 2nd floor 10.563 SF 120 /KSF 1.268 4% 51 6 : 4 30 20 10% 127 5 : 5 63 63
Retail (7760 Bldg) -1 story 5,338 SF 120 /KSF 641 4% 26 6 : 4 15 10 10% 64 5 : 5 32 32
Retail (7770 Bldg) - Ist floor 5,312 SF 120 /KSF 637 4% 25 6 : 4 15 10 10% 64 5 : 5 32 32
Office (7770 Bldg) - 2nd floor 5,312 SF 120 /KSF 637 4% 25 6 : 4 15 10 10% 64 5 ; 5 32 32
TOTAL 15,682 642 373 268 1,565 789 776
Note: The proposed project is demolishing the 7740 Bldg (15,020 SF),
NET NEW TRIPS
Condition ADT AM Peak Hour PMPeak Hour Condition ADT IN 1 our IN 1 our
Existing & Proposed Project 15,682 373 268 789 776
Existing Uses 14,890 357 238 745 745
NET NEW TRIPS 791 16 30 44 31
Notes:
' = Source: SANDAG's (Not So) Brief Guide of Vehicular Traffic Generation Rates, April 2002,
DU-Dwelling Unit
SF = Squaie Fool
KSF - Thousand Square Feet
002312 4-3 002312-ReportC
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17,2013
Figure 4-3 shows project only weekday average daily traffic volumes. These volumes are used in the
analysis of Near Term and Long Term With Project Conditions evaluated in this report.
Figure 4-4 shows project only AM and PM peak hour traffic volumes within the study area. These
volumes are used for subsequent with project conditions evaluations in this report.
002312 4-5 002312-Report_C
The La Costa Towne Center
Excel La Costa, LLC
' Urban Systems Associates, Lnc.
May 17,2013
©
1
5/6
^1/1
La Costa Ave.
©
CO
CO
I
^ 0/1
©
I-~ CN
CN •<-
R
.t_ 1 /1
3/3
La Costa Ave.
3/8 ^
La Cost
Saxon
r
o
a Ave. /
y Road
Costa Del Mar
El Camino
De
tr
Real / Costa
1 Mar
1 12
2/7
La Costa
Camin
j w
S CO T-
Ave. / El
o Real © Shopping Center Dr ^ 5/13
La Costa Ave.
©
CO 1
in 1
V Eg
^ 9/9
La Costa Towne Cntr.
©
CM CD CNI ^
^ «
CN CD CN 'I
}\V % Levante Street
2/2 _^
2/4 —^
La CosI
Shoppin
DP
1 r
m 00
in CO
a Ave. /
g Center
«y.
El Camin
Costa To>
tr
cn
CO CN
o Real / La
/vne Center
1 12 _^
El Camir
Levant
t
cn
CO
IO Real/
e Street
FIGURE 4-4
Project Only AM / PM Peak Hour Traffic
002312 4-7 002312-ReportC
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
5.0 EXISTING PLUS PROJECT CONDITIONS
5.1 STREET SEGMENTS
Figure 5-1 shows project only average daily traffic volumes added to existing volumes for the project
study area street segments.
Figure 5-2 shows project only AM and PM peak hour volumes added to existing peak hour volumes at
study area intersections.
Table 5-1 summarizes street segment levels of service using the peak hour flow per lane on each segment
between intersections.
As shown in this table, all segments evaluated are expected to operate acceptably at LOS "D" or better,
with project traffic added. Therefore, project direct impacts to street segments within the study area for
this condition are considered to be less than significant. No changes (improvements) to roadway
segments are necessary based upon this analysis.
5.2 INTERSECTIONS
Table 5-2 summarizes intersection levels of service with project traffic added to existing AM and PM
peak hour volumes at intersections within the study area.
002312 5-1 002312-Report_C
The La Costa Towne Center
Excel La Costa, LLC
Urban Systems Associates, Inc.
May 17, 2013
© .
«*5 ;^ a;
i
Co
SignaUzed
1331 /1282
^ 118/102
La Costa Ave.
©. .
— o s o « CM H5 cn .5 CM ~- 5 cn cn 1 -in ^
R ^
Signalized
20/83
^ 44/120
Costa Del Mar
© . -
CO CN — ,5; o — o ^ cn CO a ^ ^ ^ .s •^r CO o g
CN O CN £
1^ - - G
JR '
Signalized
209/186
535/384
^ 118/107
La Costa Ave.
1222/1530 ^
102/65 —^
La Cosi
Saxon
\ r
in Tj-in CN o ^ CO CO
CD
ta Ave. /
y Road
El Camit
Costa [
tr
in cn T-
CN ~~ o oo CO in T-
h-
IO Real/
)el Mar
763/836 _^
270/606 «^
301 /328 —^
La Coste
Camii
Mr
cn CD 00 CJ) CD CN O ^ ^ — Cvl CO ^ CN cvl CO CN CN h-
1 Ave. / El
io Real
©
CO CD CN CD CN ^ ^ CN o m
T- T-
JR
Signalized
^ 82/83
719/462
^ 33/33
La Costa Ave.
© o .
^-—^ CD B
?s 1
R *
Signalized
2/5
^ 29/50
Costa Towne Cntr.
® . -
—^ CO « in «j •>- cn Oi CN ^ in o to CD a ^ CO ^ S
CD CO g
co-m
JR ^
Signalized
127/97
3/0
^ 140/87
Levante Street
39/59 _^
292/773 ^
72/84 —^
La Cos
Shoppir
Dr
2 ltr
,e (J f~- o m a, r- CM -vT c ~- ~~ ~~ s CJJ m 00 a Cvl T-
:a Ave. /
ig Center
wy.
El Camine
Costa Tow
tr
in in Cvj m —
CJ)
CO
.—
cn
1 Real / La
ne Center
19/33
2/4 ^
5/7 —V
El Cami
Levant
Mr
O 00 CN CN ^ — ^ — ^ CO CN 00 00
no Real/
te Street
FIGURE 5-2
Existing + Project AM / PM Peak Hour Traffic
002312 5-3 002312-Report_C
The La Costa Towne Center
Excel La Costa, LLC
' Urban Systems Associates, Inc.
May 17, 2013
TABLE 5-1
Existing + Project Street Segment Level of Service Summary
AM Peak Hour PM Peak Hour
Road Segment D Lanes Capacity PHV V/C (1) LOS PHV V/C (1) LOS
; !1;' ^ i; a:.;: :!ti SiSStS ,5]V;s{!'Iii iSiSiIsi
La Costa Avenue Saxony Road to El Camino Real EB 3 5,400 1,285 0.24 A 1,654 0.31 A
WB 3 5,400 1,449 0.27 A 1,384 0.26 A
El Camino Real to Shopping Center Drwy. EB 2 3,600 412 0.11 A 975 0.27 A
WB 2 3,600 862 0.24 A 677 0.19 A
Shopping Center Drwy. to Viejo Castilla Way EB 2 3,600 355 0.10 A 940 0.26 A
WB 2 3,600 834 0.23 A 578 0.16 A
El Camino Real Costa Del Mar to La Costa Ave. NB 3 5,400 1,888 0.35 A 2,309 0.43 A
SB 3 5,400 1,973 0.37 A 2,128 0.39 A
La Costa Ave. to La Costa Towne Center NB 3 5,400 968 0.18 A 1,413 0.26 A
SB 3 5,400 1,453 0.27 A 1,712 0.32 A
La Costa Towne Center to Levante Street NB 3 5,400 932 0.17 A 1,570 0.29 A
SB 3 5,400 1,438 0.27 A 1,410 0.26 A
Levante Street El Camino Real to Falda Place EB 2 3,600 83 0.02 A 310 0.09 A
WB 2 3,600 270 0.08 A 184 0,05 A
Legend:
D = Direction
PHV = Peak Hour Volume
V/C = Volume divided by Capacity
LOS = Level of Service
(1) = Based on 1,800 vehicles per lane per hour
V/C LOS
0.00-0.60 A
0.61-0.70 B
0.71-0.80 C
0.81-0.90 D
0.91-1.00 E
Over 1.00 F
002312 5-4 002312-Report_C
The La Costa Towne Center
Excel La Costa, LLC
> Urban Systems Associates, Inc.
May 17, 2013
TABLE 5-2
Existing + Project Intersection Levels of Service
Number Intersection Control
AM Peak Hour PMPeak Hour
Number Intersection Control ICU LOS ICU LOS
1 La Costa Ave. / Saxony Road Signalized 0.57 B 0.63 B
2 EI Camino Real / Costa Del Mar Signalized 0.63 B 0.65 C
3 La Costa Ave. / El Camino Real Signalized 0.78 C 0.85 D
4 La Costa Ave. / Shopping Center Drwy. Signali2ed 0.51 A 0.60 B
5 El Camino Real / La Costa Towne Center Signalized 0.37 A 0.40 A
6 El Camino Real / Levante Street Signalized 0.42 A 0.52 A
Notes:
ICU = Intersection Capacity LTtilization
LOS = Level of Service
002312 5-5 002312-Report_C
The La Costa Towne Center © Urban Systems Associates, Lnc.
Excel La Costa, LLC May 17, 2013
As shown in this table, all intersections operate at acceptable (LOS "D" or better) levels of service when
project traffic is added. Therefore, intersection mitigation will be needed to accommodate project traffic.
Appendix C includes Existing Plus Project intersection levels of service worksheets.
002312 5-6 002312-ReportC
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
6.0 NEAR TERM WITH AND WITHOUT PROJECT
6.1 STREET SEGMENTS
Other projects as shown and listed in Appendix D were considered for this evaluation. Ofthe seventeen
projects considered, one La Costa Towne Square is the only project which contributed traffic to the
street segments and intersections within the study area for this project. Figure 6-1 summarizes the other
project daily and intersection AM / PM peak traffic that was included in this analysis and as discussed in
the following sections of this report.
Other approved and pending projects considered for this analysis are included in Appendix D.
6.2 STREET SEGMENTS
Figure 6-2 shows near term cumulative average daily traffic volumes, without project traffic.
Figure 6-3 shows near term cumulative average daily traffic volumes, with project traffic.
Tables 6-1 and 6-2 summarizes street segment levels of service using the peak hour flow per lane on
each segment between intersections for both the without and with project conditions.
As shown in these tables, all segments evaluated for the Near-Term are expected to operate acceptably
at LOS "A". LOS "D" or better is acceptable when project traffic is included. Project direct impacts to
street segments for this condition are considered less than significant because a better than LOS "D" is
maintained both without and with the project, therefore no roadway segment mitigation is needed.
002312 6-1 002312-Report_C
The La Costa Towne Center
Excel La Costa, LLC
Urban Systems Associates, Inc.
May 17, 2013
Table 6-1
Near Term Without Project Street Segment Levels of Service
AM Peak Hour PM Peak Hour
Road Segment D Lanes Capacity PHV V/C (1) LOS PHV V/C (1) LOS
La Costa Avenue Saxony Road to El Camino Real EB 3 5,400 1,325 0.25 A 1,722 0.32 A
WB 3 5,400 1,472 0.27 A 1,455 0.27 A
El Camino Real to Shop ping Center Drwy. EB 2 3,600 481 0.13 A 1,098 0.31 A
WB 2 3,600 906 0.25 A 803 0.22 A
Shopping Center Drwy. to Viejo Castilla Way EB 2 3,600 417 0.12 A 1,058 0.29 A
WB 2 3,600 877 0.24 A 695 0.19 A
El Camino Real Costa Del Mar to La Costa Ave, NB 3 5,400 1,901 0.35 A 2,354 0.44 A
SB 3 5,400 1,999 0.37 A 2,170 0.40 A
La Costa Ave. to La Costa Towne Center NB 3 5,400 960 0.18 A 1,405 0.26 A
SB 3 5,400 1,499 0.28 A 1,698 0.31 A
La Costa Towne Center to Levante Street NB 3 5,400 927 0.17 A 1,557 0.29 A
SB 3 5,400 1,429 0.26 A 1,401 0.26 A
Levante Street El Camino Real to Falda Place EB 2 3,600 81 0.02 A 308 0.09 A
WB 2 3,600 269 0.07 A 182 0.05 A
Legend:
D = Direction
PHV = Peak Hour Volume
V/C = Volume divided by Capacity
LOS = Level of Service
(1) = Based on 1,800 vehicles per lane per hour
V/C LOS
0.00-0.60 A
0.61-0.70 B
0.71-0.80 C
0.81-0.90 D
0.91-1.00 E
Over 1.00 F
002312 6-5 002312-ReportC
The La Costa Towne Center
Excel La Costa, LLC
Urban Systems Associates, Inc.
May 17,2013
Table 6-2
Near Term + Project Street Segment Levels of Service
AM Peak Hour PM Peak Hour
Road Segment D Lanes Capacity PHV V/C (1) LOS PHV V/C (1) LOS
La Costa Avenue Saxony Road to El Camino Real EB
WB
3
3
5,400
5,400
1,328
1,478
0,25
0.27
A
A
1,731
1,462
0.32
0.27
A
A
La Costa Avenue
El Camino Real to Shopping Center Drwy. EB
WB
2
2
3,600
3,600
484
910
0.13
0.25
A
A
1,103
807
0.31
0.22
A
A
La Costa Avenue
Shopping Center Drwy. to Viejo Castilla Way EB
WB
2
2
3,600
3,600
427
882
0,12
0.25
A
A
1,068
708
0.30
0.20
A
A
El Camino Real Costa Del Mar to La Costa Ave, NB
SB
3
3
5,400
5,400
1,907
2,002
0.35
0.37
A
A
2,361
2,179
0.44
0.40
A
A
El Camino Real
La Costa Ave, to La Costa Towne Center NB
SB
3
3
5,400
5,400
968
1,453
0.18
0,27
A
A
1,413
1,712
0.26
0.32
A
A
El Camino Real
La Costa Towne Center to Levante Street NB
SB
3
3
5,400
5,400
932
1,438
0.17
0.27
A
A
1,570
1,410
0.29
0.26
A
A
Levante Street El Camino Real to Falda Place EB
WB
2
2
3,600
3,600
83
270
0.02
0.08
A
A
310
184
0.09
0.05
A
A
Legend:
D = Direction
PHV= Peak Hour Volume
V/C = Volume divided by Capacity
LOS = Level of Service
(1) = Based on 1,800 vehicles per lane per hour
V/C LOS Legend:
D = Direction
PHV= Peak Hour Volume
V/C = Volume divided by Capacity
LOS = Level of Service
(1) = Based on 1,800 vehicles per lane per hour
0,00-0.60 A
Legend:
D = Direction
PHV= Peak Hour Volume
V/C = Volume divided by Capacity
LOS = Level of Service
(1) = Based on 1,800 vehicles per lane per hour
0.61-0,70 B
Legend:
D = Direction
PHV= Peak Hour Volume
V/C = Volume divided by Capacity
LOS = Level of Service
(1) = Based on 1,800 vehicles per lane per hour
0,71-0.80 C
Legend:
D = Direction
PHV= Peak Hour Volume
V/C = Volume divided by Capacity
LOS = Level of Service
(1) = Based on 1,800 vehicles per lane per hour
0,81-0,90 D
Legend:
D = Direction
PHV= Peak Hour Volume
V/C = Volume divided by Capacity
LOS = Level of Service
(1) = Based on 1,800 vehicles per lane per hour
0.91-1.00 E
Legend:
D = Direction
PHV= Peak Hour Volume
V/C = Volume divided by Capacity
LOS = Level of Service
(1) = Based on 1,800 vehicles per lane per hour Over 1,00 F
002312 6-6 002312-Report_C
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17,2013
Figure 6-4 shows AM and PM peak hour traffic volumes for Near Term Without Project condition.
Figure 6-5 shows Near Term With Project AM / PM peak hour traffic volumes.
Table 6-3 and 6-4 summarize intersection levels of service for the near term cumulative conditions
without and with project trips in the AM and PM peak hour volumes at intersections within the study area.
As shown in these tables, all study area intersections are expected to operate at levels of service better
than LOS "D" when LOS "D" or better is acceptable. Therefore no intersection mitigation is needed .
Appendix E includes intersection levels of service worksheets for the Near Term With and Without
Project conditions.
002312 6-7 002312-Report_C
The La Costa Towne Center
Excel La Costa, LLC
Urban Systems Associates, Inc.
May 17, 2013
© ,
5)
OS
C i
Signalized
1355/1354
^ 117/101
La Costa Ave.
©^ ~
Cvl «! ^ r~- o m <N .c m ^ 2 CJ) cn 5 — m
R ^
Signalized
20/83
^ 44/119
Costa Del Mar
© o .
CO CN O ^ o — m OS cn ^ CO o CM -- .e •f CO 00 S
CN O S
r- — — o
JR ^
Signalized
227/237
561 /459
^ 118/107
La Costa Ave.
1262/1599 ^
102/65
La CosI
Saxon
1 r
LD CO
m CN
o ^
CO CO
CD
ta Ave. /
y Road
El Camii
Costa [
tr
o
•>«• —
CN — CN ^
cn
CN CN —
10 Real /
)el Mar
763/836
312/681 _^
299/321 —^
La Coste
Camii
Mr
CD CN l-~-rf cn (D CN O
O ^ CN CN cn CM —
1 Ave. / El
10 Real
©
OO CD CN — CD Cvl
•q- ^ ^
CN o m
JR
Signalized
82/83
767/592
^ 28/20
La Costa Ave.
© .
CD
CO OS
1
IK '
Signalized
2/5
20/41
Costa Towne Cntr.
© .
^- CM ^
CO ^ m as — t- c o ^ m S coo-^ •§ ^ CO ^ g •".r CO CM r'S CO — m ^
JR '
Signalized
126/95
3/0
^ 140/87
Levante Street
39/59 _^
362/899
70/80 ^
La Cos
Shoppin
Dr
1 Mr
O CN o
64 CM CO
C ~~ ~~ 5. m o 5: CM —
<<
a Ave. /
g Center
wy.
El Camine
Costa Tow
tr
CD — CO CN
m ~~
o
cn
Real / La
ne Center
18/31 _>
2/4 _^
5/7 —V
El Cami
Levant
Mr
O O) 1^
CM — -"l---•<«• — TJ- •<
— ^ 1^ O CN CO CO
no Real/
e Street
FIGURE 6-4
Near Term Without Project AM / PM Peak Hour Traffic
002312 6-8 002312-ReportC
The La Costa Towne Center
Excel La Costa, LLC
' Urban Systems Associates, Inc.
May 17,2013 Saxony Road Signalized
1360/1360
^ 118/102
La Costa Ave.
m §
^ g
OOCvl .| m ^ 5 cn cn ,o — m o
R '
Signalized
20/83
^ 44/120
Costa Del Mar
oo CN CN IV o — m ^ cn ^ oo g
CO cn 5
CM O •"3- .« r~. — — U
JR '
Signalized
228/238
564/462
118/107
La Costa Ave.
1265/1607 ^
102/65 —V
La Costa Ave.
1 r
m
m CN
o ^ oo oo
CD
/ Saxony Road El Camino Rea
tr
CD lO
•"d- —
CM —
CN ^ ~- O
t-~- CO
t-~ —
—
1 / Costa Del Mar
763/836
313/683 ^
301 /328 -V
La Costa Ave. /
Mr
cn CD oo
cn CD CM o ^
-~ — CN
CO ^ CN CN CO CM CN
B Camino Real
©
OO CD CN — CD CN
T— T—
TJ- ^ ^
CM O LO — —
JR
Signalized
82/83
767/592
^ 33/33
La Costa Ave.
© = .
^ CD §
CO
o Cvl 5
— 00
R ^
Signalized
^ 2/5
^ 29/50
La Costa Towne Cntr.
© » ,
^— CO § m cS 7.
CM ~- m g
00 CD - 'I
CD oo TT
oo — m ^
JR '
Signalized
127/97
3/0
^ 140/87
Levante Street
39/59 _^
364/901
72/84 —^
La Costa Ave. /.
Dr
1 Mr
i: i-~ o m
,B r- CN
O ^ ^ ^
s« CJ) m CO
-S CM —
1
Shopping Center
wy.
El Camino Real
Ce
tr
m m
CN m
CD
~~~~ T—
CO
T—
cn
/ La Costa Towne
nter
19/33 _^
2/4
5/7
B Camino Real
Mr
O 00 i-~-CM CM
^ Tl- —
TJ- — ^
•<
00 CN oo oo
/ Levante Street
FIGURE 6-5
Near Term With Project AM / PM Peak Hour Traffic
002312 6-9 002312-ReportC
The La Costa Towne Center
Excel La Costa, LLC
' Urban Systems Associates, Inc.
May 17,2013
TABLE 6-3
Near Term Without Project Intersection Levels of Service
Number Intersection Control
AM Peali Hour PMPeak Hour
Number Intersection Control Delay LOS Delay LOS
1 La Costa Ave. / Sajmny Road Signalized 8.2 A 11.4 B
2 El Camino Real / Costa Del Mar Signali2Ed 7.2 A 9.2 A
3 La Costa Ave. / El Camino Real Signalized 43.9 D 50.6 D
4 La Costa Ave. / Shopping Center Drwy. Signalized 16.9 B 20.4 C
5 El Camino Real / La Costa Towne Center Signalized 1.8 A 3.2 A
6 El Camino Real / Levante Street Signalized 27.7 C 23.6 C
Notes:
LOS = Level of Service
002312 6-10 002312-Report_C
The La Costa Towne Center
Excel La Costa, LLC
Urban Systems Associates, Lnc.
May 17, 2013
TABLE 6-4
Near Term With Project Intersection Levels of Service
Number Intersection Control
AM Peak Hour PMPeak Hour
Number Intersection Control Delay LOS Delay LOS
1 La Costa Ave. / Saxony Road Signalized 8.2 A 11.5 B
2 El Camino Real / Costa Del Mar Signalized 9.3 A 12.5 B
3 La Costa Ave. / El Camino Real Signalized 47.2 D 51.9 D
4 La Costa Ave. / Shopping Center Drwy. Signalized 17.3 B 24.9 C
5 El Camino Real / La Costa Towne Center Signalized 2.4 A 8 A
6 El Camino Real / Levante Street Signalized 28.1 C 24.2 C
Notes:
LOS = Level of Service
002312 6-11 002312-ReportC
The La Costa Towne Center © Urban Systems Associates, Lnc.
Excel La Costa, LLC May 17, 2013
7.0 YEAR 2030 WITH & WITHOUT PROJECT CONDITIONS
Year 2030 traffic volumes were based on the SANDAG Series 10 Combined North County traffic model.
This project is consistent with the land use assumptions of that study. A recently submitted project, the
Legoland Hotel, includes year 2030 peak hour volumes that were included in this report.
7.1 STREET SEGMENTS
Figure 7-1 shows Year 2030 average daily traffic volumes without project traffic.
Figure 7-2 Year 2030 average daily traffic volumes with project traffic.
Tables 7-1 and 7-2 summarize street segment levels of service using the peak hour flow per lane on each
segment between intersections for the without and with project conditions respectively.
As shown in these tables, all segments evaluated will operate acceptably at LOS BA., when LOS £>» or
better is acceptable with project traffic included. Project impacts to street segments for this condition are
considered less than significant because a better than LOS "D" is maintained therefore no roadway
segment mitigation is needed.
002312 7-1 002312-Report_C
The La Costa Towne Center
Excel La Costa, LLC
' Urban Systems Associates, Inc.
May 17, 2013
TABLE 7-1
Year 2030 Without Project Street Segment Level of Service Summary
AM Peak Hour PMPeak Hour
Road Segment D Lanes Capacity PHV V/C (1) LOS PHV V/C (1) LOS
La Costa Avenue Saxony Road to El Camino Real EB 3 5,400 1,366 0.25 A 1,775 0.33 A
WB 3 5,400 1,513 0.28 A 1,496 0.28 A
El Camino Real to Shopping Center Drwy. EB 2 3,600 1,099 0.31 A 1,729 0.48 A
WB 2 3,600 967 0.27 A 858 0.24 A
Shopping Center Drwy. to Viejo Castilla Way EB 2 3,600 532 0.15 A 1,186 0.33 A
WB 2 3,600 923 0.26 A 730 0.20 A
El Camino Real Costa Del Mar to La Costa Ave. NB 3 5,400 1,990 0.37 A 2,466 0.46 A
SB 3 5,400 2,094 0.39 A 2,274 0.42 A
La Costa Ave. to La Costa Towne Center NB 3 5,400 1,002 0,19 A 1,469 0.27 A
SB 3 5,400 1,858 0.34 A 2,179 0.40 A
La Costa Towne Center to Levante Street NB 3 5,400 1,184 0.22 A 1,991 0.37 A
SB 3 5,400 1,823 0.34 A 1,787 0.33 A
Levante Street El Camino Real to Falda Place EB 2 3,600 87 0.02 A 333 0.09 A
WB 2 3,600 342 0.10 A 232 0.06 A
Legend:
D = Direction
PHV = Peak Hour Volume
V/C = Volume divided by Capacity
LOS = Level of Service
(1) = Based on 1,800 vehicles per lane per hour
V/C LOS
0.00-0.60 A
0.61-0.70 B
0.71-0.80 C
0.81-0.90 D
0.91-1.00 E
Over 1.00 F
002312 7-4 002312-ReportC
The La Costa Towne Center
Excel La Costa, LLC
Urban Systems Associates, Inc.
May 17. 2013
TABLE 7-2
Year 2030 With Project Street Segment Level of Service Summary
AM Peak Hour PM Peak Hour
Road Segment D Lanes Capacity PHV V/C (1) LOS PHV V/C (1) LOS
La Costa Avenue Saxony Road to El Camino Real EB 3 5,400 1,369 0.25 A 1,784 0.33 A
WB 3 5,400 1,519 0.28 A 1,503 0.28 A
El Camino Real to Shopping Center Drwy. EB 2 3,600 513 0.14 A 1,169 0,32 A
WB 2 3,600 971 0.27 A 862 0,24 A
Shopping Center Drwy. to Viejo Castilla Way EB 2 3,600 459 0,13 A 1,149 0,32 A
WB 2 3,600 928 0.26 A 743 0.21 A
El Camino Real Costa Del Mar to La Costa Ave. NB 3 5,400 1,996 0,37 A 2,473 0.46 A
SB 3 5,400 2,097 0,39 A 2,283 0.42 A
La Costa Ave, to La Costa Towne Center NB 3 5,400 1,010 0,19 A 1,477 0.27 A
SB 3 5,400 1,862 0,34 A 2,193 0.41 A
La Costa Towne Center to Levante Street NB 3 5,400 1,189 0,22 A 2,004 0.37 A
SB 3 5,400 1,832 0,34 A 1,796 0.33 A
Levante Street El Camino Real to Falda Place EB 2 3,600 89 0,02 A 335 0.09 A
WB 2 3,600 343 0,10 A 234 0.07 A
Legend:
D = Direction
PHV = Peak Hour Volume
V/C = Volume divided by Capacity
LOS = Level of Service
(I) = Based on 1,800 vehicles per lane per hour
V/C LOS
0.00-0.60 A
0.61-0,70 B
0.71-0.80 C
0.81-0.90 D
0.91-1.00 E
Over 1.00 F
002312 7-5 002312-Report_C
The La Costa Towne Center
Excel La Costa, LLC
Urban Systems Associates, Inc.
May 17. 2013
7.2 INTERSECTIONS
Figure 7-3 shows Year 2030 AM and PM peak hour volumes without project traffic volumes. These
volumes are consistent with the City of Carlsbad T.I.F year 2030 evaluation volumes and the volumes
used in the traffic study for recently approved Carlsbad Projects.
Figure 7-4 shows project AM and PM peak hour volumes included in Year 2030 peak hour volumes at
study area intersections.
Tables 7-3 and 7-4 summarize intersection levels of service without and with project Year 2030 traffic
included in the AM and PM peak hour volumes at intersections within the study area.
Appendix F includes Year 2030 intersection levels of service worksheets for the without and with project
conditions.
002312 7-6 002312-ReportjC
The La Costa Towne Center
Excel La Costa, LLC
Urban Systems Associates, Inc.
May 17,2013
® Signalized
1,396 / 1,395
^ 117 / 101
La Costa Ave.
Cvl —
OM
OO CJ)
in o
CvT
Signalized
.t_ 21 / 87
^ 46 / 125
Cosla Del Mar
t^ CO CO CO - <J)
t- CN to
in „ S
Signalized
.t_ 238 / 248
578 / 473
151 / 137
La Cosla Ave.
1,301 / 1,648
102 / 65 —^
La Costa Ave./
1 1 f
— If)
CO CD
Saxony Road El Camino Rea
1 tr
•5 <N Tf
a m 't
^ Cvl
S3 ^ ^
£ cn °°. ^
1 / Costa Del Mar
799 / 876 _^
331 / 722 _^
384 / 413 —^
La Costa Ave./
1 ltr
•5 Th ^
(3 CM ^-l--
CO CM inj;^ Cvl r--
El Camino Real
®
2 ^ ?
? 2 ^
Signalized
^ 82 1 83
813 / 627
^ 28 1 20
La Costa Ave.
m
Signalized
X_ 3 1 6
^ 28 1 55
La Cosla Towne Cntr.
r--. o)
<D cn CD
m cD_ m
Signalized
^ 161 / 122
.^3/0
^ 178 / 110
Levante Streel
39 / 59 _j.
390 / 968 ^
70 / 80
La Costa Ave. / Shop
f ltr
k.
,SJ
5 O O
(«J t-- Cvl Tt
1
CO ,o — CN —
ping Center Drwy.
El Camino Real
Ct
1 tr
.5 o
o cn CN ^ —
S3
1^
CD 1^
/ La Costa Towne
nter
23 / 40
2 / 4 _^
6 / 9 ^
El Camino Real/
1 ltr
-S
1 ° m'^
S3
CM
Tt OM O) — — CN
Levante Street
FIGURE 7-3
Year 2030 Without Project AM / PM Peak Hour Traffic
002312 7-7 002312-Report_C
The La Costa Towne Center
Excel La Costa, LLC
Urban Systems Associates, Lnc.
May 17, 2013 Saxonv Road Signalized
1401 /1401
^ 118/102
La Costa Ave.
UJ e
-1 u) ^ s o CJ) .e Cvl UJ ^
R '
Signalized
21 /87
^ 46/126
Costa Del Mar
^-—CO «
CD CD 00 £ 00 — r- ^ O) 00 1
^ UJ ^ 'S CD CM 00 S Tt OO UJ ,e h- — — u
JR '
Signalized
239/249
581 /476
^ 151/137
La Costa Ave.
1304/1656
102/65
La Costa Ave.
\ r
1^ CO LO CN
00 UJ
CD
/ Saxony Road El Camino Rea
tr
00 LO UJ —
CO —
CM ^
^ O
CD CO CD —
CO
1 / Costa Del Mar
799/876 _^
332/724 ^
386/420 —^
La Costa Ave. /
Mr
l~~ 00 CN
UJ Tt
CN — ^ ^ — CO
O ^ CN
CO t-
CN LO
r--
B Camino Real
® ^
oo Q r- — ^ — CD oo -^^ a
CO o oo 6,
— — -"J- S
JR 1
Signalized
82/83
813/627
^ 33/33
La Costa Ave.
® -
V_/ CN a
— 5>
^ -5
a)Oi 1
— oo
R
Signalized
^ 3/6
^ 37/64
La Costa Towne Cntr.
® -
^ ^ CO e
— CN O CN ^ t-- .S
OO - g
^ CJ) ^ a
CD CD 00 0 CO — U) f..
JR
Signalized
^ 162/124
3/0
^ 178/110
Levante Street
39/59 _^
392/970
72/84
La Costa Ave./i
Dn
itr
CN O CO
OO CM
— LO cn oo —
Shopping Center
«y.
El Camino Real
Ce
tr
CJ) UJ CN O)
O)
O
1^
/ La Costa Towne
nter
24/42 _^
2/4
6/9 —^
El Camino Real
Mr
o cn cn
CN — U) ^ oo — •>
T O) U) CN CN
/ Levante Street
FIGURE 7-4
Year 2030 With Project AM / PM Peak Hour Traffic
002312 7-8 002312-ReportC
The La Costa Towne Center
Excel La Costa, LLC
Urban Systems Associates, Inc.
May 17, 2013
TABLE 7-3
Year 2030 Without Project Intersection Levels of Service
Number Intersection Control
AM Peak Hour PMPeak Hour
Number Intersection Control Delay LOS Delay LOS
1 La Costa Ave. / Sawny Road Signalized 8.3 A 12.2 B
2 El Camino Real / Costa Del Mar Signalized 6.9 A 13.9 B
3 La Costa Ave. / El Camino Real Signalized 48.4 D 50.5 D
4 La Costa Ave. / Shopping Center Drwy. Signalized 15.9 B 20.0 B
5 El Camino Real / La Costa Towne Center Signalized 4.1 A 3.4 A
6 El Camino Real / I.evante Street Signalized 19.5 B 23.7 C
Notes:
LOS = Level of Service
002312 7-9 002312-ReportjC
The La Costa Towne Center
Excel La Costa, LLC
' Urban Systems Associates, Inc.
May 17,2013
TABLE 7-4
Year 2030 With Project Intersection Levels of Service
Number Intersection Control AM Peak Hour PMPeak Hour Number Intersection Control Delay LOS Delay LOS
1 La Costa Ave. / Sarony Road Signalized 8.3 A 12.4 B
2 El Camino Real / Costa Del Mar Signalized 7.6 A 14 B
3 La Costa Ave. / El Camino Real Signalized 51.9 D 54.2 D
4 La Costa Ave. / Shopping Center Drwy. Signalized 16 B 23 C
5 El Camino Real / La Costa Towne Center Signalized 5.2 A 8.2 A
6 El Camino Real / Levante Street Signalized 19.5 B 31.5 C
Notes:
LOS = Level of Service
002312 7-10 002312-Report_C
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
8.0 CONCLUSIONS AND RECOMMENDATIONS
8.1 EXISTING CONDITIONS
8.1.1 Street Segments
All study area street segments are currently operating acceptably at LOS "D" or better so that no roadway
mitigation is needed.
8.1.2 Intersections
All study area intersections are currently operating at LOS "D" or better during the AM and PM peak
hours so that no intersection mitigation is needed.
8.2 EXISTING PLUS PROJECT CONDITIONS
8.2.1 Street Segments
Study area street segments are expected to operate at LOS "D" or better with project traffic added.
Project impacts are considered less than significant so that no project roadway mitigation is needed.
8.2.2 Intersections
All study area intersections are expected to operate at LOS "D" or better with project traffic added to
existing AM and PM traffic volumes. Project impacts are considered less than significant. No project
intersection mitigation is needed in Year 2013.
002312 8-1 002312-Report_C
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
8.3 NEAR TERM WITH AND WITHOUT PROJECT CONDITIONS
8.3.1 Street Segments
Study area street segments are expected to operate at LOS "D" or better with project and other projects
traffic added. Project impacts are considered less than significant so that no project roadway mitigation is
needed.
8.3.2 Intersections
All study area intersections see summary Table 8-1 are expected to operate at LOS "D" or better with
project traffic added to existing AM and PM traffic volumes. Project impacts are considered less than
significant. No project intersection mitigation is needed.
8.4 YEAR 2030 WITH AND WITHOUT PROJECT CONDITIONS
8.4.1 Street Segments
Study area street segments are expected to operate at LOS "D" or better with project traffic added in Year
2030. Project impacts are considered less than significant so that no project roadway mitigation is
needed.
8.4.2 Intersections
All study area intersections see Table 8-2, are expected to operate acceptably at LOS "D" or better. No
intersection mitigation will be needed.
002312 8-2 002312-ReportC
The La Costa Towne Center
Excel La Costa, LLC
Urban Systems Associates, Inc.
May 17, 2013
Table 8-1
Near Term Without & Near Term With Project
Intersection Comparison
# Intersection
Near Term Without Project Near Term With Project
# Intersection AM Peak Hour PM Peak Hour AM Peak Hour S ? PM Peak Hour S ? # Intersection
D LOS D LOS D LOS
S ?
D LOS
S ?
1 La Costa Ave. / Saxony Road 8.2 A 11.4 B 8,2 A 0.0 No 11.5 B 0.1 No
2 El Camino Real / Costa Del Mar 72 A 9.2 A 9,3 A 2.1 No 12.5 B 3.3 No
3 La Costa Ave. / El Camino Real 43.9 D 50.6 D 472 D 3.3 No 51.9 D 1.3 No
4 La Costa Ave. / Shopping Center Drwy. 16.9 B 20.4 C 173 B 0.4 No 24.9 C 4.5 No
5 EI Camino Real / La Costa Tovme Center 1.8 A 3.2 A 2.4 A 0.6 No 8.0 A 4.8 No
6 EI Camino Real / Levante Street 27.7 C 23.6 C 28.1 C 0.4 No 24.2 C 0.6 No
Notes:
LOS = Level of Service
A = Chan^
S = Sigiificant
D= Delay in sec.
002312 002312-Report_C
The La Costa Towne Center
Excel La Costa, LLC
' Urban Systems Associates, Lnc.
May 17, 2013
Table 8-2
Year 2030 Without & Year 2030 With Project
Intersection Comparison
# Intersection
Year 2030 Year 2030 -l- Project
# Intersection AM Peak Hour PM Peak Hour AM Peak Hour S ? PM Peak Hour A S ? # Intersection
D LOS D LOS D LOS
S ?
D LOS
A S ?
1 La Costa Ave. / Saxony Road 8.3 A 12.2 B 8.3 A 0.0 No 12.4 B 0.2 No
2 El Camino Real / Costa Del Mar 6.9 A 13.9 B 7.6 A 0.7 No 14.0 B 0.1 No
3 La Costa Ave. / EI Camino Real 48.4 D 50.5 D 51.9 D 3.5 No 54.2 D 3.7 No
4 La Costa Ave. / Shopping Center Drwy. 15.9 B 20.0 B 16.0 B 0.1 No 23.0 C 3.0 No
5 El Camino Real / La Costa Towne Center 4.1 A 3.4 A 5.2 A 1.1 No 8.2 A 4.8 No
6 El Camino Real / Levante Street 19.5 B 23.7 C 19.5 B 0.0 No 31.5 C 78 No
Notes:
LOS = Level of Service
A = Change
S = Si^ificant
D= Delay in sec.
002312 8-4 002312-Report_C
The La Costa Towne Center © Urban Systems Associates, Lnc.
Excel La Costa, LLC May 17, 2013
9.0 REFERENCES
San Diego Region Traffic Engineer*s Council (SANTEC) and
Institute of Transportation Engineers (ITE), California Border Section,
Guidelines for Congestion Management Program (CMP) Traffic Impact Report,
San Diego, CA (2000)
Transportation Research Board, 2000 Highwav Capacitv Manual Special Report, Washington, DC
(2000)
SANDAG 2012 Congestion Management Program Update
002312 9-1 002312-Report_C
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
10.0 URBAN SYSTEMS ASSOCIATES, INC. PREPARERS
Principal Engineer
Andrew P. Schlaefli; M.S. Civil Engineering, B.S. Civil Engineering
Registered Civil Engineer, Licensed Traffic Engineer
Proiect Engineer
Jacob D. Swim; B.S. Civil Engineering
Senior Technical Support, Graphics and Illustrations
Jacob D. Swim; B.S. Civil Engineering
Word Processing, Report Production and Compilation
Ty Maroony
This report is site and time specific and is intended for a one-time use for this intended project under the conditions described as "Proposed
Projecf. Any changes or delay in implementation may require re-analysis and re-consideration by the public agency granting approvals.
Califomia land development planning involves subjective political considerations as well as frequently re-interpreted principals of law as
well as changes in regulations, policies, guidelines and procedures. Urban Systems and their professionals make no warrant, either express
or implied, regarding our findings, recommendations, or professional advice as to the ability to successfully accomplish this land
development project.
Traffic is a consequence of human behavior and as such is predictable only in a gross cumulative methodology of user opportunities, using
accepted standards and following pattems of past behavior and physical constraints attempting to project into a future window of
circumstances. Any counts or existing conditions cited are only as reliable as to the time and conditions under which they were recorded. As
such the preparer of this analysis is unable to warrant, either express or implied, that any forecasts are statements of actual tme conditions
which will in fact exist at any future date.
Services performed by Urban Systems professionals resulting in this document are of a manner consistent with that level of care and skill
ordinarily exercised by members of the profession currently practicing in the same locality under similar conditions. No other representation
expressed or implied and no warranty or guarantee is included or intended in this report, document opinion or otherwise.
Any changes by others to this analysis or re-use of document at a later point in time or other location, without the express consent and
concurrence of Urban Systems releases and relieves Urban Systems of any liability, responsibility or duty for subsequent questions, claims,
or damages.
002312 1 0-1 002312-Report_C
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
APPENDIX A
City Staff Scoping Meeting
002312 A 002312-ReportC.doc
Jake Swim
From:
Sent:
To:
Subject:
Attachthehts:
Sam Kab [sam@urbansystems.nel]
Thursday, July 26,2012 9:16 AM
andy@urfaansystems,:net; 'Jake Swim'
FW: La Costa To.whe Genter
img-7260329-.0001.pdf
img-72Sd329-0001,
pdf (462 KB) tody: L6^?K^ .like: ttie study a3:ea arid trip sfsdtJbti-dns, ate OK.
Saift E. K,alb-, II
tJ,3:tei.an Sys.t^ras ,AssQ:el.a.t,es,f Irie.
8-,5;9-',S:60-^4ail -T-'Qirig'ixisi Message--^—-
From;:- GleB: Van. ,:peski [mailto:Sien.Van|'e,s.kifte®rls,b
,Senfej tliiaEsday, ,JitLy 26. 2012 :e:5:i AM
Cei Van 'LytiQh,;: ,Jofai Kim
,Subj,e;et: La Costa, Towne Center
Saffl -
Preliiainary corainents from Bryan Jones,. He in.et with Jdhri Kim. Q.n these, if you have
qiiestidns you might be able to; epntact John Kim. Once you turn in an actual traf,fi,G
study, staff ,can do ,a detailed review.
Glan Van Seski,, ffi, PLS, QSt).
.,Engin,Be,riri,,g Managsi:
Land Oeyeldpment' Erigirieei'in.g
City of carlsbad
www ..caclsb^dpa, gov
P: 760-602-r^2783^
C: lM-^'^2-&-5'3€-
F:. 7gO-5"&2-lQ,S-2.
uj.cn , V a:': po a k i Q c a r .1 .'j ba dca . go-.'
Facebook •TWitte:^ Tou, Tiibte 1 Flickr | FiritgTest Enews
Jake Svvifii
subject:
Loeation;
Start;
End;
IRecurrence:
iMeseting Status;
/A {^^si^ ^i^y-c. CLc^ M'ffj.
Meeting to review trip distribution on Bressi Archstone, discuss need for TIA on Vons center
Room 174 - Faraday
Mon 7/16/2012 2:30 PM
Moh 7/16/20T2 3:00 PM
(none)
Accepted
ATtACHMENT 1
La Costa Towne Center Project Trip Generation
Existing Uses
Us* .Amount Trip APT AAI PcaK Hour Us* .Amount Trip APT %* ln|: Out tn Out •/.* lo :|oat Out
telsil(77tdBi(isj^ 1 siojy 3:1,070 Sl* 120 /KSF 3,728 4% 149 S : 4 S9 60 ,J0?4 373 5 ; i' Xii IM
Ri*!i((772():BI<ig}-,lJ£R<»f 20j8)3, SF RO «SF 3,49'? 4"/. 100 4 ,60 40 10!i 250 5 ^ 5 125 125
Otfice,f7720 Bldg) - Jhd Jlebf S.*? SF 120 /KSF i,;i,i9 4% 45 6 : ,4 27 13 10% 113 5 : 5 56, 5.6
Retail <7740,II td^- Istoiy l%m SK 120, /KSF 1,602 4?4 72 , 6: ; 4 43, 29 10% 180, 5 ; i 90 99
Raall (7750, SIdg)-,1st floor 21.737 SF 120 KSF 2,60i 4?4 lij-t 4 '63 42 iW. 2S1 5 • -5 I» 130
Office (7750 Bl%) -and flpbr 1D,5S3 SF ,126 itsy i,2(S8 51 & • 4 ^3,0 20 10% [11 5 : 5 63 63
R!a;ail,,(77SQBWg),- 1 story <,834 ,|F m /KSF •i82 4% 23 6 4 W 9 1,0% 58 5 ; J 29, ?9,
k?[ail|7770 Bldi) - tst toor 5,312 ;SP 125 /KSF ,(537 25 .6 4 ,10 10'>p 64 i 32' 35
Office 0770 BtiJg),-2ncl floor ,5.312 SF J20 /icSE, ,,(5i7 4^i, 25 4 ts !C low 64 5 ;, '3 %t 32
TOTAL 14,850 596 357 •23S 1.499 743 745
<-S. I'-^-pJvt^-
Note:Theprop.QS«lproiecliS,a;molishii)gaw7710BIdg p!,0,70SF).
iSxisting & Proposed Project
Use Amounr Trii) ADT A.\I Peak Hour PiVr Peak Hour Use Amounr Trii) ADT # out In Out Out In Out
.. •>
•KOTiKSF T92 Tb--ir iOy, -4SS~ -3-r-'2-48--249-•KOTiKSF T92 (3 Tb--ir iOy, -4SS~ -3-r-—J'-' '2-48--249-
Mulli-Family R<sWin£ial (7710 BWe) -
2nd floor 6 /pu 2S3, 8% 23 2 : « 5 ,18 9% 26 7 ; ,'3 ,1? 8
lleiail (7714 BJd^ - 1st floor 9^00 SF f:.0 '/K.SF 1,104 4% 44 6 :, 4, 26, IS 10% UO • S •: 5, ,'J3 3,3
iVIuK-Faroily Risideniial {7714 Bldg),
2nd floor li m 6 72 8% 6 2 : 8 ,1 5 9% ,6 •7 : 3 5 i
Retaili[7720 Bldg}-litiiloor 20,,S1J SF 120 /KSF 2^498 4% 100 6 ; 4 60 4Q •s ; 3, !?3, 123
Dffii* (7720 BWg)- Jttdflpcr 9.405 :SF ijft '/KSF 1,129, A% 45 6 '. 4 27 ,18 m. 113 5 ! 3 ,56 M.
R«l«a(7750 Bldg) > 1st nbbi-21, 717 ;SF 120 /KSF '2,608 104 6 ; •4 6,3-42 mn .2^1 •5 ,: 5 130 130
O&e I7"53 V,\ii.) - IrA f.oot lOjSj SF 126 /KSF 1,26s ,4% 51 6 : 4, 30 20 10«/« 127 ,3 :; 3 63 »
Retiil {77fiQ Btdsi). 1 story. 5,338 SF ')20 iKSF 64! 4% 26 6 :, 4--15 ,10 10% 64 5 •: 5 32 32
rtetail (777!) Bldg) Isttlopr 5,312 $F 120 msY 637 .4»i 25 6 ; 4 15 10 ,10« 64 i i. S 32 32
Qffice (7770 Bldg}., 3ni3 floor 5.3 ft SF' 120 /K.SI ,537 4% 25-6 ,: 4 ti 10 LtS'/. 64 S 32 :32
TOTAL 15,682, 642 i73 26,8 1,565 ,7S'9, 7?6
• ••'
mm Npti: The pro^'wd project iSdeiftolisMng ibi 7740 Bldg (15,020, SF).
NET NEW TRIPS
Ciitid Ition jtPT AM Penk.;li(iur PW Pti'k Hour Ciitid Ition jtPT DOT m OUT
• .. Eiiitiiig; iS PropijsBd Project ! 5,682 373 •as?; 78'?' 776
E:!ijtin^ Uses ,14,890 J3S 7'4,5' 745
KETNEW TRIPS 'Wl IS 30 3'
S0i3ree: S/VNDAp's (i\foi?S:Qi BriefaLnd.eofVt.'-hicularTrarf^e Oensration Rates, r\[jril'2C0:.
•Si-~;5"c!Lrar!;:Fodt
"'f*ficiU3anci Squnr? i'sef.
= study Intetseotions
•><f = Study Street Segineiits
ATTAGHMENT 2
Project Study Area
ATTACHMENT 3
Assumed Project Only Distribution Percentages
6r -?M\2^
(^Quarry Creek Mi&ater Plan ^(On Marron Rd west of College Blvd) (*) Robertson Ranch-i , ^ U.^K ^ East Village 1 \ Sage Creek High • ^ School (o)
PROPOSED-
PROJEOT
ATTACHMENT 4
Other Projects Location Map
ATTACHllrtENT 5
LA GOSTA TQ^NE CENTER
PEMDING OR APPROVED PRO JECTS LIST
Dos Golinas
Robertson Raneri PA 22
309 onits senior conttntjinig: care facilit
66,000 sq. ft. office buiiding
1,340
1,320
Include
Include
TAZ ok
Revise TAZ
RQ„bertsQn Ranch Eagt,Vitlage, Reroainlirg 246 single famity dwelling iJnits and 52 condos: 2,876 include ReweTAZ
Rancho Milagro
gage Greek, HlgH.'School
22 single family dweljing units 264 Include TAZ ok
1,500 studenis 1;950 Include Revise TAZ
Alga Morte: Park 32 acre site 1,600 Indude TAZ ok
Garlsbad La Casta-GoU'ection 53: tQwnhomes.(At ECR / Dove Ln.) 424 Include TAZ ok
10
Putpsettia, Place
Pizza Potliwiin Bressi Ranch)
82 units (68 townhomes and 14 stacked flat condo units) 656 Include
37.000 sq,ft. industrial with 4,300 sgl it restaurant
TAZ ok
692 Indude Revise TAZ
11 Carlsbad Paseo I^orth 61,860 sq. ft commercial 3.532 indude Revise TAZ
12 Carlsbad Paseo Soufhi, 120,000 sq. ft commercial 5,868 Indude Revise TAZ
13 Legoland, Hotel 250; room resort hotel 1,600 Incfude T/ttZok
14 GreenDragon Tavern 21,334 sq.ft. restaurant and book, storfe 1,305 Include TAZ ok
1S Bressi; Ranch Planned lnd,ustrial Increased TAZ to 15.0 KADT 15,000 Include 50% plus
3 hotels
Revise TAZ to
indude Project. 3
hotels. Pizza Port,
Gas Station
16 Pabmar, Airport Commons 15.0. acre community commercial 12,320 Indude TAZ ok
17 La Costa ToWne-Center
285,000 sq. ft. community commerdal
128 condominiu nri dwelling units
22,752: indude TAZ ok
64 sinQlefamllydweSiing units
55,000:sq. ft office
1i024 No TAZ ok
640 No TAZ ok
1,100 No TAZ ok
Mates:
TAZ = Traffic Model Traffic, Analysis Zone
ADT'=, Average Da iiy Traffic: Volu m e:
0Ar/f Cm'TY
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
APPENDIX B
Existing Traffic Counts and Level of Service Worksheets
002312 B 002312-Report_C.doc
City; CARLSBAD
N-S Direction: SAXONY ROAD
E-W Direction; UCOSTA AVENUE
Transportatiot) Studies, Inc.
2640 Walniit Aventie, Suit? H
Tustm.GA. 92780
File Name : h1208002
Site Cbde ; 00003S73
Start Date : 8/1/2012
Page No : 1
droups Printed- Turning Movements
DEAD END LA COSTA AVENUE iSAXGNY ROAD LA COSTA AVENUE
Southbountf Westbound Northbound Eastbound
Stan rime Riaht Thru 1 Left Riqht! Thru 1 Left RIciht 1 Thrul Riaht Thru i Left Inl, Total
07:00 AM 0 0 0 0 306 14 9 0 6 8 190 0 533
07;f6 AM 0 0 0 0 312 17 18 0 8 :i2 199 0 566
07:90 AM 0 0 0 0 304 33 10 0 7 6 215 0 575
07:45 AM 0 0 - 0 0 347 30 14 6 8 32 323 ,0 754
Total 0 0 0 0 1269 94 51 0 29 58 927 0 2426
08:0(3 ,AM 0 0 0 D 293 27 18 0 11 14 310 0 678
06;15,AM 0 Q 0, 0 343 39 i6 0 3 36 296 0 726
08-30 AM 0 0 0 0 333 ,22:-2i ,5 8 20 290 0 699
68:45 AM 0 0 0 0 354 31 19 0 11 32 3Q7 ti 754
tota! 0^ 0 0 0 13,33 118 ,68 0 33 102 1203 D 2857
"•BREAK***
04:00: PM 0 0 0 ff 267 20 23 0 11 24 374 0 719
04:15 PM 0 0 b 0 311 2i3 2'3 0 8: 16 375 0 756
04:3:0:RM b 0 0 0 ,298, iize 16 d 9 12 399 0 760
04:45 PM 0 0 0 b 302 30 28 6 17 I'i 389 b. 777
Total o; 0 0 0 1178 9? SO 0 45 63 1537 0 3012
05:00,'PIVi, 0 0 0 0 309 21 20 0 9 14 381 0 763
05;t5PM 0 0 6 0 363 27 29 0 16 17 338 b 840
05:30 PM 0 0 0 0 302 23 37 b 13 23 364 b 762
05:45 PM 0 0 0 0 291 27 26 0 11 9 344 b 698
' —raarl - —cr-u •ff T255-9S -1-21 0 —jtS^I ^ M77-— 0-8063-
Grand Total 0 0 0 0 5035 409 330 b 156 286 5144 b 11360
.Apprch "A 0 0 0 0 92.5 7.5 67.9 .0 32.'! 5.3 94.7 b total: °/o 0 0 0 ,0 44.3 3.6 2.9 0 1.4 2.5 45.3 0
Traosportatioii Studies, lno.
2640 VValaut.Avenue, Suite H
Tiistin, t;A. 92780
City: CARLSBAD
N-S Direction: SAXONY ROAD
E-W Direction; LA COSTA AVENUE
File Name : h1208002
Site Code : 00003873
Start Date : 8/1/2012
Page No : 2
DEADEND LA COSTA AVENUE SAXONY ROAp LA COSTA AVENUE
Southbound Westbound Northbound Eastbound
Start Time •Riaht 1 Ttirul Lefl! APR. Total Ribht 1 Thru 1 Left Ma. Total Riaht Thml Left 1 Anc. Tom Rifiht 1 Thm 1 Left App. Toiai IhL Total
PesK: Hour Analysis From 07:00 AM to 08:45 AM • Peakl ofl
Peak Kourfor Entire Intersection Begins BI:07:45 AM 32 07:45AM b 0 0 b 0 347 ,30 377 14 0 8 22 32 323 0 355 754
08:00 AM ,0 0 0 0 0 298 27 325 18 b 11 29 14 31b 0 324 678
09:;1SAM 0 0 0 0 0 343 38 isi io 0 3 13 35 296 ft 332 726
b'SrSb AM, 0 0 0 0 0 338 ?? 360 21 0 8 29 20 290 b 3-io 699
Total Voiurne •0 0 0 0 0 1326 117 1443 63 0 30 93 102 1219 0 1321 2857
% ADD. total 0 0 0 0 91.9 8.1 :B7.7 0 32.3 7.7 92.3 G
PHF ,000 .000 .000 .000 ,000 :955 .770 .947 750 .000 .682 .802 .708 .943 ,,OPO, ,930 .947
DEAOEND
ai C~l&. ETI], I
Right Thru
3 l—l z LU > < t
a o
Peak Hour Data
t
North
Peak Hour Bsjins at 07:4,5 Nt.
Turning Mtwernents
+—^
r-
"r"a-
Las,, T^rU RiqtiL i^30l DI^
CSS r 83i I 3t2l
Out In Total
".sftxnNV'Rfi.'^n
Transportatipn.Studies:, Inc.,
2MQ Walnut Avenue, Suite H
t«stitt,CA,S>278b
City; CARLSBAD
N-S Direction: SAXONY ROAD
E-W Direction: LA COSTA AVENUE
FUeName :h1208002
Site Code : 00003873
Start Date :8/1/2Q12
Page No : 3
DEAD END
Southbound
LA COSTA AVENUE
Westbound
SAXON Y ROAD
Northbound
LA COSTA AVENUE
Eastbound
Start Time Right! Thru 1 Left! App.Toiai Ridht 1 Thru 1 Left|,App.Tot«l Riaht 1 Thrul Left I ABP. Total Riqht 1 Thai! Left 1 APP. Tolal Int. Total j
Peak Hour Analysis,:Fro,m 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire interseetlon Begins, at 04:45 RM
04:46 PM
05:00 PM
05:15 PM
05:30 PM
302
30,9
353
302
30
,21
27
23
392
•330
39P
325
28
29
29
37
0 17
0 9
0 16
J 13_
45
38
45
50
11 389 0 400
14 381 0 395
17 388 0 405
23 364 0 387
777
763
840
762
Tptat Volume
"/oAiap. total
0 1276
0 ,92,7
101
7.3
1377 123
69.1
0 55
0 30.9
178 65 1522
4,1 95,9
1587 3142
PHF .000 .000 ,.000 •OOQ .000 .879 .842 :S83 .831 .000 .809 .890 ,707 .978 ,0OQ •980 .935
, Qui ,
rri I
DEADEND
Jn, TslaL
I ol' " Ol
Right Thru J Left, 5
-Pealf-Houf-Data-
North
Peak Hour ,Begins at 04:45 PI
Tiii-nlflo Movements
U-156J I ...ml: LIMI
Out In Total
'fiAXnWYRO,An
city: CARLSBAD
N-S Direction: EL CAMlNO REAL
E-W Direction; COSTA DEL MAR
Trattsportatioa Stwdics, Inc.
2640 Walnut Avenue, Suite H
tustin, CA. 92780
File Name ;h1208003
Site Code : 00005163
Start Date : 3/1/2012
Page No : 1
EL CAMINO REAL
Southbound
COSTA DEL MAR
Westbound
EL CAMINO REAL
Northbound
DEAD END
Eastbound . •"- • •••••[
start Tim's-RlOflt 1 Thai 1 Left Rlqht 1 Thni! L?ft Rlqht 1 Thrul Left Riaht 1 Thrui Left inf. Total
07:00 AM 0 310 7 0 0 7 3 248 0 0 0 0 575
0,7:15 AM 0 333 11 2 0 8 22 297 0 b 0 0 673
07;3tlAM 0 424 15 5 0 10 11 331 0 0 b 0 796
07:45 AM 0 :5b3 :2b 3 0 5 29 420 0 0 0 0 980
Total 0 1570 53 10 0 30 65 1296 0 0 0 0 3024
08:00 AM 0 464 12 4 0 11 15 417 0 0 0 0 923
08:15 AM b 483 11 • 6 b 3 36 438 0 0 0 0 977
08;30AM 0 446 14 6 Q 17 33 431 0 0 0 0 947
08:45 AM 0 ,533 22 4, 6 13 45 467 b b b 0 1084
total:. b 1926 59, :20 0 44 129 1753 0 b b 0 3931
•BREAK^
04:00 PM
04:15 PM
04:30 PM
04:45 PM
412
439
469
48S
10
4
ib
12
14
13
24
37
28
33
21.
31 472
26 450
27 569
32 555
976
mi
113,2
1124
4192 totei
05:00 PM
05:15 PM
05:30 PM
05:45 PM
Grarid Total
Apprch %
Totaled
0 1805
0 49,8.
0 548
0 503
6 467
36
3
i
A
7
731,7
978
472
164
2.2
1.1
70
16
15
JJL
119
25
4b
31
_3£ —72-
172
34,6
1,1
-132-
325
65,4
2.1
lie ,2046
26 647
'29 517
26 514
8 436
—8&-
399
5.3
2.6
-20+4-
1116
1160
1093
971
-4-339-
7109
94.7
45.9
15486
Transportation Studies, Inc.
,2.S40 WakutAventw, Suite H
TVistin,„CA.,927S0
City: CARLSBAD
N-S Direction: EL CAIVIINO REAL
E-W Direction: COStADELMAR
File Name : h1208003
Site Code : 00005163
Start Date : 8/1/2012
Page No ; 2
EL.CAMINO REAL , COSTADELMAR EL CAMINO REAL DEAD END
Southbound Westbound Northbound Eastbound
Start Time Riaht! Thru! Left! Ana. Total Risht ! Thru! Left 1 Ace. Totel R!.qht Thai! Le'ft! APP. TQUI Right 1 Thai! Left App. total Int. Totai
Peak Hour Analysis From 07:b0,AM -to '08:45 AM -Peakl oft
Peak Hour for Entire Intersection Begins at 08:00 AM 923 08:00 AM b 464 12 476 4 0 11 15 15 417 0 432: 0 0 0 0 923
08:15 AM 0 483 11 494 6 0 3 9 36 438 0 474 0 0 0 0 977
08:30 AM 0 446 14 460 6 6 17 23 33 431 b 464 b Q' 0 0 947
08:45 AM 0 533 22 SSS 4 0 13 17 4,5 467 0 512 0 0 b 0 1084
Tptal Volurtie 0 1926 59 1985 20 0 44 64 129 '1753 0 1882 0 0 b 0 3931
, VO ADB. total 0 m. , -3 31.2 0 68.8 6.9 93.1 0 b 0 0
PHF . :000 .903 .670 , .894 .833 .000 ,647 .696; -717 ,938 .m ,919 .000 .000 .000 .000 .907
Peak Hour Data
z
114
a
s ^
•=1
i-i-North
I Peak Hour B6gins,at 08:00 Alvi
i Turnlf>ci Movematits
1—w
>
m
n 5
Thru Riaht, r bl 17531 1231
TjsM "cfel i 3gs2l
Our In tplal
Fl f:AMII^O Rii:,Al
City: GARLSBAD
N'S Direction: EL CAM [NO REAL
E-W Direction: GOStA DEL MAR
Transpbrtatiod Studies, lno.
2640 Walnut Avenue, Suite H
Toslin, CA. 92780
FUeName ;hi208003
Site Code : 00005163
Start Date : 8/1/2012
Page No : 3
EL CAMINO REAL COSTA DEL MAR EL CAMINO REAL DEADEND
Southbound Westbound Northbound Eastbound
Rtfirf Tinrtfl Riaht 1 Thru 1 Left! Aiio: Total Riflht Thru! Left 1 App. fatal. Right! Thrtj 1 LeftI App. Totel Riflht! Thru 1 Left App;Tiiial, Int., Total 1
Peak Hqui^ Analysis From 04:00 PM 63 05:45 PM' PeaK 1 of 1
Peak Hour fbr- E ntirelrrtersectlon B'eflins at 04:30 PM b 1132 b 469 lo 479 24 0 33 57 27 569 0 596 0 0 b 0 1132
04:45 RM 0 485 12 497 19 0 21 40 32 555 0 587 0 0 0 0 l'l 24
05:00 PM b 498 3 501 16 0 25 41 26 547 0 573 0 0 0 0 •1115
05:15 PM 0 548 2 550 24 b 40 64 :2& 517 0 546 0 0 0 0 •iieo
Tptgl VplLirne 0 2600 27 2027 83 0 119 202 114 2188 0 Z?02 0 0 0 0 4531 '
% ADD. total 0 987 1.3 41.1 0 58.9 5 9B: , b 0 0 Q
, PHF .oob., ,;912 .563 ,921 .865 .000 744 ,789 .891 .661 .000 .956, .000 ,000 .000 .000 .977
1 Q
Q Z a U| : c
o -
c
EL CAMINO REAL,
Out , ^iM— JMSL,
^ml p2Sm I 4a38!
I -Ql ,2{I0(H ,27l
Rijlht TIjr'U ,L|ft
'P:eak"Ht)farData -
T ,North
Psak Hour Begins at 04;3(),pijl,
lufflfdsJsiteBflieDJs
-19 ^ ~ o o
rn
<~i I r
LM , Thm T^ishL i^^nl ,:2i88! , ,^14l
jsmi Out Irt Tofal H rAMiNrt RPAl
RICK.ENCjmEERlNd TtJjR^JMG MOVEMENT ANAtYSIS:
Sit/Cliritbad
rtit^rsectipn of; TS/S SUrcct; B ,Cattl.np RM),
li'W Stress: Ln GbitaAvemie
Pajje 1 of 3
Fife: 20IJht,#l'!
Dita; Collectid by;' Qsoar, Ko.'icoaBc, :iRiiea,
GiSuritDate;
ot/mi
Pay : Weijrissiaaj/
Wfeiitliipr: ^,uan):
tnifiit fiootipl! SijTuIizecl
South Anproach fNBl North Aptittttcii tS6) , W,cjl,Apnroach,(EB) East Approach (vVflj I imin Totat
End of IS,
mill, pri. Lrs& Xl-Tm Timt ,Ri,ghi Peds iJ-Tm "Thru Peds Left' U-Tiii Tlihi Riglit Pedi Left U-Tiii Thm Riiilht Ptdi VeliielM Peds
iS'.lJ AKI 14 0 38 0 i 4 0 •41 0 50 0 20 12 b ,7 0 83 16 •0 378 1
fi :30 AM 13: 0 44 4 1 f. 0 57 121: i Q 27 18 0 U •0 77 'S 420 1
6:«AM i3 0 ;3i I 2 & 6 ,92 155: 1 ui 0 23 24 '3 H D 125 19 I 646 7
7:00 kM 0 sis 2 0 14 0; 123 I5S 0' 149 0 42. 32 0 15 9 los 23 I 775 I 7:15 AM ,38: 0 88 4 1 13 1, 119 192 ,0 1Q7 0 45 27 1 14, '0. 167 29 V 834 2
7:30 AM 16 0 116 3 1 7 0 193 211 0 143 0 41 28 1 22 0 142 39 0 97t 2
7;« A,M 27 0 156 2 4 10 .0 t9S 205 1 160 6 54, 46 0 15 0 135 37 1 1073 6
8:00 AM 53 0 155 2 2 18 2 2SS 301 2 179 0 67 .4,7 3 40 13 ,170 •7+ 0 1293 7
W5AM • 61 1 170 ^ 1 25 ,0 247 "17?"" a. 203 1 -w ' "0' • 28" y 133 -••fl— -0— —f-
8:30 AM » 44 1 1S3 5 5 27 0 284 192 0 165 i 59 n 0 28 0 133 55 I 1248 6
8:4i AM • 68, 0 152 3 0 25 0 238 178 0 186 0 65 64 0 26 0 156 61 0 U42 0
^:M AM • •54, 6, 214 8 0 42, a 263 isi J 208 0 8S 68 0 36 0 110 48 0 132Q 1
Max, IS min. 68 1 214 S 5 42 2 283 311 2 2D8 1 88 84 3 40 0 170 74 I 1320 7
Pk HrVoL 21S 719 2i S U9 0 1032 724 i 761 2 ,269 299 0 118 • 0 532 208 1 5024 8
:8:00 AM Peak, IiiteraectionTiBHisjn Pk. Hf. -5024 Peak Hr: Factor ,0.95
^MAM Hour aater^cction Pdstrns in Pk.Hr. = S
:3;45PM 6$ 1 m 1,8 0 41 0 213 2O0 1 iiS9 0 141 52 I 32 0 102 51 0 1333 2
4;o6 PM 61 1 264 14 0 •4i5 0 213 '200 0, lio 0 113 59 0 43; 0 95 40 1 1331 1
*I>PNl 64 1 243 12 0 42 0 233 166 1 ,165: 1 121 ,82 3 31, d: 79 4 ,1270 7
4;30;PM, 52 1 297 17 0 70 0 249 298 ,0 156 0 109 6,9' 0 37 0 92 44 0 1401 0
4:4? PM 7S 1 308 19 ,2 57 1 :247, 204 ,0 204 0 132 42 0 & 0 104 40 0 1464 2
5:00 :PM, 60 2 311 16 3 46 0 305 198 a 199 0 132 73 0 41 0 112 41 0 1536, 3
S:13Rvl 92 0 28iS, 14 I 3S 0 210 196 0 215 1 123 69 0 27 0 99 38 0 140? 1
3:30,fM * fio 0 262 17 2 74 0 374 258 0 202 fl 137 90 0 is 0 98 43 b 1644 2
5;4S PM * 50 j) 285 6 4 Si Q 345 219 '6 2'(i9 0 141 79 1 24 0 92 42 4 1585 S
6:Q6,PM, * 5,9 0 31? 26 b 84 Q 287 24s '0' ios d ISl 79 0 30 0 104 45 1 1^44 1
65 0 233 18 d ISO 0 264 182 fl 2IT 0 165 73 0 •24 0 87 55 6 1443 0
6:30 PM 43 1 2J1 16 0 5S 0 258 182 •a 174 0 131 ,85 6 , 3'0 a 77 70 5 1376 5
Mfl?(. 15 mill. 92 2 312, 26, 4 84 1 •374 25 s i 217 1 165 90 2 45 0 112 70 5 1644 9
Pk.,Hr. Voi. i io'K ,S7 , 6 259 0 i270^ 90) 0 .836 0, 604 321 1 107 0 38i 185 S 6316 12
5;15PM Pwik Intersection Trafflc:ia Pk; Hr, = 6316 Pcb]i;:i-Ir. Factor 0.96
6:15-PM Hour Iiiti^iSedtiori Pdstma ill Kc. Hr.
lj Camino Real at La Costa Avenue
Lane Con-Egitfation fof rnterjectidn Capadty ytilization Page:2 of 3
Pk IHlf, Tim'e Pei'lod ; Soutii Am (NB) Nortii Appr fSB) West Appr(EB} East Appr (WB)
8:00 AM to,
,9:00 AM , Left Thru Right Left Thru Rigiit Lefl Thru Riglit, Left Thru Riglit
Lari^ Inside 1 1
Config- (left), 2 1
ttratiohs 3 1
4 1
5 1 1
4
Outside: 7
Freie-flbW
1
1
1
1
1
1
1
1
1
1
I
1
1
1
1
Lme Settings 2 -3, 0 2 3 1 2 t 1 1 2 1
Capacity 3600 600C 0
Are tiie Nonh^outh phiases split (T/N),? N
Afe the East/West jsJiases: sptit fYMp N
Efficiency LostFacter O. fCi
HourlyVolume 220
Adjuste'ii Hoiu-iy Voluine -220
tJtiiizatioH Factor 6.06
Critical Faetors &.06
idtr Ratio = i).7a.
3600: ^OQO tM 3,600 4000 im I-SQO 4000 1,800
719 2,1 m 1032
74a 0 m 1Q32
0.12 0,00 0.03 0.17
jLDS = c
724
507
0:2?
0.28;
7S3
753
0.21
0.21
20
0.07
299 118 53,2, 208
299 lis 53? 2Q8
047 0.07 0.T3 b-l?
0.13
Tuniing Movements at Intersection of: El Camino Real artd La Costa Avettue
W
e
,s
t
A
P
•P
r
time: 8:00 AM
to 9:00 .AM
Dale: 08/03/11
Day: Wednesday
Name: CsGar, Roxanne,, .Rhea
North Approach
Totals
2807
Suh-
totali
1476
•1331
724
763;
26?
299
Subtotaiii
Total
i45!
:220
2
2411
3563
1875
0
1032 iJ9
North
719
960
El Carttiiio Real
1688
— 208
532
lis
Total
Subtetais:
Sub-
, totals
858
409
La Costa Avenue
Totals
1267
E
a
s
t
A
P
P
r
South Approach
Note-; Jjetf-turn vqlimies inqliid,c
IJ-tums. U-turns in bold.,
30%E.TOR,re(iuction usie,tl, for STiKTs
El Cammo Real at La Costa Avenue
Laae Cojifigurai,|o» forlitrersectioii Capaeifjf Utlliiation Page 3 of3
Pic. Hr, Time Pefidd; South Appr (NB) North^ Appr (SB) West Appr (EB) East Appr (WB)
5:1.5 PM to
6:13 PM Left , Thru Right Left iTiiu Ripht Left Thru Right Left Thru Right
Lane Inside I 1 I 1 1
Contig. - (left) 2 1 1 I 1
urations 3 i ( I 1
4 i 1 1 1
5 I 1 I 1
6 1
Outside 7
Fre'e-flow
Lane, Settings 2 3-0 2 3 1 2 2 1 ;l 2 ;i
CaBaoity 3600 6000 0. 3600 6000 1800 35,0,0 4000 1800 1,800 40e!0 IOT
Are the Nofth/Seutb ph8ses;split.{^ u Are fhe£ast/Wesrphasgs,:split:(Yji<l5?' N
Efflciericy Lost Factor 0.10
Hourly •'Volunie 246 1092 €7 299 1270 9Q^8 836 .604 ',32:1 107 381 185
Adjusted ,HiEiurly Voiuitie 248 iis9 0 m :L270 616 836 :6.04 321 107 385 185
iJtiiization Factor &j07 o:i:9 .KOO :D.O8-OM 0,35 0.23 D.15 0-18 0.06 0.10 0:10
Criti:cai Factors 0.07 0.35 0.23 O.IO
IGLfRatio = 0:83' LOS - D
TumingMovements at Intersection of: EI Camino Real and La Costa Avenue
W
e
s
t
A
P
P
r
Time ::5:15 PM
to 6:15: PM
,13ale: os.'oyj]
,Day: Wednesday
Name : Oscar, Roxaniii:. Rhea
Totals
3294
Suti-
,:,tdtals,
1533
176]
S3fi
504,
321
.Subtotals.
Total „
North Approach
908
El Camiiio Real
*1
1700
4590
0
2477
1270 299
•IC
North
246 1092
2.
140:5
3105
South Approacii
i
f
67
185
381
107
total
Subtotals,
Subi
totals
673
970
La Costa Avenue
Totals
1643
E
a
s
t
A
P
P
r
Note ; Left-tiim vnlumes include
U-tunis. U-turns in bold.
30% RTOR, reduction used for SBRTs
Transpprlatipn Studies,, liip,
2640 Walnut Avenee.'SuiteH
Tustin, GA. 92780:
City: GARLSBAD
M-S Direcfion: SHOPPING CENTER DRIVEWAY
E-W Direction: LA COSTA AVENUE
FUeName ;hi208004
Site Code : 00000562
Start Date ; 8/1/2012
Page No :. 1
SHOPPING CENTER
DRIVEWAY
Southbound
LA COSTA AVENUE
Weatbound
SHOPPING CENTER
DRIVEWAY
Northbound
LA COSTA AVENUE
Eastbourid
•Start Time Riaht) Thru 1 Left Riaht 1 Thru i Left, Riaht 1 - Thrul Left Riaht 1 Thru! Left Int. Total 1
07;00AM
,07:15 AM
07:30 AM
07:45 AM
29 0 3
31 0 5
30 6 7
33 1 8
18 144 5
22 1 45 1
24 155 0
16 19l 6
4 0 ,3
0 0 2
1 1 1
2 , ,1, , 6^
8 47 5
5 46 3
8 44 , 5
7 76 13
266
260
277
•360
Total
:08;0G,AM
03:15:AM
D8:30AM
,6g:45AM
123 1 23
30 2 13
37 4 •io
27 1 16
30 3 6
80 ,636 12
18 161 8
17 202 10
20 175 5
27 181 5
7 2 12
4 2 e
3 1 8
2 i 8
1 0 0
28 213 26
14 42 7
24 79 11
12 ,79 13
20 90 8
1163
309
406
360
371
Totsil
"* BREAK***
O4:0&PM
04:15 PM
04:30 PM
04:4S RM
124 10 45
45 5 26
32 2 25
43 7 35
40 6 24
82 719 28
15 78 10
15 116 4
23 136 4
16 118 B
10 ,5 24
•3 6 11
10 3 20;
8 4 19
10 6 15'
70 290 39
27 169. 15
24 159 11
1:8 189 11:
19 . 200 18
1446
410
421
500
478
Total
05:00 PM
05:15 PM
05:30 PM
165 20 110
37 1 30
43 2 33
36 1 41
eg ,448 24
16 105 5
28 103 5
19 102- 3
31 19 65
13- 3 16
6 7 22
10 5 -18
66 717 55
20 196 17
25 186 13
17 206 15
1809
459
473
473
05:45 PM 41 7 38 25 109 6 " IT"" ~ ^74~ tff •462:""
Total
Grand Total
Apprch'%
Totar%
15? 11 142
569 42 320
61.1 A.5 34.4
91 ,0.7 5.1
88 419 19
319 2222 83
12:2 84.7 3,2
5:1 35.4 1.3
,51 18 64
,99 44 165
32.1 14.3 53.6
1.6 0.7 2.6
•75, 762 61
259 1982 181
10.7 81.8 7.5
4.1 31.6: 2.9
1867
6285
Transppriation Studiesi, Inc.
2640 Wakiit Avfsaue, Stiite H
Tustin, CA. 92786
City: CARLSBAD
N-S Direction: SHOPPING CENTER DRIVEWAY
E-W Direction; LA COSTA AV6MUE
File Name : h1208004
Site Code •00000562
Start Dale : 8/1/2012
Page No : 2
SHOPPING CENTER
DRIVEWAY
Southbound
i A AWCKMIC i SHOPPING CENTER
LA COSTA AVENUE DRIVEWAY
Westbound j Northbound
LA COSTA AVENUE
Eaistbound
Sfa'rlTimfi Riahti Thrul Left 1 App.,TOWI. RiQht 1 Thru 1 Left 1 ADB. Tbiai 1, Rioht I Thru 1 Left 1 ABP. toiai Riaht 1 TTituI Left 1 ADB. tiiai int. Total
Peak Hour Aj)a
Peak Hourfor E
bSiOQ AM
08:15 AM
08:30 AM
08:45 AM
yste.From 07lOG AM M q8;45 AM
ntire IntersecJbn Begin? at 08:00
30 2 13 45
37 4 10 51
,27 1 16 44
30 3 6 39
• Peak 1 ofl
AM
18 161 8 187
17 202 10 229
20 175 5 200
27 181 5 213
* 2 8 14
3 1 8 12
2 2 8 12
. „ 1 0 0 1
14 42 7 53
24 79 11 114
12 79 13 104
20 90 8 118
309
m
360
371
TotSi Volume
% ADD: tot^l
124 10 45 179
69.3 5.0 25.1
82 719 28 829
,9.9 86.7 3,4
10 S .24 39
25.6 12.8 61,5
70 290 39 399
17.5 72.7 9.8
1446
PHF 83S .825 .703 .577 .759 .390 ,700 .905 .625 ,625 .750 ,696 .729 -806 ,750, .845 .890,
SHOPPING CENTER DRiVEWAy
Out In ^ Total ^
jZm\ CWl
I 1241 TOI *S\
THRI Left U
.s>—1 Q; 4-
Peak Hour Data
t
North
Peak H6ilrBBgins.at:D8;gO Ad/
I Tiirnlnn fjIpv-irilBntB „
•^S
w D • w
^> o o
H C9
ca AV m
_^ _^ o fn
5!
r Leit Tfthi Riaht
I .24i'^,,5i .iei]
r~io8i Ml '1-471
Tolal Out, In .qMnpPINf^ RFNtFR nRIVFWikY
Transportstion Studies, Inc.
2640 Wklriiit Avenue, Suite H
Tustin, CA. 927S0
City: CARLSBAD
Direction: SHOPPING CENTER DRIVEWAY
E-W Direction: LA COSTA AVENUE
FiJaName : hi208004
Site Code •; 00000562
Start Date : 8/1/2012
Page No : 3
SHOPPINCS CENTER
DRIVEWAY
Southbound
LA COSTA AVENUE
Westbound
SHOPPING CENTER
DRIVEWAY
Northbound
LA COSTA AVENUE
Eastbound
Start Time Riaht 1 Thru 1 Left 1 Apo.Toiai Rfoht 1 Thru 1 LSft 1 Aoe. Tite! RiahtT Thru 1 Left 1 m. Toiai Wqhtl Thrul Left 1 AUB.Total inl Total
Pe,ak Hogr:Aria
Peak Hour'fer E
04:30 PM
04:45 PM
d5:do PM
, 05:15 PM
ysls Fro,m 04:130 P|W to 05,;4,5 PM,
nflre Intersecfca Begins at 04:30
48 7 35 90
40 6 24 70
37 1 30, 68
,4-3 2 33 78
•Peakl Dfl
PM'
23 1,36, 4
16 118 $ 140
15 105 5 126
28 103 5 1 35
8 4 19 31
10 6 15 .31
13 3 16 32
6 7 22 35
16 189 11 216
19 200 18 '237
20 193 17 233
25 1 86 13 224
500
478
459
473
TotalVolums
% ADD, Total
168 16 1,22 306,
64.9 , 5.2 39.9 ,
83 46,2 20 565
14.7 81.8 3.6
37 20 72 129
, 28,7 15,5 55.8
80 771 69 910
8.8 84.7 6.&
1910
,PHF ..875' ,571 .871 ,850 .741 .849 :833 .667 .712 .714 .818 .921 .mo .954 .819 .960 .955
til v-a' l—l 2 UJ
,coj ^. -.
Peak Hour Data
r North
;Pe9,K Ho"r?^iris ai 04:30 Ph
TMcnipci Movem&nts
o o
r—i z -|C o m
Thru . :Right
f' 721 m. -m
Left
•IIBl
out in , ,'„ Total
pii:OPpiNf^ r.FMTPR nRiVFWAV,
TranspottaliciH Studies, las.
2640 Walnut, Aveniie, Suite: H
Tusfin, CA. 92780
City: CARLSBAD
N-S Direction; EL GAMIMO REAL
E-W Direction: LA COSTA TOWNE CENTER
File Name : hi208005
Site Code :0OQ00559
Start Date ; 8(1/2012
Page No ,: 1
Grouiis Printed- Turttin.o Movements
EL CAMINO REAL LA COSiTA TOWNE EL CAMJNO REAL DEAD END
iSouthbouncl LicN 1 cK
Westbound
Northbound iastbound
Start Time Riaht 1 Thrul Left Riaht Thrul Left Riflht1 Thm! L6f( Riaht 1 Thrul Lfeft Int. Total
07:00 AM 0 145 0 0 0 3 1 125 0 0 0 0 274
07:15 AM 0 227 0 0 0 1 0 1,46 0 0 0 0 374
07:30 AM 0 295 0 0 0 2 0 206 0 0 0 d 503
0f:4SfiM 6 335 i 0 6 0 3 203 0 6 0 d 542
total 0 1QD2 1 0 0 6 4 680 0 0 0 0 1693
08:00 AM 0 374 0 1 0 7 4, 1,95 d 0 .0 d 581
08:15 AM d 330 0 a 0 5 8 215 0; 0 6. d 558
08:30 AM (5 3S4 2, 6 6 4 254 0 0 0 0 621
08:45 AM 0 351 1 h 0 2 ,i. 246 0 0. Q 0 601
Tofel 9 1409 3 2 0 20 17 ,910 0 0 0 d 2361
BFiiEAk'***-
04:00 PM 0 314 2 i 0 9 5 3,S5 0 0 d, 0 686
04:16 PM 0 311 1 1 0 4 6 35i 0 d d d 674
04:30 PM 0. 315 2:: 2 b 10 6 379 0 d 0 0 714
04:45 PM a 331 2 ,d d 10 3 ,395 0 0 0 0 741
Tots! 0 1271 7 4 0 33 20 1480 0 0 0 0 2815
05:00 PM 0 326 0 2 0 10 5 359 0 0, 0 ti 702
Q5:15P'M d 388 3 •i d 11 7 403 0 0 0 0 813
05:30PM 0 345 ,5'^ 1 d 6 9 •315 0 D 0 0 680
05:45 PM '0 3'35~~ -1 ""•o~ 5 325" "0 - •'xr 662-
Total 0 1389 g 4 0 31 22 1402 0 0 0 0 2857
:Grand total 0 5071 20 10 .0 90 63 4472 0 0 0 0 9726
Apprch % 0 S9.6 0.4, lo 0 90 1,4 ^8.6 0 0 0 0
Total % 0 52.1 0.2, 0.1 0 0.9 0,6 46 0 0 0 0
"TiBnsportatioii Studies, Inc.
2640 Walnut Avenue, Suite H
Tustin, CA, 92780
City; CARLSBAD
N-S Direction: EL CAMINO REAL
E-W Direction: LA COSTA TOWNE CENTER
FUeName : h1208005
Site Code : 00000559
Start Date : 8/1/2012
Page No : 2
EL CAMINO REAL LA COSTA TOWNE CENTER EL CAMINO REAL DEAD END
Southbound Westbound Northbound Eastbound
Start Time Riaht 1 Thai! LeftI App, Total Right 1 Thrul Left Aw.Tolel Rlqht Thru 1 Left 1 Anp. Total Riqht 1 Thru 1 Left App. Total Int. Total
Psak Hour Analysis From 07:00 AW to 03:45 AM • Peak 1 of 1
Peak Hour for Entire Intersecition Begins at 08:00 AM
08:00 AM 0 374 0 374 1 0 7 8 4 19S 0 199 0 0 0 0 581
08:15 AW 0 330 0 330 0 0 5 5 8 215 0 223 0 0 0 0 558
08:30 AW 0 354 2 356 1 0 6 7 4 254 0 253 0 0 0 0 621
08:45 AM 0 351 1 352 0 0 2 2 1 246 0 247 0 0 0 0 601
Total Voiurne 0 1409 3 1412 z 0 20 22 17 910 0 927 0 0 0 0 2361
% ADP, Tota! 0 99.8 0,2 9.1 0 90.9 1.8 98,2 0 0 0 0
PHF .000 .942 .375 .944 .£00 .000 .714 .688 .631 .896 ,000 .898 .000 .000 .000 ,000 .950
ELCAMINOREAL
Qui , In . , Total
912] 1 14121 I 23241
I O! 14091^1
Right Thru Laft
ea—I _l
.S>—1
a 4-
Peak Hour Data
t
North
Poalc How Begins at DS-.OO AN
Turra'no Movemenis
n f ?8
o
'1
Lett
t
Thru Rlnht
T
9101" T
Jim I B27i Cagg
Out In Total
PI TAMIMnRFAl
Traiispdrtatlein Stiidies, Inc.
2640 Walnut Aveniie, Suite H
Tusdn, CK. 92780
City: GARLSBAD
N-S Directiori: EL CAMINO REAL
&W Directiori: LA COSTA TOWN E CENTER
File Name : h1208005
Site Code : 00000559
Start Date : 8/1/2012
Page No : 3
EL G;^MINP REAL LA COSTA TOWNE CENTER EL CAMINO REAL DEAD END
Aouthbound Westbound Northbound Eastbound
Start Time Ridht 1 Thru 1 Left 1 App.Total Rioht 1 Thrul Left, Aiip: Total Riaht! Thrul Left 1 Aopitoisi .....Ri9ht 1 Thru 1 Left App: Total Inl Total
Peak Hour Analysis, From O4:O0 PM to 05:4 5 PM-• Peak 1 Of 1
PB,ak Hour for Entire Intersection; Begins M 04:30 PM
04:30 PM 0 '315 2 317 2 0 10 12 6 379 0 385 Q 0 0 0 714
04:45 PM 0 331 2 333 0 0 10 10 3, 395 0 398 0 0 0 0 741
05:00 PM 0 323 d 326 2 0 10 12 5 35,9 0' 364 0 0 0 0 702
05:15 PM 0 388 3 391 1 0 11 12 7 4153 0 410 d 0 0 0 813
Tot# VplUfTie 0 1360 7 1367 5 0 41 46 21 1536 0 1557 0 0 0 Q 2970
% ADD.'Tbtal 0 99.6 0.5 10:9 0 89.1 1,3 98=7 0 .0 0 0
PHF .000 , ;876 .583 .874 .625 ,000 .932 ,958 :750 ;953 .000 ,949 .000 .000 .000 .000 .913
Q Z OI'E
EU CAMWO REiiL
0(it tn tofal
Ri^ht;
, ol„ i'i^SL
Thfj Left
L'j»
-Peak-H©t!f-Dat-a-
Noith
Peak Hour Begins at 04:30 P;«
Turnino Movements I
oo
£,0
z m n o
HOl -I ro
Left Thru ^ Right
__BI 15361 -M]
^i4oi|- I ,13571, LzassI
OiJt Iri Total
Fl OAMiKipRFAl
RICK ENGINEERING TURNING MOVEMENT ANALYSIS
City: Carljlitd
Intecsactioft of: N/S Street; El Camino Rjsal
EAVStrest: Lovanto Street
File; 10nM#l»
Data CoUeoted by: Angel, Suitor
Page 1 of3
Count Vito:
-08/03/11
Day: Wednesday
Weatiier: • Sunny
Traffic Control: Signalized
Soutii ApproachrNBI riottlt Approieh (SB) WestADDfDacli lEB) Eittt Appro nehfWB) 15 min Total
End of 13
mill, pti. Left U-Tm Tlii-u Peds Left U-Tm Tlira Rii!ht Peds Left U-Tjn Thm Peds Left U-Tm Thra Rililit Peds Vehicles Peds
6:15 AM 2 1 42 0 0 3 0 41 4 0 0 0 0 0 0 7 0 0 S 0 112 0
6:30 AM 0 0 56 5 1 3 I 68 5 0 1 0 0 0 0 10 0 1 10 0 ISO 1
<:45AM 2 1 71 3 0 2 0 106 6 0 0 D 0 0 0 24 0 1 13 0 229 0
7:00 AM 2 0 84 6 3 12 1 136 9 0 0 D 1 1 0 18 0 0 18 0 288 3
7:15A.M 2 0 IOS 6 0 S 0 142 9 0 4 0 0 2 0 24 0 0 IS 0 323 0
7:30 AAI 0 0 139 3 0 3 0 174 8 0 1 0 0 1 0 23 0 1 23 0 381 0
7:45 A.M 8 1 182 10 2 11 2 224 23 0 4 0 0 1 0 23 0 2 31 0 527 2
8:00 AM 4 0 205 11 1 11 2 310 16 0 2 0 0 2 0 37 0 2 31 0 634 1
8;15AM * . .4.-0 9- 5 0 -33fh" —9 —0— —2— 0 —6— -—1 —0— —30— —0— J —S2 —0— —634— —-5—
S:30.AM • 3 0 204 8 1 14 0 341 10 0 4 0 0 2 0 37 0 1 36 0 660 1
8:45 AM • 2 0 219 7 0 IS 0 346 7 0 3 0 1 2 0 40 0 1 30 0 676 0
9:00 AM • 5 0 260 3 2 10 1 313 8 0 9 0 1 0 0 33 0 0 28 0 671 2
Max. 15 mill. 8 1 260 11 5 18 2 346 23 0 9 0 1 2 0 40 0 2 36 0 676 5
Pk. Hr, Vol, 14 0 880 27 8 51 1 1330 34 0 18 0 2 5 0 140 0 3 126 0 2631 8
8:00 AM Peak Interseaioa Traffic in Pit Hr. 2631 Peak Hr. Factor 0.97
9:00 AM Hour Intersection Pdstms in Pk, Hr. 8
3:45 PM 8 0 355 26 0 15 0 269 13 0 13 0 1 2 0 20 0 1 25 0 748 0
4:00 PM 7 0 305 28 0 24 0 269 15 0 2 0 1 5 0 IS 0 2 15 0 S91 0
4:1 SPM 13 0 377 38 0 IS 2 29S 9 0 15 0 2 2 0 25 0 0 21 ! 840 1
4:30 PM 10 0 310 22 0 34 0 332 13 0 7 0 0 3 0 21 0 0 19 0 771 0
4:45 PM 2 0 366 24 0 23 0 296 8 0 2) 0 Q 4 0 21 0 0 24 1 739 1
5:00 PM * 10 0 360 35 2 35 0 351 8 0 6 0 I 3 0 23 0 0 17 0 859 2
5:15 PM * 5 0 368 39 0 38 0 343 12 0 ri 0 0 1 0 17 0 0 24 0 858 0
5:30 PM ' 3 0 356 37 1 41 0 457 3 0 8 2 2 2 0 25 0 0 16 1 952 2
5:45 PM > 2 0 335 36 I 43 0 381 7 0 4 0 1 1 1 22 0 0 28 c 860 2
6:00 P.M 3 1 314 24 2 32 1 337 5 0 3 0 ] 3 0 17 0 0 33 0 774 2
6:15 PM 4 0 309 32 ) 25 0 303 7 1 5 0 1 2 1 22 0 0 22 0 734 3
6:30 PM 1 0 315 24 0 39 0 321 5 1 4 0 0 4 0 21 0 0 25 1 759 2
MftX, 15 mill. 13 1 377 39 2 43 2 457 15 I 2) 2 2 S 1 25 0 2 33 1 952 3
Pk. Hr. Vol, 20 0 1419 147 4 157 0 1532 30 0 29 2 4 7 : 87 0 0 95 1 3529 6
4:45 PM Pcuk Ifltersection Tra'ffic in Pk, tir. 3529 Peak Hr. Factor 0.93
5:4S PM .Hour Intersecti-sii Pdstms in Pk. Hr. = 6
EI Camino Real at Levante Street
Lane Configuration for rntersectlen Gspacity Utilization
?k. Hr. Tirne Period;
8:00 AM to
9:00 AM
South Apiif (NB)
Lane^
Config -
uratldtts
Inside
(left)
Outside
Free-iflow
Left thru Riaht
1
1
North Appr (SB)
Lett Thi-u Right
West Appr (EB)
Left Thm Right
Page 2OfS
East Appr(TO)
Left Thru Right
1,
I..ani5 Settings 1 3
Capacity 1800 6000.
Are thei<lorth/South phases split (Y/N)?
Are the Easb*West phases spljt„(Y/lvI)?
Eftrciency Lost Factor 0.10
Hourly Volume
Adjusted Hourly Volume
Utilization Factor
Critical Jactors
0
0
1 3
1800 6000
t 1
1800 2000
1 1 1
1800 2000 1800
14 8,80 27 52-, •1330 34 18 2 5 140 3 126
14 f07 0 52: 13.64 0 18 7 0 140 3 126
0.01 0;15 0:00 0,03 0:2a 0.00 0.01 0,00 Q.OO 0-08 0.00 0.07
0.01 0.23 0,00 O.OS
ICU Ratio •= 0.42 LOS= A
Turning Movenaents at Intersection of ; EI Camlno Real and Levante Sf refet
W
e
s
t
A
P.
P
r
Time: 8:00AM
to 9:00 AiVl
Date: 08/03/11
Day: Wednesday
Name; Ang,eL SwitpS
Totals.
76
Sub-
totals
25
Subtotals
Total
;NDti:h Approach El CaMno Real
1
1475
1416
2441
1
34 1330. 52
llorth
14
0
2396
1
880 57
$21
1025
126
3,
140
Total
Subtotals
Sub-
totals,
26S
;80
Levante Street
Totals
349
E
a
,S;
I
A
P
P
r
South Approach Note; Leit-ti:m vpJunies include
U-turns. U-turns in bold.
El Camino Real at Levante Street
Lane Configuration for Intersection Capacity Utili3:atioa
Pk. Hr. time Peiiod:
4:45 PM to
5:45 PW
South Appr ft^B)
Left Thru Right
Lane
Config-
urations
Inside
(lefl):
Outside
Free-iflow
1
2
3
4
5
6
1
North Appr (SB)
Left ThiTi Right
West Appr (EB)
Left Thru Right
Page3of3
East Appr (WB)
Left Thm, RiRht
Lane Settings 1 3; 0
Capacity I'SOO 6000 0
Are thel^fbrth/Southphases split;(Y/N)?: N
Are the East/West phases split ('Y/Kl)? N
.feffiGiency Lost; factor 0.10
Hourly Voluine 20 1419 147
Adjustetj Hourly Vohinje 20 155'6 Q
Utilization Factor Q.01 :P6 0.00
Critical Factors 0.26
I
18QQ:
157
157
0.09
0,09
3
6000
1532
1562
0.26
0
0
30
0
0.0(J
1 1
1800 1000
31
31
0.02
0.02
4
11
0,01
7
0
O.OO
1 1
1800 2000
87
87
6-05
0
0
0.00
1
ISOO
95
95
0.05
0,05
ICURatio = 0.52 L(3S>
Turning tvlovements at Intei'seCiioh ol': El Camino Real snd Levante Street
W
e
•S
f
A
,P
,P
r
Time ::4:4S PM,
to ?:45 Piyt
,Date;; 08/03/U
Pay: Wednesday
Naine ; Angel. S anlos
Totals
94
Sub-,
totals
52
42
Subtotals
Total
North,ApproaGh
1625
1719
1532
El Camino Real
3262
6
157 30- 1532 157
North
20
0
3212
1419
1586
1
147
1543
95
0
87
Total
Subtotals,
Sub-
totals
182
308
Ley ante Street
Totals,
490
a
s
t
A
P
P
r
South -Approatih Note: Left-turn voUttties ihciude
U-turns. U-tiims ih bold.
Transportation Studies, Inc.
2640,Walnut, Avenue, Ste H
Tiietin,CA.,92780
Location: : LA COSTA AVENIIE
SfiKinent: : SAXONY RQAD TO EL CAMINO REAL
Clieni; : URBAN SYSTEMS
Site:
Date:
GARLSBAD
08/01/12
Eferva • EB •^ WB " CombinEd Day: Wednesduy
Begin AM PM AM PM AM PM
12:00 55; 1,51 242 1,099 24 73 280 1.178 79 234 522 2,277
12:15 48: %i 24 290 72 558
12:30 28 290 13 314 40 604
12.:45 30 299 13 294 43 593
ot-oci 20: 7.6 m 1,206: 6 27 232 1.013 26 103 537 2,219
01;;i5 22 277 7 255 29 532
01:30 16 306 9 254 25 5,60
0i:4S 18 318 •5, 27i 23 590
2.3,22 02:00 14 48 309 1,283 i. 29 244 1,039 22 77 553 2.3,22
02:15 1,2 340 8 248 20 M 02:30 7 312 5 272 12 584
02:45 1,3 322 i 275 S3 597
Q3;0Q '8; 3,0 2as, i;335 9 37 260 1.128 17 ,67 546, 2,463
03:15 i44 ;8 290 17 634
03130 .6 ,354 IQ 292 16 646
03:45 7-•351 •10 286 17 637
04;0ii 50 390 1,524 14 101 296 1,279 23 161 686 2,903
04:15 .i 394 29 332 .37 i&\
04:30 1,5 396 20 332 ,35 728
04:45 •ai 444 38 319 6$ 763
05:00 18 215 393 1<S97 64 378 322 1.3'60 82 393 71,5
05;i5 42. 420 80 372 122 792
05-,30 ,5,€ •§74 no 320 ,166 694,
05:45 99 410. 124 3*5 2i23 756,
06:00 80 356 1.419 163 915 296 1,002 243 1,381 652 2421
66;15 IOO 34^, 20.2 256 302 604
06:30 118: 369 248 234 3166 ,£03
-™.-fi(SWi.-06145 ID'S •346~ 302
07:00 195 991 28S 1,045 323 1.361 200 092 518 2,352 488 1,737
07:15 20,6 273 318 208 52:4 481
07:30 242: 226 362 152 604 3,78
07;4i5 34f 258 358 132 706 390
08:00 274 1,2S8 263 941 339 1,459 136 464 613, 2,747 •399 1.4p5
08:15 31,9 250 37B 122 697 372
b8:30 ,336: 228 366 ,112 702 '340,
08:45 35^ 200 376 94 735
2.283
294
09:00 310 1,106 216 627 294 1,177 118 '359 604 2.283 334 ,986
09,;15 294 i?3. 280 97 574 280
09:30 'i41 TIS 3:Q2 73, •,544 191
09;45 '260 JIO 301 71 561 ISl
lt):d0 24i5 1,05$ ni 474 294 1,104 98 .251 539 2,169 '223 725
10:15 274 137 295 58 570 195
1,0:30 •286 120 259 37 545 157
l'0;'fe 26D '92 255 58 '515 150
11:00 356 1,Q2S 101 285 2615 1,072 45 154 522 2,100 147 439
ihis 234 58 2S4 34 48S 92
11:30 i6l 62 286 42 •547 104
11:45 •111. 64 :26S ,32: 543 96
Totiils 6,534 12,935 •7,733 9,919 14,267 22,8.54
St5lif% 45.8 ,56,6 54.2 43,4
Dav-Totiils 1?,4'69 17(652 37,121
Day,5pliis 52,4 •47.6
Pe£ik,'Hour 0S:,i5 04:30 08:00 05100 08:00 0430
yO'luiite L324 1,653 1,459 1,360 2,747 2,998
Fixettir 0.92 0;93 0.96 0.91 0,93 0.95
13120800!
Locadoa
Segment
Client
Transportation Studies, Inc.
2640'Walnut Avenue, SteH
TustUi, CA, 92780
LA COSTA AVENUE
EL CAMINO REAL TO DRIVEWAY
URBAN SYSTEMS
Site:
Date:
CARLSBAD
08/01/12
fcterval •EB • WB • Canbineil DiQf; Wednesday
Begin AM PM AM PM AM PM
12:00 20 66 132 367 14 36 171 726 34 102 303 1,293
12:15 21 128 12 168 33 296
12:30 18 ISO 5 199 23 359
12:45 7 147 5 188 12 335
01:00 10 33 140 550 4 11 154 637 14 44 294 1.207
01:15 8 114 1 166 9 280
01:30 5 ISO 3 179 8 329
01:45 10 146 3 158 13 304
02:00 4 14 152 619 5 10 154 647 9 24 306 1,266
02:15 4 151 3 156 7 307
02:30 3 171 0 161 3 332
02:45 3 145 2 176 3 321
03:00 4 11 144 688 4 13 168 647 8 26 312 1,335
03:15 2 182 2 ISO 4 332
03:30 2 180 4 170 6 350
03:45, . 3 .W. 5 159 8 341
04:00 3 12 197 836 8 SO 134 671 11 61 33l" 1,507 •
04:15 4 194 10 161 14 335
04:30 1 204 14 208 15 412
04:45 4 241 18 168 22 409
05:00 5 62 214 864 29 199 158 647 34 261 372 1,S!1
05:15 7 228 46 160 53 383
05:30 20 226 52 158 72 384
05:45 30 196 72 171 102 367
06:00 24 131 214 742 74 438 148 542 98 569 362 1,284
06:15 36 188 96 147 132 335
06:30 26 174 137 126 lfi3 300
— '—*4-'3— (l-jf-C -UlJ 1-^1
07:00 49 230
lUU
169 577 160 760 rtrl
106 413
VTS—
209 1,010
"—iQ-i~—
275 990
07:15 61 144 188 109 249 253
07:30 55 120 193 96 248 216
07:45 85 144 219 102 304 246
08:00 67 380 139 481 192 858 82 269 239 1,238 221 750
08:15 101 140 236 65 337 205
08:30 108 106 207 68 315 174
08:45 104 96 223 34 327 150
09:00 119 4nl 108 324 181 718 67 200 300 1,179 173 524
09:15 116 92 158 53 274 145
09:30 130 72 190 42 320 114
09:45 96 52 189 38 285 90
10:00 99 488 62 226 162 669 37 101 261 1,157 99 327
10;15 106 56 172 24 278 80
10:30 155 62 182 14 337 76
10:45 128 46 153 26 281 72
11:00 117 508 34 108 174 677 17 74 291 1,185 51 182
11:15 120 32 154 16 274 48
11:30 141 16 170 24 311 40
11:45 130 26 179 17 309 43
Totals 2,416 6,582 4,441 5,594 6,857 12.176
Split% 35.2 54.1 64.8 45.9
Pay Totals 8,S98 10,035 19,033
Day Splits 47.3 52.7
Peak Hour 10:30 04:45 08:00 12:00 08:15 04:30
VoLime 520 909 858 726 1,279 1,581
pactor 0.84 0.94 0.91 0,9) 0,95 0.96
* Data File: D12O80Q2
Transportation Studies, Inc.
2640 Walnut Avenue, Ste H
Tustin, CA. 92780
Localion : LA COSTA AVENUE
Seoment : DRIVEWAY TO VIEJO CASTILLA WAY
Client : URBAN SYSTEMS
Site:
Date:
CARLSBAD
08/01/12
Interval •EB -WB Combined Day: Wednesday
AM PM AM PM AM PM
12:00 22 69 106 556 8 34 187 722 30 103 293 1.278
12:15 20 146 14 185 34 331
12:30 18 156 10 211 28 367
12:45 9 148 2 139 11 287
01:00 10 28 133 540 8 8 137 343 18 36 270 1,083
01:15 9 129 0 IIS 9 247
01:30 3 130 0 148 3 278
01:45 6 148 D 140 6 288
02:00 8 17 133 598 2 10 131 525 10 27 264 1,123
02:15 3 151 4 111 7 262
02:30 3 172 0 145 3 317
02:45 3 142 4 138 7 280
03:00 4 12 142 684 4 20 182 594 8 32 324 1,278
03:15 3 174 2 136 S 290
03:30 3 176 4 170 7 346
03:45 2.. 192 , , 10 m ; n 318
04:00 S 14 199 S56 5 47 117 500 10 61 316 1,356
04:15 3 200 10 101 13 301
04:30 1 215 8 133 9 370
04:45 5 242 24 127 29 369
05:00 1 32 224 935 22 218 105 523 23 250 329 1,458
05:15 5 240 52 156 37 396
05:30 8 233 66 125 74 360
05:43 18 236 78 137 96 373
06:00 19 120 230 774 36 363 112 473 75 483 342 1,247
06:15 26 184 104 122 130 306
06:30 33 182 102 122 135 304
ut):43 42 ns 101 ••••I'17 M9— 295— — 07:00 51 232 182 636 123 726 127 476 174 958 309 1,112
07:15 47 150 155 125 202 275
07:30 52 138 217 117 269 255
07:45 82 166 231 107 313 273
08:00 62 336 158 526 192 804 95 343 254 1,140 253 869
08:15 87 138 204 129 291 267
08:30 94 lis 181 38 275 176
08:45 93 112 227 6J 320 173
09:00 84 386 122 363 181 688 75 264 265 1,074 197 627
09:15 113 96 172 55 285 151
09:30 99 75 167 66 256 141
09:45 90 70 168 68 258 138
10:00 82 430 59 234 127 609 34 123 209 1,039 93 357
10:15 106 71 165 28 271 99
10:30 144 60 166 26 310 86
10:45 98 44 151 35 249 79
11:00 98 500 4-1 120 141 632 25 87 239 1,132 66 207
11:15 126 25 150 20 276 45
11:30 126 25 ' 160 34 286 59
11:45 150 29 181 8 331 37
Totals 2,175 6,822 4,139 5,173 6.335 11,995
Split% 34.3 56.9 65.7 43.1
Day Totals 8,998 9,332 18,330
Day SpIiB 49.1 50.9
Peak Hour 11:00 04:45 07:30 12:00 08:15 05:15
Volume 500 941 844 722 1,151 1,471
Factor 0.83 0.97 0.91 0.86 0,90 0.93
* Dntal-ile: Dl208003
TranSpof tation Studies, Inc.
2640 Walnut Avenue, Ste H
TiSstin,GA. 9,2780
Location; : ELCAMINOREAL
Sefi^uenl: : COSTA DEL MAR TO LA CDSTA
Client: : URBAK SYSTEMS
.Site:
Date:
CARLSBAD
0,,$/0l/12
Inten'al •NB SB Cprabined
Begin AM PM AM PM AM PM
12:00 43 136 369 1,582 25 86 451 1,689 59 222 820 3j271
12:13 40 386 23 442 53 328
12:30 26 395 21 408 47 803
12:45 27 432 16 388 43 820
01:00 18 52 461 1.795 8: 29, :3Sl2 1.522 26 81 853 3,317
01:15 11 408 s. 360 19 '768
01:30 14 495 9 380; 23 876
0I;45 9 430 4 ,390 13 S'20
,3;,29p MM 10 41 438 1,747 6' 40 •357 1,543 16 81 793 ,3;,29p
02:15 10 4l3 7 375 17 789
02:30 3 470 16 38? 15 8S2
02:45 15 ,425 17 428 33 854
03:00 ,12, 3,5 439 1.911 il 44 400 1,765 23 80 85.9 3,676
03:13 10
3,5
464 :3: 4# 13 904
6,§:30 4 500 10 458, 14 m 03:45 ,16 4S5 20: 467 •30 95.1
04:00 11 82 522 2,178 16 112 '458; 1,932 .27 194 930 4,110
;04:15 6 518 18 486 24 1,004
^04:30 16 554 34 •45?: 50 1,032
04:45 49 574 44 5W 93 1.094
:OS;oe 28; 22? 5,04 ?.,092 55 348 514 2,152 83 577 1,018; 4,244
05:15 •48
22?
•51S-Id: 5M, 118 1,228
05:30 70 462 m 558 171 .1,020
05:45 S3 m. 122 470 205 978
,,Q6.:00 102; 5:85 489 i,tl2 163 969 470 1,610 267 1,554 959 3,422
05:15 119 435 206 3,63 325 804
05:30 164 437 285 395 45b 833
"~D6>4r' ~ •" '700"' ?SCr~ •• •- 3i'2r-STo" 512 OLU
07:00 251 1,385 425 1,475 295 1,599 278 976 547 2,984 704 2,45!
0745 286 356' 367 277 553 533
;67:30 372, 35b 45,0, 220 822 580
07:45 476 ,333 .m ibl 962 534
08:00 398 1.882 343 1.142 504 1,972 206 719 3,854 551 1,S61
bi;:15 494 292 488 179 982 ,471
08:30 492, 290 472 170 964 460
08:45 49,8 '215, 308 154 i,bos 379
09:06 47(5 1,76,8 252 804 420 1.6,2§ 139 441 895 3,396 391 1..245
0,9:1,5 43,5 214
804
42? 104 855 318
09:30 •43 5 • 165 39-7 9b 832 255
09:45 421 173 3?2 108 803 281
10:00 ::394; 1,564 184 ,,••537 338 1,4'64 lia 338 752 3,028 305 '875
,10:13 394: 134 372 ;8o 755 214
Vb:3o 422 122 368 64 790 186
10:45 354 97 355 72 720 169
11:0'0 384 1-465 :94 263 3SG 1.606 54 171 770 3',D7l 148 434
11:15 365 55 40,6 43 712 98
11!30 377-66 448 40 ?'17 105
11:45 398: 48 374 ,'34 7>2 82
Totiils 9.225 17,33'8 9,897 14.858 19,122 3,3,196:
Splil9!! 4S,.2 ,33.9 51,8 46:1
DSy Tat'ils 26,,.553 24,755 51.318:
Day S.ptit.'i, Sl.S 48,2
PealcHdUr 08:15 04:30 ,0§:00 04:45 08:00 ,04:30
•Voiunic 1.9,60 2,250 1^*72 2,202 '3,854-4,372
Factor (),9.8 0;9i 0,97 0.90 0.96 0.S9
Day; Wednesday
Diitss Fii; DI20,S004
Transportation Studies, Inc.
2540 'W.alnut Avenue, Ste H
TusUn,CA:927S0
Location: : ELCAMINQREAL
Sejement : LA GGSTA TO TOWNE CENTER
aient: : URBAH :SYSTEMS
Site;
Date;
CARLSBAD
OS/Ol/12
Interval • SB • Ccmbined Day: Wednesday
AM PM AM PM AM PM
12:00 16, 56 ill 1,220: 22 59 288 1,167 38 115 599 2387
12:15 17 •277 16, 31,5: 33 592
12:30 10 :312 .11 253, 22 .567
12;4'5 l3 3,20 9 309 •22 629
01:00 8 24 •290 1,234 ll 2S 532 1,179 19 52 572 2,413
bl;15 4 330 7 283 11 613
01:30 6 M 6 318 12 638
01:45 6 394 4 296 lb 390
o^po 6 16 304 1,21b 6 28 252 1,173 12 44 S66 .2,383
b2!l5 3, ;i96 4 297 •7 593
02:30 2 314 5 270 8 584
02:45 ^ 296 12 344 17 640
D3:t)0 '5 23 333 1,3:31 7 28 262 1,189 12 51 595, 2,520
03:IS 6 •318 •,2 317 8 635
03:30 8. 320 7 317 15 ^7
OMS 4 12 2'93 16 653
04:00 5 46: 332 1.476 3 46 278 1.272 8 92 630 2,748
oms 6 379 5 3,42 12 721
04:30 IS 368-16 306 31 674
04:43 20 397 21 .345 41 743
OftOQ 19: 110 370 ^402 14 145 312 1,386 33 235 6,82 !2i7S5
05:13 18 402: 22 402 40 804.
05:30 3:3 324; •33 338 65 662
Q3;4"5 40 306 76 334 ,116 640
05:06 56 '3b2' M 1.062 Ss 446 296 1,058 114 748 503. 2;120
06;i5 57 236 ,86 23s 143 494
06:30 95 244 •126 256 221 500
06:45 94 235, 176 26S~ -?'70~ 523—
07:00 124 689 248 885 150 1,004 198 697 274 L693 446 1.582
07:15 150 210 227 181 377 391
07:30 212, 212 287 170 499 382
07:45;, 203 215 34b 14S 543 363
0.8:00 201 911 206 586 370 1,393 156 364 .571 ,2304 362 1,250
08:15 ,2,12 172 314 148 526 32b
08:30 242 i,6Q 336 J2:i 578 2S1
08:45 256 148 373 13,9 :629 237
O9.;0Q 232 927 131, 477 299 1,14? 95 :298 331 2,076 245 775:.
09:15 210 134 310 72 .52(3 206;
:0,'9':313 ,238 72 268 5-4 504 125'
6'9;,45 ?49 120 272 77 521 197
10:00 209 955 lib 254 353 1,058 60 ISQ; 462 Z,QI3 170 444
10: IS-248 68 276 42, ;524 no il 0:|O 256 47 24,1 36 304 83
10:45 242 39 281 43 523 Sl
11:00 251 1,051 47 118 298 1,187 34 116 5^9. 2,238 81 ,234
11:15 25S 26 ,274 20 532 46
11:30 274 28 29b 4.0 554 58
li:45 268 17 325 22 ,593 39
Totals 5,110 11,365 6,571 10,279 11,681 21,644
Sptitf 43.7 5;2,5 56.3 47.5
Djiv Totals;
Bay SRj,i,t5
i6,47S
49.4
15,850
50:6
33,,,325
Peak Haur
Voiume
Factor
1,1:00
1,031
:0:96
04:30
1,537
0.96
O8;0fi
1,393
0.93
04:43
1,398
0:87
DB:O0
2,304
0:93
04:30
2,903
0.90
Data File : Dt20800.'i
Transportation Studies, Inc.
2640 W,4lnut Avenue, Ste H
Tustin, GA, .92780
Lopatitm; : ELCAMINOREAL
Segment: : LA C6STA TOWNE GNTR TO LEVANTE
Client: : CMBAN SYSTEMS
Site;
Dale:
CARLSgAD
08/Oi/l?
Interv,t|l •NB SB • Combinea Day: Wednesik-y
Beftln AM PM m PM AM P{4
12:00 17 58 '288 1,189 20 37 305 1,211 37 115 593 2,400
12:15 14 :296 13 342 27 638
I2;30 >? 307 15 264 29 571
12:45 14, ,.2?"S 8 3,00 22 598
OUOO 8 27 in 1,240 12 34 298 1,220 20, 61 570 2,460
01:15 7 335 10 296 17 631
01:30 4 •335 4 3'2b 8 555
01:45 8 .298 8 306 15 604
02:00 6 15 28:6 1,224 1 25 264 1-,I77 7 40 550 2,461
02;1S 4 3'06 6 3O4 10 610
02:30 328 8 266 1,0 59,4
Q2:4S i 3,04 10 343 13 647
b3:0O s 23: ',3lT 1,320 5 25 260 14 48 577 2,503
03rl5 5 334 S 334 10 668
{i3;3b 4 297 5 314 9 611
03ii^ 6-372 9 273 ,15 647
04:00 5 43 .328 1.456 5 47 317 1,291 11 90 64,5 2,747
Wi 5, '350 5 312 11 662
04:30 li. :3§6, 15 336 28 722
04:45 20 392 20 325 4b 718
6?:,0Q !9 ,107 354 1,421 12 150 323 1,419 31 237 677 2,840
05:15 IT 4i7 24 395 41 813
03:30 32 •297 •25 330 33 627
05:45 '39 3:53 68 370 107 723
b5:'£K3 ii ;i92 ;27i LP65 32 402 292 1,091 104 694 364 2,159
06:15 54 •292 78 268
1,091
i3: 56 b
p,S,:30 75 252 122 247 198 499
06:45 rnr " :252 150" 284-~ 260'
07:00 122 674 260 898 168 993 226 747 290 1,667 ,486 1,645
07:15 142 222, 212 202 354 424
07:30 i9i 202 252 l5l 444 353
07:45 218 214 361 168 579 382
osioo 194 914 207 595 302 1,568 147 562 496 2.282 354 L257
b&is sii 180 363 155 597 336
08:30 237 172 317 127 554 i99
0^45 251 1.36 3S4 132 635 m 09:00 ili 926 142 1,398 105 305 567 2,124, 247 •795
09:15 232 133 291) •77 522 4lO
09;?0 226' 101 289 58 515 159
09:45 ,23,6 114 2,84 65 520 179
10:00 215 966 IOS 277 244 1,060 •68 195 460 2.026 176 473
10:15 245 72 281 52 ,527 1,24'
,10:30 :26b 58 257 41 517' 99
10:45 244-39 273 •35: 322 74
1,1:00 234 1,03^ 45 120 285 1:175 42 125 •519 4,213 as-243
il;i5 235 21" 2'94 ;22 530 43
11:30 276: 33 270 35 545 70
11:45 292 , 18 325 ,25 4l3 ••14
Tptal? 5,083 i:),,398, 6.514: 1:0.527 n,.397 21,925
Split?! 43-S ,52.0 ;.^S.2 48,0
Day Tptals 'l6,48'i 17.041 33;522
Day Splits 49,2 50.8
PcEil! Hciut ll;b()' 04:30 b8.;;l5. 05:00: 08:15 04:30
Vol ume 1,03§: 1,,549 1.401 1419. ,2,353 2,930
Faetor 0,89 0;93 o.9i 0,90 0.9.3 0.90
"Data File D1208006
Transportation Studies, Inc.
2640 WalnutAvenue, Ste K
Tlistin, CA. 92780
l,ocatiop : LEVANTESTREET
Sejtmtnt ; &0 EL CAMINP REAL
Ctietit : URBANSYSTEMS
Site:
Date:
CARLSBAD
08/01/12
IntervHl, EB - 'WB Combined
Begin AM PM AM PM AM PM
12:00 5 17 28 137 1 7 45 147 7 24 73 284
12; IS 5 30 3 33 8 53
12:30 2 41 1 29 3 70
12:45 4 38 •40 6 78
0};00 6 11 37 145 5 9 is 147 11 '2,0 65 293
01 ill 1 44^ 1 35 2 79
01:30 2, 3,9 2 34 4 73
01:45 2 26 i 5b 3 76
teoii 0. 2 44 159 0 1 32 154 ,0 3 75 313
&2;15 1 0 40 1 87
02:30 1 26 b 35 1 64
£)fc45 0 42 1 44 1 86
0350d i: 3 43 ibi a 7 41 157 '5 10 89 350
03:15 0 61 2 41 3 102
bliti '1 46 0 36 1 32
•03:45 b: 43 2 39, -1 87
O4:,0O 1 2 60 m 2 12 40 165 3 14 100 387
.0 46 1 44 i 91)
04:30 0 61, •5 41 3 102
04:45 1 3-4 4 41 5 95
65;jfc 2, 4 54 278 •5 ,54 39 177 7 58 93 45,5
05: is 1 64 10 37 11 101
05:30 0 82 23 •49 u 131
05:45 1 7$ 16 52 f7 ,13b
06:00 3 17 54 212 20 94 SO 128 23 111 84 340
06:15 •J 52 20: 30 ,22, 82
Q6:3iD 2 52 30 30 32 8i
tJ5:45" 10 54: —— -38 ••^A~-—52—
07:00 7 37 48 185 Al 233 25; lOi 54 270 74 286
07:l'5 11 48 58 27 69 75:
07:30 9 47 54 24 73 71
07:45 10 42 64 '24 74 65
osibb 24 90 42 158 55 253 17 72 80 343 59 240
08:35 20 41 59 20 89; 61
08:30, 24 34 60 24 ,84 58:
08:45 22 51 68 11 9b 62
09:60 32. 1&7 4i 112 53 221 17 47 85 328' 58, 159
09:15 21 25 50 14 71 4?
09:50 30 21 63 7 93 28
09:45 i4 24 55 9 79 33
10:00 28 115 22 ;5'2 •30 183 7 31 7S-29S 29 S3
16;15 2S 15 ,45: ,8 74 23
10:30 28 jb 47 7 73 17
10:43 -31 5 40, 9 71 14
;itoo •S3 142 15 45 42 165 7 15 77 307 22 6 b
Ihis '32 7 45 3 77 lb
11:30 36 11 4,0 1 76 IS-
11:45 39 12-, 3S, 4 , 77 IS
•mm 547 1,.91'8 1,239 1.342, 1,786 3.260
Splint 30.5 ,58.8 69.4 41..2':
Dav total i; 2.463 •2,581 5,046
Diiy Splits •48.9 51,1
PeakHEiur li:ob 05:00 Q7:3D: 05:00 oan.s 05:00
Vohinib 142 il8 :253 177 348 455
F'adtor 0:91 0,8,5 0.92 0.85 0.97 0.87
Day; Wednesdav
Daiii Fiie : D120S0067
Tratispartation Studies, Inc.
2640 Walnut Avenue, S^uite H
Tustin, CA, 92780
City: CARLSBAD
N-S Direction: EL GAMINO REAL
E-W DirectiOrt: SHOPPING GENTER DRIVEWAY
RieName ; H1208006
Site Code ;Q0003873
Start Date : 8/8/2Q12
Page No : 1
Pro UPS Printed- Turnl no Movements
ELOAMINOREAL
Southbound
DRIVEWAY
Westbound
ELCAMINOREAL
Nbrthbound
DEAD END
Eastbound
Start Time Rtohtl Thml L?ft Riaht i Thrul Left RiQhtT Thru! Left Rloht 1 Thru 1 Left' Int. Total
07:00 AM 0 159 0 0 D 0 3 118 0 0 0 0 280
07:15 AM 0 196 0 0 0 0 1 146 0 0 0 0 343
07:30 AM 0 :263 0 d 0 0 1 177 0 0 0 0 441
07:45 AM 0 410 0 1 0 0 1 240 0 0 0 0 652
Total 0 1028: 0 1 0 0 6 681 0 0 0 0 I7,ie
Q8:bOAM 0 327 D 3 0 0 2 194 0 0 0 0 526
08:15 AM 0 372 0 1 0 0 10 221, 0 0 0 0' 604
.08:30 AM 0 350 0; 5 6 0 3 22g 6 0 0 0 584
QMS AM 0 , m b . .6 0 0 3 298, 6 0 0 0 736
Total 0 1478 0 15 0 0 18 939 0 0 0 0 2450
• BREAK"
0.4:00 PM 0 :3& 0 7 0 0 3 376 0 0 b 0 748
04:15 RM a 346, b ^3 0 b 3 369 0 0 0 0 731.
04:30 PM: 0 402 0: ,9 b b ,2 ^73 0 0 0 Q 786
64:45 PM 0 389 0 8 0 0 7 367 b b 0 0 7:71
Total, 0, 1499 0 37 0 0 15 1485 0 0 0 0 3036
05:00, PM, 0 375 0 7 0 0 5 373 0 0 0 0 760
,05:15 PM 0 498 0 10 b 0 2 385 0 0 0 0 895
05:30 PM^ 0 457 0 13 0 0 4 402 0 0 0 0 876
05:45 PM 0 400 0 8 0 0 4 373 0 0 0 0 785
Totali - T73;a u 38 0-— - -0-—1-533 : g: 0— —0— ,.Q. 33ie-
Grand Total 0 5735 0 ,01 0 0 54 4638 0 0 0 0 10518
Apprch % 0 100 0 100 0 0 1.2 98.8 0 0 0 0
Total %^ 0 •54.5 b 0.9 :Q 0 0,5 441 0 0 0 0
TiOTspoitafion Studies, Inc.
2640 Walnut Avenne, Siiite H
Tustm,!:A.927S0
City: CARLSBAD
N-S Direction: EL CAMINO REAL
E-W Direction: SHOPPING CENTER DRIVEWAY
Kile Name : H1208006
Site Code : 00003873
Start Date : 8/8/2012
Page No : 2
EL CAMINO REAL DRIVEWAY ELCAMINOREAL DEADEND
.Southbound Westbound Northbound Eastbound
Start Time Rldhtl Thru 1 Left! App.,T4(at Right 1 Thru 1 LSfil AOP. Toljl Riflht1 Thrul Left 1 App. Total Rlqht 1 Thrul LeH App. Total , Int. Total
Peak Hdur Ana:iysi3' From 07:00 AM to 08:45 AWi: Peakl of 1
Peak Hourfor E ntfre Iriferseotibri Bsgirisaf 08:00 AM
08:00 AM D 327 d 327 3 0 0 3 2 194 0 196 0 0 0 0 526
O&ISAM Q 372 0 372 1 0 0 1 io 221 0 231 0 0 0 0 604
08:30 AM 0 -SSO 0 3,5b ;5 0 0 5 3 •226 b 229 0 0 0 0 584
08:45 AM 0 429 0 429 ;6 0 0 6 3 2&k b 301 0 0 b 0 736
Total VbMrp'o-0 1478 Q 1478 15 0 0 16 18 939 0 957 0 ,0 0 0 2450
% App. Total 0 • 100 0 100 0 0 1.9 98.1, 0 0 0 b
PHF-.000 ;861 .000 .861, .625 .000 .000 .625 .450 ,788 .000 .795 .000 .000 ,000 .000 .832
Peak Hour Data
g;ja
HI £
Q
1_
'North
Peak HtiurBsglnsal 08:00, Af^
Turnfna;MQvemants i
^-1 1
Left Thai Right rrw
Lmsl L_2£zi HMD
Oiit In -Tdtst
Fl,-nAM!NQ'RF:i«il,
Traiisixirtation Studies, Icc,
2640 Walnut Aviiiiie. Suite H
Tusaii,CA. ,92780
Gity; CARLSBAD
N-S Direction: EL GAMINO REAL
E-W DIrectidn: SHOPPING CENTER DRIVEWAY
FUeName :H1208006
Site Code : 00003873
Start Date : 8/8/2012
Page No : 3
ELCAMINOREAL DRIVEWAY EL CAMINO REAL DEAD END
Southbound Westbound Northbound Eastbound
StartTlme Rldhtl Thml LeftI App. Total Riqhtl Thru] Left Apij. Total Rlqht,! Tliru 1 Left; ji^PR. Total Rlnht 1 Thnil Left ! App. Tolal Irtt. Total
Peak Hour /\nalysls Froni 04:00 PM fo 05:46 PM •Peak lofl
Peak HoLif for E ritire Ihterseotloh Begin3;at ,05:00 PM
OBibb PM 0 375 0 -375 7 0 0 7 s 373 0 37'8 0 0 b b 760
06:15 PM b 4sa b 493 Id 0 0 10 2 385 0 387 0 0 0-:0 895
05:30 PM 0 457 0 457 13 Q 0 13 4 402 0 406 0 0 0 0 876
05:45 PM b ,400 0 40b 8 0 0 g 4 m 0 377 0 0 0 0 785
Total Volumd 0 1730 0 1730 ,38 0 0 38 15 1633 0 1548 0 0 0 0 3316
%AbD,total 0 100 0 100 0 0 1 99 b 0 0 0
:PHF .000 .868 ,000 .868--731 ,000 .000 ;731 .750 .953 .000 .953 ,000 .000 .000 .000 .926
ELCAMINOREAL
,..",in, ,. , , Trtgt, I -17-301 I' -33011
1 01 17361 n!
RJjht T|tu L|ft,
Q z m c
o "
:< ....
m
3 2^
a: -r
North
Peak Hour Begins at C&OO PNjl
-luiri!ngJ(l£affl.t!:
a
= 1
Laft Thru Riatit
aLj;S33l llll
L
tmu rasi
Oiit In Total
Pi r:A'Mli-jril;!Fal
HCM Signalized Intersection Capacity Analysis
1: La Costa Ave. & Saxony Road -
Existing AIVI
5/15/2013
> r •4— ^
:';fl3f|:-:. :;:-:;:• Lane Configurations tt r Voiurne (vph)' 1219 102 117 1326 30 63
Ideal Flow (vphplj 1900 1900 1900 1900 1900 1900
Total ios? t'iTie.(s} 40 40 40 40 40
Lane Util. Factor 095 1.00 0 95 1.00 1,00
Fri - , 0,99 , ^^•'•^•r:'r 1 00.' Too 1.00 ' 0 85
Fit Protected 1.00 0.95 1,00 0 95 1,00
Satd. Flow (prof) 3498 1770' 3539 . 1770 1583 ... Fltfermitted 1,00 0.95 ' 1.00 0.95 1 CO
Said. FidwXperm) '-'1 '' 3498 ' 1770 -'3539 1770 '1583 "
Peak-hour factor, PHF 0,90^ 0.90 0.90 0,90 0.90 0,90
Adj..FlowiypHl., ^ ?^ .-• 130 1473 33 Biiiiiliiiili RTOR Reduction (vph) 6 •"o 0 0 0 64
ta^e,X37o!jp1^(^^h) ' 130 • '1'373' 33 - 6 f'" ^
Turn Typ Prot custom
•protectedPliases. . 2 1, 6 • 3 l2|l||i||s||-||i|S:|f
Permitted Phases 8
Abfijgt^il^reen^ls),.. ,^, 404 7.9.: 61 6.1-"
Effective Green, g (s)
Actuated g/C Ratio
40.4 7.9 52,3 6.1 6.1 Effective Green, g (s)
Actuated g/C Ratio 0 61 pi^^^:::|C:ijr:;«i 012 0 79 0 09 0'09
Clearance Time (s) 4.0 4.0 4,0 4,0 4,0
Vefircle Extension (s) M~ "'3.0'^ 30 30 ' 3.0
Lane Grp Cap (vph) 2128 211 2787 163 145
v/s Ratio Prot c0 42 0 07 c042 ctfb2
v/s Ratio Perm 0.00
v/c Ratio 0 69 0 62 0 53 0.20 '0 04 •T^* :';'••:':.V.V l-'y'}.' '•(•ft:'^:^'^}/^ ''
Uniform Delay, d1 8,7 27 8 ^2,6 27 9 27 5
Progression Facto-100 100 100 . 1,00 , '100 ^ V
Incremental Delay, d2 0.9 53 a2 06 0,1
Delay (s) 97 :^f1'^:f^'ii;^s-; , "33.1-"^ 27 28 5 • 27,6
Level of Service A C A C C
Aoproach Delay (sj 97 ^:;^^'?v:;l:ii^i^li%x^ 52 27 9 SlUiSHiiRi Approach LOS A' A C
HCM Average Control Delay
HCM Volume to Capaaty ratio
Actuated Cycle Length (s)
Intersection Capacity Utilization
Analysis Period (mm)
p/'Critical Lafio Group >
8.0
. Ql62^
66.4
56.8%-
15
HCM Level of Service
Sum of lost time (s)
IcQievel of Service
12.0
Baseline Synchro 7 -Report
Page 1
HCIVI Signalized Intersection Capacity Analysis
2: Costa Del Mar & El Camino Real
Existing AM
5/15/2013
< t A V i
It^ ; J ii;A^l-.-ii:;ji^.: • ••'i
Lane Configurations V\ f ttf* i| ft
Volume (vph) a;i|g;-||W-, 20 1753 129 59 1926
Ideal Flow (vphpl) 1900 '1900 19001900 1900 ' '1900 ' '
ilKsllBiiSllliS 40 4.0 4 0 4.0 4 0
Lane Util. Factor 0.97 1,00'' 0,91 100 0.95
Ft \ V' • i,-06 • 0,85 ' 0 99 ' liiiiPSiiBiii '",^_;,
Fit Protected ^0,95 • Too"too 0.95 1.00
Satd?FroW.(prpt). ' - ~ 3433 1770 3539 • ISSBlilis? •': .':\i-:'-,= :,
Fit Permitted "0,95 1,00 '1.00 0 95 i 60
$atd Flw (perm) - ' 3433 1585 5033 ' ' 1776^ 353§
Peak-hour factor, PHF 0.90 0,90 0,90 0.90 0.90 0.90
Adj Flow (vph) mmm ^''2V'"1948 t43^'/\6rv 2140,:: I 1 ^. I. "1. 1
RTOR Reduction (vphj^
EaH'GrliipfiBw(vph)} ..
0 20 5 0 0 0 RTOR Reduction (vphj^
EaH'GrliipfiBw(vph)} .. '2 2087" 0 ' 66"' 2140
Turn Type custom Prot
ProlGtecT Pb^es:-"' '\ ^
Permitted Phases 6
Actuated Green, G is) 103 jM; 108.5 9 2 1217
Effective Green, g (s]|
Actuated g,C Ratio
10.3 lO.'s 108.5 92 1217 Effective Green, g (s]|
Actuated g,C Ratio 007.; '0 07 ^' 0 78 ""• "'0 07^^ 0'87
Clearance Time (s) 4,0 ' 4T' 4.0 4.0 "4 0
VehTcfe Extension'(s) 3 0' -30 30 3.0 '*3 0^
Lane Grp Cap (vph) 253 116 3901 116 3076
v/s Ratio Prot . , cO.QI 0 41 0 04 ' cO 60 '
v/s Ratio Perm 0,00
V/c'F^.atiQ^V^ ^o.ig"'^' iiiliil3:iB|:f 0 57 0.70 '
Uniform Delay, dl 60'.9 ' ' 60T''eT 63,5 3,0
Progression Factor -=•-foo 100 'I90 ,^ \I,OO\V;I1QO: ' • lliiiiliiiii incremental Delay, d2 04 JO 04 63 13
Delayjsj' 61,3:"' 60 2 6 5 69 7 -4 4 X
Level of Service E E A E A
Apptp&ch De[ayj|s)'< 61,0 \ 7 6;5 . 6,-3 ^ lifillliiSili Approach LOS E A A
fntl^lSI^Wd!^
HCM Average Control Delay
HCiyTVplume to Capacity ratio
Actuated Cycle Length (s)
lnte;[section Caqapty Utilization,:'
Analysis Penod (mm)
c^ fcnfical tane Group
7.3
"uao"
63^2% •'"It
HCM Level of Service
Sum Of lost time (s)
ICU^Leyel of Service ;
3.0
'B^:
Baseline Synchro 7 -Report
Page 2
^3
El Camino Real at La Costa Avenue
Lane Configuration for Intersection Capacity Utilization
Pk. l^lr. Time Period
8:00 AM to
9:00 Atvl
South Appr(>iB)
Left Thru Right
Lane
Config -
urations
Inside
(left)
Outside
Free-flow
North Appr (SB)
Left Tliru Right
West Appr (EB)
Left Thru Rieht
Page 2 of3
East Appr (WB)
Left Thru Rieht
Lane Settings 2 3
Capacity 3600 6000
Are the Nonh/South phases split (Y/N)?
Are the East/West phases split (Y/N)?
Efficiency Lost Factor 0.10
Hourly Volume
Adjusted Hourly Volume
Utilization Factor
Crhical Factors
0
0
N
N
2 3 12 2 1 1 2 1
3600 6000 1800 3600 4000 1800 1800 4000 1800
220 719 21 119 1032 724 763 269 299 118 532 208
220 740 0 119 1032 507 763 269 299 118 532 208
0.06 0.12 0.00 0.03 0.17 0,28 0.21 0.07 0.17 0.07 0.13 0.12
0.06 0.28 0.21 0.13
ICURatio = 0.78 LOS^
Turning Movements at Intersection of; El Catnino Real and La Costa Avenue
W
e
s
t
A
P
P
r
Time: 8:00 AM
to 9:00 AM
Date : 08/03/11
Day : Wednesday
Name : Oscar, Roxanne, Rhea
North Approach
Totals
2807
Sub-
totals
1476
J331
763
269
299
Subtotals
Total
1875
724 1032
1451
North
220 719
2
960
2411
3563
0
119
El Camino Real
1688
— 208
532
118
Total
Subtotals
Sub-
totals
858
21
409
La Costa Avenue
Totals
1267
s
1
A
P
P
r
South Approach
Note : Left-turn volumes incliitlc
U-Uinis. U-turns in bold.
30% RTOR reduction used for SBRI s
HCM Signalized Intersection Capacity Analysis
4: La Costa Ave. & Sliopping Center Drwy.
Existing AM
5/15/2013
Lane Ckinfiguratons tT* \ tli HH *5 HB Hi Volume (vph) '39 290 70 28 719 82 24 5 10 45 10 124
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost timpfs] . 40 40 4.0 40 40 40 4.0
Lane Util. Factor 1,00 0,95 1,00 0,95 1 00 100 100
W" I 1,00 0.97 1.00 0,98 0 97 100 0.86
Fit Protected 0,95 1.00 0 95 1.00 0.97 0,95 1.00
Satd Flow (prot) 1770 3436 '1770' 3485 * < 1746. 1770 1604
Fit Permitted 0.95 1.00 0 95 1.00 0.97 0 95 100
Satd^Flowlplirnr *. 1770 - 3436 1770 3485 ' ^746 • ' 1770 1604
Peak-hour factor, PHF 0,90 0,90 0.90 0,90 0,90 0.90 0,90 0,90 0.90 0,90 0.90 0.90
AdJ-Flpw'(vph): 43 322 ' 78 ' ,S'1 , 799 '"9r> • 27 .11 50 -138
RTOR Reduction (vph)
LaneCaroup Flow (vph) ? . .? 2() 0 0 9 0 0 10 0 0 121 0 RTOR Reduction (vph)
LaneCaroup Flow (vph) ? 43 380 0 ' 3r '881 0 34 0 50"" 28 ' b
Turn Type Prot
7 • " 4
Prot
3 8
split
2
Split
6 6
Permitted Phases
Aaualed:^rien-G(s) 38 345 25 33 2 ills 8.3 8.7
Effective Green, g (s) 3,8 34 5 2,5 33,2 8,3 ' 8.7 8.7
Actuated g/C Ratio 0 05 049 o:o4' 047 012 012' o:i2
Clearance Time (s) 4.0 4,0 4.0 4.0 ^0 40 4.6
Vehicle tension (s) ^ - • 30 30 30 30 30 30^ -Jo
Lane Grp Cap (vph) 96 1693 63 1653 207 220 199
y/s Ratio Prot '' , c0 02 011 0 02 c0,25 c0 02 cO.03 0 02
v/s Ratio Perm
y/cRatioI". ^ 045 ' 0 22 "0 49 0.53 017 0.23 014
Uniforrn Delay, d1 32.1 10,1 33.1 12*9 27.7 27.6 27.3
Progresslgn l:acfo; ^ -"l.k , 0.40 1 00 1.00 '1.00 - IOO • 1.00
Incremental Delay, d2
Delay (s)
32 0.3 5.9 1.2 0.4 0.5 0.3 Incremental Delay, d2
Delay (s) 514 ' 4'4. 39,1; 14.2 V .•28.1.-•Ilii 28.1 27.6
Level of Service D A D B C C C
Approac^pelay'{s) 89 15.0 ' 281 27.8
Approach LOS A 'B C C
HCM Average Control Delay
HCM Voltime tfCapacity ratio
Actuated Cycle Length (s)
Ijitersiction Capacfty Utilization
Analysis Period (min)
c Critical Carte Group
15.3
0 42
70.6
50.7%
15
HCM Level of Service
Sum of lost time (s)
ICU Level of Service
B
160
A
Baseline Synchro 7 • Report
Page 4
HCM Signalized Intersection Capacity Analysis
5: La Costa Towne Ctr. & El Camino Real
Existing AM
5/15/2013
Lane Configurations ttt Volume (vph) 20 2 910 17 3 1409
Ideal Flow (vphpl) 1900 1900^ 1900 1900 1900 1900
Total Lost fime (s) ^ 4.0 --.•4,0 - . 40 iiil:|i!iiPiilSPiilK^^^ Lane Util. Factor 0.97 "oil* 1.00 6.91"*
fli ^' 0.99 1.00 100. 1.00,
Fit Protected 0 90 i3o 0,95 1.00
Satd Flow (prot) 3412 5071 1770 5085
Fit Permitted _ 0.96 1.00 ' 0,95 1.00
Safd" 'Pjowtpemi) 34i2 5071 1770 5085
Peak-hour factor, PHF 0.90 0.90 0.90 0,90 0,90 0.90
^dj. FJow^(vphj-„ _ 22 ; 2' 1011
RTOR Reduction (vph)
Latie.Oroup Ftow'(vph) '
2 " 0 1 0 0 0 RTOR Reduction (vph)
Latie.Oroup Ftow'(vph) ' 22 ' 0" IffiSill ''0 • 3'" "1566
Turn Type Prot
Profected Phases 8 7. iSSiSss8sxi:3;j:i:ii::;s^
Permitted Phases
/^ctuaEji'^re§l]T^3|3)''^ -. 4:2" 122 5 1 3 127,8.*' ^ '
Effective Green, g (s) 42 122.5 1,3 127.8
Actuated g/C Ratio 0 03 0 88 ^ ."^-"0.01
Clearance Time (s)
Vehicle Extension (S)
40 4.0 40 40 Clearance Time (s)
Vehicle Extension (S) .-•3,0 3.0 30 3.0 - ^" ^ " ' .
Lane Grp Cap (vph) 102 4437 16 4642
v/s Ralio.Prot cOOl 0.20 . ' 0.00 lIHiiHlliiiiiiiilBii^^ v/s Ratio Perm
v/c Ratio^ P22 " 0 23 0.19 liipiPiiiiifiifiiliW Uniform Delay, di 66,3 'i.r 68 8 6,8
Progression Factor I 100;/ ?;i-::;;:B:^¥::-.1,95 136
Incremental Delay, d2
Delay (s)
""Y1 0.1 4,2 Ti"^"""""""'"""^ Incremental Delay, d2
Delay (s) 67.4. r 28 97 8
Level of Service E" A F " "A
Approach Delay (s) 67,4' • 28 viM:M iiP;il:^ii^S^v lililSiiiiiliiiiiiiBi^^ Approach LOS E A
HCM Average Control Delay
HCM Vofume to,Capacity ratio
Actuated Cycle Length (s)
Intersection Capacity Utilization'
Analysis Penod (min)
c Cntical Lane Group
2.1
J33
"'iioT'
27 2'--
15
HCM Level of Service
Sum of lost time (s)
feu Level'of Service''
iiiliiiiiilillISM
3.0
M
Baseline Synchro 7 • Report
Page 5
El Camino Real at Levante Sti eet
Lane Configuration tbr Intersection Capacity Utilization Page 2 of3
Pic. I h-. Time Pertod : South ApprCNB) North Appr (SB) West Appr (EB) East Appr (WB)
8:00 AM to
9:00 AM Left Thru Right Left Thru Right Left Thru Right Left Thru Right
Lane Inside 1 1 1 1 1
Config - (left) 2 1 1 1 1 1
urations 3 1 1 1
4 1
5
6
I 1 1
Outside 7
Free-flow
Lane Settings 1 3 0 I 3 0 I 1 0 I 1 1
Capacity 1800 6000 0 1800 6000 0 ISOO 2000 0 1800 2000 1800
Are the North/South phases split (Y/N)'? N
Are tlie East/West phases split (Y/N)? N
Efficiency Lost Factor 0.10
Hourly Volume 14 880 27 52 1330 34 18 2 5 140 3 126
Adjusted Hourly Volume 14 907 0 52 1364 0 18 7 0 140 126
Utilization Factor 0.01 0.15 0.00 0.03 0.23 0.00 0.01 0.00 0.00 0.08 0.00 0.07
Critical Faclors 0.01 0.23 0.00 0.08
ICURatio = 0.42 L0S= A
Turning Movements at Intersection of: El Camino Realand Levante Street
W
e
s
t
A
P
P
r
Time :8:00 AM
to 9:00 AM
Date: 08/03/11
Day: Wednesday
Name: Angd, Santos
Sub-
Totals totals
76
51
25
0 if
Subtotals
Total
North Approach EI Catnino Real
i
1475
1416
2441
1
34 1330 52
.4-1 \ l-j>-
Nonh
\
\A g.SO
0
921
2396
-<—
r
1025
126
3
140 0
Total
Subtotals
Sub-
totals
269
80
vev.irtfe Streel
Totals
349
E
a
s
t
A
P
P
r
South Approach Nole ; Leri-tuni volumes include
U-turns. U-luins in bold.
HCM Signalized Intersection Capacity Analysis
1: La Costa Ave. & Saxony Road
Existing PM
5/15/2013
Lane Configurations tti 1 tt \ f
Volume (vph) 1522 65 ,101 1276 55 123
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width 12 , 12 '"12 12 12 13. ' ^^lii^/'i'K^fli^'^^:,;-"—'^•'••"•••'^^ •':•::•;-•;i!^:^:!iaopm:w^^^
.vC;J^y^i^j":'>i:-:y,^Ai>:j:-'•• ^ :.:.'•:i:^---i:i-•.'-^^-Vi:i^^^:,;.:•.:^A::-ii;^..:^:':.>.:.-ii^-ii:;-C-,':/',:'^
Total Lost time (s) 4.0 4,0 40 40 4,0
Lane UtifiFactoi' - •
Frt
0 95 . ~i,po " 0 95 '1 00 ,100' Lane UtifiFactoi' - •
Frt 6,99 1,00 1 00 1 03 0,85
FltPrQtecBd\ 1 00 095 1 00 0 95 100
Said. Flow (prot) 3518 1770 3539 1770 1635
Fit Permitted 100 0 95 1 00 0 95 ^.i.oov:.; •^••:l^v|K::'j^;;'^^^^ -:::V-i-i-'--:!
Satd. Fiow (perm) 3518 1770 "3539 1770 1636
Peak-hour factor, PHF.-. 090 0 90 0 90 0 90 090 . 0,90,
Adj. Flowjyph)
RTOR'Reductionwh)
" 1691
' -:3:
72 112 "^1418" 61
0 0
137
123 \
Lane Group Flow (vph) 1760 0 112 1418 61 14
Turn Type . ' Prot, farm
Protected Phases 2 "'l ""l^ 3
Pe);m!ttB^Raps
Actuated Green, G (s)
Effective Green g(s)
36 6 "5.1 45,7 6.1 6.1 Actuated Green, G (s)
Effective Green g(s) 36 6 45 7 '^0' 6.1 61
Actuated g/C Ratio 0.61 0,09 0,76 0.10 0,10
Clearance Time (sj 4.0 40 4 0 40 40 J - if*^ -r t.
Vehicle Extension (s) 3.0 3.0 3 0 30 3,0
Lane Grp Cap (vph) • 2153 , ~ 151 2705 181 167'
v/s Ratio Prot c0.50'" cO.06 040 c0 03
v/s Ratio Perm 001^' '
V c Ratio 0 82 0 74 0 52 0 34 0,08
Uniform DeNy, c1 90 26 7 ;;2 8'- "25 0 24 3
Progression Factor 1.00 1 00 100 1,00 1.00
Incremental Delay, d2 • 25 ^,177". 02 1 1 02^ *
Delay (s) 115 444 3 0 26 1 ~ 24.5 "
Level ofSe'T/ice B A" C' HliHB Approach Delay (s) 11.5 6,0 25,0
ApproachiQ-S^ ....^ ' B^ A C
HCM Average Control Delay
HCM Volume to Capacity ratio
Actuated Cycle Length (s) I
Intersection Capacity Utilization
^•nalysis Penod (m.n;
c Cntical Lane Group
99
0.75
598
63.1%
' M5,
HCM Level of Service
Sum of lost time (s)
ICU Level of Service
120
B
Baseline Synchro 7 -Report
Page 1
HCM Signalized Intersection Capacity Analysis
2: Costa Del Mar & El Camino Real
Existing PM
5/15/2013
< ^ \ \
Lane Configurations f ttli tt
Volume (vph) •, ^ 119 83 2188 114 27 2000
Ideal Flow (vphpl) 'i'966 1900 1900 igoo1900 1900
Total Lost time (sj 40 40 40 4 0' iliSifiifSiSiiliiii^^
Lane Util. Factor 0 97 1.00 0.91 1.66 0.95
Frt,. : • 100 / 0 85'^^ '0.99 ^ ~ , .;i.bo Fit Protected 0,95 1.00 1.60 0,95 1.00
Satd Flow''(pr'otJ 3453 ^'"1770 353&' ,
Fit Permitted 0 95 1,00 ' i"oo 0 95 1,00
Satd Ffpw (pe'rm) ^ -34'33 •• '1583 -"5047 • ~ - " ' :177Q 353^ -
Peak-hour factor, PHF 0.90 0.90 0.90 0,90 0,90 0.90
132 92 2431 127 30
RTOR Reduction (vph)
Lane Group Flbw(vph)
0 '^65 ""3 0 0 0 RTOR Reduction (vph)
Lane Group Flbw(vph) . 132"^' -"^27"'^ 2555 b' " 30' 222f " ' ~
TurnTj^e _ _^
Protected Phases
custom Prot TurnTj^e _ _^
Protected Phases • 1 _ 8 -
Permitted Phases "6'
Actuated Green, G fs) • 112 112 1119 49 120 8"
Effective Green, g (s) 11.2 lil^'riTF'" 49 120.8
Actuated g C Ratio 0 08 008 080 0 04 o,8& \.^" „' "
Clearance Time (s) 4.0 40 t.^ 4.0 40
Vehicle Extension (s);.: :-^\ 30 :.3.0= --30 -30 3"0
Lane Grp Cap (vph) 275 127 4034 62 3054
v/s .Ratio Prof CO 04 iiilifflHli ^ ' 0.02/ c0§3 ' . ' \
v/s Ratio Perm
CO 04
0,02
v/c Ratio, 048 0 21 0 63 0.48
Uniform Delay, dl 61,6* 60,3 5 7 66 3 3.5
Progression Factor" 1(5Q 10l) 0.,80-too r • 1.00. , - - - , • '"^ ' '
incremental Delay, d2 1,3 0.8 0.5 58 16
belay "(fi)-.' ' 62,9 - ' 61,^-^-' 50,' : 72,;i
Level of Service E 'E'*"'A
Approach. p'eliy(s)' -'62 2 ^''6.0 liiiiliiiisiiiffiHli^^
/^proach LOS E A A
HCM Average Control Delay
|HCM Volume to Capacity ratio
Actuated Cycle Length (s)
InferseofiQil c'appicify Utilization:
Analysis Period (min)
c;f||riira|ia|f^|i^|j|||^^
8.0
0 71
'i4a6'
15
HCM Level of Service
Sum of lost time (s)
MCll Level of Service
3.0
C
Baseline Synchro 7 -Report
Page 2
El Camino Real at La Costa Avenue
Lane Configuration for Intersection Capacity Utilization Page 3 of2
Pk. Hr. Time Period : South Appr (NB) North Appr (SB) West Appr (EB) East Appr (WB)
5:15 PM to
6:15 PM Lefl Thru Right Left Thru Right Left Thru Ri.Eht Left Thru Rieht
Lane Inside 1 1 I 1 1
Config - (left) 2 1 1 I I
urations 3 1 1 I 1
4
5
6
1
1 I
!
1
1
1
1
1
Outside 7
Free-flow
Lane Settings 2 3 0 2 3 1 2 2 1 I 2 1
Capacity 3600 6000 0 3600 6000 1800 3600 4000 1800 1800 4000 1800
Are the North/South phases splii (Y/N)? N
Are the East/West phases split (Y/N) ? N
Efficiency Lost Factor 0.10
Hourly Volume 246 1092 67 299 1270 908 836 604 321 107 381 185
Adjusted Houriy Volume 246 1159 0 299 1270 636 836 604 321 107 385 185
Utilization Factor 0.07 0.19 0.00 0.08 0.21 0.35 0.23 0.15 0.18 0.06 0.10 O.IO
Critical Factors 0.07 0.35 0.23 0.10
ICU Ratio 0.85 L0S = D
Turning Movements at Intersection of: "El Camino Reitl and " Lrctista Avenue
W
e
s
t
.\
V
P
r
Time : 5:15 PM
to 6:15 PiVl
Date : 08/03/11
Day : Wednesday
Name : Oscar. Ro.xanne, Rltea
North Approach El Camino Real
Totals
3294
Sub-
totals
1533
1761
836 '
604
321
Subtotals
Tolal
2477
4590
0
908 1270 299
North
t 246 1092
2
1405
3105
1700
South Approach
1
r
2113
185
-< 381
107
Total
Subtotals
Sub-
totals
673
970
La Costa Avenue
Totals
1643
s
I
A
P
P
r
Note ; Left-tuiT) volumes include
U-tums. U-turns in bold.
30% R I OR reduction used for .SBRTs
HCM Signalized Intersection Capacity Analysis
4: La Costa Ave. & Shopping Center Drwy.
Existing PM
5/15/2013
> > t A V i V
Lane Configurations 'I tti 4*
Volume (vph)-' 59 771 20 -^-i'i^et'-l' 83 72 20 37 122 16 168
Ideal Flow (vphpl) 1900 '1900 '1900 1900 1900 1900 1900 1900 1900 1900 1900
TotaTLost time (s) •4,0 "- 4.0, 4:0 ' 4-0 " - 4.0 wmm Lane Utii. Factor 1,00 6.95 i.OO 0.95 1,00 1,00 1.66
Frt ^' 1 00 , 0-.9'9 foo 0 98 0 96 > IOO 0.86 •
Fit Protected 0,95 1.00 0,95 1,00 0,97 0,95 100
Satc|..F|OW„(prOt) . .' 1770 3489 1770 345,8 . 1742 1770 - 1608
Fit Permitted _ 0 95 103 0.95 1.66 097 0,95 1.00
Satd'Flow (perm) -••:--'^:..i-77D:"i 3489 1770 3458 1742 1770 > 1608
Peak-hour factor, PHF 0.90 0.90 0.90 0,90 0,90 0,90 0,90 0,90 0.90 0.90 0,90 0,90
Ad, .Flow (vph) 66 857 ,89 22 513 92 80 22
:;m!;-,:ii^ViE:;:«-J'.:.':i:A{!i1i:;<:r
41 136 18 M87
RTORReductlon (vph)
Lani Group .Flow (vpB)-- ,
0 8 0 0 17 6 0 23 0 ' 0 158 0 RTORReductlon (vph)
Lani Group .Flow (vpB)-- , , - 66 • 938 0 22 588 0 0" 120 0 156 47 ' 0
Turn Type Prot Prot Split Split
•nn^iii lillP V.V:. 3 8 2 6 6
Permitted Phases
feiii^ed'(Jre0n;Gjs)\ 5.8 , '30\6:" 22 27 0 10 3 ' 10.9 109.
Effective Green, g (s) 5.8 36'6 ' 22 27,0 10.3 16.9 10,9
Actuated g/C Ratio 0 08 • 044 ^ 003 0 39 Bill 015 ' '0f6 '^016"^
Clearance Time (s) 4.0 4.0 4.0 4'0 4.6 4.0 4.0
Vehlde'Extension (s) '3.6 ^ "3.0 3.0 30 30 30' 30
Lane Grp Cap (vph) 147 1525 56 1334 256 276 250
v/s Ratio Prot' c004 cO.27 0.01 0.17^ ' c().67> ;'. c008 003
v/s Ratio Perm
v/c Ratio ^ \ -^ . 0.45 0 61 0 39 0 44 047 ~;049 0.19 ^!i::^|vij
Uniform Delay, d1 30.6 15.2 33.2 15.9 27.3 27 0 25.7
Progression JFactor ^ 153 ,C66 V 'loo.. 1 00 . 1,06 100 1,00.
Incremental Delay, d2 1,7 i';5 4.5 1.1 'i.4 1.4 QA"'
Dela7Isf>~ ^8 4 •J15 ' ~-37.7- \ 17 0 287 - , 284 261
Level of Service D 3 "'D'""' B c C c
Approach Delay'(s) 139 177, .28.7 , 27.0 ,
Approach LOS B B" c 15
HCM Average Control Delay
HCM yolumelto ..
Actuated" Cycle Lengtfl (s)
Intersecliqn Capacity Utilization.
Analysis Period (min)
c -Cntical Lane Group ^ '
18.1
: 0.57-
'76.6
-59,0%
"15"
HCM Level of Service
Sum of lost time (s)
'ICU Level of .Service
B
16.6
- B;
Baseline Synchro/- Report
Page 4
HCM Signalized Intersection Capacity Analysis
5: La Costa Towne Ctr. & El Camino Real
Existing PM
5/15/2013
< t V \
Lane Configurations ttl^ ttt Volume (vph) ' • - 41 Wmm 1536 f|2lS 1360
Ideal Flow (vphpl) "1900 1900 1900 'ifoqj 1900
Total Lost'time (s) ,, ' ."•':4:0;"-: '""Cq-: 40 l!:i;pilSlliiiBgiiS Lane Util. Factor 0.97 0.91 • i.o6' 0,91
Fft ' . ^ ' 6.98 .1:00.
Fll Protected 0 95 ' i.oo" 0.95 1,00
Satd Flow(prot) 3401 5075 1770 5085 '
Flt^Permitted 0.96 i.66 0.95 1.00
Satd. Flow^peri^) 3401 5075 WM 5085
Peak-hour factor, PhF 0.90 0.90 0.90 0,90 0,90 0,90
Adj Flow (vph) " 46 1707^ 23'' 8 ""I5ll . I .
RTOR Reduction (vph)
Lane'cSrHip FToW'(vph). .
5 "'"""'o'" ''T 6 b" 0 RTOR Reduction (vph)
Lane'cSrHip FToW'(vph). . 45 1729' 8 '1511
Turn Type Prot
Prot6cted,Phases'^* 6 s; liBI W-^'Wsf^$^!^^^^^^^f:tM:'&M-^it^Ww\-f\MfW^'^-CW'i^^ '•^l-:^^^-:^-^^'^
Permitted Phases
Actuafed^refn, G (s) ^ 62 -;:?:':.^:f--::::f'?^^ 12C3 1 5 125 8 '
Effective Green, g (s)
MSnffii^ilBii
6,2" 120.3 1,5 125,8 Effective Green, g (s)
MSnffii^ilBii 0 04
•?:•:•;-••: j-.-i.-:-:-;-.: iw .-.t i--
^J:vv;^,\::;'::-: c: •. 0 86 '^•Ji,;?:;^^.?;:.;..^^-'"""abi-^-090
Clearance Time (s) 4,0 •iO 4,6 4,0 ' '
Vehiole Extension (s) '* 30 -30 30 30 - • ' r-Lane Grp Cap (vph) 151 4361 19 4569
v/s Ratio Prot cO,01 -. c6;34-000 iliiiiiiiiliBiilH v/s Ratio Perm
v/c Ratio • 0.31 0.40 0 42 pliSlslllBSliilSiiiiliPSS^ Uniform Delay, dl "64.8 21 68 8 10
Pro^ressioh Factor '* io"o^. C22'. .•--fO'O"; fiiiiiiiiiiiiiis^ Incremental Delay, d2 "0,2 8.2 0,1
Delay (i), 9' 76 9
Level of Service E A 'A
Approaiih belay (s) - . ^66 0 '3--9' liiiilMlillliliilBl^ Approach LOS E A A ApproachLOS E A /
l^te^Pi^^^iTijai^^^^i^^^^^^^i^^^^^^^^^^lfa^
HCM Average Control Delay 7.6 HCM Level of Ser
»V,^-.,.-.^„T,,^..|W,^»..>«W.......T.W..
HCM Average Control Delay
HCM Volume to Capacity ratio
Actuated Cycle Length (s)
Inters^dtfofi C^l^a^^^
Analysis Period (min)
c *GntioalLaiie Group
7.6
ROii
146.'0
40.1'%':
15
HCM Level of Service
Sum of lost time (s)
-JCUleyel of Service •'
12.0
Baseline Synchro? - Report
Page 5
El Camino Real at Levante Street
Lane Configuration for Intersection Capaciiy Utilization Page 3 of3
Pk. Hr. Time Period : South iU5pr(NB) North Appr (SB) West Appr(EB) East Appr(WB)
4:45 PM to
5:45 PM Left Thru Ri.eht Left Thru Right Left Thru Right Left Thru Ri.ahi
Lane Inside 1 1 1 I 1
Config - (left) 2 i 1 1 1 1
urations -, 1 1 i
4
5
6
J 1 ] 1
Outside 7
Free-flow
Lane Settings 1 3 0 1 3 0 1 1 0 1 1 I
Capacity 1800 6000 0 1800 6000 0 1800 2000 0 1800 2000 1800
Are the North/South phases split (Y/N)? N
Are the EastAVest phases split (Y/N) ? N
Efficjency Lost Factor 0.10
Hourly Volume 20 1419 147 157 1532 30 31 4 7 87 0 95
Adjusted Hourly Volume 20 1566 0 157 1562 0 31 11 0 87 0 95
Utilization Factor 0.01 0.26 0.00 0.09 0,26 0.00 0.02 0.01 0.00 0.05 0.00 0.05
Critical Factors 0.26 0,09 0.02 0.05
ICU Ratio 0.52 LOS = A
Turning tviovements at Intersection of: El Caitiihi) Real and " Levante Street
W
e
s
I
A
P
P
r
Time: 4:45 PM
to 5:45 PM
Date: 08/03/11
Day: Wednesday
Name: Angel, Santos
Totals
94
Sub-
totals
52
42
Subioials
Total
North Approach
30
1626
1719
El Camino Real
3262
0
1543
1532 157
•< Noi1h
^ t |—
20 1419 147
0
1586
3212
f
95
0
87
Tolal
Subtotals
Sub-
totals
182
308
Levante Street
Totals
490
South Approach Note : Left-turn volumes inckide
U-turns. U-lurns in bold.
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
APPENDIX C
Existing Plus Project Synchro Worksheets
002312 C 002312-Report C.doc
HCM Signalized Intersection Capacity Analysis
1: La Costa Ave. & Saxony Road
Existing + Project AM
5/15/2013
Lane Confipurations tT* 1 tt 'i
Voiump (vph) J ''222 ^ 102 ' 118 1331 30 63
Ideal Flow (vphpl) "l900^' 1900" 1900 1900 1900 1900
Total tpsMime'fs) " ^ ..4.0^ /4.0^^4V 4 0 ' 4.0
Lane LJtil, Factor 0.95 1.00 0.95 1,00 1,00
Frt' .V ' ^ . 0 99 -;••"^:{T:i^^*^:•.^-•^ iob; i,og; 1.00 " 0.85
Fit Protected ' 1.00"" 0,95 1,00 0.95 1.00
Satd. Flow (prot) 3498 1770 3539 1770 ^1583'-' .
Fit Permitted 1,00 0 95 1 00 0.95 1.00
Satd FlowfpferiTir 3498 1770' '3539' \T10 " 15^-
Peak-hour factor, PHF 0.90 0,90 0.90 0.90 0,90 0.90
' fc' 11-3 131 .1479 33
RTOiy^educjion (vph)^^
Can*^'5foilp?ro'w (vphT'
6 o" 0 0 0 64 RTOiy^educjion (vph)^^
Can*^'5foilp?ro'w (vphT' - "1465 ~ 0 ' 131 " 1479 "--33' "6'
TurnType^
Protected Phases
Prot custom^ TurnType^
Protected Phases IHSO lilHIiilliii Permitted Phases "8
40 5 •-79 524 6 1
Effective Green^gjs) _
Actuated g/C Ratio
40.5 79 52.4 6.1 6.1 Effective Green^gjs) _
Actuated g/C Ratio 061 ' 0 12 0 79 0 09 0 09
Clearance Time (s)
Vehicie Extensioi{(s) ^'
40 4.6" ^4,0 4,0 4.0 Clearance Time (s)
Vehicie Extensioi{(s) ^' "30 "3 0 '"•"3 0"'""3 0 ' 3.0" '
Lane Grp Cap (vph) 2130 210 2789 162 . 145
v/s'RatolProt cO 42 •|^i:^C||i;; 0 07 c042 .CO02
v/s Ratio Perm 0,00'
;:^::',•^.•':•;r•*?^s^^^•.•5•.^?^•^,'^v;::'^^^^
v/c Ratio 0 69 0 62 b'53 0,20 0 04
Uniform Delay, d1 8.7 27.9 * 2.6 28.0 27.5
Progression Factor, 1 00 1 00 , M 00' 1 00 100,' ^ liiiliiilS Incremental Delay, d2 0.9 5.7" 0.2 " 6.6 0,1
Delay (s) 9 7 33.6 , , 2 8^' 28 6 277,-
Level of Service A CAC , P Approach Delay (s) ^ 97 , 53 - 280
Approach LOS A A " C
HCM Average Control Delay
HCiyi Volume lo-Capac[fy ratio ,
Actuated Cycle Length (s)
Intersecipn C'apaCity'^Utilization
Analysis Penod (mm)
c Critical Lane Group,
8.0
063
66.5
53.9-.J
15
HCM Level of Service
Sum of lost time (s)
ICU Levefof Service
12.0
B
Baseline Synchro 7- Report
Page 1
HCM Signalized Intersection Capacity Analysis
2: Costa Del Mar & El Camino Real
Existing + Project AM
6/15/2013
r ^ t V i
iiill&,l:'i| mis'-mw SiiiSf ffi::;:? J;li-^:;;:'-&:S: |'Ci'\s^§*'^:^y';'5K
Lane Configurations ttt* \ tt
Volume (yph) _ -44 20 1758 130 59 1929
Ideal Flow (vphpl) "' '19661966 ' 1900 iooo' 1900 'i960
Total Lost tim'e"'(s) < '"'46"\ 4.0 40 BiliI 40 40
Lane Util. Factor 0,97 1.00 0,91 1.60 ' 0,95
iilllilllifi'^ PSiPiSii:' 0 99 ^ i^09.' 100
F|Protected 0,95 TOO 100 0.95 1,00
Satdj, Flow (prot) 3433 ;.1583 5033 ' 1770 351^^ ^ -
Fft Pemitted 0.95 1,06 1,00 0.95 1,06
Said. Flow'(perm) . 3433 1583 5033 1770^ 3539
Peak-hour factor, PHF 0,90 0,90 0,90 0.90 0,90 0,90
Adj Flow (vph) • 49 22 1953 144 66. ••WWW'^^'^i0-p&M^}^A^'^\^i''S^s:iW^WW^Wi^&:J^-:W- >^'J\
RTOR Reduction (vph)
Laiie Group Flow (vphi
0 20 5 0 * 0 0 RTOR Reduction (vph)
Laiie Group Flow (vphi 49-" 2 " 2093 • 0 §6' " 21"?3 "-^""'"'"- ' ' "
Turn Type
F.ate^tf-ll^ses
custom Prot Turn Type
F.ate^tf-ll^ses 1'. ' 8, " 1 . t ' .. _
Permitted Phases "e""
Actuated Green, G (si 10 3 10 3 108 5 9,2"
Effective Green, g (s)
SctUatedl/C Rlio" .. _
10.3 10,3 108,5 9,2" 121.7 Effective Green, g (s)
SctUatedl/C Rlio" .. _ - OM"' 0,07 . 0.78 0 07 0'87
Clearance Time (s) 4,6' '16" •4.0 4.0 '4.6
Vehicie Extension (s) - -7-'-3:b7'-3,o-: ^ lo" 30 3'0 '
Lane Grp Cap (vph) 253 116 3901 116 3076
v/s Ratio Prot c0 01 ' 0,42 -.0,04 liiiliiiiiiiH /^;^:^/':^'..^3;;!^-'^^i%i:j^
v/s Ratio Perm 6^66 v/c Ratio, ' 0.19 001 0,54 0-57, , 0 70 ^•WWW-WWv^WW''W{:vWW\'W W'-J' tW^^^W!^^'''W^ W'
Uniform Delay, d1 ' " 60,9 '60,1 ' '6,1 63.5 3.0
Progression Facte 1 CO 1 00 1 13 •^i.boi"-. 1,00' '
Incremental Delay, d2 0,4 * 0.0 04 63 13
Delay.(sl. "'ei.S' .60 2 73 69''7 '!^^3:?7.^:{ic^*;s;i^^^ ;"••:• ^^^f^9^-^-^ '^''^r^
Level of Service A E" A
Approach Delay (s) 'V''^6i:o'.^^;-.--.-V'"'' 73 iiSililiiillia
Approach LOS 1'""""* A A
HCM Average Control Delay
HCMyolun\e'fo Capacity ratio ;
Actuated Cycle Length (s)
Intersection Capadty Utilizatioh'
Analysis Period (min)
c "Critical LanS'Group
77
0 63
140.6"
63,3% :
••'Is
HCM Level of Service
Sum of lost time (s)
IIHlllgliiill
5.0
B
Baseline Synchro 7- Report
Page 2
EI Camino Reai at La Costa Avenue
Lane Configuration for Intersection Capacity Utilization Page 2 of3
Pk. Hr. Time Period : South Appr (NB) North Appr (SB) West Appr (EB) East Appr (WB)
A fyi 8:00 AM to
^ ^ 9:00 AM Left Thru Ri.eht Left Thru Ri.eht Left Thru Ri.ght Left Thrti Ri.eht
Lane Inside 1 1
Config- (left) 2 1
urations 3 1
4 1
5 1 I
6
Outside 7
Free-fiow
I
1
1
1
1
1
1
1
1
1
1
1
1
1
I
Lane Settings 2 3 0 2 3 1 2 2 1 1 2 1
Capacity 3600 6000
Are the North/South phases split (Y/N)?
Are fhe East/West phases split (Y/N)?
Efficiency Lost Factor 0.10 (L
HourlyVolume 220^ 719
Adjusted Hourly Volume 220 740
Utilization Factor 0.06 0.12
Critical Factors 0.06
•y
0
N
3600 6000 1800 3600 4000 1800 1800 4000 1800
\^ ^\
21 119 1032 72? 763 269 299 118 532 208
0 119 1032 507 763 269 299 118 532 208
0.00 0.03 0.17 0.28 0.21 0,07 0,17 0.07 0.13 0.12
0.28 0,21 0,13,
/ /
fxi<.-/>'-'\ ICURatio = 0.78
' ^./^ -
^ Tuming Movements at Intersection ol:
LOS =
Ei Caniliio Rear and Xa Cbsti Avenue
W
s
t
A
P
P
r
Time: 8:00AM
to 9:00 AM
Date; 0S,''03/11
Day: Wednesday
Name: Oscar, Ro.xanne, Rhea
North Approach EI Camino Real
Totals
2807
Stib -
totals
1476
1331
76:
269
299
Subtotals
Total
1451
1875
3563
0
724 1032 119
North
220 7!9
2
960
2411
South Appioach
1
21
1688
208
532
lis
Total
Subtotals
Sub-
totals
83S
409
La Costa Avenue
Totals
1267
E
a
s
t
A
P
P
r
Note : Left-lum volumes inckide
U-lurns. l)-turns in bold.
30% RTOR reduction used for .SBRTs
HCM Signalized Intersection Capacity Analysis
4: La Costa Ave. & Shopping Center Drwy.
Existing + Project AM
5/15/2013
Lane Configurations tt» t1^ 4* 'I ^
VolunielvphJ , 39 292 72 33 719 82 29 5 18 45 10 124
Ideal FJow (vphpl) ^ 1909 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total i!ost tini'e (s) ^ " 4(5 40 40 40 ifiHIiiil " 40 "40 40
Lane UtiL Factor 100 0.95 1.00 0'95 1.00 1,00 100
WW. . 100 0 97 IOO 098 0-95 100 '086
Fit Protected 0,95 1,00 0 95 1.00 0.97 0,95 i,06
Satd Row(pr,otJ W< '1770 3434 1770 3185 1728, 1770, ^1^04-
Fit Permitted 0 95 100 0 95 100 0,97 0,95 100
Satd Flow (perm) •• 1770 3434 1770 '< 3485; •• 1728 ^'1770 1604
Peak-hour factor, PHF 0.90 0.90 0,90 0.90 0.90 0.90 0.90 0,90 0,90 0,90 0,90 0,90
Adj Flowfvph) . -WWh^tAh 324 80 '799.. \ fii 732 6 26 ;_"SQ; '11 '13?
RTORReduction (vph)
La'rt^Ijroup^Flovvfvpii)^
0 21 0 6 9 0 0 18 0 0 121 "0 RTORReduction (vph)
La'rt^Ijroup^Flovvfvpii)^ ? ^ " 43 '383 ' 0 ' ""37 881 ^ ' 6 0 40 ^ 0 "50" " 0
Tum Type Prot Prot Split Split
l=r5rti:»C:y:, wsmmm tx'i ' 3 ' 8l ^ 2 6 6 •lit--
Permitted Phases
ggulfed Careen^G (s)' 38 ' 34.3 /?j:.'!f*f:-'"^?:'' 25 33 0 85 67 87
Effective Green, g (s) 38 34.3 25 33 0 8,5 8,7 ' 8'.7
A5ly|ldg;cjRati& \ 0.05 •.\0.49 0.04. 047 012 012 012
Clearance Time (s| 4 0 ' 4.0 4.0 4.0 4.0 40 40
Vehicle ExteiisTon (s) 30 30 30 30 30 30 30
Lane Grp Cap (vph) 96 1683 63 1643 210 220 199
v/s'^tlo Prot ' c002 on 0 02 c0 25 c0 02 c0p3 002^
v/s Ratio Perm
v/c Ratio' ' \ 045 . 0.23 0 59 0 54 " 019 023 0 14
Uniform Delay, d1 321 ' 10.2 33.2 13,1 27.7 27',6 27,3
Progression Factor 142 0 3§' 1 00 Too ' " 100 1 00 1 00
Incremental Delay, d2 3.2 0,3 13.2 1,3 04 0,"5 0,3
,48 8 42 46 5 -143 '28.1 WM 28:i 27,6,
Level of Service D A D B C C C
Approach Delay (s) 85 15''6 28.1 . 27 8
Approach LOS A B C C
^^^^
HCM Average Control Delay
HCMVolume to Capacity ratio ,
Actuated Cycle Length (s)
Intersection Capacity Utilization
Analysis Penod (mm)
c V Critical Lane Group ^
15,6
0 43
'76'6'
15
HCM Level of Service
Sum of lost time (s)
JCtJ Level of Servioe ^
B
'?6.6"
A
Baseline Synchro? - Report
Page 4
HCM Signalized Intersection Capacity Analysis
5: La Costa Towne Ctr. & El Camino Real
Existing + Project AM
5/15/2013
< t V
Lane Configurations tt^ ttt
Volume (vph)'--.,.!, •• |tpli|i29S; 2 913 IIP 8 WWWWWWWM7WWW-'-WW'J
Ideal Flow (vphpl) 1900 1900 1900 1900 ^_ 1900 • 'i960 TotaJ l-ost fime (s) * •^'*' "-.1-0. [' 4.0 '„-.',.* .. -4.0-' 40 , ' ^.•r^;',-:'.:-:ij:^s:>^::';:::;-;^;^^t:^
Lane Util, Factor 0,97 0.91 i.66 "• oil^
Frt .1 • -' 0.99 ^ 1',60 1:00
Fit Protected '5,96 1,66 0,95 "I'oo
Satd Flow (prot) 3421 5070 1770
Fit Permitted 0.96 'i",66" 0,95 i,o6' Satd .Flow'dbfemi)" 3-^21 -„ '•' A 5070 1770 5085
Peak-hour factor, PHF 0.90 0,90 0.90 0.90 0,90 0,90
Adj Flow (vph) 32 2 ToUW.-21 9
..... aillllililiiiiil RTOR Reduction (vph) 2 """""o'* i 6 0 0
Lan*rG7oup'FioW(vphj 32 0 'i'634''' 6" 9-1566
Tum Type Prot
8 , ,7 aiillHIliiillillii Permitted Phases
Actuated Green G (s) , • 4.5 122 0 f5 ^
Effective Green, g (s)
Actuated g-C Ratio
45 122.0 15 127,5 Effective Green, g (s)
Actuated g-C Ratio 0 03 ,0 87;-0.01 o?i.
Clearance Time (s)
Vehicle Extension (s)
4.6 4.0 4,0 40 Clearance Time (s)
Vehicle Extension (s) \\:3:oT 3.0'"'' 30 JiiiiiilillliiiSiiilli-iS?
Lane Grp Cap (vph) 110
v/§ Ratio Prot > \ cOOl
v/s Ratio Perni
v/c [Ratio'J' ^, -~ 0 29
Uniform Delay, dl 66 2
PrQgresslofi Factor'' .Z^, ^,00
Incremental Delay, d2 1,5
Level of Sen/ice E
/^ppfpac]l Dpay (s), - " 677;
Approach LOS E
4418
-^6.20 i
0 23
1.5
2 54
""o.V
,- 3.5
A
" 3.5:
A
19
0 01
0.47 i
68,9
P32|
12,8
1103:
F'
4631
c0,31
0.34
0.8
• o;49 i
6.1
05
'""A"
'" 1.2
A
HCM Average Control Delay
HCM Volum'^ fo Capsci */1 ado
Actuated Cycle Length (s)
inlejsectjph Capacity'tJtilization:
Analysis Period (mm)
c ^.Cfitical Lane Group _ ;
2.9
m.o
3t2%
15
HCM Level of Service
Sum of lost time (sj
"ICU Level'bf Servioe •
i.O
A
Baseline Synchro 7- Report
Page 5
El Camino Real at Levante Sti eet
Lane Configuration for Intersection Capacity Utilization
Pic. Hr. Time Period :
8:00 AM to
9:00 AM
South Appr (NB)
Lane
Config -
urations
Inside
(letl)
Outside
Free-flow
Left Thru Right
I
I
1
1 1
Lane Settings 1 3
Capacity 1800 6000
Are the North/South phases split (Y/N)?
Are the East/West phases split (Y/N)?
Efficiency Lost Factor 0.10
HourlyVolume -fo 14
Adj usted Hourly Vo lume 14
Utilization Factor 0.01
0
0
N
N
North Appr (SB)
Left Thm Ri.ght
I 3
1800 6000
West Appr (EB)
Left Thru Ri.ght
1 I
1800 2000
Page 2 of3
East Appr(WB)
Left Thru Ri.ght
0 I I 1
0 1800 2000 1800
4^
880 27 52 1330
907 0 52 1364
0.15 0.00 0.03 0.23
34 18
0 18
0.00 0.01
Critical Factors / O.OI 0.23
2 5 140 3 126
7 0 140 3 126
0.00 0.00 0.08 0.00 0.07
0.00 0.08
y
<*W''SA ICURatio = 0.42 LOS'
Turning (vlovements at Intersection of
A
El Caihino Real aita Lcvarite Street
W
e
s
t
A
P
P
r
Time :8:00 AM
to 9:00 AM
Date: OS/03/11
Day: Wednesday
Name: Angel, Santos
Totals
76
Sub -
totals
25
Subtotals
Tolal
North .approach
1475
1416
North
\
14 880
0
921
2396
El Camino Real
2441
1
1025
34 1330 52
r 27
126
3
140
Tolal
Subtotals
Sub-
tiitals
269
Levante Street
Totals
349
E
a
s
t
A
P
P
r
South Approach Note : Leh-iurn volumes include
U-lurns, U-tui^ns in bold.
HCM Signalized Intersection Capacity Analysis Existing + Project PM
1: La Costa Ave. & Saxony Road 5/15/2013
•> .. :mw. wmw. Lane Configurations tti 'i tt f
VolufTie (vph) •-i15,30 • -" 65-; 102 1282 55 124
Ideal Flow (vphpl) 1900 J900' 1900 1900 i966 1900
Total lost time (s) W-:W7W^ "40 .40 40
Lane Util. Factor 0 95 1.00 0,95 1,66 100
•^msmwwm 0 99 1.00 1.00 0 85
Fit Protected i.OO • 6.95 100 0.95 i.oo" Sa{d."Flow (grot) ^ 3518 Iiill 1770 • 3539 1770 1583
Fit Permitted 1,66 0 95 '*"i.o6' " '6;95" '""i,'6'6" Satd i^lbw,(perm} '•"'^ 3518 " 1776'-3539 "1770 1583 " ' "
Peak-hour factor, PHF 0,90 0.90 0.90 0,90 0.90 0,90
1700 72 113. . 1424'' 61 \ i38 ^
RTOR Reduction (vph) 3 0 0 o' 0 124
L'iri$G7oupl:FowIvph) " 1769" "T13'' '1424'"' ^ "61 •-Y4- .f^---.- —^
Turn Type Prot custom
Protected Phases 2 ^^."t.:':f^^
-,..,-.•... .',,av.
6 3 liiiBliSillfsSJRIS;^
Permitted Phases^
6-8-:, / Actuated Green G(s) 41 7 56 513 " 68 6-8-:, /
Effective Greea g(s)_ 41.7 5.6 513 58 6.8
.Actuated g;C Ratio 0.63 008 0 78 010
Clearance Time (s) 40 40 4,0 4;o 40
Vehide Extension (s) ^ So 30 3,o; -"3D < 30 ' ^ . " ^ ^*
Lane Grp Cap (vph) 2219 150 2747 182 _163 _
v/s Ratio Prot ^ , -"cO.56-cO.06 0.-40 -cO.03
v/s Ratio Perm 0,01
0 80 ,0.75 0.52 0.34 ilBpiiiiiiiiiiiiiBiisiip Uniform belay, di " "9.1 29.6 28 27.5 26,8
Progression Factor 100 \mW 100
Incremental Delay, d2 2.1 19.1 0,2 1 1 "0,2"
Delay (s);, " 111
- ^v.:. «.-.-:^v .•r^AVi'l'^i^.-'^f.-'i.
43 7 29 28 6 WWWKfS^USgffWWWWWW^jWWSwW^ Level of Service B D A C ..^ ^.„,, , „..„,.„„,.I „.,,.,' \ 1,,',.
Approach Delay (s) W\^XW' ••;. 6.'3'"' 27 6
Approach LOS B A C
HCM Average Control Delay
ROM \^]ur)e jo Capacity'ratio ^
Actuated Cycle Length (s)
Intefiectiop Capacity Utilization •
Analysis Period (min)
|||iif ^||l||5og||^i^i^
9.9
0,73-
"'eiii
63 3%
15
HCM Level of Service
Sum of lost time (s)_
ICyTevel of Service'
12.0
B
Baseline Synchro 7 • Report
Page 1
HCM Signalized Intersection Capacity Analysis
2: Costa Del Mar & El Camino Reai
Existing •^ Project PM
5/15/2013
< < t A ^ i
Lane Configurations ttl^ *i tt
Voluine (vph) ' 120 83 2194 115 27 2008
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Tota] Lost timfe{§) 40 ..40 40-40 . fiO ' , .
Lane Util. Factor 0 97 100 0.91 1,00 0 95
Fri W . 100 0.85 0 99 1,00 • lioSiiiiS^iiSiSWiiiifiBSB^ Fit Protected ' 0.95 ' 100 100 0.95 1 00
Satd Ftow (prot) ' 3433 1583 5047 1770 3539 '
Fit Permitted 0.95 1 00 1,00 ' 0.95 1.00
Satd'FFowfparm)'" 3433 '1583 '504?^^ 1770 '3539
Peak-hour factor, PHF 0.90 0.90 0,90 0,90 0,90 0.90
AdlE'loVCvpSn 133 ' S2 2438 128 30 2231 ^
RT()R Reduction (yph)
Lane Group Flow (vph) o' 65 3 6 0 0 RT()R Reduction (yph)
Lane Group Flow (vph) 133 27' 25'63'"' '"O" - 30 223! * •*' -
Turn Type
Protected PJiases
custom Prot Turn Type
Protected PJiases Ipiil 7 iiiiliiillHIllliMIK^ Permitted Phases 6
4auatedGj$ep,Gi&J, 112 112 111£ 49 •120,8' '
Effective Green, g (s)
Ac!uate3j/C» ^ ,
11,2 11.2 111.9 4,9 120.8 Effective Green, g (s)
Ac!uate3j/C» ^ , 0 08 ""008 0 80 . 0 04 086 ^ ' '
Clearance Time (s) 4.0 4.0 4.0 4.0 4,0
Vetficle'&<tension fs) ' 30 30 3'0^ 30 " 30 "
Lane Grp Cap (vph) 275 127 4034 62 3054
v/sRa'tioPtot c0 04^ ' 0.51 ^ 002 c0 63
v/s Ratio Perm 0,02
V/c Ratio .J, 0 48 0 21 0 64
Uniform Delay,'d1 ^ 61,6 60.3 5,7
Prog>eislon,Factor ^, ' ' 1,00 1 00 1 21
Incremental Delay, d21,3 0.8 0.5
Dei^iy(s1f\r;^ ^ ^ .63,V 611 X-4
Level of Service E E A
Approach Selay (s), 62 2 74
Approach LOS E A
0.48
66.3
i.OO
5.8
72.1 ~
E
0 73
3.6
W.QO
1.6
5,1
A
60
A
HCM Average Control Delay
HCM yplurne'lo Capacity ratio
Actuated Cyde Length (s)
Intejgection CapacSy Utilizatiofi
Analysis Penod (mm)
C Critical Cane Group^^'
9.2
'0,71.
140,6
65.6%
' 15
HCM Level of Service
Sum of lost time (s)
Tcu Level of'Servfce
8.0
C
Baseline Synchro 7 • Report
Page 2
EI Camino Real at La Costa Avenue
Lane Configuration for Intet-section Capacitv- Utilization
Pk. Hr. Time Period :
5:15 PM to
6:15 PM
South Appr (NB)
Left Thru Right
Lane
Config -
urations
Inside
(left)
Outside
Free-flow
1 1
2 I
3
4
5
6
7
Lane Sellings 2 3
Capacity 3600 6000
Are the North/South phases split (Y/N)?
Are the East/West phases splh (Y/N)?
Efficiency Lost Factor 0.10
Hourly Volume
Adjusted Houriy Volume
Utilization Factor
Critical Factors
'47
246 1092
246 1159
0
0
N
N
67
0
North Appr (SB)
Left Thru Ri.ght
2 3
3600 6000
West Appr (EB)
Left Thru Rieht
2 2
1800 3600 40O0
Page 3 of3
East Appr (WB)
Left Thru Risht
112 1
1800 1800 4000 1800
299
299
0.07 0.19 0.00 0.08
0.07
AO
1270 908
1270 636
0.21 0.35
836 604
836 604
0.23 0.15
321
321
0.18
107 381
107 385
0.06 O.IO
0.35 0.23
185
185
0.10
O.IO
ICURatio •= 0.85 LOS= D
Turning Movements at Interseclioti'o^^^ El Camino Real "and La Costa Aven-ue
y
V/
e
s
1
A
P
P
r
Time :5:15 PM
to 6:15 PiVI
Date : 08./O3/11
Day : Wednesday
Narae : Oscar, Roxanne, Rhea
Noith Approach El Camino Real
Totals
3294
Sub-
totals
1533
1761
836
604
321
Subtotals
Tolal
2477
4590
0
2113
908 1270 299
North
k
246 1
1092 2
1405
3105
1700
South .Approach
r 67
185
381
107
Note :
Total
Subtotals
Sub -
totals
673
970
La Cosla Avenue
Totals
1643
E
a
s
1
A
P
P
r
I,,eft-ttirn volumes include
U-tums. U-uirns in bold.
30"/;, RTOR redLiotion used for .SBKTs
HCM Signalized Intersection Capacity Analysis
4: La Costa Ave. & Shopping Center Drwy.
Existing + Project PM
5/15/2013
Lane Configurations tl^ t>
yolijme(vph) 59 773 84 33 462 83 77 20 45 122 16 168
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 19O0 1900
Total Lost time (s) . -40 ' 40 40 4.0 "40 4,0 40
Lane Util, Factor 1.00 0.95 160 0,95 1 00 1 00 1 00
. -100' .0,99 ' I'OO 0 98 N?i^^:?;i'j^i:'T 0 96 1 00 Ctf86 * <
Fit Protected 0,95 1,60 0.95 1,00 0 97 0^95 1,00
Satd'HoW^^prot)' , \ 1770 3487 liiiiS 1770 3458 • ^.';..i(;i;:::;''::itiS: 1736 •|||:S|!!? 1770 1608 1
Fit Permitted 0,95 1,60 0.95 106 6.97 0.95 "100
Satd. Row {pemi) 1770-3487 1770 3458 17'36" 1770
Peak-hour factor, PHF 0.90 0,90 0.90 0,90 0,90 0.90 0.90 0,90 0,90 0.90 0.90 0.90
Adj/i?w{ypii3;:s; 66 859 03 . 513 ,927 , "85 22 " 50 136 •• 18 M RTOR Reduction (vph)
Lane Group Flow (voh)
'0 9 0 0 17 0 0 26 6 0 158 0 RTOR Reduction (vph)
Lane Group Flow (voh) 66 ' '^943 0 '37 588 0 0 132' 0 • 136 47 • 0
Turn T^e Prot Prot split Split
Pfptected Phases Ilia i4 3 8 2 2 6 IIHI Permitted Phases
^,10'9 ' Acluated'Green. G (s) 58 301 23 26 6 •'^'ii'i''J~^<?Tr.^'^ 107 10,9-^,10'9 '
Effective Green, g (s) 5.6 30,1 1,3 26.6 10,7 10.9 16,9
AcfoVtedg/C^atiQ* 0.08-' - 643 ~ 0 03 OS's ^^0.^5."-0.16-016
Clearance Time (s) 4.0 4,0 4,0 4.6 4,0 4.6 4.0
Vehicle Extension fs) > ^ 3,0 30 . 3 0'^' 30 - 30 30
Lane Grp Cap (vph) 147 1499 58 1314 265 276 250
v/5 Ra"tlg'Prot ,c064 c0 27 0 02 017 c068 c0.08 0.03
v/s Ratio Perni
v/c Ratio _ 0 45 0 63 0 64 .'0^45', 0 50 049 019
Unilbrm Delay, dl 30,6 15,6 33.4 16.2 27.2 27.0 25.7
Progression Factor .151 1.00 100 1,00 iOQ:. 100 1.00
incremental Delay d2 17 1.6 20.8 1.1 1 5 1.4 6.4
Delay ^s) 47 8. •'7 2 54 2 173 28 7 284 ?61 i
Level of Service D B D B C C C
Appfoach"Delay (s) >1912 194 28 7 27 0
Approach LOS' B B C C
HCM Average Control Delay
HCM VoTume'to Capacity ratio
Actuated Cyde Length (s)
Jntefsection Capadty Utilization
Analysis Period (mm)
0 Cnljcal Lane Group
21.2
0'58,
70.0
60.0%
15
HCM Level of Service
Sum of lost time (s)
ICU Level of Service
16.0
B
Baseline Synchro? - Report
Page 4
HCM Signalized Intersection Capacity Analysis
5: La Costa Towne Ctr. & El Camino Real
Existing + Project PM
5/15/2013
< t t
itewfet." „„. jl'-. %l\ <-..... ' . - ..1
Lape Configurations w ttl^ ^ ttt Vdum^ (vph) ^ 50 5 1546 25 20 1360
Ideal Fiow (vphpl) 1900 i960 igoo i960i966'
Total Lp^tjime (s) 4.0 -^:, 4 0; 40 , 40
Lane Util. Factor 0.97 0.91 1.00 0.91
Frt . 0.99 100 1 00 1.00, , " '
Fit Protectea 0.96* 1.06 0.95 1.00
Satd, Flow (prot)' '"" 'mmfww 5073 J770 608^ ' . '> •U? '-."v^^'. :-ww'.
FItPermitted 0.96 100 6,95*'{;o6"'"'"
,Satd7Floi» (pfertfl) - ' 3407 "5073 1770 5085
Peak-hour factor, PHF 0,90 0.90 0.90 0.90 0,90 0,90
M£lqWlvphJ\. ^ 56 -..5. 1717 28. ' ^ 22; lift: ' ' ^
RTOR Reduction (vph) 5 0 1 ' 0 ^ 0 0
Lane Group Flow (vph) 56 6 -1744 '"^22" 1511'-
TurnType_
Pfbtecfed Pnases
Prot TurnType_
Pfbtecfed Pnases SBIill 7 ^ 4
Permitted Phases
Acfua+ed Greer G(s) 36 ww?^l'^m•. 5 0 125 4 \ ' • ' "
Effective Green, g (s) 6.6 116.4 5;0 125.4
Actuate'dg/C'Fiaho, > ,.•0.05 " "OSS 004 0 90~-; i^l^:ij^3j|':;;^
Clearance Time (s) 4.0 4.0 ""'40 ''4.0
\/ehlcTe""Extension (s) ' ^3.(i 30 30-30
Lane Grp Cap (vph) 161 4218 63 4555
v/s Ratio Prot cO 02 cO 34' 0 01 c030 . {"'
v/s Raiio Perm
y/c^Rifajp^ ' '0 35' 0,41 0 35 0 33 y;'v.-;;7;;7:
Uniform Delay, dl
Pr6gires"sipn Factor. - c
64.6 3.0 65.9 1,1 Uniform Delay, dl
Pr6gires"sipn Factor. - c .7! "W",: •:'.r:-:'.S?::«r;-';'^-Sf:':,^=^";.;^i:i;^>::^-^
^ 3,70'-0.90 4 69
Incremental Delay, d2 i.3 0.2 '18' """6;i
Delay isi f-c 9 11 5 iiilll; ^612 . 52 . - , Sliliiiiilf;
Level of Service E ' " B E A
/\ppr6ach belay {s) 65 9 r • 115 liiiaiiSiaailiifliiW 'WSSiSi
Approach LOS E B A
HCM Average Control Delay
HClVI Volurhe to Capacity ratio
Actuated Cycle Length (s)
intersection Capacity IJiihzabon'
Analysis Period (mm)
c Cntical Lan6 Group , ' :
10.0
0 41
140.6
'46.4%
15
HCM Levei of Service^
Sum of lost time (s)
icOTevVl of Service "':
12.0
A
Baseline Synchro 7 • Report
Page 5
El Camino Real at Levante Street
Lane Configuration for Intersection Capacity Udlization Page 3 of 3
Pk. Hr. Time Period: South Appr (NB) Noi-thAtiprfSB) West Appr (EB) East Appr (WB)
4:45 PM to
5:45 PM Left Thin Right Left Thru RiKhf Left Thru Right Left Thi-u Right
Lane Inside 1 1
Config- (left) 2 1
urations 3 I
4 ! 1
5
6
Outside 7
Free-flow
1
1
1
1 I
1
1 1
1
I
I
Lane Settings 1 3 0
Capacity 1800 6000 0
] 3 0
1800 6000 0
1 1 0
1800 2OO0 0
1 1 1
1800 2000 1800
Are the North/South phases split (Y/N)?
Are the East/West phases split (Y/N)?
Efficiency- Lost Factor
Hourly Volume
Adjusted Hourly Volume
Utilization Factor
Critical FatJtors
N
N
^1 0.10
20
20 1566 0
O.OI 0.26 0.00
y 0.26 /
157 1532 30 31 4 7 87 0 95
157 1562 0 31 11 0 87 0 95
0.09 0.26 0,00 0,02 0.01 0.00 0,05 0.00 0.05
0.09 y 0.02 ^0.05
ICURatio = 0,52 L0S =
--¥imMiig--M-oveitwttt4-at4ittei'3eett0rt-efT--El-C*BSi»«-Bftal—an-d—^Levante-Street-
W
s
t
A
P
P
r
Time: 4:45 PM
to 5:45 PM
Date: 08/03/11
Day: Wednesday
Name: Angel, Santos
Totals
94
Sub-
totals
52
42
31
4
7
Subtotals
Total
North Approach El Camino Real
1,
1626
1719
1532
3262
0
157
North
1
20
0
3212
1419
1586
1543
30 1532 157
147
95
0
87
Total
Subtotals
Sub-
totals
182
308
Levante Street
Totals
490
E
a
s
t
A
P
P
r
South Appi-oach Note: Left-tum volumes include
U-turns, U-tums in hold.
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
APPENDIX D
Other Projects Considered
002312 D 002312^Rcport C.(loc
(jT) Robertson Ranch-, East Village \
(7) Quarry CreeK Master Plan
^(On Marron Rd west of Collesje Blvd.)
Sage Creek Higti
• —^ School (D
PROPOSED-
PROJECT
ATmCHMENT4
Other Projects Location Map
LA eOSTA TOyViaE CENTER
PENDING OR APPROVto PROJECTS LIST
1 Quarry Greek,Master Plan
Do,s Golinas
65a LinitS; parK S;ride, commtinity faci iti^S'
309 units ,5enior GOntinuing care facility |
5.578
1,340
fncltide
Itldidde
TAZ ok
TAZ ok
Robertson;Raneh PA It geyOOG'sq. ft. office building: 1,320 Include Revise TAZ
Robertson:Rarie,h'Ea,st:Vjllage Remaining 246 ;singie family dwelling iioits and 52 condos 2,876 include Revise TAZ
Ranoho ivlilagro 22 single fatnily dwelling:,;units 264 Incliide TAZ ok
Sage:Cree,k:,Higti School T,50,0.,studerits 1,950 Include Revise TAZ
Aiga Norte Park 32 acre site 1,600 Include TAZ ok
Cgplsbad Ua .Costg:C.QlleGtion 53tQwnhbrri:eg;(AlECR/Dov6Ln.) j | 424 Include: TAZ ok
Roinsettia, Place 82 iinits (68 tovvntiomcs and 14 stackgtjjflat Gondo units) 656 Include TAZ ok
10 Pizza Port (w/in Bressi RartcH): 37^000 sq. ft industrial with 4.300 sq. ft.|restaurant. 692 Include. Revise TAZ
11 Carlsbad Paseo,North 61 ,B60 sq. ft. COmrhercial 3.532 include RevlSieTAZ
12 Carlsbad Paseo South 120,000 sq. fL commercial 5,868 Include Revise TAZ
13
14
Legoland Hotel 25,0 room resort hotel 1,800 fnclude TAZ ok
Green Dragon: Tavern 21,334 sq. ft. restaurant and bboK stojef 1^5 Indlude TAZ ok
Bressi Ranch: Rlanded Industrial Increased TAZ to 15.0 KADT 15,D0tj Include 50% plus
3 hotels
Revise TAZ to
include Project, 3
hotels, Pizza Port,
Gas Station.
16 Palomar Airpdrt Commons 15.0 acre com ni unity conl merdjal 12,320 tnclude TAZ ok
285,000 sq. ft. community commercia 22,752 Include TAZ ok
17 La Gosta:Toyv'ne (Renter 128 candominium^ dwelling: units 1,024 No TAZok
64 single family dwelling units, 640 Mo TAZok
55,000 sq. ft. office 1,100 no TAZok
TAZ: Traffic Model Trafflc Analysis Zone
APT = Average Daily Traffic Vblume
An~lys_l: lnlei:occ~6n:
Fulllf<l! COOd!Uo11:
Cat¥. ·
Compal)y;
Pr9J~C!: Hulitt:er~
Jll.cob Swim
EJ ca~nO' R!iill/ Lilvii.nle sveet:
·o\t)_erPtojec~
M!012Q11
lkba~ Sy,tcm3 /\l)$0;llltes, Inc.
002312
Other Projects
lnteliuictioh ii
Et#-~~~ t;J~me~ L!l,y~n~ $1f!le\ NIS slr'eel Nani_O:-EJ Camin'o R~al
TP^FFIC IMPACT ANAJLYSIS
For
LA COSiA TOW lSQtJAR£^
Prepared for
ASPEN mOPERTIIS
D,ecember,.23,200,8
© URBAN SYSTEMS ASSOCIATES, INC.
TRAFFIC PLAwkli-JG&B!^GlNEEfelNG, MARKETI^
CONSULTANTS TO mDUSTRY AND,C3QVERN,MEMT
4540 Reaniy Villa Road, Suite 106
SanDiego, CA 92123-1573
(858) .550-4911
La Costa TQVn Square
Aspen Properties
© Urban Systems AssopiateS, IrK:.
December 23,200.8
TABLE 4-1
Project Trip GeBeratioa
PropOs.ed
Broject Amouut Trip Rate
'/„.!..;,.^:...;,.-„jja.v
AM PEAK HOUR PMPEAK HOUR
PropOs.ed
Broject Amouut Trip Rate
'/„.!..;,.^:...;,.-„jja.v
ADT % In/Out In Out % n In/Out In Out
I Conjraunity
Shopping Center SF 80 /KSF 2-2,752 4 910 ' .S : 4 54.6 m 10 2,'27;5 5 : 5 1,13^ ,i„te
^Condominium 12.8: I3U /DU 1,024 :8 82 2 : S m 10 1,02 7 ; 3: 71
-il,
31
iSmgle'Fsimiiy:
Resiaentjal m m. 10 /DU 8 51 ^ : 7 i-5 36 10 7 ,: 3, 45 I;
19
*:
55,000 20 1,1,00 14-154 :? ? I i3S> 15 13" :i4:3 ,2 : 8 29 9 -' 114
TOTAL 25,516 1,197 716 481 2,S84 1,283 ijidi
:l;
: Legend;
©'-Trip, rates source,is SANDAG Traffic Generation :Rates, for the San Diego Region, April 2,002.
•"KS'F^hOTSMia'S'Ctcare-Felt
Dtr = Bwslling Units.
00070'^ 4-4 0007G4Jlepdrl_H.(bc
•in Cpstn Ta\-vn Square
Aspen Pfoperiies
© Urban Systems Associates, Im,
December 23. 2008
NOTEA:
,At the: IiitsT5tatii,:5./(La:C(3sta A.'i'eiiue;anci
.rtil.eistai? 5 /Leti,cad,ia Eoulevard .iniferchanoe, the
,dis,{ribution is split 3:& to and fTom tho;north aTid
3% tt> aricl frorrt ftiis south.
FIGURE 4-2
Project Trip Distributiori Percentages
0.00704 4-5 OOOIOHJeportJldoc
La Costa To^in iSqim'e
Aspen Prpperties
I Urban Sysienis Assoeiates, Inc.
December 23,2008
w
FIQURJE 4-4
Projeqt 0»ly Average Dail}^' Traffic
0Q07O4 4-7 OOO/OyReporlJLdoc
ia Costa Tom Square
Aspen Properties
© Urban Systems Associates, .Inc.
December 23,2008
Page l pf 6
;K
i t ^7/13
t k
\r
•^
,ui in
Raridlio Sartta Fe Road al
Sail Marcos Drive
00
r«
03
,/j(aitct Or.
Rancho :Santa F» Road at
;|slan:d Driv^
> 7/1 3
\r
f» in cvl —
Rantjfio Saofi Fe RbatJ
„<••<,
7/l'3
M,eli'bse ;Prive at
Palom'ar Afrport Road
%
1 t
lo o to
M "--N IS,
ir>
Randho Santa Fe Road at
Camino .del Arrov:0
It!
J?aric/io Swiiido
in
Melrose, Drive at
Rancho Br'ayado:
FIGURE 4-5
Project Oftly AM / PM PeakIBbur Traffic
000704 4-8 0001M_RaporiJi.i\oc
Hi/.
'cJL
x
M'
5 •2,^ 57^ ,/|5T
4-
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
APPENDIX E
Near Term With & Without Project Synchro Worksheets
002312 E 0023I2-ReporlC.doc
HCM Signalized Intersection Capacity Analysis
1: La Costa Ave. & Saxony Road
Near Term AIVI
5/15/2013
—• > f ^ ^ A
.'!;A£fl, t\yfe jrjL.^ Ij^^P SV^;3~-:--!;3-::-'-""'.^-;5^
Lane Configurations
Volume (vpf^ 1262 102 117 1355 30 63
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Total Lost ttme (s) ' ;4o 40*' 4^0 JO "40 '
Lane Util, Factor 0.95 1.00 0.95 1,00 1.00
Frt ' \ . , ^ ' 0 99 " ' ^^ 00 1,00 Vl 00 0.85
Fit Protected 1,00 0 95 1 00 0 95 1 00
Satd;FJpw{prpt)^ 'SSOQ- . 1770'^ 3539 ,17"70;.458| - W"i '"'^
Fit Perniltted 1.00 0,95 1.00 0.95 1.00
Saldflowfperrnf'^' , . 3500 " f770 - 3539 ' 1770 ISSS* ^ ' ~-
Peak-hour factor, PHF 0.90 0,90 0.90 0,90 0.90 0.90
Adj.:FloV(yph): - '1402' iy^^Wi^i^ iii?^ ^Wc^0^iiWrW 'W^^\
RTOR Reduction (vph) 6 0 0 0 0 64
LaneGrbup Flov/fvpti) 1509 "^T •"'l3t)Tl566'' "^33 ' • 6^
Turn Type
^5tectld_Phases
Prot custom Turn Type
^5tectld_Phases 2/
Permitted Phases 8
Actualedfereen,-G{s) 41 1' "8j).S53l7''T2 7 §2 WW. " '
Effectve Green, g (s) " " 417 8.0 53.7 6.2 6.2
ActuaWiJcmp^'"^"^ 0 61 . Ojr' 079' ,\0 09'^ 'O'OT
Clearance Time (s) 4.0 4.0 4.0 4.0 4.0
Vehicle Extension (s) 30 ' 30 ' '3 0 ' 3 0 3 0
Lane Grp Cap (vph) 2149 209 2799 162 145
v/s TRabo Proj' , \'^ « fcO 43 ^ 0 07' cQ43 cQ02 '
v/s Ratio Perm o.oo'
v/c Ratio Q.70 ^62 '0 54 ..0^20 0,04 , ^ :i^Mv^ii^^WW'^'WV::i: "^r! 'W^
Uniform Delay, dl 8.9 28 5 2 6 ' 28 6 28 1
Pcc^ressiori factor'-100 '^"^-^'lO^l'^ JOO joo'.M'oo ' ""^ ^
Incremental Delay, d2
Delay (s)L/\
1.1 5.7 0,2 0.6 0.1 " ^ " Incremental Delay, d2
Delay (s)L/\ 99 W" 34 2"''' 28 292/x2a3'^ ,\ T '
Level of Service A C A C' C
Approach Delay (s>) 9-* ^ * ^' r 53 ''28 6"
Approach LOS A ' " A " C
HCM Average Control Delay
HCM Volume lo C?pac ty ratio
Actuated Cycle Length (s)
IplerseCtio/Capacity Utilization
Analysis Period (mm)
c Critical LaneGjroup ^ . N
8.2
'^064
67 9
57 9% •
15
HCM Level or Service
Sum of lost time (s)
rcU Level of Service
12.0
Baseline Synchro 7 • Report
Page 1
HCM Signalized Intersection Capacity Analysis
2: Costa Del Mar & El Camino Real
Near Term AM
5/15/2013
t V
iliS& iSM:.ilii:?ifi£:£2.i:il:i^
Lane Configurations V\ f m *i H Voljme(vph)" 44 20 1772 129 59 1955
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 , . 40 40 J.Q^ ' 40
Lane Util, Factor 0,97 1,00 0,91 1.00 095
HW ^ 1.00 • 0 85 0 99 1.00 ^ 100
Fit Protected ~ 0,95 1,00 1,00 0,95 1.00
Satd.jfow(prot)^, ' , 3433 •1583-5034 1770 3539^^ " ^
Fit Permitted 0,95 1,00 1 00 0.95 loo""'
Satd'Flow (perm) 3433 1583 5034^^' 1770' 3539
Peak-hour factor, PHF 0,90 0,90 0.90 0,90 0.90 0,90
mmmv'kw 4.9 22 1969 143"' 66,"
RTOR Reduction (yph)
Lah6 Groiap'Flow (vph). >
0 20 6 0 0 RTOR Reduction (yph)
Lah6 Groiap'Flow (vph). > 49 ^' ' 2 2108 66
Tum Type
Er^ictiphkses". -
custom Prot Tum Type
Er^ictiphkses". -t. 8 •ai. ^ IIBI
Permitted Phases 6
Actuated Green G (s) i03 103 108.5 92 1217^ " , ,
Effectve Green, Q
Actuated g/C Ratio'
10.3 10,3 T08,5 9.2 1217 Effectve Green, Q
Actuated g/C Ratio' 0 07 0 07 0 78 0,07 0 87 ^
Clearance Time (s) 40 40 4,0 4,0 4,0
Vehicle Extension (s) 3'0 30 • 3,0 30 30
Lane Grp Cap (vph) 253 J_16 3901 116 3076
v/s Ratio Prot cOOl 0 42 0 04 c061 ^
v/s Ratio Perm 0 00
v/c Ratio 0.19 0 01 -,"0 54 -.0.57 •> 0 71 -liiliiiBlliilliillB^ Uniform Delay, d1 eo9 60.1 6.1 63 5 3.1
Progression Factor - LOO -i.po 0 95 tSo 100,. .\
Incremental Delay, d2 04^ 6.0 0.5 6.3 14
Delay (s) "x ' " 61 3 ' 60'2 , 62 69" . 4.5
Level of Service E E A E ' A
Approach Delay (s) 6~1 0' 5 2 6 4\
Approach LOS E A A
HCM Average Control Delay
HCM \^lijm^ to Capacity ratio-'
Actuated Cycle Length (s) ^
Intersection Capacity Utilization
Analysis Penod (mmj
c'^ 'Critical Lane Group
7.2
0 67
140.0
64.0%
15
HCM Level of Service
Sum of lost time ^s)
ICU Level of Service
8,0
' 'c
Baseline Synchro?- Report
Page 2
HCM Signalized Intersection Capacity Analysis
3: La Costa Ave. & El Camino Real
Near Term AM
5/15/2013
> —• > r *-t V \
IHifisM,,,- ' 3:;iil:5 liHil 2iili:i;;
Lane Configurations ft r \ f itt* V\ ttt f
Volgrpe (vphj ^ 763 312 299 118 561 227 220 719 21 148 1032 724
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 ^ 1900 1900 1900
Total Lost time (s) 40 40 ''40 iO 40 40 , 4.0 ^ "40 40 '40 40
Lane Util Factor 0.97 0.95 1,00 1 60 C95 1.00 0.97 0,91 0.97 0.91 1.00
1 00 "l.OQ, 0 85 1 00 ^iloo.. 0 85 loo 100 -.1.00 1.00 085
Fit Protected 0.95 1,00 1,00 0.95 1,06 1.00 0.95 1,00 0.95 1.00 1.00
Satd Row (p(ot) •3433 3539 ,1583. Wmw 3539' 1583 3433 5064 3433" 5085 1583
Fit Permitted 0.95 1.00 1,00 0.95 1,00 1.00 0.95 " " 100 ""0.95 1.00 100
Safer'Flow (peW \ 3433 3539 1583 1770 3539 1583 3433 - 5064" " '3433 " 5085 ""1583
Peak-hour factor, PHF 0.95 0.95 0.95 0,95 0,95 0.95 0.95 0,95 0.95 0.95 0.95 0,95
AO] Flow (vph) 803 =328 315 124 5-91 239 232 .757 ' 22 156 1086 ' \762
RTOR Reduction (vph)
[ane^roup Flow (vph) 9' b 0 169 d 0 131 0 2 0 0 0 14 RTOR Reduction (vph)
[ane^roup Flow (vph) 9' 803 328 146' ^24" 591 "108! ' 232 777 ' 0" • '156;" 1086 748
Turn Type Prot Perm Prot Perm Prot Prot pm-i-ov
pTotectecrPhases 5 2 6 3 g - 7~"-4' WWJ
Permitted Phases 6 4
^ctiJaiefGTeetii? WW W. ^9 ^ 54 6 54.6 :^14.5 29 2 29 2 •'44 4 .?r'iS:.;.-.Wi5:;:HW:V-'3.-"-'10 5 ..419" 1818
Effective Green, g (s)
Acfu|fedg/a"kat'o
39.9 54,6 54.6 14,5 29 2 29.2^ 13,6 44.4 10.5 41,9 '^818 Effective Green, g (s)
Acfu|fedg/a"kat'o 0 28 0 39 '- 0.39 -010 ' 0 21 0 09 0 32 008 : 30:30'''^ >0.58
Clearance Time (s) 4.0 40 4,6 4.0' 4,0 40 4,0 40 4.0 4,0 ' 40
Vehicle Extension (s) 3,0 30 3.6 30 3^0 "3"'0 > 30 30 3.0 • '3.0 30
Lane Grp Cap (vph) 978 1380 617 183 738 .330 . 319 1606 257 1522 970
v/s Ratio Prol/ / ' c0 23 0 09 0 07 c017 c0 07 015 0 05 0 21 CO 22
v/s Ratio Perm 0 09 '0.07 0 25
v/aRalio' '/^^ 0 82 0 24 0 24 0 68 \-o.8o:-0 33 0 73 -'0.48"-0 61 0 71 ' -0J7
Uniform Delay, dl 46 7 28,7 28 7 60.5 526 47,1 61,8 38.6 62 8 43 7 22.0
Progression^Facto' 1.06 1.00 100 0 80 ' 0,86 • 0 98 '0 91,^-103 0 94 103 ' 116
Incremental Delay, d2
Delayls')'
5,6 0.1 0.2 8.4 5.5 0.5 7,9 10 2"9 2.1 2.8 Incremental Delay, d2
Delayls')' 523 28.8 28.9 56 9 50 8 46 7 •-".640 40 9 61.9 469 ' 2^8 2
Level of Service D C C E D D E D E D C
Approach Delay (s) •• 41 9 50,6 45 2 «^W^W^WiWS^''' 40.9
Approach LOS D D b D"
HCM Average Control Delay
l;;|Cf»^ Volumf Jd Capacity ratio
Actuated Cycle Lenglh (s)
Irjterseqtiori Capacity Utilization
Analysis Penod (mm)
c Critical Lafia Group
43.9
0 78
140.0
76 8%
"15
HCM Level of Service
Sum of lost time (s)
ICU Level of Service
^ D
12.0
D
Baseline Synchro 7 • Report
Page 3
HCM Signalized Intersection Capacity Analysis
4: La Costa Ave. & Shopping Center Drwy.
Near Term AM
5/15/2013
—*• > ^ t V [ V
&il-y ail m •mw Lane Configuratons tli %
Volume (vph) 39 362 70 28 767 82 24 5 10 45 10 124
Ideal Flow (vphpl)
Total Los! tirtie (s)
1900
^ ' 40
1900
.4,0
1900
:,-f^?;;^:f>J2:-;:-:;>^
1900
4.0
1900
' 40
1900 1900 ^ 1900
40
1900 1900
40 .
1900
40
1900
Lane Util, Factor 100 0 95 1 00 0.95 1.00 1,00 1.00
Frt 1,00 098 lOtf 0.99 0.97, 100 0.86
Fk Protected 0.95 1,00 0.95 1.00 0.97 0.95 1 00
Sit^; FlbW'(prQt) 1770 3453 1770 3488";. 174§ 1770 16()4
FltPermJed 0 95 1,00 0,95 IOC 0.97" 0,95 1.00
Satd" Flow (perm) •1770 . 3453 1770 3488 1746 Vi:^-?\:;t'!^'^ '1770 1604
Peak-hour factor, PHF 0.90 0,90 0.90 0,90 0.90 0,90 0.90 0.90 0,90 0.90 0.90 0,90
43 402 •78 31 91 27 • • 6 "• 11 50" "IT" 138
RTOR Reduction (v^hj
talrelsroup F'lowwTi)' •>
0 15 0 0 8 "o 0 10 0 6 121 0 RTOR Reduction (v^hj
talrelsroup F'lowwTi)' •> - 43 465 " '0 '3f 935 0 6 ' 3T ' 6 :"5o'"' 28' 0
TurnType
f rjl^edf^ases "W^W
Prot
7 4
Prot
3 > 8
», J ...
Split
_ 2 2 mm Split
6 .6 •^^ ^ ^
Permitted Phases
Actiiated Green, G(sj 38 • 34 5 2 5 33 2 83 87 87
Effective Green, g (s) 3.8 34,5 ^2,5 33,2 8.3 8.7 8,7
Acfu&le'dg/C'Ralio" 0 05 049 "0,04" . 047' i ^ '0J2 012 012
Clearance Time (s) 4,0 40 "4,6 4 0 40 4.0 4,0
Vehicle Extension (s) v ' . 3.0 3 0 3 0 3 0 30 3 0 3.0
Lane Grp Cap (vph) 96 1702 63 1654 207 220 199
v/s Ratio P|6t C0 02 0"13 0 02 c0 27 'c002 ^ c0 03 0.02
v/s Ratio Perm
y/q Ratio 045 0 27 049 057 017 0 23' 014
Uniform Delay, dl 32.1 104 33,1 13,2 27,7 27 6 27.3
Prog'fessioij Fj^actor 0 60 f31 1 00 ^ 1,O0~ 1 00 100 100
Incremental Delay, d2 3.2 04 5,9 1,4 04 0.5 '0.3
Delay , , 224 14,D •39.1 14 6 281 281 27 6
Level of Service C B D B'" C C C
Approach Delay (s) IT '-14.7. 154 28.1 27 8
Approach LOS B B C C
HCM Average Control Delay
lHib|i|^Q(ijjje to_pa(^
Actuated Cycle Length (sj
[ntersection Capacity Utilization
Analysis Penod (mm)
G|^l|o||Qi|Sf yf^l^
16.9
0,44 ' ^
mo
52.0%^ :
15
HCM Level of Service
Sum of lost time (s)
iOU Level of Service' '
B
16.0
A
Baseline Synchro 7 -Report
Page 4
HCM Signalized Intersection Capacity Analysis
5: La Costa Towne Ctr. & El Camino Real
Near Term AM
5/15/2013
Lane Configurations
Volume'fvph)
Ideal Flqw (vphpl)
Total Lost time (s)
*iV
20
1966
"io
2 WMWW
1900
40
1900
3 1409
1900 1900
4.0 4 0
Lane Util, Factor " oif' 6.91 'lOO 0,91
Frt• ~ 1 00 ^ 1 00 100 . ' ~ , ';'
Fit Protected IM" 1.00 0,95 1.00
Satd,'Ffow Cprot) ,
FItPermitted
•3412'
'OM^
,-5071;:/ i.66
1770 5085 " , . . r "
0,95 100
Satd. I^lovi/(penny ' ' ^ f34l2t, 5071 " 1770 5085
Peak-hour factor, PHF
RTOR_^Reductlon (vph)
Lane Group Flow (vph)
O.90
22
2
- 22
0.90
' '2
0
0,90
; Mi
1
'^1029'
0.90
• 0
0,90 0,90
,J 156§, .
0 0
""3 ' 1566 " ' ^ — -
TurnType^^_
Protected Phases
Permitted Phases
8
Prot
:S>i:S>*S:!s:€5Siaia»::j5ffi
/\cTu^tfd iSr^en, G (s) ^
Effective Green, g (s)
Actuated g'C Ratio'
Clearance Time (s)
4.2
42
'0,'03"''
4.0 '''**''"••"*••*••'•'•• 122,5.'
122,5
0.88
40
'•fSVS^^
1 3 ' 1278^ _ ^
13 127,8
ip^iiii^iiiiiiiiiPiPiiiiiiPii;^
4.0 4 0 V'efiicle SdensTon (s) ' ' , 3.0 iilOS' 3.0 30 30 ' '
Lane Grp Cap (vph)
v/s fetio Prot
102
c0 01 •.4/;-5.f^-:?:rf,f';v5J.
4437
0 20
16 4642
0 00 c0''31
v/s Ratio Perm
v/c Ratjp .0.22 0.23 IsosiiHiiiii'iapiii Uniform Delay, d1
Progression Factor^
Incremental Delay, d2
Delay ($) ';
Level of Service
66.3
too
1.1
67 4 . ' " "'1
1.4 * •
0.76 "o.f"
12
A
68,8 0.8
. 0 76 1 22
4.5"6,2" "
IIS)iliiSiii|iiii^^
)^pproac^^pelay^(s) "
Appmadn LOS
67 4.
E
12
A A
^^^^^^^
HCM Average Control Delay 1.8 HCM Level of Service A
hICM Volume to Capacity ratio .0,33;,/-SMlliiiiiSiiiiliiiiiisiiii^^ Actuated Cycle Length (sj
ir|tersectlon::Capaeity:li|li||Sor)|;
Analysis Period (mm)
c»CriE8|Fj||H8^sti|^^
140.0
y 2='^
15
Sum of lost time (sj
""fCQlevel of^efvi'ce;
8.0
Mm!
Baseline Synchro 7 - Report
Page 5
HCM Signalized Intersection Capacity Analysis
6: Levante Street & El Camino Real
Near Term AM
5/15/2013
> >
Mii. .jmy mm '•y •> H ^W Ji-'^L-m Lane Configurations \* t f ttl^
yolume (vph) 18 2 5 140 3 126 14 880 27 52 1330 34
Ideal Flow (vphpl) 1900 mo'' 1900 1900' '1966 1906' i960 1900 1900 1900 1900 1900
Total Lost time (s) '/ 40' - 4.(5 4.0 • - "4,6-•:• 4.0'" - - .4,0- . 4 0 - '4,0; :i/;>:.:-\j,.ri;
Lane Util. Factor 1.00 1,06 1,00 1,00 1 00 100 0-91 1.00 0.91
1 00, '-.0,^8^';,. 100 1 00 0 85 • • 1,00 -1.00 ' , , .100\ 100
Fit Protected 0.95' 1,00 0 95 "ioo 1,66 0,95 1.00 6.95 ioo
Satd Flow (prot) 1770 1653 ' 1770. 1863 •iill '••1770'' 5063 1770' 5066
Fit Permitted 6,95" 100 0 95 1.00 166 0 95 100 0.95 100
Satd .Flow (permf ' . ' 1770 '•l'fe3'' 1770 1863 1583: 5063' '1770 5066
Peak-hour factor, PHF 0,90 0.90 0.90 0,90 0,90 0.90 0,90 0.90 0.90 0.90 0.90 0.90
Ad/Flo//Jvphj -20: 2 6 156 •l40" .^,38
RTOR FReduction (vph) 0 5 0 0 6 -' 0 2 0 0 1 0
Lane Group Flow (vph) * ' ~ 20' ' 0 • '' 156' ' 3 29' • •ioo6>'"'; 0"'^'""58''^Igir^' 6
TurnType
Prptectl^ Phases ' J
Prot Prot Perm Prot Prot TurnType
Prptectl^ Phases ' J WWWJ: 6 3 lilHH'
Permitted Phases 6
/VctuatedGreen G (si 44 157 176 28 9 23 9 .32. 820 87 875
i.--..:..,-:;.-.":...!.••:; ^.-.-£V»•:^^-^\*i^v•t*^•^v•..•:\•^^,?^^.r,'^' '*S:fe;:#:"-
Effective Green, g (s)
Actuated g'C Ratio
4,4 15.7 176 28,9 28;9" 3,2 82 0 8.7 87.5 Effective Green, g (s)
Actuated g'C Ratio 0 03 '"•ori I. 013 0 21 0 21 0 02 0 59 0.p6>'^'0 6'2
Clearance Time (s) 40 ...^ '"Jo" '" 46' " 4,0 '4,0 40 40 40
Vehicle Extension (s)' . 3.0 , ^'•"•T3.o';\-\ 30 3 0 3 0' "^3.0 .30 .':y.30"' ' 3.0
Lane Grp Cap (vph) 56 185 223 385 327 40 2965 110 3166
v/sRat|o prot. o'oi "P.-OO , liK iiilll 001, '020 cO.03' CO 30
v/s Ratio Perm cO.02
v/c Ratio ^ - - • " 0 36'^ . 0 01 070 -0,01 0 09 • ,o,4o; 0 34 053" 048
Unifonn Delay, d1 664 ' 55.3 58.7 ""442' '44;9" 67.5' 15.0 63,7 14,6
P[ogr6ssion,Faetor "^JOO ' •MOO" . 100 • \ipo if661 • 100--'i700". ^ . 0'80 • ' j95
Incremental Delay, 62 3^-•"6,6 "" 9.2' 6,6 o.^ ' 6.4 03 43 ^05
Delay{s}"-- •^ " '70,3 " ;;55,3 67 9 4^2 45 0 73.9 153 553 279
Level of Service E E "E" D "E B E C
-65 0 .569 ^16.2' 28.9
Approach LOS E E B C
HCM Average Controi Delay
fiCM Volume to Capacity ratio •:
Actuated Cycle Length (sj
|ri|^^iii|§|||t|^
Analysis Period (min)
c Critical L*ane Group
27,7
- 0.45;:
'140"6"
' 15
HCM Level of Service
Sum of lost time (sj
liiQie^eiaft^flitSS
8.0
Baseline Synchro 7 • Report
Page 6
HCM Signalized Intersection Capacity Analysis
1: La Costa Ave. & Saxony Road
Near Term PM
5/15/2013
Lane Configurations tT*
Voiurne (vph) T 1599
Ideal Flow (vphpij 1900
Jotal Lost tme (s) ' ' ^ 4 0
Lane Util. Factor 0.95
Frt ••;- ; ' ^0 99
Fit Protected 1,00
Satd,Flov^>jo't), " 3519
FItPermitted 1,00
$atd.Flotv'fp%'mn)^^ ' . 3'519
65
1900
1
101
1900
•4.0 .
100
\tPP..
0.95
1770 -
o.o's
1770
tt
1354
1900
40
0,95
i'oo
1,00
3539
loo"
3539'
\
55
1900
40
1.00
1.00
0,95
1770
0,95
1770'
123
1900
40
1.00
0 85
100
•1583
1,00
1583
Peak-hour factor, PHF
RTOR Reduction (vph)
Lan^G>6^p1=loV?(^h)
0.90 0.90
1777 .72
"4 ' " 0
1845 0
0.90
il2
112
0,90
f5pT
0
1504
0.90
61"
0
' 61
0.90
121
'16
es •
Turn Type
Permitted Phases
Effective Green, g (s)
^Mted'g/Cpio-:;"
Clearance Time ^s)
Vehii^e'Extension (s)
'374
374
'. aeiv
40
3.0
Prot
1
51
5,1
0.08
4.0
'30
custom
6 .'3
46,5
46,5
<or75\;
4,0
30
72
7.2
012
4.0
"30
8
72
7.2'
4.0
'^30
< V 1 •*•
11T ». usr
Lane Grp Cap (vph) 2133 146
v/s Ratio Prot "\ ^ ^c0 52 " ^ J c005 ,
v/s Ratio Perm
v/cfetio \ 0 87 ' ^ 0 77 .
Uniform Delay, d1 10.1 27.7
Progression Facto; 1 00 1 00
Incremental Delay. d2 3.9 21.1
PilayM, _ . ^ . .s14.0"\, ^"48 8
Level of Service , ^ D
Approach Delay (s) ' ' 14 0
Approach LOS B
2667 207
0'42 c0 03
0 56
3.3
0.3
35
A
67
A
029
24 9
1 00
08
,257
C
24 9
C
185 ilP
0.01
0 09
24.3
.1.00
0.2
24 5
C
HCM Average Control Delay
HCM Voluire to Capacit/ r'u
Actuated Cycle Length (s)
lntersfec|pp Capacity litilization
Analysis Penod (mm)
c Critical Lane Group
114
0.77
61.7
•=15; A
15
HCM Level of Service
S?3isSS;<g|5':i%;?2S6
Sum of lost time (s)
""ICU Levefof Service •:
B
12.0
C
Baseline Synchro 7 • Report
Page 1
HCM Signalized Intersection Capacity Analysis
2: Costa Del Mar & El Camino Real
Near Term PM
5/15/2013
t V i
wm^: ..V Jill-
Lane Configurations V\ f ttl* tt
Volume (vph) 119 83 2240 ;:?ii4' 27 2051
Ideal Flow (vphpl) 1900 1900 1900 jgoo i960 1900
Total Lost time (s) liilliiiilRiS 40 40 . ^
Lane Util, Factor 0.97 1.00 o'gi 1,00 0.95
Frt ' \ ^ " -" ipo 0 85 0 99 iiiffiiliiiiiiliilg^
Fit Protected 6.95 " 'i'.OO' 1.00 0^95 1,66"
SatdjFlowfprot) 3433 " 1583 5048 -/ 1770-3539'
Fit Permitted 6',95 1.00 1.00 0,95 1,00
Satd. Flo&-(perm)' '. 3433 1583 5048 1770 3539
Peak-hour factor, PHF 0.90 0.90 0,90 0,90 0.90 0,90
A!dj,JJow(vph);'^ .< 132 92 2489 f27 30
RTOR Reduction (\ip\\)
Lane Group Flo;/ (vph)
0 64 3 0 0 0 RTOR Reduction (\ip\\)
Lane Group Flo;/ (vph) 132- 28 2613 0 •'^30; 2279^ ' '" "
Turn Type custom Prot
8 ^;:|r.^'>>;~:;i'fs
Permitted Phases 6
Actuated Green, G (s) 112- 11.2 •4;^.-S!;i'!45S::' 45 ^20 8^' " " * -
Effective Green, g (s) 11.2 11.2 112,3 45 120.8
Acfugted g/c;^Ratio' _ 0 08 0 08 0 80 0 03 '0.86 ' ~" ^
Ciearance Time (s) 4 6 4.0 40 ' 4.0 40
Vehicle fektension-'(s)• ' 30 ' 30 - 3,0 - , -S.O -^ ^ 3.0 V -,/ . ^ .
Lane Grp Cap (vph) 275 127 4049 57 3054
V/s3atio prot ' ' c004 ^ 0,52' 0 02 C064
v/s Ratio Perm 0 02
V'C Ratio ^^0.48'' 0 2'2 0 65 .-/o.ss:' Uniform Delay, d1 61.6 ~"60,3 57 6B.'7 ' 3.7
P.'ogressipn Factor , 100% 100 1 19 . 1-QO^ iiSiiilWIiiSilliPWK
Incremental Delay, d2 13 0.9 0,5 85 •'•'17
Pe!ay{s)v'vL:^,.;^' 629 61? 73 75 2 5.4 ^ :'..;' ^ ;• . ''^
Level of Service E 'E A E A
Approdch Delav (sj 62 2 " " "7 3 IpSPiSIIIIRliiii^piplfiflliii
Approach LOS E A A
HCM Average Control Delay
H'p;M^-yplOm;e;^^^ -
Actuated Cyde Length |s)
lrifer§gctfqq Gap'aci'ty Jjtitization.
/^alysis Penod (mm)
c . bntical Lane Group -
9.2
0 72
' 140.0
66.8%,:
'15
HCM Level of Service
Sum of lost time (sj
fCU Levefof Serace ;•
8.0
ifil
Baseline Synchro 7 -Report
Page 2
HCM Signalized Intersection Capacity Analysis
3: La Costa Ave. & El Camino Real
Near Term PM
5/15/2013
> r *-^ t A V
•gggBig ;vi^-' ijj
Lane Configurations tt f tt f V\ ttl* ttt
Volume ^vph) 836 681 321 107 459 237 246 1092 67 350 1270 908
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost timfejs) ^40 40 4,0 40 40 40 40 40 40 40. .40
Lane Util. Factor 0.97 0,95 100 100 0,95 1.00 0,97 0,91 0 97 0,91 1.00
Frt . 100 100 0 85 100 1 00 0 85 100 0 99 1 00 too _ 085
Fit Protected 0.95 100 1.00 0.95 1.00 100 0.95 100 0T95 100 •* Aft
lw Satd_ Flow/(prot). 3433 3539 1583 . 4770'. 3539 1583 3433 5041 V 3433" 5085 158^
Fit Permitted 0 95 100 lo'o 0.95 1.00 1,00 0.95 1.00 0 95 1.00 1.00
Satd Flow ('perm) ' > '3433 3539 1583 17'70 3539 '1583 3433 5041 '3433 5085 1583
Peak-hour factor, PHF 0,95 0,95 0,95 0.95 0,95 0.95 0.95 0.95 0 95 0,95 0,95 0,95
Adj Pl® (vph) 1 ^ 880 717 338 113 483 249 ••259 wm: 'w 71 ' 368 1 ''''9S6
RTOR Reduction (vph)^^^
Lane Group Flo ,v (vph)
0 " 0 "l63 0 0 134 0 4 0 0 0 13 RTOR Reduction (vph)^^^
Lane Group Flo ,v (vph) -880'" "717 " V75 li3 ' 483 115 '259 1216 "0 zeT 1337 943
TurnType
Profected Phases
Prot
5 2
Perm Prot
1 6
Perm Prot
3 8
Prot
. -7- -- • 4
pm•^ov
PermitFed Phases 2 6 "4
M^^¥pC4{^ly^^W 44,8' 56 3 56,3 J34" , 24 9 249 131 3&i'Vi^^'^^!t7j-412 /|6 0
Effective Green, g (s) ^4 8 56 3 56;3 " 13,4 24.9 24.9 13,1 36.8 17.5 41,2' ' '86.6
Actuitedg/'C Ratio---0 32 0,40 0 40 '010 018 018 0 09 0 26 0J2" 0 29 ' 0 61
Clearance Time (s) 40 " 4,0 40 4.0 4 0 40 40 40' 4,0 4.6 40
Vehicle Extension (s) 30 30 30 3.0 30 ~ 3.0 • 30 30 " 30 30 ' 3 0
Lane Grp Cap (vph) 1099 1423 637 169 629 282 321 1325 429 1496 1018
v/s Ratio Prgt 0 26 020 0 06 c014 008 X 0^24 c0.11 ^ 0 26 c0 30
v/s Ratio Perm 0,11 ^ 0.07 0 30
v/c Ratio'; J ^ 0 80 0 50 0 28 0 67 0 77 0 41 0 81 0 92 0 86 . 089 0 93
Uniform Delay, dl
Progression Factor
43 5 314 28,1 61.2 54 8 51.6 62.2 50.1 60,0 47.3 24,2 Uniform Delay, dl
Progression Factor : 1.00--100 •'• 1 00 •1,'06" 09§ 128"-0^6 10. 108 097 0'93
Inc'omental Dehy d2
Delay (s)
4.3 ^ 6,3 'o;2 35 5.0 0.9 13.0 11.0 12,1 6.7 109 Inc'omental Dehy d2
Delay (s) 47 8 31.7 28 4 .73 4, 58 7 66 3 631 62 2 76 9 527 . '334
Level of Service D c C E E E E E E D C
Approach Delay (i) 384 62 9 32 4 49.1.'
Approach LOS D E E ' D
HCM Average Control Delay
H'CI»/t Volunie to Capaciiy ratio^.
Actuated Cycle Length (s)
ijifersiction'CapicitYutilization
Analysis Penod (mm)
c .Critical Lanfe Group
50,6
088
140 0
85 97,
15
HCM Level of Service
Sum of lost time (s)
ICU Level of Service
5.0
E
Baseline Synchro 7 • Report
Page 3
HCM Signalized Intersection Capacity Analysis
4: La Costa Ave. & Shopping Center Dnwy.
Near Term PM
5/15/2013
> ^ t V I V
mmmwmwywMwmwBmimmmmiMwx^^wmk......mi m\ wm-^^ Lane Configurations
Volume (vph)
t^ tti Lane Configurations
Volume (vph) 59 899 80 20 592 83 72 20 37 122 16 168
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 40 40 40 40 •iiSRs 4.0 40 4,0
Lane Util. Factor 100 0.95 1,00 6.95 1,00 1.00 100
Frt " \ / 1.00 -:.Q.99' WW:i'!^^^-1*00 ' 0 98 0 96 100 tf86
Fit Protected 0,95 100 0,95 1,00 " 0.97 0,95 1,00
SatdptoVtprot) ^ 1770 3496 1770 3474 1742 1770 1608
FItPermitted 0 95 100 0.95 1,00 0.97" 0 95 1,00
Satd,Tlow'(perm]' 1770' 3496 1770 ' 3474 *^s^;;^;*yi&";i:^-; "1742 !7"70 " 1608
Peak-hour factor, PHF 0,90 0,90 0.90 0.90 0.90 0.90 0,90 0.90 0.90 0.90 0.90 0.90
AdjFJow(vphJ 66 9Q9 " 89 22 658 ' 92 ^ ^'80 * 22"" 41 136. "18 187
RTOR Reduction (vph) ^
Lane Group Flow (vph)
0 7 0 0 13 ' 6 0 23 6' 0 158 0 RTOR Reduction (vph) ^
Lane Group Flow (vph) 66 i"o§1 6 737 ^'o 120 ' ' 0 13f 47" ' ^"0
Turn Type Prot Prot Split Split
7 4 •mm •^v '/SN 2 2
•< * ^ »
6 .....,... i.
Permitted Phases
«t^r,e|Q,'G(s):.^. 58 30 3 27.0 ^^^Sy::!•'/^'' 103 .. -10? . 109.
Effective Green, g (s)
Actuated g'C Ratio
58 30,6 22 27.0 103 10.9 10.9 Effective Green, g (s)
Actuated g'C Ratio 008 044 0 03 "0.39 015 • " 0.16" 016
Clearance Time (s) 4~0 40 4.0 4,0 4.0 40 4.0
Vehicle Extension (s) 30 30 * 3,0 ^}W^^^^pw^ 30 30 30 S|:;|M
Lane Grp Cap (yph) 147 1528 56 1340 256 276 250
v/s'Rati6 Prot
v/s Ratio Perm
v/c Ratio . >
Uniform Delay, dl
Progression Factor
Incremental Delay, d2
Delay (s)"'Vr^ '\
Level of Service
Xpproar-h Delay (s)
Approach LOS
cO 04 CO 31 0 01 0 21
045
30.6
152.
17
'482'
^"D
071.
161
- 090":
2.2 \l
B
185
B
0.39
33 2
"ioo
45
37 7
D
0.55
168
1 00
" 16
184
B
18,9
B
c0 07
0.47
27,3
1 00
1.4
28 7
C'
28 7i
C
cO 08 > 0 03
049
27.0
'1,00
14
'^8.4
c
0 19
25.7 "
i'oo .
04
26,1
C
27.Q
C
HCM Average Control Delay
[pu Y^iljtilJiJCapacity ratio \ -
Actuated Cycle Length (s)
Intersection Capaqti^ Ujiljzation
Analysis Period (mm)
p. '^Cntical LaneGroupv -
20.4
0 62
70 0
62 6 ;.
15
HCM Level of Service
Sum of lost time (s)
CU Levtl o'Servre
16.0
B
Baseline Synchro 7- Report
Page 4
HCM Signalized Intersection Capacity Analysis
5: La Costa Towne Ctr. & El Camino Real
Near Term PM
5/15/2013
< K t A V i
mmUi\ww:y,j±y mmm -Iliili ws^'WWwyw-W'^wwswMi ';?f ;|» ••JK-'V^: W; WWWwWWl • WiW
Lane Configurations m *i ttt Volyme (vph) '41 5 1536 21 7 1360
ideal Fiow (vphpl) 1900 1900 1900 1900 1900 1900
Total Lost time (s) . 40 ' 40 4.0 40 ; i";Sv^^'i;r\-i'^^;r:!?i^^
Lane Util. Factor 0,97 0.91 1,00 0 91
0 98 . 100 100 100 ' , ^ \
Fit Protected 0.96 1.00 0.95 100
Said>iow(pr6t); ' 3401 5075 1770 5085 " I. '%^fyjr-\yy^WW'^ 'W:^• v'W\ }-:' W
FItPermitted^ 0.96 1.00 0.95 1,00
Said. Flow (perm) ' , ,' 3^01 5075 1770 5085
Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0,90 0,90
.Adj, Fjo\vivph) •; ; 'la:; 6 1707 23 • 8
RTOR Reduction (vph) 6 0 1 0 0 0 '
Lane Group Flow (vph) 46 "•:o"' ' 1729"" 0 8' '
Tum Type
P[9lg.cted .Phases " 6 ^ 8'
Prot
IIS >!.i<-, 4,^
Permitted Phases
^c^aSgi;fir§^h}^|s]';v\ ^ 62 .120j3 ^-15 l2"5^8:.
Effective Green, g (s) 6.2 '120^3 " 1,5 125 8
•Actuated g/C Ratio :-jo4.^ ' 0 86^r-0 01 OS'O" ^ V; -
Clearance Timers) 4.0 4.6' 40 4.0
\/ehicle Extension (s) 3.0":1 ^ 30 3C ~'-'30 ^ ' '^'"" 7 »
Lane Grp Cap (vph) 151 4361 19 4569
v/s Ratio Prpt cOOl c0 34 0.00' CO 30
v/s Ratio Perni
v/c Ratio ' :0?t 0.40 lUfi 042 0 33
Uniform Delay, dl 64.8 21 68,8 1.0
Progressii^n Factor ' / ; too 0.31 SliiiSij Ii5 /297 - <
Incremental Delay, d2 1.2 C.2 88 '6,1
Delay (sl 66 0 , o:g . •iisi 87 9 3.2 ^ ;I . aiiiMilSfliiSlil?
Level of Service E A F A
ApproacH Delay (s) ' 660 0 9 •3 6 ' "
Approach LOS E A
mm
A
mm mm AA..^ .....„,..,.,.^_-i.,/.Lr,,^.<..j .f-s.v„._-.„a/xiLl 1
HCM Average Control Delay
HCM Volume to Cappcity rat o
Actuateij Cycle Length (s)
Intefsecttdri Capacityiftiiizailon '
Analysis Period (mm)
c'-, Critical Lane Group"
3.2
146.6
4o:i%"
15
HCM Level of Service
Sum of lost time (s)
ICUleveTpf Service ;
12.0
A
Baseline Synchro 7 • Report
Page 5
HCM Signalized Intersection Capacity Analysis
6: Levante Street & El Camino Real
Near Term PM
5/15/2013
Lane Configurations
yplume (vph)^
Ideal Flow (vphpl)
Total Losttjme (s)
Lane Util. Factor
Fit Protected
^^td Ffpwlpfot}'-'
Fit Permitted ^
Satd Flowfperm].-..'
?1
1900
'"4.0
1.00
too
0,95
1770
0.95
1770
4
1900
4.0
1 00
0.90
100
1576
1,00
1676
7
1900
87
1900
40
1,00
100
6.95
1770
0.95
17/0
t
0
1900
r
95
1900
40
1,00
0 85
1.00
1583
1.00
1583
20
1900
40
1 00
1.00
0,95
1770
0,95
1770
ttt^
1419
1900
40.
0.91
0 99
1.00
5014
1.00
5014
147
1900
157
1900
' 40-
1,00"
100
0;95"
1770
0.95
1770 ^
ttt^
1532
1900
40
0 91
100
1,00
507J
1.00
"507"f
30
1900
Peak-hour factor, PHF
RTOR Reduction (vph)
Lane broup Flow (vjh)
0.90
34
0
34
0,90 0,90 0,90 0,90 O.i
4
7
8' 97.
0
0
0
97
J06,
18
0,90
22
0
22
0.90
7
1733
0,90 0,90 0,90 0.90
l3
"o
m
0 0 1
0 174 1734
Turn Type
Et&teggipifses ""-^^'^^
Pemnitted Phases
Aj^#Gr>l5;:G{s),;. ^
Effective Green, g (s)
SottiSg/c^atAj ^-^
Clearance Time [s)
Vehicle Extension (s)'
•r?S:$S'S::
Prot
5
48
48
0,03
"4,0
30
Prot
6'
157 >
15.7
0,11
40
3 0
'12^::
12,8
0 09
4.0
30
Perm
Milk
6
23.7..
23.7
ff.17.V
40
3.0
Prot
45
003
"4.6
'30
Prot
8 .
.77 8'
77.8
0 56
4.0
30
7' 4:
177 91 0
17,7 91,0
013 0 65
40*"' 4,0__'
3 0"T'3l) '
Lane Grp Cap (vph) 61 188
Ws Ratio P[ot , ^ 002 0 00
v/s Ratio Penn
v/c Ratio „ s'- 0 56 0 03
Uniform Delay, dl " 66.6 55,3
Progressig£F§c|or., ^ tOO J„00
IncrementaTDelay, d2^ 10.6 ll.l
'DSiis).'y[: " 771 J5 4
Level of Service E E
Approacff Delay (s) - ^ ^ .71,5
Approach LOS E
162
c0 05
0 60
61.1
100
5,8
67,0'
E
57 6
E
268
cO.01
0.07
48.9
100
0.1
49 0
"D
57
0 01
0 39
66.4
,100
43
707
E
2786
c0 35
0 62
21 1
..100
1 1
, 22 2
C
22 8
C
224 3296
cOlg.. 0 34
0,78
59.2
0.95
15.2
714
E
• 0.53
'"13.0
106
0.6
14 5
B
19.7 .:
B
hCM Average Control Deiay
HCMVjaiiime'-to Capacity ratio J
Actuated Cycle Length (s)
Intersectioji Capaci^ Utilization •
/Analysis Period (mm)
c >C7if6ai Lane Group
23.6
0 55
' 140.6
•'60.9%:'
^ 15
HCM Level of Service
Sum ofjost time (sj
ICU Level of Service_ _
12.0
. B-
Baseline Synchro 7 -Report
Page 6
HCM Signalized Intersection Capacity Analysis
1: La Costa Ave. & Saxony Road
Near Term + Project AM
5/15/2013
Lane Configurations tl» tt r Volun^e (vph) •"1265 102 118 1360 30 63
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Total Lost time (s) , 40 40 40 40^ 4.0
Lane Util. Factor 0.95 1,00 0,95 1,00 100
Frt": ' " ^ o.a9 1 00 1 00 100 0 85 ' , s::^.v;;^;-;,;;f;;f:^i-.:::i^:;.
Fit Protected ioo 0,95 100 6,95 1,00
ISatd PM(PM'^'/" 1 , 3500 ' 1770 3539 1770 ^1583
Fit Permitted ioo o;95 1,00 0,95 1 00
safd:>]6\«?tp&m)"'.^'-'....^''-3500 " 1770 3539 1770 ^ 1583 '
Peak-hour factor, PHF 0.90 0.90 0.90 0,90 0,90 0,90
&CFl3wtyp1iLr 1406-113 131 1511 33 ' 70 S ... liliiHil RTOR Reduction (vph)
L1lfierGr6upFlow(vphl ^.
5 0 0 0 0 64 ^ RTOR Reduction (vph)
L1lfierGr6upFlow(vphl ^. ' T514 0 131 .l5ir " 33 6 '
Turn Type
ep»PBis-g?%;:"
Prot custom Turn Type
ep»PBis-g?%;:" 2 ' ' W' (»»>>j3„»
Permitted Phases 8
Actuated fereen.Gfs) "'"4i^. .1 80 53 8 6.2 6 2 ;j^.^:;;;::^;;:;;:;:v:,,^^::;i:^;^vi^:;i::
Effectve Green, g (s) 41.8 8;o 53.8 6.2 62
m^miofdpw. 012 0.79 '0.0^, 059 '
Clearance Time (sj 40 40 4.0 4.0 4,0
Vehicle" Extehsion (s] ' 30 30 ' 30 30 S-O '
Lane Grp Cap (vph) 2151
v/s Ratio Prot"'«";' c0 43
v7s Ratio Perm
v)c Ratio J " 'v - 0 70
Uniform Delay, dl ^ ^ 8,9
Progression F.pctbr ' 1 00
Incremental Delay, d2 1,1
Delay (s) IPO
Level of Service A
Approach Delay (s) 10 0
Approach LOS A
208
?I07
0,63,
28.6
100
59
34,4
C
2800
c043
0 54
26
' 00
0,2
28
A
53
" A
161
co:o2-
0 20
28 6
100
0,6
29 3
C
28 6
C
144
0,00
0,04
28.2
1 '00
o.i
28 3 c'
HCM Average Control Delay 8.2
HQM^Voiume to Gap^^city ratio" \ ' 0 64'
Actuated Cycle Length (s) 68 0
SiiHSS^SiililBiMiliiiSSiiBiS
Analyses Period (min) ^ 15
HCM Level of Service
Sum of losVtime (s)
Tcu Level of Service."
12.0
Baseline Synchro 7- Report
Page 1
HCM Signalized Intersection Capacity Analysis
2: Costa Del Mar & El Camino Real
Near Term + Project AM
5/15/2013
t V
l.'j:!MiS2 Iiiii;
Lane Configurations r ttT^ 'i tt
Volume (vph)' WW0 20 -51777/ 130 59 yfiMWWy'
Ideal Flow (vphpl) 1900 1900 Igoo' 1900 1900 1900
Tolal Lost time (s), -. 4.0 IliiP: iilof 40
Lane Util. Factor 0,97 1,00 0.91 1.00 0,95
100 0.85 0.99 100 ililiffiiilil >. '^-Wi^y -^y Vi^yi); 7^-W?^W^^W^
Fit Protected 0,95 100 • ioo 0.95 ioo" 3433 IliisM '5033 1770" 3539 •
Fit Permitted 0,95 1,00 100 6.95 1.00
Satd. Flpw"(perm)-c' '•'* .• 3433 l/1PT 5033 f/|p|T 1770 3539
Peak-hour factor, PHF 0,90 0,90 0.90 0.90 0.90 0,90
Adj flow (vph] ' 49 22 '1974 144.-' 65 2176
RTOR Reduction (vph)
Lane Group Flow (vph).
0 20 5 0 6"' 0 RTOR Reduction (vph)
Lane Group Flow (vph). -»4g-"•',- 2 ^•"2'il4'' WX 66 ' 2i76
Turn Type
Protected Phases 1
custom
8
Prot
7 ISHlilE '•^•^Jil-^r iiri^'^l{yijy:.yy'.'^y:usl:['£.-J^
Permitted Phases
/^cfijjt?|Gfeb]ii^G'('s^ ~*
Effective Green, g (sj
Actuated g/C ^tio " ;
Clearance Time (s)
Vehicle Extension (s)
^ 1Q.3: 103 138 5 ^ 92 ^121 7 • '
10,3 10,3 108,"5 9.2 121.7
0,07 'o'of' 6778 . 0,07 ' o,87,..',.v '•;;::""
40 4,6 4,0 ' 40 4,6
30 3:0-^: 3.£)"'" ' Iliili;: 30 " ^
253 116 _^ 3901 116 3076
:c0.oi / ' "6.66"
•0,42 0 04 ISillBiiiiiiliiliH
019 001 0,54, , '0.57' iiliillB
60,9 661 6,1 63.5 3.1
~ 1,00 M.OQ '164" ; 1.00 plffiiliB^ll^illl
0.4 0.0 0,5 6.3
613 60.2 "-:ip.5^ > Vj69J. 4 5 •• ' ^
E B "E" A
610 10 ipBiiipiiiiaiig;
E B A
Lane Grp Cap (vph)
V/s Ratio Prot
v/s Ratio Perm
v/c Ratio
Uniform Delay, d1_ _
progres'slon Factor : y
Incremental Delay, d2
Delay (sj
Level of Service
/\pproacii.Delay(s)
Approach LOS
HCM Average Conti'ol Delay
HCM Volume.^to(5apacifyratip^ [
Actuated Cycle Length (sj
|nfir|^|§||||S3^l|®
Analysis Period (min)
If|Sji|icai;|ariif
9.3
2b7
140.0
64.1%;
ii
HCM Level of Service
Sum of iosttime (s)
fp;Blg|;elfeiSiiift
8.0 c
Baseline Synchro 7 • Report
Page 2
HCM Signalized Intersection Capacity Analysis
3: La Costa Ave. & El Camino Real
Near Term + Project AM
5/15/2013
Lane Configurations tt tt V\ ttT* ttt
Volume (vph) 763 313 ,::^'3bi/ Wm" i/;564/ 228 223 723 22 w-^ww. 'iB34\i 724
Ideal Flow (vphjilj 1900 1900 1900 1900 1900 igoo' i960 1900 1900 1900 1966 1900
Tofal iQsl time (s) 40 4,0 4.0 ^ IRoi 40 40 40 '40 • .4.0. -4.0
Lane Util. Factor 0,97 6,95 i6r 1.00 "0.95 "106' 6,97 '0.91 0.97 0.91 1,00
frf ":/.^ r ^ \ ;• fSlioi 1,00 0 85 100 ifiooi 1,00 , .1,00' 0 85
Fit Protected 0,95 1,00 1,66 6.95 1.00 1.00 6,95 i'oo 0,95 i.66 lo'o
Satd FIctw (prot);^^ •3433 3539 •1583 1770 3539 , 1583 3433 "5063 3433 5085^ i-583
Fit Permitted " ~ " 0,95 1,06' ' "i'66 '0.95 1.60 "'i.oo' 6,95 "T.OO" 0.95 1.00 T.OO
Satd,'Flov? (perm). :T 3433 3539 1583 ?i77o;^^ 3539 i583 3433 5063 3433 5^)85 1583
Peak-hour factor, PHF 0,95 0.95 0.95 0.95 0.95 0,95 0,95 0.95 0,95 0.95 0.95 0,95
m'^mM) W. 803 329 317 . 124 594 .;-^'246i^ 235 761 23 ^157^-. 1088 ''X6^2'
RTOR Reduction (vph)
Lane Group =lo,v (/ph)
0
803
0
'• '329 -
' 764
;;i53'>.
6
.;im
0
694
iso
110
6
235
2
782
0
0
0
157
0
1088 •
11
Tum Type Prot Perm Prot Perm Prot Prot pm-i-ov Tum Type
.5 2 1 .6 '3 8 7 as . ,5
Permitted Phases 2 4
Actuated Green G (s 39 9 .. 53.5 53 5 14 5 281
*if:3^-,-.i^uc.:.:iv:
';28jr ";i2;9; 45 5 :^-Sn.i:.-;:;.;w:is^ 105 '4.-1 83,0
Effective Green, Q^) 39,9 53'.5 " 53,5 14.5 28.1 28.i 12 Q 45 5 10.5 43.1 83.0
.AB|ial||§rRl;ti^^^ 0 28 0,38" 0 38 ^d.id" /0,20 < 0 20 -\o,;o?; 0.32 0,08 0 31 0 59
Clearance Time (s) 4,0 4,6 • 4;6 4.6 ' 40 4,0 40 • 4,0 40 4,0 4.0
Vehicle Extension .(s) i'.. • . • 30 IPli 3 0 30 30 30 .3:0' 3,0 ' 30 . 3.0 30
Lane Grp Cap (vph) 978 1352 605^ 183 710 318 316 1645 257 1565 984
v/s Ratio Prot c0 23 iiMi Miil G017 IMIi 015 0,05 021 c022
v/s Ratio Perm 6;io' 0,07 0.26
0,82 •' 0.~24.. 0.25- 0 68 •.,0,84 ^"0.35,. -0,48 0.61 070
Uniform Delay, di 46,7 29 5 29.6 60.5 53.7 48,6 ' '619 37.7 62.8 42,7 21.2
PrpgressionFactor 1 00' 100 f.OO' 1,19/. . 114 . 1.70 0 92 'lio ^ 1 04 0 93 1 11
Incremental Delay, d2 56 0.1 6.2 84 '7,5 '9.6" '1,6 i3.6 1,8 2.5
Delay (s) ^ 52,3 ^ .29.6 29.8 80,6 ";68.5' ^ m "66.1 ' 42 5 68 3 417 26.0
Level of Service D "c C F E " E D ' """""'E D C
Approach Delay (s) . 4^2^ 73.5 lllHII/ i;4pS Ws$Wi 37.8
Approach LOS D E' D 'D
HCiyi Average Control Delay
iiilil^fiiSMiiSlli
Actuated Cycle Lenglh (s)
jfi§§||i^||a|||j^l^ip^
l^^alysis Period
!l|||||||i|fflliif|^
47.2
-.0.78^ ITao'
77.0% ;
15
HCM Level of Service
Sum of iost time (sj
ilMSWfSliiiiSS
D
T^o'
D
Baseline Synchro 7- Report
Pages
HCM Signalized Intersection Capacity Analysis
4: La Costa Ave. & Shopping Center Drwy.
Near Term -•- Project AM
5/15/2013
Lane Configurations t1^
yolume (vph) ^ 39 lii§4;-
Ideal Flow (vphpl) 1900 ' i960
total Lost time (s) 40 iSl
Lane Util. Factor 1.66 0.95
Frt - . ' - -Ipo' 0.98
Fit Protected 0.95 A rtrt
i.OO Satd Flow (prot) ' "ATTP^:
Fit Permitted 0.95 1.66 Said FloWfpefm)'"'"' 1770 ii5if
Peak-hour factor, PHF 0.90 0.90
72
i960'
1
33
1900
40
i.66 •HI
"6.95"
f77p " 3488
6.95' 1.00
1770,-/' '3488-'
767
1966' '^•:0W
0,95
'0.99 :
'Too
82
1900
29
1900
4*
Wm?
1900
s-i;oi
"Too'
09"5
0,'97
1729
1),97
1728>:
1900
45
1900
40
1,00' . iroo"
0,95
1770
0,95
1770
10
1900
,40
1.00
0,86
1,00
1604
100
1604
124
1900
RTOR Reduction (vph)
Lane Group FlovJ (vph)
43 6*
43
404
"ie"
0,90
• ' •'8pr', '""6"
ifPS
0.90
0
^ 3^ :
0.90 0.90 0.90 0.90 0.90 0.90 0,90 0,90
&52 , 91 '32 6 ' 20 , 50 ^ 11 {3i^
8 0 0 18 * "0 0 121 0
935 ^ * 0 • 0' " 40 0 ^ ^'50 ' '28 " 0
Turn Type Prot Prot Split Split
_ 'f 7-; 4"; W ^8 2" "2 6\.
Pemnitted Phases
Actuated Green G(sl 38 343 25 33 0 8.'5 87 ^nww' Effective Green, g (s) 3.8 34,3'"" 2.5 33 0 8.5 8.7' 8.7
Actuatecl g/C'Ratio 0,05 ^ 0,49 .004"-• 6.'47 012 012 ;Cf2. : :
Clearance Time (sj ' 4.6 4.0 4.0 4,6" 40 4.6 40
Vefiicle Exteiision (s)« s 30 liiioiifi 30 30 '30 •;'3.b 3d
Lane Grp Cap (vph) 96 1691 63 1644 210 220 199
v/s Ratio Prot c0 02 Iiiiiiii isiiiif iiiiiiii CO 02 • cO.03-' 0,02
v/s Ratio Perm
v/c Ratio •;y-Q:45--: IHiiiil ,0.59^ ^0 57 , 019 0 23 0.14
Uniform Delay, dl 32,1 "io.'s""' 332" " T"3.4" 27.7 27.6 27,3
T23 111 '100 1.00 ' ioo > 100 1.00
Incremental Delay, d2 3,2 6.4 132 14 0,3
Delay (s)' • ' * ~ 42;5 ' 12' ',- .4'6;5-/ vJ48 ' 28,1 • 28.'r.-"27.6
Level of Service D "B ^ ' D _ B C c C
Approach Delay (s) f 146 • ^"T6.0 MilliSWitliliili • -j/V 27 8
Approach LOS B B C C
HCM Average Control Delay
IlKffilKiiiiilMiii
Actuated Cycle Length (sj
JSIS||j|||i|Bi|||iiS
/''^.nalysis Period (minj
17,3
••• 0,45
Ho'
•52.0'%.:
• 1'5
HCM Level of Service
Sum of lost time (sj
Is^iellpfiifvlil
B
Te'o
. -A:
Baseline Synchro 7- Report
Page 4
HCM Signalized Intersection Capacity Analysis
5: La Costa Towne Ctr. & El Camino Real
Near Term Project AM
5/15/2013
Lane Configurations w ttt* ttt
Volume (vph) " 29 /2-|/#i33/i|;|0.: 8 1409
Ideal Row (vphpf) 1900 1900 1900 1900 ' 1900' 1900
Total Loat time (s) ^ 4.0 40 XWWMMWIWIWWMWM ;^;T:-:-.^:;^f^;;::.^/s;--;^^r-:^-:;:-f^
Lane Util, Factor 0.97 0,91 1.00 6;9i
Frt , ^',0.99 -\ lipf/iillSil / 1,00' WliWBSiW:mWWWgww 5:5;/3;-K:-:::SS:«?sj^^
Fit Protected 0.96 "^Too'' 0.95
Satd. Ftow (prot) ' 3421. ' 5070' 1770 5085 •^r;:;::;; iv::':-::i ^v-;':.;^^--•;^;^ :-':^^^^
Fit Permitted 0.96 1,00 6."95 1,00
Satd". Flow (perm) • .' 3421 : 5070 ; . ^ -1770 '5085
Peak-hour factor, PHF 0.90 0.90 0,90 0,90 0,90 0 90
Adj-Flowjvph) ^ 32 2 1014 21 9 1566 • ' Ks?3;¥/g/iK?/i:f:/::/ •// yM
RTOR Reduction (vph)
'Lane Group'^oW-(vph)
2 '6i 'b" 0 •""' 0 ' RTOR Reduction (vph)
'Lane Group'^oW-(vph) 32 0^ i034/r>' vB' • ^ 9 wi'-^^^i?':-'-^' r;-^r^«"*'i'^:i:-;;^'; 's^''-" l^y ^•"'•:/cu^^/.;:>:;
Turn Type
Protected Phases
Prot Turn Type
Protected Phases 6' . 7 '*: ;:4^' • ^: : '
Permitted Phases
fctuated^green, G (s), .45 ^ 122 0 " 1 5. 127 5 ^'^^^§^>M<iMi^^!y-^WWrW:
Effective Green, gjs) 4,5 122,0 1,5 127,5
Acttlate&gJCR^fio 7 0 03 /'.,''0'.'87 ^ "'^ 0,01 ' 0.91^
Clearance Time (s) 4,0 4.0 4.6 *4.0'
Vehicle Extension (s) . 3.0 " . ^ 30-30 30
Lane Grp Cap (vph) 110 4418 19 4631
v/s Ratio Prot . c0,01 0,20 0 01 IHilliiliillili v/s Ratio Perm
0,20
v/cRalio.^j ' " 0 29 0 23 , 047 0 34
Uniform Delay, dl 66,2 1.5 68.9
progre^sioji Factor 120/'^ U9 IlillfBSIlSiilli •£ W^M'-:-'i-}y
Incremental Delay, d2 1,5 6.1 141 '"""'0.2""
Delay (s) 67 7 . .'19 1116,8 ISolillPilliiiliii ;;s^':^;^;?vi^;P^^;sf^ w -'sW. 'w^y
Level of Service E " A F A
Approach Delay (s) • 67,7 - • "j'9'< iiill Approach LOS E A A
HCM Average Control Delay
KCM.^.VoJumeHo'Capacity, ratio i
Actuated Cycle Length (s)
Analysis Period (minj
2.4
0 34
140.6
15
HCM Level of Service
Sum of lost time (sj
ICU Level of'Service •
1.0
'A
Baseline Synchro 7- Report
Page 5
HCM Signalized Intersection Capacity Analysis
6: Levante Street & El Camino Real
Near Term + Project AM
5/15/2013
> > r *-^ t V i
f W ' MIS i;Slliii2.
Lane Configurations t ttii ttii
Volume (vph) 19 2 5 •S|l:4d?: 3 127 883 27 54 1336 36
fdeal Flow (vphplj
Total Lost'time (s)
1900 1900 '1900^ 1900 1900 • 1900 1900 1900 1900 1900 1900 1900 fdeal Flow (vphplj
Total Lost'time (s) : - 4:Q-40 40 40 40 '40 . • 4.0 4,0
Lane Util, Factor 1.00 i.OO ixid 1.00 1.00 1.00 6,9i 1.00 0,91
Frt'-/. ;c ,;^-100 i|6;i;il lillK 1.00 •• iPip/ •r '1 00 ^ 100-.' ^.:100 1,00 .,
Fit Protected 0,95 1.00 0,95 100 "'Too' 0 95 ioo 0.95 100
S;atd>low(prQt)' , 1770 • 1653 SIH 1770 :i863'' 1583 1770 5063 • 1770 5065
Fit Permitted 0,95 i,66 0.95 1.00 1.00 0.95 1,00 0.95 1,00
Satd.FldiAl^fperm) "' ^ 1653- -ify$y[ 1770 1863 •.1583' 1770 5063 1770 -so'es--yyy.
Peak-hour factor, PHF 0.90 0.90 0.90 0,90 0.90 0.90 0.90 0,90 0,90 0.90 0.90 0.90
Adj Flo.-'(vpn) .:: ::2t; 2 ill •v,w; • 3 ' l4j'. '-;/-i6.^^ 981 "30 60 1484 • 40
RTOR Reduction (ypn)_ 0 0 0 0 iil "6 2 _0^^ 0 2 6 Lane Group Flow (vph) T ^ 21 3 0 l55' ' 29 16 1009''^" -0 "•^•'60 1523'" ' d
Turn Type
Protepte^'Ptiises'-^;
Prot Prot Perm Prot Prot Turn Type
Protepte^'Ptiises'-^; 2 IHII :.w(w 3 :,|S;:§;J|g|a|||
Permitted Phases 6
Actua'^^'dGr¥h.G'(s)'""^' ^ -T6 iflB " 176' 28 7 .2aj 32 81 8 8.9 87 5
Effective Green, g (s) 4,6 15.7 17,6 28.7 28.7 3,'"2 818 8.9 87.5
Actuated g'C Ratio 0 03 -^O'll" , 013 0 20 ••;d.20-'::' 0 02 0 58 ' 0.06 0 62 V1' .
Clearance Time (s) 4.0 40 4,0 4.0 •"4.6' 4,0 40 40 4.0
Vehicie Extension (s) 30 '•/'-^'.O'-V-3,0-30 '.-3,0 3,0 -'3.0 > 30 " 3.0
Lane Grp Cap (vph) 58 185 223 382 325 40 2958 113 3166
v/s. Ratio Prol .' lliMI • O.OD -c0,09 0 00 0.01 0';20 -C0 03 " 'c0,30 :
v/s Ratio Perm 'cao2"
y/cfRatlQ ^ 0 33 -'^o.oi ^ i-0,70-0 01 ;>o.69--' .040 0 34 0 53 0'48
pniform Deiay, dl 66.3 55.3 5'8.7 44.3 45.1 67.5' 15.1 63,5 14.1
Progression Factor -'30 1,00 ioo ' ido ' .i.o;d •" '100 1 00 0 76 ' 2 01
Incremental Delay, d2
De'ay (sl
3.8 6.0 9.2 '6,6 IT' "6,4 03 4,5 0,5 Incremental Delay, d2
De'ay (sl •' "..7P1 55 3 67 9 44,3 , -45.2 73.9 ;.i5'4"-, 52 5 28 8
Level of Service E E E D D i B D C
Approach Delay (sj ^' ;- ;65.o • "570 16.3: ^y^>^^: 29 7
Approach LOS E E"" 'B c
HCM Average Control Delay
HCM>VBlume"taCapacity ratio ;
Actuated Cycle Length (s)
ffl^^^loij^^UiiMteffi
/Analysis Period (minj
|||§n^|||g|Qij||l|:^
28.1
' 0-45;
140.6
,54.4%
15
HCM Level of Service
Sum of iost time (s)
iilEi:ievli?pf;s|®ii^^
8.0
Baseline Synchro 7- Report
Page 6
HCM Signalized Intersection Capacity Analysis Near Term + Project PM
1: La Costa Ave. & Saxony Road 5/15/2013
—• r ^
w^m^y liil «; f;sIiiS;;'
Lane Configurations t^ tt \ i*
iiiiiiiSMiffii/i;if ' 1607 102 1360 55 124
Ideal Flow (vphplj i9o6 ;j966 ; 'i960' I906 1900 i'966
||!alii||S|||i|i:«|§^ , 4.0; ''.4'.p;. . -4.0
Lane Util. Factor 6.95 1,00 '6,95 1.00 1.00
Frt.^J:: / iillSiifl 100 103 ' 1,00 0 85 - '
Fit Protectea 1.00 0,95 1.00 0.95 100
Sal'd;,:|io|(prd^,/ ^^-I . \' ,3519 17'70 , ' 3539 1770 158'3
Fit Permitted 1.00 0,95 1,00 0.95 100
Sald.'PTai (pefm) i770 '3539 1770' 1583 - - , - .
Peak-hour factor, PHF 0.90 0.90 0,90 0,90 0.90 0,90
Adj F!ow(vphJ "2 , 113 1511 ' 61'
RTOR Reduction (vp_W_ _
Lane Group Flow (vph)
4 0 0 """"""6" 6 122 RTOR Reduction (vp_W_ _
Lane Group Flow (vph) '^ 1854 "d" 113 '''i'5ii. wmmmymwm^swmwmmmymimm Turn Tj/ge Prot custom
Protec"ted,Phases 2 "7T; 6 • 3 :2^j5t^^.^5p^^;^;:^^s^;;tp?::::v^^^
Permitted Phases V,..,.:.^:.::,,=.,-,....,...,.,..^„.,^,-..,,.-^^^ ..,„.„..:,.-.,..:.„::„-.„
Aalu|iTe^''^reejii;;^;{sj" 374, • 5.i 46.5 7 7' W^mwmwywsw!^ysmwwwmmmwwi. Effective Green, gi(s) 37.4 5,1 46.5 7,2 7.2
* Actuatldg/CRatio ' / :o.6i ''• ililii OOS 0 75 ' Ol"2-^0\2 ^
Clearance Time (s) 4.0 40 4.0 • "'4.0 4.0
Vehic e Extension is) ill'iliilf 30 30 30 9i0^MWWimW^i^WsKmWy&^iWWWW^
Lane Grp Cap (vph) 2133 146 2667 207 185
v/s F|atio Prot c053 ^>•^•^;lV.•:*:^^:^:i;::ii. cO 06 0''.43 -c0 03
v/s Ratio Perm """oH""""'""""'"^" v/c Ratio, 0.87 . 0 77 0.57 0 29 0 09 " \ ' ' ^ '
Uniform Delay, di "' io;i 27 7 33 24 9 '243
Progression Facte \Woo^ 100 ' 1,06' 1.00 Ido . , -
Incremental cielay, d2 41 221 0.3 08 0.2
Delay (s)J '; ^ ^ 14,2';^ 49 9 35 25 7 iiiiiiiiiliiliBiSiis^ Level of Service B D A C c_ _^
App'roaptTDelay (s) 142 . 68 ^ 24 9 ^;:\^i;:i^^;^-/:,(f^^^
Approach LOS B A C
F^R^flSplS'SifimfrM
HCM Average Control Delay
HCMybliTme 'to Capaciiy ratio
Actuated Cycle Length (s)
[ntersection Capacity Dtilization;
Analysis Period (min)
c Critical Lane Group
11.5
" 0.78':
6i7'
'65,5'%;
15
HCM Level of Service
Sum of lost time (sj
fcO Level of'Service
B
Baseline Synchro 7- Report
Page 1
HCM Signalized Intersection Capacity Analysis
2: Costa Del Mar & El Camino Real
Near Term + Project PM
5/15/2013
t V I
Lane Configurations r tt^ tt
Volume (vph) 120 83 2246 115 27 2059
ideai Flow (vphplj " i 960 iooo' 1966 _;i9o6; 1900 '1900
Tqtal Losl.timfe (s) , ' . J ^ 40 ,4.0' ' .4'a 40
Lane Util. Factor 0.97 1.00 6,''91 160 0.95
:ii5^Hliiiiilil " , 100 0,8^ 0 99 100 'p:6pf;;iiiiiipiiiiis Fit Protectea 6,95' T.66 ' Wm' 0,95 1,00
Satd.'Flow (pfot) \\ , 3433 1583 -,5048" 1770 ' 3539 . , •' - - -
Fit Permitted 0,95 166 ioo " 0,95 1,00
Satd, Flow (perm)'.. 3433 '1583 5048 1770 3539
Peak-hour factor, PHF 0.90 0.90 0.90 0,90 0,90 0,90
Ad],Fjqw(yph} 133 92 2493 128 30 2288 \ , , . ' ' .
RTOR Reduction (vph) '6" 64 "3 0 6 Lane Gioup Flow (vph) 133-28 2021 0 30 2288
Turn Type custom
paeM®#Tj.""'^™; "] 1;'-" WW Wt
Permitted Phases 6
ActuaigiGreen, G (s) " \ 11? 1 ] i I12 f:
Effective Green, g (sj 11,2 11.2 112,1
Aduatedg/C'Ralio''^., 0.08^- 0'08 .0 8Ci
Clearance Time (s) 4 0 4 0 4 0
Vehicle Extens1on'(s)' 3.0 ' 3.0 - 3 0
Prot
7
47 ^ i26 8
47 T20.8'
• WW 0.'86
40 ... ....^
30 30
59 3054
fflSi c0 65
0.51 0 75
66.5*' 37
IBf "6.7 i,7
733 55
I" A
63
A
Lane Gr£ Cap (yp^^^^^ _ 275
v/sRatio'prot , cOOA]
v/s Ratio Perm
v/c Ratio •' W : 0 48 ;
Uniform pplay,d1 / 616
Progression, itactor - '..^ 100 •
incremental Deiay, d2 1,3
MkWyJiW- tV,63Qj
Level of Service E
Approach Delay (s) / 62 2
Approach LOS E
HCM Average Confrol Delay
HClyl\ol,ume'to .Capacity ratio
Actuated Cycle Length (s)
Intersection Capa%^ Utilization
Analysis Period (min)
127
0.02
0. 22
60.3
1. QO
0.9
•:6T2
"'""'E'
4042
0 52
ISPi
5.8
2 27
05
137
B
'43.7'
B
12.5
'' 0.73
i40.0"
67.0% '
•^'•"15
HCM Level of Service
Sum of lost time (sj
ICIJ Level of Service ,:
B
8.0
C
Baseline Synchro 7 -Report
Page 2
HCM Signalized Intersection Capacity Analysis
3: La Costa Ave. & El Camino Real
Near Term -i- Project PM
5/15/2013
> > ^ t V \
iilM wmw Ms;i • MW
1^.-. y:^l%'Wk^,-.iy
i:MiI: iiii
Lane Configurations tt f tt f V\ ttti V\ ttt r Volume (vph)' .836 683 328 '^;::/T07;;: 462 238 249 /Tloge-; 68 352 1277 908
Ideal Flow (vphplj 1900 1966 1900 1900 1900 1966 1966 1900 1900 1900 1900 1900
^([J||||m|j@|i§i;|||/ ;"4"o 40 Silol 40 - •40 40 40 iiioi? . 4.0-40 40
Lane UbI, Factor 0.97 0.95 " T66' i.'oo' 6';9 5 ' ' Too "0^97 0.91 0.97 0.91 1.00
Frt 100 ^"JI-OO , 0.85 '1.00 ' 100 0,85 - 100 0 99 1.00 1.00 085
Fit Protected 6,95 1.00 100 6.95 1,00 1.00 0.95 1.00 0.95 1.00 1,00
s;aTiflow (prot)W'~. - " \ 3433 3539' 1583 ' i77d-3539 1583 3433 5040 ' 3^33 5086 1583
Fit Permitted 0,95 ioo 0.95 100 0,95 100 095 1,00 1,66
Satd.'Flovy'fperm) • "-3433 3539 1770 3539 1583 3433 5040 " '•/''^li^T'-ltTW:. 343'3 5085 1583
Peak-hour factor, PHF 0,95 0,95 0.95 0.95 0,95 0.95 0.95 0.95 0.95 0.95 0,95 0.95
AdLFlow{vph) I v" - " 880 ' 719^ 345 113 485 251 262 ';7ii54 T •72' 371 1344" s-' 956
RTOR Reduction (vph)
Lane Group"Flow"(vph) "
'""""""o' 0 16*2 0 0 134 0 4 0 0 "'"0 15 RTOR Reduction (vph)
Lane Group"Flow"(vph) " • 880 if;l:f| ' 183 113 486 117 262 1222 371 1344 fill Turn Type Prot Perm Prot Perm Prot Prot pm-i-ov
l^rolg|ted Phases '7 5 " 2 .1 6 3 8
i--*i:f«*»it: S::M--).:!;-;.-IJS.-liiiS
"•/ %
: 5
Permitted Phases 2 6 4
Actuated Green.:G (s'l ^ 44,3_. , 56.4 56,4 •* '134 25 5 25.5. ^l3|^ 364 178 40.8 851
Effective Green, g (s)
AQfuafed'gTCBatig 7';
44.3 56,4 56,4 134 25.5 25.5 13,4 354 17^8 """40;8 '85,1 Effective Green, g (s)
AQfuafed'gTCBatig 7'; 032 040 * 040 ' 010^ 018 0.18 ^;B3P; 0.26 013' 0.29 661
Clearance Time,(sj 4.6 4,0 40" AT" 40 4.0 " '40 40 ' 40 40
Vehicle Extensi'Qn (s) . 30 30 30 3.0' 3 0' ' 30 30 , -3.0 -• 30 30 30
Lane Grp Cap (vph) 1086 1426 638 169 645 288 329 1310 436 1482 1007
V/^ Ratio Prpt'" . 026 C?0 0.06 cO.14 ; o;q8 0.24 . 'y' -cO.fl' 0~26 c0 3d
v/s Ratio Perni 0,12 6.07 0.30
v/c Ratio 0.81 050, 0 29 ''0.6f-0,75 WMW \d,"80 0 93 0 85 0 91 0 93
Uniform Delay, dl "44,0 313 28.2 612 54,3 50.6^ •'62,6' 50.6 59 8 47.8 • 24.9
Progression Factor 1 00 1'00 ;""ido P.84" 0 99 1 18' 0.98 109 1.01 '•09'5 1,00
Incremental Delay, d2 47 0.3 6.2 85 44 WWi ~ Ti.8 12,5 7.5 12,1
Delay ]s) - v-. -18 7 '31.6/ 23 5 59 8 581 60,3 72 4 67 7 . 71-9 '::
... .
52 9 37,0
Level of Sen/ice D C C "T E E E "E D "D
/\'pproa(i.f)'belay (s)• ^38 8 IBiSI • '59.d'~' ••"68.6 ' 49 9
Approach LOS D "'~'E E "'ID '
HCM Average Control Delay
fillSiMiSHlilaiil
Actuated Cycle Lenglh (s)
Inters'ection Capacity Utijizalion
Analysis Period (minj
0 Critical Lane Group ^
51,9
023
140,0
86.i% ^
"15
HCM Level of Service
' . I... •-
Sum of lost time(s)
illilil:i[l||ii|i;
D_
8.0
E
Baseline Synchro 7 -Report
Pages
HCM Signalized Intersection Capacity Analysis
4: La Costa Ave. & Shopping Center DnA/y.
Near Term + Project PM
5/15/2013
Peak-hour factor, PHF
Aoj Flow (vphj _
0.90 0.90
HI
7
0.90
;^ |3
"1"
0.90
37
0.90
658
13
0,90
92
0
0,90
- 86
0.90 0.90
22 50
26 0
0.90
136
0
0.90
18
158
168
1966
Lane Configurations '*i t'^ ^ t"^ «^
Volume (vph) ' ' 59 901 84 33 592 83 77 20 45 122 16
ideal Fiow'(ypil{)i)"1900 1906 1900 1900' 1966 1900 i900 1900 1966 1906^ 1900
Total Lost Jime (s)' 40 40 40 40 40 40 40
Lane Util. Factor 1.00 0.95 1,00 0,95 1.00 100 100
lifliPiiiRillSllPililliiiP
'Fit'pi-otected ' """*'""6','9'5I'.OO'6,95"iB"***" 0,"97''6,95 1,66
Satd'Flow (prot) ^ 1770 3494 ' - 1770 3474 1736, . " 1770 1608
FItPermitted 0,95 100 "" 0.95 1,00 6,97 0.95 1,00
Satd Flow (perm) W\ 177(j - 3494 ''^ l 1770 3474 -• ' . 1736' 1770 1608 0,90
iil
'" • 6 Lane Group Flovv fvph) 65" 1087 ^'"^'^ 0 ' '37' 737' " ^0 '0^ 132 • " 0' iso" • 47-0
Turn Type^
gfotecte^ .Phases/^:f''''"''
Prot
7
Prot
8
Split
impiilpl
Split
6' 6
Permitted Phases
A'-tuated Green G(s) 58 '30T • 23 26 6 107 ,, jo.-g^"' 109 i;i;;:i-?y
Effective Green, g (s)
Actuatecl g/C Ratio ^"^ "
30T " ' ?3 26.6 10,7 16.9 10.9 Effective Green, g (s)
Actuatecl g/C Ratio ^"^ " 0 08 0^43 \ /" 003 0 38 0,15 016 .0,16
Clearance Time (s) '40"' 40 "4,6 40 4,6 40 " 40
Vehicle Extens on (si " '3.0 '^'s'.d < -"•• / '3.0"^-"sTo ~ 30 3.0 30
Lane Grp Cap (vph) 147 1502 58 1320 265 276 250
v/s f^atio Prot''.'-' " cO.04 "c0.3l, • . Ililllil 0.21 " Tcd.o'^v c0 08 • 0 03
v/s Ratio Perm
v/c Ratio' ' 0.45 liili/iil iiiPiil 0,56 . -\' ^ 0 50 iiiiiiii; 019
Uniform Deiay, dl 361"" 16.5 334 ' i'li 27,2 '• 27.'6 25,7
Progression Factor 0 67 ;. 1,4,9 160 1,00 V 1,00 ~ , -;•. •'-:'5•"T:d6"•^ lOO-
Incremental Delay, d2 "1.7 • '"2.4 20.8 1,7 1.5' 1.4 0,4
Delay ^s' 221 27 0" , , 54.2. 188 28,7 ^ 28,4 • .26r
Level of Service C 'c D ' ^B C C C
Approach Delay (s) .26.7- . -•20,5' •' "• 28,7. -2r;d-
Approach LOS C C C " "c
HCM Average Control Delay
HCti^ Volume to Cupacify ratio \
Actuated Cycle Length (s)
lqtersectipn.-|;apaGityfUtilizat!pn;;
Analysis Period (mm)
c Critical Lane (Troup
24.9
0 63
70 0
•"63.5%'
15
HCM Level of Service
Sum of lost time (s)
'Sfi^ieSiBi^Siciiil
16.0
gill
Baseline Synchro 7 -Report
Page 4
HCM Signalized Intersection Capacity Analysis
5: La Costa Towne Ctr. & El Camino Real
Near Term Project PM
5/15/2013
Lane Configurations ttii 1 ttt
Volufne (vph), -5 /•1'545S/-25 20 WiMWWWWWWW-ideal Flow (vphplj i960 1900 1900 1900 Wm Total ,Lost bme (s) 40 4 0" .,.;; ;.'-•.-; f ' 4,0-' fSppliSilliiS "'iw^f^ww^i^^'^ ^:v;^^ ••'•^;:.;fc:-;:'/V s^^-^
Lane Util. Factor 0.97 6,91 1,66 0,91
mlW W ~' " -0 99 liilli - Tod, ,.1 00
Fit Protected '0,96' ' "1, 6b 0 95 1.00
Said Flow (prot) ' 3407 wmwk 1/70 fiiPilSilllS©
Fit Permitted '6,96 i,6o 6,95 1.66 S'aTd f^r6W(p&mV. -3^07 ' 1770^ ^50^5'
Peak-hour factor, PHF 0.90 0,90 0,90 0.90 0,90 0.90
Adrl:i#(vi)L.^ 56 6 1717 WW . : 'S;.; ;''r^,;^^-V.'-";.'^?s,-^":^/?v^?j:':^--;; ^:T^':vy^Wy:^^''cy'
RTOR Reduction (vph) 6 0 i 6 ' 0 0
LWnFGrbup plowi'vph) ' 56 iiiPl 1744'^ "•d" 22 /ig511:/!S///::/Sf/;/:* ^!^^^iW^W^^W0lS'^^y^W. ^WW^^W'^ ^^WW-W:yWW:i$
Turn Type Prot
\ 8 7' y^.yJiyMd'si. iyiy;
Permitted Phases
-M ^ 1164' ' .5.0 i25"4'^ :
Effective Green, g (s) 6,6 5.0 1254
Actyatedj/C^atio • Q'O"5 0 83 PH 0 90
Ciearance Time (s) 40 4.0 4.0 4,0
Vehicle'Extension (s) ^6 3,0 30
Lane Grp Cap (vph) 161
'v/s Ratio Prot' ^c002
v/s Ratio Perm
v/c Rabo ^ J 0,3'5
Uniforrn Delay, d1_ 64 6
pfpg^llBniFactdr^;-;"';. ' T'OO •:
Incremental Delay, d2 1 3
Delay»'' /: " 659
Level of Service E
Approach Delay (s) 65.9
Approach LOS E
4218 63 4555
c0,34' , 0 01 c03'0
0.41 \' 0 35 ^ ^ 0 33 ^
3.0 65.9 1,1
3 70 147._0T3J
0.2 2.0 d.r 115 986 03
B "F A
1i5 -. ' '^ , 'fJ
B A
HCM Average Control Delay
HCM Volume to Capacity ratio
Actuated Cycle Lenglh (s)
Intersection CSpaaty Utilization
Analysis Period (mm)
c Cntical Lane tproup
8.0
WoMi 'Wm
,40.4%
15
HCM Level of Service
Sum of lost time (s)
ICU Levefof ServipV
12.0
iiii
Baseline Synchro 7- Reporl
Page 5
HCM Signalized Intersection Capacity Analysis
6: Levante Street & El Camino Real
Near Term -+- Project PM
5/15/2013
> —»• > *-t r \ y
[^®isi&'§:S*'Si'^ii;:v|^ i'.'il£i;_ MIS; Sill /illi'
Lane Configurations \ t If \ tt^ ttti
Volume (vph) - 33 4 7 87 0 97 20 1428 147 159 1538 32
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Losi time (s) 4.0 4.6 40 4.0 40 •'40 40 40
Lane Util, Factor 1,00 1,00 1 00 1,00 1.00 0.91 1,00 0,91
1 00 090 . ;100': " 0 85 100 '•099 lop 100
Fit Protected 0 95 1,00 0.95 ioo 0.95 1,00 0.95 1,00
Said FIOwTpfot) ' . 1770 .'-1676-'-'.-1,770 ^ 1583 1770 5014 1770 5070
Fit Permitted 0 95 1.00 0.95 1,00 0.95 1.00 0.95 100
Satdc F|owfp6rml'" 1770 16'76 W^^w0^-1770 1583 1770 5014 1770 507'0
Peak-hour factor, PHF 0,90 0.90 0.90 0.90 0,90 0,90 0.90 0.90 0,90 0,90 0.90 0,90
ArFioMirr " ^ 37 u. 4; 8 97 Q 158 22 1587' «'l6i . 177 ••'ifo-g-rf^sg
RTOR Reduction (vpy 0 7 0 0 "o 91 6 7 0 0 1 0
Lane Group"Fld'w.'(vph) • '^ 37 *"^''T 6' 97 17 22 1743 0 "^177 1744 ^ d
Turn Type
^rotecfe,^^ll,aSi^ *"'*^»''
Prot Prot Perm Prot Prot Turn Type
^rotecfe,^^ll,aSi^ *"'*^»'' 5 2 . WW 6' 3 8 1 w , . 7 ' A'-
Permitted Phases 6
ActIiil%c;Grel,:0;(s)1' ' • 59 15 0 .\2.WW 215 42 . 778 18.8 A4fT'3
Effective Green, g (s) 5,9 15.0 124"' '21,5 ' 42 77,8 18.8 92.4
Actuated g/C Ratio 0 04 ' 0:11*: 0 09 SIS '015, 0 03 056 P-l? 056
Clearance Time (s) 4,0 4,0 40 4.0 4.0 4,0 40 4,6
Vehicle Extension (s) ' 3.0 30 30 5 30' 3.0 30 • 30 3"0
Lane Grp Cap (vph) 75 180
v/s Rati'o Prot ' ' 0 02 ^ 0 00
v/s Ratio Perm
v/cRafio' '-^^-^ ' _' 0,49 ,003
Uniform Delay, d1 65;6 56.0
Prog'resslon Factor -;- ^ 1 00 1 00
Incremental Delay, d2 5,0 0,1
Delay (s) :J\7d6 56 0
Level of Service E E
Approach Delay (s) ^ ' 67 0
Approach Los E
HCM Average Conti-ol Delay 24,2
HCM.Vblumetop^pacityrajfo ^ 0 56
Actuated Cycle Length (s) _ 140,0
Intersection Capaoity Utilization 61 2%
Analysis Period (mm) 15
0" Crifical Lalie Group"
157
cO 05
0.62'
61,5
' 100'':
7,1
58 0
243
c0,01
0.07
50.7
1 00
01
508
D
53
0 01
042
66.7
too
5.2
71.9,^
E 59:1
"'"E '
HCM Level of Service
i^^:^'^i^?-#w:::'^:'^;:^^^^^;'^^
Sum of lost lime (s)
ICU Level bf Service
2786
cO.35
0 63
21.2
'.-1 00
1.1
22 3
C
22,9
C
238
cO.10
0 74
58.3
095
116
66 7
E
3346
0,34'
, 052
12,3
" i24
0,6
158
B
205
C
12,0
B"
Baseline Synchro 7 • Report
Page 6
The La Costa Towne Center © Urban Systems Associates, Inc.
Excel La Costa, LLC May 17, 2013
APPENDIX F
Year 2030 With and Without Project Synchro Worksheets
002312 F 002312-Report_C.doc
HCM Signalized Intersection Capacity Analysis Year 2030 AM
1: La Costa Ave. & Saxony Road 5/15/2013
>
Wlir4ir*l , - ; ^ \iM ?l<sft, "#}/ 'Ujfs^ <
Lane Configurations tli tt f
Volume (vph) 1301 102. '117 1396 31 65
ideal Flow (vphpl) 1900 1900 * 1900 1900 1900 1900
Totaf Lost time (s) ' 40 40 ^4o; 40 " 40 , yyy^i y''y^y"^^^~^y^y'}y^y-iyii
\%^0^^'iWW^^: •^^^^vi/^^ i^li i
Lane Util. Factor 0,95 1.00 0.95 1 00 1,00
Frf ., ' " 099 Too , 100 •• -1,00 085 ' " P"-- '^TTf':^ ^ •^••^^i^-'*'\!';t?^-^': ^y 'f.\
Fit Protectea 1,00 0,95 1.00 0,95 100
Satd.Flo\{r(pfot) -3501 .^^•-;•i7;•i'•1J^£v;•:••,•t*•:• •1770 3539-. 1770 1583: • .
Fit Permitted 1.00 0 95 1,00 6.95 1,00
Satd Flo^tpemi) 3501 1770 3539 i770^ 1583 '^ '
Peak-hour factor, PHF 0.90 0.90 0,90 0,90 0,90 0,90
Adj Flow (vph) 1445' 113 130 - 1551 34
RTOR Reduction (vph)
Lane'GroupTlow (vph)
5 0 0 0 0 66 RTOR Reduction (vph)
Lane'GroupTlow (vph) 1554 " 0 isd' 1551 • 34' 6
Turn Type Prot custom
Pratesjeiphafe^^
Permitled Phases
Actuited Green'G(s)
Effective Green, g (s)
Actuated g'C Ratio
Clearance Time (s)
Vehicle Extension (s)
43.0
43.0
"0 62"
40
3.0" *
77 '
7.7 54.7
0lil"079 '
"4.0" '4.0"
•^3.0.^ ^ 3.0^'
. 3
6.2
6.2
0'^0&
4.0
^3.0
6,2
'0.09.
40
SO
Lane Grp Cap (vph)
v/s Ratio'Prot
v/s Ratio Perni
V c Ratio
Uniform Delay, dl
Pi-ogression Factor
Incremental Delay, d2
Delay (s)- ... '• .:
Level of Service
Approach Deiay (s).^ '
Approach LOS
2185 198 2810 159 142
c0 44 ' 0 07\cQ44' cO'02
"0.00
Qtl
8.8
:,0B6- 055 0 21 0.05 Qtl
8.8 29.3 2.6 29.1 28.6
\"100 1 00 1 03 IM; 100
1.1 7.6 0.2 6.7 6.1
"99 W ' 370 28 29 3 28.8
A D A C C
9^9' • ^ "i^5 ' 291
A A C
HCM Average Control Delay
HCM Volume to Capacity ratio
Actuated Cycle Length (s)
intersection Capacity iJtilization
Analysis Period (mm)
c 'Cnlical Laqe Group
8.3
0 65
68 9
59.0% t^
15
HCM Level of Service
Sum of lost time (s)
ICU Level of Service
12.0
B
Baseline Synchro 7 -Report
Page 1
HCM Signalized Intersection Capacity Analysis
2: Costa Del Mar & El Camino Real
Year 2030 AM
5/15/2013
Lane Configurations V\ f ttt^ *i tt
Volume (vphJ' 46 21 1861 129 59 2048
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Total Lost time (s) 40'*' P 40 4 0 ' VO'
Lane Util. Factor 0,97 1,00 0.91 1.06 0.95
FEi , ^^W, W ' J 00 0 85 0 99 1 00 1 00
Fit Protectea ^ 0.95 1,00 ioo 0.95 100
Said'Flow (piot) ' 3433 1683 J,.563§ ' '17703539 ' "
FItPermitted 0.95 i.OO 100 6.95 1.00
Said Fiow(pe.'m) 3433 1583 5036 1770 3539"'-
Peak-hour faclor, PHF 0.90 0.90 0.90 0.90 0,90 0,90
Ad)-.FIqw.(vph) -. . 51 23- 2068 ^ 143' 66 2276 i;.i^;&-;ȣv,:^iii,ii^|^/:;^
RTOR Reduction (vph) 0 21 4 6 0 0
Lane Group Flow (vph) ~ - ,„„^.„,,„ ' 66 2276 "
Turn Type
Protected P'lases"
custom Prot Turn Type
Protected P'lases" IHSSBBiilliiii
Pennitted Phases 6
Actuated Green G (s 10 3 '^ 10 3 108 9 -. ;8.8_'i2i:7'^^" '
Effective Green, g (s)
Actuate3.g7c Rafi5 ;,* "
10,3 10,3 108,9 8,8 121,7 Effective Green, g (s)
Actuate3.g7c Rafi5 ;,* " 007 ' 0 07 0 78 0'05 0 87
Clearance Time (s)
Vehicle Extension*(s)'
4 0 4 0 '" 4 0 ' 4,6^ ' "4,"0 Clearance Time (s)
Vehicle Extension*(s)' "'30\ JO' ' 30' t -A 30'"^ .30' '
Lane Grp Cap (vph) _ 253
v/s Ratio Prot ^' " cO oT
v/s Ratio Perm
v/c Ratio- , '' 0 2().
Unifonn Delay, dl ^ 61,0 _
Progressioii Fac|or' » ' 1 00 ..^
Incremental Delay, d2 0,4
Delriy (s) 61 4
Level of Service E
Apprpach Delay (s)'~ .6ld J
Approach LOS E
HCM Average Conlrol Delay
HCM VpfOiiieJo CapacityT'atio - ,V
Actuated Cycle Lengtii (s]^
Intersectioii Capacity Utilizatiop' ,^, -
Analysis Period (mm)
Q Critical Lane Grpup' -• .
116
0,06
0 01 '
60,1
Too,
01
60,2
E"
3917
044
0 56
"6,1
0 74
0,5
51v
A
51
A
111
0 04
0 59
63 9
100
8,3
721
E
3076
cO,64
0 74
34
foo
1,6
50
A
69
A
: ,: : ^.,' - ,.:
6.9
0 70
140 0
65 6%
15
HCM Level of Service
Sum of lost time (s)
ICU Level of Service -
A
8.0
-/>C f:
Baseline Synchro 7- Report
Page?
HCM Signalized Intersection Capacity Analysis
3: La Costa Ave, & El Camino Real
Year 2030 AM
5/15/2013
> K. t A V 1 V
i;::'S:'»;3Mi)kis Wmy /-fil/ IS
Lane Configurations v\ tt f •i tt f V\ ttt^ V\ ttt r Volume (vph) 799 331 384 151 578 238 227 753 22 157 1323 746
Ideal Flow (vphpl)
Total Lost time (s)
1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Ideal Flow (vphpl)
Total Lost time (s) 40 40 * 40 ' 40 40 40 4 0 40 40 40 40
Lane Util, Factor " 0.97 0,95 1,00 1.00 0 95 1.06 0,97 0 91 0,97 0,91 1 00
Frt' 1.00 '100 085 ' 100 . 1.00 0 85 1 CO ' ioo 1,00 . 1.00 . 08^
Fit Protected U95 100 1,00 0.95 1.00 1.00 6,95 1.00 0,95 1.00 100
SatdsFlOw(er6ll 3433 3539 ..1583 -. 1770 3539 1583 . 3433 5034 3433 5085 1583
Fit Pemltted 0.95 1,00^ 1.00 0.95 " 100 lo'o 0,95 '"Too 0,95 1.00 1,00
Satd. Fiowl'perm)' 3433 3539' 1583 1770 3539 1583 ^ 3433 5064 '3433 v 5085 1583
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0,95 0,95 0,95 0,95 0.95 0,95 0,95
Adj Flo.v(,ph) 841,: 348 404 159. 608 251 .239. 793. 23 165 1393: ^'785
RTOR Reduction (vph) 0 0 155 6 6 126 0 2 0 6 0 11
Lane Group FiowTvph), 841 348' 249" 159 " 608 ' 125 239' ""814" " - 0'" 165 " '1393" 774
Turn Type
p?ot»haiis:-;:-
Prot Perm Prot Perm Prot Prot pm-i-ov Turn Type
p?ot»haiis:-;:-5 2. <^:;<V^"0^;^i'.'::':---;
. Jl-1 V. -fr 1 6 3 8' 7 ' 4' 5
Permitted Phases 2 6 ' 4
Actuated Greer,, G (s; 38 2 • 5"0,0'' • 500 17:2^' 29 0 290 • 122 "46.3'--.^ 105 '44 6 '. K82 8
Effective Green, g (s) 38,2 50,0 50.0 ' i7;2 29 0 29.0 T2.2 46.3 10.5 44.6 82,8
Actuated g C Ratio 0,27-' 0 36 0'3'6 ,0,12" ' 0 21 0 21 0'09 0 33 0,08 0 3'2 '^0 59
Clearance Time (s) 4.0 40 4.0 ' 4;o 40 4,0 4.0~ 4.0 40 4.0 4.0
Ve'hicfelxtensibn (s) "'30 s'o 30 ' 30 '3 0 3,0 30 30 30 3,0 "30
Lane Grp Cap (vph) 937 1264 , 565 217 733 328 299 1675 257 1620 981
v/s Ratio Prol. ,^ ' c024 oTd 0.09 .coir c0 07* 016 0 05 c0 27 0 22
v/s Ratio Perm 0.16 0,08 0 27
v/c Ratio,, •". -0,90 0.28 0 44 0 73 083 0 38 0.80 049 0 54 0,86 079
Uniform Delay, d1
Progression Factor ^ • ,
49,0 ""32,1 34.3 59 2 53.1 47,8 62,7 37 4 62,9 448 21.9 Uniform Delay, d1
Progression Factor ^ • , , 100 100 •'^iOO ' 1.l7 • 102 ^ 137 •1.i6 0 83 • 0.95 101 1 17
Incremental Deiay, d2 11,2 01 0.6 10.5 6.7 0,6 13.5 1 0 37 4,3 29
Delay (s) ^- * " 60 2 32 2 34 9 79 8 ' 608 66.2 80 2 32 0 63 3 '495 28 5
Levei of Service E C E E E F C E D C
Approach Delay (s) -.^ ''. \ 47,7 • 651 44 3 43,4-
Approach LOS D E D D
^^^^ mi
HCM Average Control Delay
HCM''yplume"to Capacity'ratio
Actuated Cycle Length (sj
iiifefs^dtiqo C&pacity Utjizaitibb,':
Analysis Period (minj
f:|;|ri||i|i|||§p3^
48.4
0'86
"146,0
•'84;1'%-:V^
'Tr
HCM Level of Service
Sum of lost time (s)
|StSy|lipf:plv®S
p
" 16,6
--;E:
Baseline Synchro 7- Report
Pages
HCM Signalized [ntersection Capacity Analysis
4: La Costa Ave. & Shopping Center DnA/y.
Year 2030 AM
5/15/2013
Lane Configurations 'j t1^
Volume (vph)' , 39 390
Ideal Flow (vphpl) 1900 1900
Total Lost time (s) ' 4,0 s 40
Lane Utll. Factor 1,00 0.95
Prt\-"* ' '^ 1D0 .^98
Fit Protected o 95 1 00
S"'aldTplow'(prot) / ^ 177p ^ 3458
FItPermitted ' 0.95 lOO"
345'8
70
1900
28
1900
40
1,00
1 00
0 95
1770
0,95
1770
tT^
813
1900
40
0,95
0 99
1,00
3491
Too
'3491
82
1900
26
1900
4*
5
1900
4.0
1,00
o.'g7^
0.97
1745
0.97
1745'
11
1900
48
1900
4,0
1,00
100
0.95
1770
' 0 95'
1770
10
1900
40
1.00
0,86
1,00
131
1900
1.00
1603
Peak-hour factor, PHF 0,90 0,90 0,90 0.90 0.90 0.90 0,90 0.90 0,90 0.90 0,90 0.90
Mow(vM'^/ --' 43 433 78 > 3f: 903 ''"^g5r. ^' 29 . 6 ]2 . •*';53' 11 146
RTOR Reduction (vph)
Lane Group Flow (vph)
0
'43
i4
497"
0
"0
0
31
^ "8 ' ^6
"986'^"'"" 0
0
0 " ii 6
' 36 -O'
' "o
53
128
' ' '29 ' 6
" " 0 Tum Ty^e Prot Prot _ Spitt _
Protected Phases-; lillif 4 3 .J...-^-,-1..-
•? ~-.... **. lilli!l!KI 6 6 "
Permitted Phases
Actuated Green G{s) 38 -343 25 SSC '^iiW' ' 88 8.8
Effective Green, g (s)
Actuated g C Ratio
3.8 34,3 2.5 33,0 8.4 8.8 8.8 Effective Green, g (s)
Actuated g C Ratio '005 0.49 0 04 0'.47' ,^^v:ij^::;::-vS::.;:!S:::V-0".12 Vi3.^ 013
Clearant^e Time (s)
Vehicle Extension (s) '
4,0 40 4.0 4.0 4.6 40 4,6 Clearant^e Time (s)
Vehicle Extension (s) ' ^ 30 30 SO 30 ':S;:;f-?.i'?:.S--':'-u'-";::i 3 0 ' s'd S'O"
Lane Grp Cap (vph) 96 1694 63 1646 209 223 202
v/s Ratio ?rot cO.02 014 0 02 c0,28 c002 . " cOOS ' '002'
v/s Ratio Perm
Vc Ratio 0 45 0 29 0 49 0 60 'i^^;:^^-;-^5::-'\::^.^ 017 0 24 ,015
Uniform Delay, dl 32.1 10,6 33,1 13.6 27.7 27 6 27,3
Prdgres^fon Factor 143 ^ 0 61 ^100" 1 QO . 1 00 1 00 100
Incremental Delay, d2 31 0.4 59 1.6 0.4 6,6 0,3
Delai (s) 48,9 '69. ' 391 J52, . 281 " 281, 27 6
Level of Service D A D B C C C
Approach DelayTs), WWWWk 10.1 160' •' : 281 " 27 7
Approach LOS B B C C
HCM Average Control Delay
HCM Volume "to Capacity ratio
Actuated Cycle Length (s)
Intersection Capacity Litilization *
Analysis Penod (mm)
c Critical Lane Group
15.9
046
70.0
537%
15
HCM Level of Service
Sum of lost time (s)
ICU Level of Serviiie
B
W('^^j^zW,
16.0
A
Baseline Synchro 7 • Report
Page 4
HCM Signalized Intersection Capacity Analysis Year 2030 AM
5: La Costa Towne Ctr. & El Camino Real 5/15/2013
t V i
|5iliiel(iS?^3'-SIIM^ V HISS;
Lane Configurations
Vblume (vph) \ '
Ideal Flow (vphpl)
Jotal Lost time (s)
Lane Util, Factor
Frt . „ .
Fit Protected
w
28 3
1966"1900
40
0,97
0.99 :'
6,96
1168
1900 '
'.--.'• 4.o;".
0.91
100
1.66
1900 ^
*i ttt
3 1795
T9661900
liiiillliiHiliiiPlliW
1,00 0,91
too J.OO .. _ .
"6,95""i .60' Satd;'RQW(pr6t)'> /V-
Fit Permitted
Satd Flow(perm.i
"W--''\\
0,96
:.'3410'
, 5074
Too"'""
5074
J770 / 5085"-"
0.95 100
1770 5085
Peak-hour factor, PHF
mmrmw:y.:„y.
RTOR Reduction (vph)
la?e Group FIQ'^W'V
0.90 0,90
' 3i:/"3"
3 0
%y^r'
0,90
'1298
1
1316'
0,90
i9 .
0
0
0.90 0.90
3" ig'g^"; r
0 0 t^smmm§mmmwmmmBiwsmmm
Turn Type
ilHiliiif
.' -4.4
44
, 0.03 "
" 4.0
30
Prot ^ _ ^ _
P/StecJ^P.H?5es-
Pemiitted Phases
?^aui]ed;Green;G(s)'y'
Effective Green, g (s)
Actuated g/C.Ratic
Clearance Time (s)
Vehicte Exferiston (s)'.-'
ilHiliiif
.' -4.4
44
, 0.03 "
" 4.0
30
8 .
. 122.3 '
122.3
'",:d,87::/
4.6
. .3.0"
1J?«x1.?7 6/, X > ^J^
13 127.6
liiliiSltlliiiliiipfSilS^
4.0 40
'so ' 3,0 ' , ^ - ' Lane Grp Cap (vph)
y/s Ratfo;,t'rot • •-.'";
v/s Ratio Perm
107
cO.01 - '
4433
'0.26.
16 4635
'000 c0 39
v/c Ratio' 0 29 . ..I'O.SO'- ' lipii!ll:|iSiiil|^^
Uniform Delay, d1
Progression Faclor
incremental Delay, d2
Delay (s)
Level of Service
66.3
100 , "
1.5
67 8
T5
412
'0.2
''' 64
'A'
Wu"6.9"
.0,90 127, • . - \ . *- ..>,/'•'- .
3.5 0.2
"E' "' 'A "
Approach'DeJay (s)
Approach LOS
67."8
E
""''6 4.
A A
HCM Average Control Delay 4.1
HIHilliiBBiilSSiiiiiiilliii
Actuated Cycle Length (s) _ " 140.o'^
Analysis Period (mm) 15
g|ff||^|^i||i§fp|||5l|:|Ji;^^
HCM Level of Service
Sum of lost time (s)
fcU'Ll'vel of'Service';"
8.0
A
Baseline Synchro 7 -Report
Pages
HCM Signalized Intersection Capacity Analysis
6: Levante Street & El Camino Real
Year 2030 AM
5/15/2013
> *-^ t A V
iy -^IL.... Iiii iiiilii •Siil
Lane Configurations t f ^ ttT*
Volume (vph) ' ' 23 2 6 178 3 161 14 1122 29 56 1691 34
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Tola) Lost time (s) -40 40 4.0 4.0 40 40 40 40' 40
Lane Util, Factor 1.00 1 00 1,00 1,00 1.00 1.00 0,91 1 00 0 91
Frt ;" - ' _ 100 0 88 100 ' 100 085 100 1,00 '•SWWW 1 00, 1,00
Fit Protected 0.95 1 00 0,95 1,00 1,00 0 95 100 0,95' 1.00
Satd Flow (prot) 17J0 1645 ' J770 •1863. 1583 1770 5065 1770'''/507'0
FItPermitted 0.95 100 0,95 1.00 1.00 0 95 ^ 1,00 0.95" 1.00
Satd Flow (pefm) -1770 1645 "1770 1863 ;t583 1770 5066 1770 '5070
Peak-hour factor, PHF 0.90 0,90 0,90 0,90 0.90 0.90 0.90 0,90 0 90 0,90 0.90 0.90
M'iLow]ypJi)"'. W. W' 26 "2 '7?W' 1,98'. 3 179 16 1247 32 ^" g2^^t879'" . 38
RTOR Reduction (vph)
Laiie'Orou pTiSw (vphl
6 6 6 0 0 115 0 1 0 0 1 0 RTOR Reduction (vph)
Laiie'Orou pTiSw (vphl . '26 ' "3 d 198 3 64'' ' 16 1'278' " d" ^ §2" '1919' d
Turn Type
Protected;Phases
Prol Prol Perm Prot
8
Prot Turn Type
Protected;Phases ' 5.^ - -^.^ ' 6, 3 8 ..^;7'C4 .
Permitted Phases ^ 6
^c!4liL3j5ree3V<>'(4'^'v2 3 9" ^15t 7 20 3. >32T 321 23 800 8:p,. .857.
Effective Green, g (s) ^ 3.9 15,7 20,3 32.1 3Z1 2.3 ^80.0 8.0 85.7
Sctualedjfcl^llb,'; " '0.03. Oil , . ois"-' 0 23 ' 0.23'" "0 02 ' 0 57 006 061
Clearance Time (s) 4.'6 4.0 40 4 0 476" 4.0 4,0 4.0 4 0
Vehicle Extension (s) ' ' 30 , 3*0 ' 30 30 30 30 3"'0 3.0- 3.0
Lane Grp Cap (vph) 49 184
v/sRatioProt'^' O'OI 000
v/s Ratio Perm
v/cRatio. "-'T 0 53 0 02
Unifom Delay, dl _ 67,1 55.3
Prog,resS[pn Faptor1 OQ " 1 00
Incremental Delay, d2 10.6 0.0
Delay(s).-' " ^ _ 7'7 7 555
Level of Service E_^ E
Approacli'Delay(s} ' _ " . 72 0
Approach LOS E
257
c0.11
0,-7
57.6
>100
13.3
70 9
427
ooo':
0 01
41 6
1 00
0.0
'41.7
D
57 8
E
363
c0.04
0.18
^3 3
i,00
0.2
'43.6-
D
29
O'Ot
0 55
68 3
ioo
20;8
89 I
F
2895
0 25
044
17.2
,100
0.5
17,7
"B
186'
B
101
c0 04
0 61
64.5
131
98
94.2
3104
c0 38
0.62
16.9
D49
09
91
A
118
B
HCM Average Control Delay
Actuated Cycle Length (sj
intersection Caisacity ll|ilizabri
Analysis Period (min)_
c 'Critical Lane''Groups ^ - •
19,5
0,57,
140,0
63.3%'
15"
HCM Level of Service
Sum of lost time (sj
ICU Le.'el of Service
B
80
111
Baseline Synchro? - Report
Page 6
HCM Signalized Intersection Capacity Analysis Year 2030 PM
5/15/2013
> ^
l-nhjci'.i^i.s /iiffiiiM SSiSi; illi. ^i'lM;?^:^^-^''^!^'?::;.'^^^
Lane Configurations t^ tt r Volume (vplrj''''' iB48" 65 ^ 101 1395 SS57|i 127
ideal Flow (vphpl) _ 1900 1900 " 1900 i9o6 1900 1966
Tofal Losftfrol {s^-WW'. ' i//w;? :Cv"Uv;j^^;:;;" •••;-U " 4,0 ' ;';io,-40 "4 0' ' "W r ;li;'?^^^^^^«;?^^^^ yy^y •'^W.:^}W^
Lane Util. Factor 0,95 1.00 0 95 1,00 ioo Frt »' V/'^' '' 0 99 U!^ ;-}"-^^"-;^:iV-.100 , 1.00 100 0 85
Fit Protected Too 0,95 1,00 6,95 1,00
Satd Fiow{prot) , 3519 , *^i?.'^:^i/^'^;:v!^'^::-l?' 1770 3539 1770 aiililHIi Fit Permitted 103 0,95 1,00 0,95 100
Satd Flo'wTperm)," '' 3519 -.1770 3539'. 1770 1583
Peak-hour factor, PHF 0,90 0.90 0,90 0,90 0,90 0,90
1831 72 -112 -IMoS 63 iiliSiiiiiiii '^y.-.-W^^^^'^W^^^W-'^^^^^^ :/V^ \
RTOR Reduction (vph)
LaneGrouoFloW'vph)
3
iooo ^-
0 0
112"
0
' 1550
0
6'3'
i"22'""
wmmmmm Turn Type Prot custom
Permitted Phases
Effective Green, g (sj
Actuated g/C Rati'o'
Clearance Time (s)
Vehicle Extension (s) ' •\\
,- 'ijiuaiiHrtirei ;*jj*-w;i»: 3
'37.^4 73 1 J
'37,4 5,1 46,5 7,3 73
0 61 008 ' 075' ^012 ;d'i2
40 4"6 4 0 4,0 40
30 ^" s^o' " s'o ' 30 ;---'3o
2130 146 2663 209 187
c0 54 .^^ . G0.06./".0'44'^
0.01
0 89 0 77 d 58 0.30 7pTd^'; *
10,5 27 8 3,4 24,9 24.3
• "iido^ ' ' • V ,1 Od' jW 100 y 100 ' .
52 '^'"li;?"6,'3' 0,8 6.2
s; 15,7; -; - , 48 9 3 7 , 25,7 ""•24,6'.';j
B D A C .* 1 -9. '""15,7 "' - r'' 7 T' " - 6,7,' 24,9 iS^;i^;/^S/(|^
'B 'A C
Lane Grp Cap (vph)
v/s Ratio Pro't'". "7
v/s Ratio Perm
r//« Ratio
Uniform Delay, dl
Progression Factor
Incremental Delay, d2
Deiay''(s]'"l V ' ^
Level of Service
Approach Delay ^s)
Approacii LOS
HCM Average Control Delay
HQI^ Volurqe totlapacjty ratio ;
Actuated Cycle Length (s)
Intersection Capacity'utilization:
Analysis Penod (mm)
c ' Crfhcal Lane G(;oup ;
12.2
0 79
' "61.8 '
•66.6%'-
i?"
HCM Level of Service
Sum of lost time (s)
ICU Level of Service
B
12.0
Baseline Synchro 7 -Report
Page 1
HCM Signalized Intersection Capacity Analysis
2: Costa Del Mar& El Camino Real
Year 2030 PM
5/15/2013
t i
Lane Configurations f ttti tt
iSMiilffllKllsii; 125 87 2352 WM'i 27 '•2i,49://T::i,;;;/'.::,/:^^^^^^^^ Ideal Flow (vphpl) i960 igoo i9o6 1900 1966 1966
Total LpsTtirneTs) ^ ' 40 ' 4.0 "• ,4,0 \ 4"0" iilliliiilllliil^ Lane Util. Factor 0,97 i;6o 0.91 Too' 0.95
Frt.-. ^ . ^ too ; '0,85 • - 0.99 W^M%W^i. ',100 '-'
Fit Protected 0.95 1,06 i.66 ^ 0.95 1,66
'Sa]d..Ffow{Rr6t) ;.> " ' 3433' 1583 / 5050 - ." 1770 3539
Fit Permitted ^ 0,95 i;6o' Too 'o^ir "Too'^"'""'""''"'' Sat(5, Flow .(perm) -.3433 1583 'l&jsd:!/! 1770 3539
Peak-hour factor, PHF 0,90 0,90 0.90 0.90 0.90 0,90
imaiiBii •139-9/ .2313. 127^^
-^.••.••l,.A-:'M'^--k
30 :iaMiilfiiiIiiSiiaB^^ RTOR Reduction (vph) 6 62 3 0 0 0
tEe''GrVup'PToV(vph) • 139 *35 ""273'7 0 30 l3llSii?Hlilifiii
Turn Type
Protected Phases '' '
custom Prot Turn Type
Protected Phases '' ' iiiii 8 7 ilHliiliiiiiiiilllliiliiiS Pennitted Phases !'•>,<:-»:.•:;%: i-' :l-». 6
7
AchfaJp''pen,lG(s)' ; :;ii:4. '11.4 1121 , - - ^ -74:5: IMiliailililiiiiiiiliiiiS Effective Green, g (s)
Acluate'd'g/C Ratio
114 114 1121 45 120.6 Effective Green, g (s)
Acluate'd'g/C Ratio 0 08 Q,''d8 ' "0 80 / lililBilffiKililliBBlililiiii^ Clearance Time (s) ^ 4.0 4.6 "' "4;o 4.0 40
Vehfcie Extension'(s') "s'o' ": '3.0 • r-T 3,0"^-i '•W'\-^Wiy:'^ '•3.0 ^ wmmmiimmmmmmw^mmmi Lane Grp Cap (vph) 280 _ 129 4044 57 3049
v/s Ratio Prot ' cO.64 IBilii 002 BBIiiiiiiillBiliillii^^ v/s Ratio Perm
V/c Ratio 0,50 ; 0.27 ;0,68 0,53 . ISiiliilililiiliiP^^ Uniform Delay, dl
PrPgression Factor
61,6 "eoT 6,1 66.7 41 Uniform Delay, dl
PrPgression Factor 1 00 ""'.'ipq" 2,50 1 o'or; WSSWSgyyMWyWWWmy^yWW
Incremental Delay, d2 14 1.2' 0,6 8.5 2,1
DeLay(s) , 62 9 61 6 15,"8 ". 75 2 i;Ssiig||?iif|S|if||77i7
Level of Service E E B" E A
iSppro'ac^ Delay (s)" wwmi 15 8 SlUSISil wmmwismmmimssmmmsm. Approach LOS E B""' A
HCMAve^^^^^^ , J,3^.9
liBliHlliHiiiiillftiiiiiilfi
Actuated Cycle Length (s) _ 140.0
siBiSiHiiliiKiilffiiiiSiS^^
Analysis Period (mm) 15
5||iM|i^i;|ane?|^g|i^
HCM Level of Service
Sum of lost time (s)
ICU Levefoflfeervice
B
il!
Baseline Synchro 7- Report
Page 2
HCM Signalized Intersection Capacity Analysis
3: La Costa Ave. & El Camino Real
Year 2030 PM
5/15/2013
> > *-^ t A V
Mill mwwm.. Lane Configurations tt \ tt ttT» ttt
Volume (vph)^ PMie'; 722 W-^M>W'-137 473 248 254 :;T|4|;|gr;/: iWiiWWM' 1529 936
lideai Row (vphplj
Total Lost time*(s) •
i96'6 1900' 1966 i"900 1900 1906 1900 1900 1900 1900 1900 1900 lideai Row (vphplj
Total Lost time*(s) • 40 ^ -'Wo {;4;o/ ' r4;o 40 ipi 40 40 40 ' 40
Lane Utii. Factor 0.97 1,66 100 *i,66 1,66 6.97 T.66 0.97 *100 1,00
Fi;?;7;;^ssSv7;;; 'MOO ;ii6di 0 85 ; Too pii 0,85 -1,00 0.99 1.00 1 00 „/D,85
Fit Protected 0.95 ' 1.00 i,o6' 6,95 ' Too 1,06" 0,95 Too 0.95 100 1,00
Satd.'FloW (prot)" . 3433 , 3725' "1770-iipl 1583 3433 5539 3433 5588 • 1583
Fit Permitted 0,95 TB " 0,95 i,"66 •'1.66' " 6^5' i.66 0.95 100 1,00
Satd^Flow-'(pe1'm->'--.;s, - • ",3433 3725 ^•1583-1770 •:"3725 1583'^ 3433 's'ssg 3433 •, .5588 " ' 1^83
Peak-hour factor, PHF 0,95 0.95 0,95 0,95 0.95 0.95 0.95 0.95 0,95 0,95 0,95 0,95
Adj^Fi9w(vpy)^.:' ' 922 " 760.' V''435' ' TT4' ' "4'98" ^ 261'^ 2fi7 "i^pTr""'; 75 391' 1715
RTOR Reduction (vph) 0 o" 'm' "6"' 6 l'58 0 5 0 0 6 12
Lane Group Flow (vph) " 922 V- '^ed'^ 273 :-'T44--'498^' fdS-^ 267 1274 0 "' 3'91 1715 "973
Turn Type
P]olecled''Phasls /''
Prot Perm Prot Perm Prot Prot pm-i-ov Turn Type
P]olecled''Phasls /'' 5 TW^^. llfSil ';; ,1;' 6 8 lilHil Pennitted Phases 2 * " 6 " 4
Actuated Green, G IS) %9: ' 'MS.'s-r 488 ' fl 24 9 24 9 133 4d'd "
• :
r \5.^w ' i-8
Effective Green, g (s) 40.0 48.8 48 8 24.9 24.9 13.3 '40,0 ^'^ 19.1 45.8 85.8
Actuated g/C Ratio' •" •• • - . 029'' '=.0.35" 0 35 012 013 ,018 Oio'; 029 0.14 033 iSI Clearance Time (s) 4.0 " 4.6" 4.0 4.0 , , ^ '4.6 4.6 40 4.0 ' 4,0 40
Vehicle Exfehsion^s) '•-^-""3,0" • "3.0" 30 •^3.0 30 3.0 " ' 'ao"'"'-3.0 " ' 3.0^ 30 \i--.3:0
Lane Grp Cap (vph) 981 1298 552 204 663 282 326 1583 468 1828 1015
v/s Ratio Prot > 0 27 llIPl fflii iiifl WWWWWy O'.OS';-023 fillHIf • -0.31' • cO.27
v/s Ratio Perm '''6;i7" '6.67' "0'34
v/c.Ratio_ , . . • .' 0.94 ; U59' 049 0.71'' ' 0,75' iiill; 0.82 , 0 80 0.84 0,94 Ili Uniform Delay, d1 48.8" 37.3 "35.9 "59,7 54.6 56.6 62,2 46.4 58,9 45 7 25.4
Progression Factor 1.00 • i'oo illll 0 96 ; 0^1 093 ' •1,32 ' 0 83 iiiiioi 0 95 WM
incremental Delay, cl2 16.6 ' 0.7 af •' "9.2 " 41 0.7 i3,3 '"^'4.6 9.8 8,9 16.0
Delay (s) • < 64 8. 38.6 -36 6 6':.2 •-'48.3 M78 ,95.6 42.3 , • ,68.6 .;' .^52 4 ^ -..40,6
Level of Service E ''D " D ;;^i D' D_ ^ F D E D D
Approacl^ Delay (s) .49,4' '51,0 "515^ -50,7:
Approach LOS 'D D' D""' D
HCM Average Control Delay
HCM;Volum6 to Capacity ratio
Actuated Cycle Length (sj
liliSSKiiKiiH^IlSffi
Analysis Penod (mm)
|j|;Grjic|||iafjl|Gi^
50.5
'146.0
'90.1 »/o
15
HCM Level of Service
Sum of Iost time (s)
i'Clif^ivlt^ilSei^lc;!;}
D
8.0
;1ES
Baseline Synchro 7- Report
Page 3
HCM Signalized intersection Capacity Analysis Year 2030 PM
5/15/2013
> *-^ t A V i V
f^^^^M?-?^Ml;u. .>.-7^ ,„ t^./^ SUM 1 . iy^0w
Lane Configurations tT* tT^
Volume (vph)- ••, - ; , ' 59 968 :i';;8d:-' 20 627 83 77 20 40 131 16 178
Ideal Flow (vphpl) 1900 1966" ,1900 1966 1900' 1900 1900 ^ 1900 19O0 1900 1900 1900
Total Lo^l time (s)' 7/7liK 7111 '4,0. 40 • -"'4,0-4,0
Lane Util. Faclor 100 "6;95 "i;66 . ^ . "i,66' ' 1,66 1,00
Frt ^ . ' ;io'o • * 'p.ogj-'•idd: 0 98^ 0.96 100 0.86 liiil
Fit protected 0.95 1,00 095 1.00 ""6^97 6.95' 100"
S^fet-Flow (prot) ." ' 17J0 ' ,3499" i77d • • 3477" ' 1741 1770 i607
FItPermitted 0 95 1 03 0.95 1.06 6,97 ""6;'95" 1.66
Satd Flow (perm) ^ 1770 3499' 1770 3477 1741 -1770 • 1607 '
Peak-hour factor, PHF 0.90 0.90 0,90 0.90 0.90 0,90 0,90 0,90 0,90 0.90 0.90 0.90
" 6C iiil §9 - ,22 -697 ""92" 85 iliBp
/S.ji'.^^,^jjiij,-;<j-v/;:iSH'S
»1 mm 18 198
RTOR Reduction (yph)
Lane Group Rov (vph)
0 7 '""'6' 0'" 12 0 6 23 0 0 ie'e 6 RTOR Reduction (yph)
Lane Group Rov (vph) 65 '• o' 22 • '777 ~ 0 129 '0' ^ r46^ 50 7SQ
Turn Type
Protected Phases
Prot
4,
Prot
5 ; W4 w
Split
2 2
Split
6 • 6
Permitted Phases
Actuated Green.-G(s)
Effective Green, g (s)
MuaMg/e-.i=?atio-:-"'^j:
Clearance Tjme (sj
Vehi cle "Extension (s) "•
'^5,8
5.8
0 08
4.0
^30
50 0
sol
•"""•6,43^.
4,0 '
^^30
22
2J
d:o3i
4.0'
so
26 4^
26 4
0,35
" i'o'
3,0'
MB
i6.6
0,15
40
30
112
11.2
yoM':
40
3.0
11 2
112'
016
4'.6
' 3.0
Lane Grp Cap (vph)
v/s Ratio Prol
v/s Ratio Perm
v(c Ratio , ,
Uniform Delay, dl
ProQ'ession Fac'o'
Incremental Delay, d2
Level of Service
Appr6¥ch'petay'(s)
Approach LOS
147 1500
ilKiiiiiii;
l0|51it0iplSI7
'sol17T
liSgiiii^iiit
Tr""11"'"
D B
iSi^lipliiii
'"""""B
56
fill
0 39'
33,2
ifil
45
377
D"
1311
0 22
loS
'17.5
fclpl
2,6
19.5
B
' 20."0:
B
264
0,49:
27.2
i,4
28 5
C
28 6
C
283
cp08
0 52
26,9
1 00
1,6
285
C
257
0.03
WMI
25,5
''1.00
0,4
25 9
C
26,9
C
HCM /Werage Control Delay
fliSSiffiiliBiBiSil^;!
Actuated Cycle Length (^^^
IMSIiliiiilltiiiiMllil
Analysis Period (min)
c .CriticalLarieGfoyp ^ , :
20.0
iiiei
• ~
15'
HCM Level of Service
Sum of lost time (s)
liliiKPSeSili
16.0
'c
Baseline Synchro 7- Report
Page 4
HCM Signalized Intersection Capacity Analysis
5: La Costa Towne Ctr. & El Camino Real
Year 2030 PM
5/15/2013
< t t V \
/Jlllf ,T/
Lane Configurations W tt^ ttt
Volume (vph) ;/7M5/' 6 §1970;^:--21 7 1732
Ideal Flow (vphpl) " 'Igoo " 1900 1900 1900 1906 1966
Total Lost time (s) ' ' '4,0 40 lilfi WMSWWWWWWWW^WWSWWWWWWM
Lane Util. Factor OSI 0.91 i.66 0.91
* 7'"'; * , ; 0.98'. ioo '•100 ilWiflii/liifpillpS^
Fit Protected 6,96 1.00 a95 1.00
Satd Flow'(prol) 3405 . 5077 . -r70 5085 ; " "' -„ "
Fit Permitted 6,96' 1,00 "6,95 1.66
Satd flow (perm)-''' • 3405 'fWffWW, 177'0 Iid85l7i17liiiii^
Peak-hour factor, PHF 0.90 0,90 0,90 0.90 0.90 0.90
AdjFlow(vph) . • " "6i " 7 2189 23' " 1924
RTOR Reduction (vph)
Lane Gioup Flow (^ph)
7 6 0 0'" 0 RTOR Reduction (vph)
Lane Gioup Flow (^ph) ;"6i 0 22T2 ' • WM 8 mmimmmmsmmmywmwmwwmwy Turn Type
Protected Phases
Prot Turn Type
Protected Phases J ;67 . 8 -777
Permitted Phases
^tu-aP;«:G^(s), 68 Mi9:7;7> ••;:S-Tj^tVt?;;---' .-•?;?; r'l/j^'J'K. .""1.5" .1252T:-;^ ^/-^'-t-""
Effective Green, g (s) 6.8 119.7 1^5 * i25,2
Actuated g/C Ra'io 0^05, :-:.^;,3!".^">f ;•.-?.-.>•-;•(• "d,8B ': 001 »€,^i:ia!S£i:|i/m:;;i^^
Cleararice Time (s) 40 ""'" 4,6 '4.0 4,0
Vehfcle^Extensiofi (s) " 30 30 ^ • 30\
Lane Grp Cap (vph)
v/s Ralio Prot'!' , > ^
165
' c0,02
4341
' co.44; •;
19
iSSl
4547
c0,38
v/s Ratio Perm
v/c Ratio " ' - \\ T " 037 -:
Uniform Delay, dl 64,5
.Pi^dgVliiipn F&dpi f--': " ~- lOp I'
Incremental Delay, d2 i,4
Delay (s) ^. ' , " \ e'SO
Level of Service E
Ap"pt.6ach befayjs) '''. , "^mSs' [
ApproatJiLOS ' ' '''" ' E "
lOtSii
2,6
0.06
0 3
0.4
A
04
A
:i0i2S
68.8
"065
7.3"
52 3
D
0 42 Tl'
3 29
'oT'
43
A
4.5 ••:
A
m HCM Average Control Delay
HCM Volum^to;capaaty ratio..
Actuated Cycle Length (s)
Intersection, Capacity Utilization
Analysis Period (mm)
c Critical Lane Group
34
"O^SL;
146,6
^""48.5%^
15
HCM Level of Service
Sum of iosttime (s)
ICU'Lev'el of Service' ^
12.0
illll
Baseline Synchro 7- Report
Page 5
HCM Signalized Intersection Capacity Analysis
6: Levante Street & E! Camino Real
Year 2030 PM
5/15/2013
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
TotajLost time (s)
Lane Util. Factor
Frt ^:'7,
Fit Protected'
Satd Flow(proti
Fl: Perm'tted
Satd Ftow (perm)
40
1900
4.0
1.00
1 00
0.95
1770,
0.95
1770
4
1900
'40'
1,00
0 89
1 00
1663
'lOO
165?
1900
110
1900
^40
1,00
100
0.S5
i77Q
0.95
'1770
t
0
1900
f
122
1900
40
1,00
0 85
1,00
1533
1,00
1583
^
20
1900
*40
1,00
100
0.95
1770
0,95
1770
1810
1900
40
0,91
099
1,00
*5024
ioo
5024
159
1900
170
1900
40
1,00
1 do
0.95
1770
0.95
'1770
ttii
1947
1900
40
0,91
. 100
1,00
5074
" 100
'"^074
30
1900
Peak-hour factor, PHF
Hmmw:,Wy
RTOR Reduction (vph)
Lane Group Flow ivph)
0.90
0
'44
0.90
4
9
"^"5
0.90
. 10
0
' d"
0.90
122"
0
122
0.90 0,90
0 " 13j
"o' iTe
'0 20
0,90
22
""o"
22
0,90
2pT7'
6
2l82
0,90 0,90
177 189
0 0
"^ 0 '- i89
0,90 0.90
216^".? '33
1
2195
Turn Type
P'otected Phases
Permitted Phases
Actuated Green G(s
Effective Green, g (s)
pd;ate|'g/eMafia7^"^
Clearance Time (s) ^
Vehicle Extension (s)
Prot
6,9
005
40
30
15,q
15,0
Oil
40
3''Q
Prot
w
121
12.4
0 09
4.0
SO
Perm
20 5
20,5
0i5":
40
3'0
Prot
3
38
3,8
0 03
40
SO
8
78,4
•784"
0'56
40
30
Prot
•^•^.''"'•'-7
182
18'.2
* 01"3"
40
30
'-.4
928
92.8
'0 66
'4.0
3d
Lane Grp Cap (vph) 87 178
y/s Ratio Prof ' ' 0 02 000,
v/s Ratio Perm
V/$Ra;tio7!'. '0'51 ' 003
Uniform Delay, dr ' 64;9 56.0
Progilssip'o Faciof^,, _ . \ i 00 1 'Po
Inaemental Delay, d2 4.6 0.1
Oeflyfsj;^-. " 69 5 56,0
Level of Service E E
Appr'b'a'ch'"Delay(s) - '66;2
Approach LOS E
157
c0 07
•0,78
62,4
100
21.1
§3'5
F
232
cO.01
0 09
51.7
•1,00
02
'-51 8
D
48
0 01
0 46
67,1
foo
6,8
73 9
E
86 8
E
2813
.cO.43
0 78
24.0
' .1 00
2.2
'. 25:1
C
230
C
230
cO.11
0,82
59.3
' 120
19,7
91 1
F
3363
0.43
065
14,0
0.56
10
88
A
153
B
HCM Averaje Control Delay
HCM Yplilme to Capacity ratio "
Actuated Cycle Length (s)
Inlefsectron Capa'clty Utilization:
Analysis Penod (mm)
0 "Cntical Lajne^ferpup Wffi
23.7
'' '0,68; uo.'o
J0,7%
" 15"
HCM Level of Service
Sum of lost time (s)
IC'U Level of Service'
12.0
C-
Baseline Synchro 7 • Report
Page 6
HCM Signalized Intersection Capacity Analysis
1: La Costa Ave. & Saxony Road
Year 2030 + Project AM
5/15/2013
Lane Configurations ti^ tt f
V't|ime'(v|^^ 1304 102 118 1401 31 65
Ideal Flow (vphplj 1900 1900 1900 1900 1900 1900
Total Lost time (s) , wmwW' 4.0 i--:4:P;? WWW^WWWwWmWM&W:
Lane Util, Factor 0,95 1,00 6,95 1.66 i.oo Frt 0 99 1 00 MMy MldOT 0.85 WWWWWWSSW: Fili=rotected 1.00 0,95 1.60 '6I5 1.06
Satd Flow ("prot) -3501 1770 ilmWh fi?7di 1583 ysyiyfyyWi
FItPermitted" "Too" 6^95 ' 100 0.95 1.66
Said, Flow{perm) ' ' 3501 3539 1770 1583
Peak-hour factor, PHF 0.90 0,90 0.90 0,90 0.90 0.90
Adj. Flow (vphj .;TT449"' ^ 'T13":-" "131';' "'1567 •' •. 34-'\ 72 ' ' iiSlfflliii! RTORReduction (vphj 5 'o'"" * 6 0 0 66
Lane Group'Flowtvph) wwiwm'-'-IBiiSlilii 1557 34 6
Turn Type Prot custom
Protected Phases; > " '. "2 'W ^-6 3 yyiyif!3y~yyjy^Q:;yyy:sy. iW -7^1/
Permitted Phases "8
f tifualed'Green, G (s) 42 8 8 0 54.8 • ' 62 .6.2. . ^ . s 5 -
Effective Green, g (s) 42.8 8.0 54.8 '6;2 6.2
Actuated g/C Ratio • • 0,62 0.12' " 'O.79-' iO;dp 0 09 ' . ' . ::i':;:-i;'-i;;;^;:-; ;::::u:'vi
Clearance Time (s) 4,0 40" 4,0 To ' 4.6
Vehicle Extension (s) 30 3.0 SO 30 'yyywyww.
Lane Grp Cap (vph) 2172 205 2811 159 142
v/s Rati'o Prot ;;|||Q.4|; WWwMWWSMW. |cd;li c0 02
v/s Ratio Perm
^W^^WmSW0WW&W 0 72 0 64 0,55 ®,2f| W&fWWWWIW^WWWiWW.
Uniform Delay, d1 '9.'0 29.1 2,6 29.1 28.7
Progression Factor ' 100 IliliKlipdS WMW 100 WW0WWWWSSWWWWWW. ^.Wy^yWi^-fi^'^WWWW'iWWW ywyy^yyyyi,
Incrementai Delay, d2 1.2 '6,4' 01 6.7 6.1
ii!li!iiiSiil-Sii;i i7lpTT 35.5 28 iSgfl S8:p;il7SiiSPi lSl7iiiSiii,
Level of Service B A c c Approach Del.ay"(s) l:/;/To7 54 lilii; lSS;if;7iiilliilHI Approach LOS B A c
HCM Average Conlrol Delay
|SM:';|||!S|gj^^
Actuated Cycle Length (s)
fn|||se|tiQ|;|ap||t|||ti^
Analysis Period (minj
8.3
"0,65:
"69.5
::5apl
15
HCM Level of Service
Sum of lost time (sj
HiitEevefpSSefsice
12.0
ISi:
Baseline Synchro 7- Report
Page 1
HCM Signalized Intersection Capacity Analysis
2: Costa Del Mar & El Camino Real
Year 2030 + Project AM
5/15/2013
Lane Configurations V\ •n tt
ypium||yjpl§;77^ WWWM':: ymw 1866 130 59 2051
Ideal Row (vphplj _ 1900 1900 1900 1900 1900 1900
Tolal Lost time (s) 40 40 WW^yWm 7=lid?Jai-;ffl^;-::::/:::,;/
Lane Util. Factor 6,97 1,00 ' 6,9i 1.00 6,95
Frt 100 0 85 WQ:02W. 777:S;00; 1 00
Fit Protected "795' ' 1,00 1.6o 0.95 100
Satd, Flow (prot) 3433 1583 '5036 1770 3539
Fit f'ermltted 0,95 1,00 1,00 0,95 1,00
Satd Flow (perm) 3433 ,1583 5036 • 1770 . 3539 " ' " ~
Peak-hour factor, PHF 0,90 0,90 0,90 0,90 0,90 0,90
Adj Flow(vpfi) '• . 51. "'^23 2073 144 ' 66 2279 ' , ,
RTOR Reduction (vph) 0 2i 4 0 0 6' Lane Group FlovJ (vph) ""'• 51 .'2 2213 0 66 WmBcWMW9sSS9XWB0^
Turn Type custom Prot
Protected Phases -' 1 Slim .8. 7-
Permitted Phases 6
lillBlilliliiiiiMBI^^ Actuaied Green, G(s),.,:,.:.: ^ 10,3 103 108,9 88 lillBlilliliiiiiMBI^^
Effective Green, g (s) 10,3 ias" "'i68,r" 8,8 121,7
Actuated g/C Ratio' d,07i • ' 0,07 0 78 0,06 0.'87
Clearance Time (s) 40" 40 '4.0 40 40
Vehicle Extension (s) 3.0 30 30 /l/iSlfl.! 3.0 • " -
Lane Grp Cap (vph) 253 116 3917 111 3076
v/s Ratio Prot 0.44 •i;77ip;i; cO.64
v/s Ratio Perm 0,00
v/c Rati'o 0,20 '7didif 0 56 0 59 lmM:WWWWW0yW^WWMWWWWmW
Unifomi Delay, di "61,0 "66T 6.2 63,9 3,4
|K:^te|s!OT;|S|c^ iSilK HiPl WWMWWyWWmWWWmWWSWyWMIW^^ Incremental Delay, d2 0,4 oT " 6.5 ' 8,3 1,6
D:elijr:ts|l||iw iiiip 60,2 72,1 7;;®il7il7ilil7ii7ii^
Level of Service E E A E
S§p:f6^D|as|:($j7HS 61 0 yi:^W^yW--yW-67 ;7:6:§;;iSRii37i7ill7s7S
Approacii LOS 'E'" A"
HCM Average Control Delay
j^H^yftiiftttSt^
Actuated Cycle Lengtii (sj
fnfeisiSifpfiif |pS^
Analysis Period (minj
7,6
W^!m
140,0
^65;7i:
15
HCM Level of Service
Sum of lost time (s)
icuTe'i^ejvi^fwi^e?
3,0
C
Baseline Synchro 7- Report
Page 2
HCM Signalized Intersection Capacity Analysis
3: La Costa Ave. & El Camino Real
Year 2030 + Project AM
5/15/2013
>
—*•
> r ^ t
:^EB1S' fi--
Lane Configurations tt f tt f m Volume (vph) 799 332 386 ;':i5i: 581 239 ;:T230:^: yWsr::.:.
Ideal Flow (vphplj 1900 1900 1900 1900 1900 igoo i960 1900
Tpt^fpjstvtijii^^^^ s7i;4;d;'-iiiip;; 7TdT mm': WX3M-1 40 W:MM 4.0
Lane Utii. Factor 6.97 0.95 1.00 1,66 " 6.95 i.oo 0.97 o.gi
llliSiiiiiii 1.00 •|;i--:Qpi >T0;85/-; ;-Ti;6o;' ;7T0dS 0 85 1.00 ;:7io6;;-;
Fit Protected 6.95 T.OO 1.00 6,95 ' 'ioo' i.OO 6.95 ' i;66
Satd Flow (prot) 3433 3539 1583 7770" 3539 1583 3433 5063
Fit Permitted 0!95 " i,o6 i"!oo 0.95 i"!66 i.OO 6.95 106
Satd Ftow (perm) • 3433 3539 1583 i/i776:' 3539 1583 3433 ".5063
Peak-hour factor, PHF 0.95 0.95 0.95 0,95 0.95 0,95 0,95 0,95
Adj'FlDw(vph)^:.. 7iBSiS " 349 ;• 159 iiifs • 252
,. •
242 -',-797
RTOR Reduction (vph) 6 6 225 0 6 • 0" 2
Lane iSroup Flow (vph)"' liigIS 'iisii llSill 105 242
23
1900
V\
158
1900
w.m
0.07
100
0,95
3433
0,95
3433
ttt
1325
1900
:!;';4-d;'
0,91
7,00^ i;66'
5085;
1,06
5085?
f
746
1900
4,0
i.OO
0.85
160
1583
"T.66
1583 0,95
24
0
'0
0,95 'MM
0
166
0,95
1395
6
1395"
0,95
785
23
762
Tum Type Prol Perm Prol Perm Prol Prot pm-i-ov
Protected Phas'es 5 2 1 6 /p^/:^!;^;!; '3 - 8 '7 4" 5
Permitted Phases ^ 2 6
' 147^ 12.1
4
Acluated'Green;'G"(S).. 32,2 . 45.2 "30.8 ,30.8 ' 147^ 48 9 12.1 46.3 78,5
Efliective Green, g (s) 32,2 45.2 45,2 its" 30.8 " so.'s" 14,'7 '48,'9 12.1 46.3 78,5
Achiated g/C Ratio lilfpl Il3i:; 0,32 ioMI 0.22 IfdSit 0,35 . 77;.i:Q§SI 0,33 0.56
Clearance Time (s) 4,6 4.0 40 '46' 4.6 4,0 4,6 4.0 4.6 4.6 40
Vehicle Extension (s) WyW^!&W ';if3:d;,| 'l:^r3:GS 3,0 'mm :;.i;3;DS* 30 3.0 3.0 3,0
Lane Grp Cap (vph) 790 1143
\§:pg;illlll/7i7;;c^^
v/s Ratio Perm
|^iBit|lp|i7lt7i7S^
'u'niib"rni'peiay;;d^^^ 53,9 35.6
Progression Factor'J 1,00 1 00
incrementafDeiay,'d250,6 6.'2
Delay ts) - 104 5 35 8
Level of Service F D
Approach Delay (s) 72.2
Approach LOS E
Pnte^'^cSBf^'ohjrf^f^fe^^ 'i.t:
HCM Average Control Delay
Actuated Cycle Length (s)
lnters'ection::Qapacity Utilization
Analysis Period (min)
%/Sflfcl||a||;§ffi
511
0.11
0.35
36.2
iJop;
6.4
51.9
0.89
iiao
14;4l''
15
225 779
f|M7SH7'^
0 71 0 79
"ssi5i,5'
114 '0,86
8,4 45'
75,3 48,7
E D
S7Hi;54;7:3
D
348
'aof
0,30
45!6
1,23
"6!4
55-5
E'
360
WMi
idll
60.3
tiif,;:
'4.7
MM
E
1768
"SIC
0.46
35.4'
16:74^;
0.9
271
C
37 9
D
2g7
0,05
0,56
isi.4
0.95
i.5
6OI :
1682
0 27
0.83
43.2
1.00
3.4-
D'
43.1
D
HCM Level of Service
Sum of lost time (s)
llGtiLevMSfiSecyiSS
D
20.0
711
gss
sdT'9
6.20
0 82
24.9
S;1M7
s.g
iasT
c
Baseline Synchro 7- Report
Page 3
HCM Signalized Intersection Capacity Analysis
4: La Costa Ave, & Shopping Center Drwy.
Year 2030 + Project AM
5/15/2013
Lane Configurations HH3 tti t^ A* *s !•
Volutiie (vph) 39 3g2 72 33 813 82 31 5 ;:•;'Tg -' 48 10 131
Ideal Flow (vphpi) '1966 ' i960 1900 1900 1900 1900 1900 ; 1600 1900 1900 1900 1900
T^@:Lpst|ine;(i^ WWW^ 4.0 //•p;:;: ww:o: ;71|i 40 40 4.0
Lane Util, Factor 1,00 0,95 1,60 6.95 i,o6 1,00 1.00
Frt 100 0,98 100 0.99 100 0 86
Fit Protected 6,95 i.66 0,95 "166 " 0,97' 0.95 1.00
S'atd. Flow (prot) 7ii7lo.S ;i45ii ;i|M9ii ///;;/;/: 1728 1770 1603
Ftt Pennitted 0,95 1.00 0,95 i';66' 6:97 0.95 1.00
Satd, Flow (perm) • • , ipi77d;/ 3457 y^'iSSy TTIld; 734911 1728 1770 1603
Peak-hour factor, PHF 0.90 0.90 0,90 0,90 0.90 0.90 0,90 o,go 0,90 0.90 0.90 0.90
AcljTlbwjvph)" " 43 " 37 '903 •"34' iiiii 21 . 53^ "146
RTOR Redudion (vph)' 0 ii' 6 6 "8 0 6 18 0 0 128 0
'Lane Group' Flow (vph) ' '• ^ 43 • 502 0 37 ' -• 986 " • 0 ifEioi 43 0 53" '29 ^ '0
TurnType Prot Prot Split Split
Protected Phases \ ' '7 '4 'i3. -8 IlliSii 2 - ' 2 ,-.•6 ' 6 ^j:-^:/j;.;;:1
Permitted Phases
. 32,9-l^'tijafed Green, G,(s)" 3,8 34.2 2.5 . 32,9-ililii 85 ;|l|:||||; 88 ' 8.8
Effective Green, g (s) 3,8 '342 • 2.5 32"9 8,5 8,"8 8.8
Achjated g/C Ratio' 0 05 1;S:4H - 0,04 ' 0,47 0I2 71111 v:ci;i3;'H' 0.13
Clearance Time (s) 4,6"' • ' "4.6 4,0 4.6. 4,6 4,0 40
Vehicle Extension (s) ;:7-;ild*; yWWW 30 3d 30 30 3.0 ;?iS''7^
Lane Grp Cap (vph) 96 1689 63 1641 210 223 202
v/s Ratio Prot c002 0 02 cO.28 CO 02 0,02
v/s Ratio Perm
0.60 v/c Ratio 0,45 WM^ 0.59 0.60 0,20 0.24 0.15
Uniform Delay, di
Progression Factor
32,1 'i'6.7 33.2 13.7 "27,7 27.6 27.3 Uniform Delay, di
Progression Factor /:;:|Til5 0.54 ;iii; 1,00 100 Sil'SW 11:001;
Incremental Delay, d2 3.2 0,4 i'3.2 " i.'6' 0,5 0.6 0,3
Delay (s) ;;::;i4i5f ' 62 15,3 . yyyM}. 28,2 28.1 27.6
Level of Service "' " " D A 'D B C C C
Approach Delay (s) •Siis;/ 28 2 27.7
Approach LOS A ' ' 'B C C
HCM Average Control Delay
i|e|t;fpiiiisiipiti^
Actuated Cycle Length (sj
|nlefl|^|§;Gp|piiy;^
Analysis Period (minj
|;|;§fi|^f|an|^i;iiu^^^
16,0
0,47
70.0
;:53:7i
i5
HCM Level of Service
Sum of lost time (sj
|"!3ij;il\i|;i;Sif^iSi;^
B
'"i6;o'
A
Baseline Synchro 7- Report
Page 4
HCM Signalized Intersection Capacity Analysis
5: La Costa Towne Ctr. & El Camino Real
Year 2030 Project AM
5/15/2013
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Tp|ii;t:6$f
Lane Util. Factor
iilliSliilll
Fit Protected
Satd Flow (prot)
Fit Permitted
Milfefiil(pliTi)7j
37
1900
ii;pi
6.97
0.99
0.96 111
6.96
Mi'
3
i'goo 1900
:7i).
0.91
lOO:
1.00
5073:
1,00
f;5p7|
19
1900 1900
14.6;
'"'i66
:i';66v
0,95
1770
0,95
1770
ttt
1795
1900 Wm
6.9i ;iP6^; 1,66
5085;: T66
50855
Peak-hour factor, PHF
Adj.;Row-(yph)
RTOR Reduction (vph)
0,90
" 41
" 3
ill
0,90 0.90
Bi^iippef?
0 1
- 0 " 1320'
0.90
- ,21 6" ••'-'d;
0,90
9 6'
9
0,90
1994
" 0
119^1
Turn Type Prot
Protected Phase^'' ; '-/6''.; - 8 ' ' • • "7 liiillliSSiBiiiiiiliiiiSii^^ Permitted Phases
Actuated Green, G (s) 120 5 1,5 ITf;oiiil7iSiiii7S^
Effective Green, g (s) 6,6 ims" 1,5 126.0
Actuated g/C Ratio ^ ; 'mKWWm 0,86 liifO-SH 0 90 ' ' * .
Ctearance Time (s) 4,6 40 4,0 4.0
Vlhl'i;i^;Ellnsioil?(s^^^^ WmM.o^yW 3,0 30 '/0W;S;K;:;|77?S
Lane Grp Cap (vph) 146 4366 19 4577
v/s Ratio Prot cO.OI 0 25 /7liM;i cO.39
v/s Ratio Perm
v/c Ratio 028 tlll|Pld77 0.47 WmWyysWSWWmWWWmWW^^ Uniform Delay, dl 64.9 1,8 68.9 u
§p§fgt^|;^ft|;i*7S 1 00 77i:lPT§i7s 0.60 Wm3^iWwyiMWWWWWWW:MWW^
Incremental Deiay, d2 1.1 6";2 12.0 6.2"
SiiliilillliifiSlil 66 0 WWSS&fWS. 53 0 fiBmW'^wiM&wwww& Level of Service """E" '"' ' ""A ;;•;;_ J) Approach Delay (s) 66 0 WWfSlmS^WyWi •^••T//-;'v>^^'177-:''/-' i;aiil7;ilfii:Si7l77:l7;'M^
Approach LOS E "'""A A
PefsectioolSCiraffSr^^l !gW^Wg3^iiw«l:5iSiiW^
HCM Average Control Delay
t||M:|ji^9m^ji|£^^
Actuated Cycle Length (sj
jnfefS|||cK;3||i^
Analysis Period (min)
p\jfCntiei|[^|^Gr^
5.2
fi6;43i ' iio.o
15
HCM Level of Service
Sum of iosttime (s)
iPuSi^eliS^sli^iee^^^
8.0
A
Baseline Synchro 7 -Report
Page 5
HCM Signalized Intersection Capacity Analysis
6: Levante Street & El Camino Real
Year 2030 + Project AM
5/15/2013
> > r ^ t A V I V
HHSf MUS: M
Lane Configurations
Volume (vph) 24 2 6 178
t
3 y.Mr. 14
ttT^
1125 29 58
ttti
1697 36
Ideal Flow (vphpl) 1900 " 1900 igoo; 1900 1900 1900 1900 1900 1900 Tgoo 1900 1900
Total Lost time (s) 40 74:3;^; 40 40 40 WS^oW 40
Lane Util. Factor 1,66 *"i,66' " 1.66 1.00 1,00 "i.6o 0,91 6,9i
,iliiPliii77 ;7;Slld; 0 88 WWmi ;ild6v 085 Sip 100 /plod;? 100
Fit Protected 0,95 -'^;QQ" •"6.95 1,66 1,00 "6.g5 "Too 0,95 1,00
Satd. Flow (prot) 1770 11141:7 1770 '186© 1583 1770 "5066 iiilffiii 5069
Fit Permitted 0,95 1.00 0.95 " i.66 Too • 0.95 1,00 6.95 1.00
Satd, Row (perm) , •' -1770 sail®' 1770 1863 1583 •i77d;/ 5066 : i77d "5069--
Peak-hour factor, PHF 0.90 0,90 0,90 0.90 0.90 0,90 0.90 0,90 0.90 0.90 0.90 0,90
Adj.'F]OT^(\^it>)-27 . ^2 , 7 ' M98^ 3 ^ 180 16 liiSfi 32 ' 64 1886 !iij
RTORReduction (vph) 6 6 " o' 0 6"' 115 0 ' i ' 0 '6 1 6
Lane Group Flow (vph) 27 0 WSMM 7131 65 HP 1281 0 64 . '•1925-
Turn Type
Protected Phases -
Pejmitled Phases
Prot
5 2 " :Sp;i?:f::K
Prol
iiii .6'.
Perm
6 ~
Prot
3 8
Prol
7'7-' 4
Actuated Gree'n,;G'(s)' -. .-' 3.9 157 20,3 32.i ' 321 29 794 - ;:,,8,6-: 85.1
Effective Green, g (s) 3.9 157 20,3 32,1 32.1 2.9 79,4 8,6 85,1
Actuafed g/C Ratio iiiiffi; . "Oif; 0.15 023 023 0.02 0.57 ^:"'0,06"^ .0.61
Clearance Time (s) 4.0 4,0 4,0 "40 4.0 4.0 4,0 4.6 4,0
Vehicle Extension (s)-WWWMi 30 30 30 3.0 WWi.Sy 3.0 30
Lane Grp Cap (vph)
v/s Ratio Prot
49
0 02
184
'ooo
257
c011
427 363 37
0 01
2873
0 25
109
cd04
3081
Cp38
v/s Ratio Perm 'c6;6r' v/c Ratio' 0,55 0 02 0 77 •WoM'-'iwmw 0 43 0 45 0,59 062
Uniform Delay, dl 67.2 55.3 57,6 '41,6 43.4 67.7 • 17,6 640 174
Progression Factor
Incremental Delay, d2
liiipdf
'127
1 00
6.6
1 00
13.3
1 00
6,6
100
0.2
1 00
7,9
100
0,5
"" 1,13
7.3
0.49
0,9
Delay (s) 79 9 7^i7 70 9 illp 436 ^ 75.6 181 79.2 94
Level of Service E E "E "" D D E" * B" E A
Approach LOS
73 8
E
57 8
E
188
B
117
B
HCM Average Conti'ol Delay
HCM Volume to Capacity ratio
Actuated Cycle Length (s)
,jn^i||||gffi|^paS§^^^
/Analysis Period (min)
e;f||i|^|tiinl;|rgp7|^^
19,5
7111
140,6
;^63?6%s
15
HCM Level of Service
Sum oflost time (s)
;icy;;L'i/l;Slsifijd^^^
B
8.0
WM
Baseline Synchro 7 • Report
Page 6
HCM Signalized Intersection Capacity Analysis
1: La Costa Ave, & Saxony Road
Year 2030 + Project PM
5/15/2013
Lane Configurations tt*
Volume (vph) < ' '1656
Ideal Flow (vphpl) 1900
Yotal Losftime (s) ' 4 0
Lane Util, Factor 0,95
f'rt 7, > . W. . 099
Rt Protected 1,00
Satci, Flow (prot) . ,3m
FItPermitted 1,00
Said; Flow (perm) ' • .3519
65
1900
102
1900
40
1,00
1 00
0,95
1770
0.95
T770
tt
1401
1900
40
0 95
J.o\ Too"
3539
1,00
3539
1
57
1900
40
1,00
1,00
' o.gs"
1770
6,95
1770
5*
128
1900
40
1,00
0,85
" ioo
1583
1,00
1583'
Peak-hour factor^PHF 0.90 0,90 0,90
: ; T84J, 72 ^"'IM
RTOR Reduction (vph) 3 0 0
"Lane Grcrup'Flovv (vpfi)'' i 909' ^ " 0 "' i 13
0,90
1557 .
0
1557 ''
0,90
63
0
63
0,90
"142
122
20
Turn Type
;pfpt'6ctedPJi'ai§s::j-^
Permitted Phases
gtc}uated G[eeii, G'(S)
Effective Green, 9]s)
.&iiuate3g7G Aatio </;;.
Clearance Time ^)
•Vehicle Extension (s)
Prol
y 6
37,4 ^' 5,1-45 5 73
37,4' 5,1 46,5 7,3
0 61' 0,08 -• 0 75 012
4.0 4,0' 4,6 40
'30 3,0 •3,0 30
2130 146 2663 209
cQ54 code. 0,44"*^ c0,04
0 90 , 0,77 0 58 0,30. .
10,5 27 8 3,4 ~24,9
100 - : ' 100 • • Too "1,00/^
54 22,1 '0,3 0.8
159 49 9 37 25 7
B D A C
'159' ' 68 '2479,.
B A C
„.,'^,7
ajstom
8
.7.3
7,3
oH
4,6
30 Lane Grp Cap (vph)
v/s Ratio Prot
y/s Ratio Perm
v/cRatio_
Uniform Delay, d1
Progression Factor -.
Incremental Delay, d2
Delay (s)
Level of Service
Approach De'aj I's^
Approach LOS
HCM Average Control Delay
HCI^ Vqtiimelojpiipactty ratio' :
Actuated Cycle Length (s)
Intefseclioil Capaaty Utilization ^
Analysis Period (min)
c-; Critical Lafi'eGrqup; v »
187
0 01
oil
24,7
1 00
6,3
24 6
C
12.4
0 80
61,8
pip
'" "is
HCM Level qf Service
Sum of lost time (s j
'/ICU Level of Service '
'•?:i|^^^^-i^'^t^^^^^:-l^^^^t|i^^7^i^''^^^^
B
120
"C"
Baseline Synchro 7 • Report
Page 1
HCM Signalized Intersection Capacity Analysis
2: Costa Del Mar & El Camlno Reai
Year 2030 + Project PM
5/15/2013
< t r V 1
te%''ik.ilfilL ^ .1-JJU.^. 7. ... J. ---
Lane Configurations f ttl* tt
Vofume (yph) "126 87 2358 71:5l-27 2157
Ideal Flow (vphpl) igoo 1666igoo" j9oo_;'' 1900 1900
Total Lost time (s) . 4,0 "v4.o'.-"rT6:.' 40 WSSWWWy '',-1-1-';,-'-' iWyyi^iW'-
Lane Util. Factor 0.97 1.00 0.91 100 6.95
F'rt" W t -i."o"o '•p85 '0 99' :a&-^-i:;:;^;;'^ 1 00
Flii^rotected' 6,95 loo" lO'O 0.95 i,o6
Satd. Flow (prot) ' "-3433. illgililPiSS 1770 3539
Fit Permitted ' 6,95 1 00 1 66 0 95 1.00
Said, FI6wlberm),.v .3433 ?3illli5Sid!^5 1770 '3539
Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0,90 0.90
."14PT Q-" 2620 128 - '3'0-2397 iiiiiil 7*77'^'''^-i
RTOR Reduction (vph)
lafreGro^pWvp-R)''
0 89 2 0 0 0 RTOR Reduction (vph)
lafreGro^pWvp-R)'' • *---i4o" 8 2745 ' d" 30 2397 ' 7 5 •:t7ii")^77 • v ft;"
Turn Type
PrqfecteCpFiasif.
custom Prol Turn Type
PrqfecteCpFiasif. y 1.. 8 \i W. 7' llBlii
Permitted Phases 6
Actireted'Grieii; "G (s) !• 114 , ii4Uil.il " Ts^t='''^i.:?-''?S^,?-J ^i^^^#:;Si:i-5.5 120 6 wwywyt ';;;" ;7 Effective Green, g (s)
Actuated g/C Ratio
11.4 114 111.1 5,5 120.6 Effective Green, g (s)
Actuated g/C Ratio 0 08 0 08 0 79 0 04' 0 86 .1., 'j. -
Clearance Time (s) 4.0 "" "4.6 """i.o"' "4,6" 40
V'ehicle.Extension fsj • "'"."•'-lo'' -" 30 ' SO '" -•J3:d' • -'"S-O ' ' - ' -
•
Lane Grj) Cap (vph)
v/s Ratio Prot
280 129 4008 70 3049 Lane Grj) Cap (vph)
v/s Ratio Prot c0 04 054 0,02 c0 68 '^i^(§^WW'^!y?^ iWiWi
v/s Ratio Perm 0.00 *
v/c Rallo^ - \ ;|ili50l - p.06 0 69 . 0,43 JltdlMllil y§0$^^
Uniform Delay, dl 61.6 "59.4 "' " 6.5~ 65,7 42
'Progression Factor " , ' - i.^o'p 10d- '2 35 1.00 100" -Isi-iiiiii
Incremental Delay, d2 14 "6.1' """ol •"• 4,2 2.1
Delay'(s)'__. W \ ' W 63 0 < 59 6 ' 161 69 9 Biiiii;
Level of Service E' E B E A
App'roach Delay (s) 6r6 . V . fe,i ' Iiiilii 'i:-W^^^^^ -ji '-iy-^^;;? - '~ " ?-^i:.:v>;-:•:;':,
Approacii LOS ' 'E B A
HCM Average Control Delay
HCM .Volpnie''tb Capacity ratio ;
Actijated Cycle Lengtii (s)
Intersection Capacity Utilization :
Analysis Period (minj
G||jpl|c|||^ff|j5Pg||;|fti
14.0
iipl
iio^
.69.9%'
15
HCM Levei of Service
Sum of lost time (s)
8fl;;ieMf|peKipeii
B
,';C:
Baseline Synchro 7 -Report
Page 2
HCM Signalized Intersection Capacity Analysis
3: La Costa Ave. & El Camlno Real
Year 2030 + Project PM
5/15/2013
•
Lane Configurations V\ tt r tt f tt^ V\ ttt f
Volume (vph) 876 724 420 137 476 249 257 1148 72 373 1636 936
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
LaneVfidUi / ,12-'2 13 ':i2 -12 13 ' '12 12 ' 12 12 "12 13
Total Lost time (s) 4.0 40 4.0 40 40 40 40 40 40 40 40
Lane Util Faclor ' J97 0 95 100 100 0 95 "1 00 " 0B7 -0 95 im 0.97 *0.95 . 1.00
Frt 100 1.00 0 8o i^'o 1,00 0,85' too Oytf 1.00 1.66 0.85
FllProtected * ' 09b 100 1 00 0:95 .1,0.0 100 0,95 'Too 0.95 100 100
Satd, Flow (prat) 3433 ' 3539 1633 1770 3539 1636 3433 5262 3433 5309' 1636
prtPjrtjiitted'" •*; 0 95 "100 - [1 00, , 0 95 1,00 1.00 0.95 -1,00 BUI 0 95 .1'.00 1.00
Satd, Flow (perm) 3433 3539 1636 1770 3539 1636 3433* 5252 3433 5309 16*36
Pealc-tipur fael5/, PHF 0 95 0 95 . 0,95 0 95 0,95 0 95 0.95 0 95 0,95 095 095 £95
Adj, plow (vph) 922 762 442 144 50i 262 271 1208 76 393 1722 985
fiTO'R^ReducliQri'fvpii) ^ ""o -159, • d' 155 0 0 0 . 0 ; '10
Lane Group Flow (vph) 922 762 283" T44" 501 107 271 ' 1279 " 0 393 1722 975
!rt!]Jxp6:.; : Prot Perm Prot Perm Prot -prn+ov
Protected Phases 5 2 1 6 3 8 7 4 5
Permitted Phases 2 6 4
Actuated Green, G (s| 33 0 46 9 46.9 Tai 25 0 25 0 12 7 42 3 18,7 '48.3 86.3
Effective Green g(si 38,0 ;46 9' ' 46''r ' "16.1 25 0 25 0 127 42 3 * "'^ 187 48 3 86^3
lictiiated g C Ratio 0,27 0.34 0.34 0.12 '0.18 0.18 0,09 0 30 0.13 0,3^4 0.62
Clearance Tim6'(s) 40 40 40 4.C 4.0 40 40 40* 40 " T4 0 "40
Vehicle Extension (s) 30 3.6 3.0 3.0 3,0 3.6 3,0 30 30 30 3.0
Lane Grp Cap (vph) -932 1186 548 204 632 292 311 1590 459 1832 1055
v/s Ratio Prot c0 27 0.22 008 cO.14 0,08 0,24 cO,11 0,32 c0 25
v/s Ratra Perm , 017 0 07 liSiif WWW '035
v/c Ratio 0.99 0 64 6.52 0,71 0.79 0 37 0,87 0,8"6 0.86 6,91-6.92
Unifpr'm Delay, d1 50 fc 394 374 59,7 •' 55 C 50 5 52 8 45 0 59 3 V444 23'§
Progression Factor 1.00 100 i.OO 1 02 0.85 101 0,76 1,15 '0.96 0.96 130
jncrenieptat Delay, d2 26 5 12 ^ 08 , 92 5.8 07 :19,9 38 117 90 '108
Delay (s) 77.3 40.6 38,3 70,3 52 6 51 6 67,9 £5 7 68.7 51.8 418
Levefof ServiceT'' E D *D E ^ D P ' E E E "' '• b • D
Approach Delay (s) 56.1 551 57.9 50.8"
Approach 1.0S." , . E WM^i:<kiy E D W0MuWii
HCM Average Conlrol Deiay
HCM Volume to Capacity ratio
Actuated Cycle Length (s) . -
Intersection Capacity Utilization
Analysis Period (mfn)
c Critical Lane Group
54 2
0.89
140 0
90.4%
15
HCM Level of Service
Sum oflost time (s)
ICU Level of Service
D
lO
E
Baseline Synchro 7 • Report
Pages
HCM Signalized Intersection Capacity Analysis
4: La Costa Ave. & Shopping Center DnA/y.
Year 2030 + Project PM
5/15/2013
Lane Configurations t1^ *1 tti 4*
Volume'(vph) 59 970 84 33 627 83 82 20 48 131 16 178
Ideal Ftow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost firne (s]" • 40 4.0 ^ 4.0 '4 0 - 4,0 4.0 "40 iiii Lane Util, Factor 100 0.95 1.00 '0.95 106 160 1,00
Fit%-T\7 7 ' 1 00 ' 0,99 , 1.00' 0 98 0 96 100 ^0:86
Fit Protected o;95 100 0.95 100 0.97 0,96 1,00
Satd Flow (prot) .51770 •:-3497 , 1770 ^ 3477. 1735 1770 • 1607
FII Permitted 0.'95 1,00 C95 1.00 0,97 0,95 ido Satd Flovv (perfh)' '/-,"'•--"' " 1770 3497 1770 3477 1735 i770' 1607
Peak-hour factor, PHF 0,90 0.90 0.90 0.90 0,90 0.90 0,90 0.90 0,90 0,90 0,90 0.90
66 1078 93 37 .. 6"97 92 91, 22-,.53 -'l'i6. w%y.y jgs
RJOR Reduction (vphj 0 7 ' 0 6"' 13 0 0 26 ' -* 0 6 166 0
.LiilSfroSp^FToftvpIl} 'V -.- • 66 'il64 776 ' 0^ ^ 140" " ' 0 " 50 0
Turn Type Prot Prot Split Split
Prptected Pjiases, ^. ^4;. ' ' '3\ •' 8' 2 2 6 6
Permitted Phases
Acluated'Green" G(s).-. 5,8 296 23 261 - ioj li.-2 1T'2
Effective Green, g (s)
Ac|uated""g/C.''Ratio'.
58 29.6 2.3 26,1 10.9 11.2 11,2 Effective Green, g (s)
Ac|uated""g/C.''Ratio'. ' " oM' 042 """ 0,03' 0 37 0T6 0,16" 016
Clearance Time (s) 40 40" 40 4,0 4;6 4,0 "4.0
Vehicfe ExtensTort'(«)":• 30 30 3 ('"S'O 30 ^•;^^|:|.;~A:^/|^;y '<^'0 30 SO
Lane Grp Cap (vph) 147 1479 58 1296 270 283 257
v/s Ratio Prot. , , coro4 ^cO 33 -002. 0 22 };i;;;v;;-:V;;/':;/;v C0.D8' QOO'S 0 03
v/s Ratio Perm
^cO 33 -
v'c Ra*io , 0Y5 0 79 - 0 64 '0,60 0 52 . 0 52 019
Uniform Delay, dl 30 6 17,5 33.4 17 7 ' 27.1 ' 26.9 25.5
°rog'-ess cr^ Facto'-141 103 v' .1.00 ^1.00 ' '•;l^i'7-'v^-^^i ' 1 60 1 00 100
Incremental Delay, d2 1,5 3,0 20.8 2.1 f7 1.6 04
pelaj(sj - • 44 5 ^ 21 0 X T' ' 542, i98 28 8 28 5 25 9
Level of Service 'D C D B C C C
Approach belay {s) 22 2 21 3', Siiil liiiiS ?8 8 26 9
Approach LOS C C C C
HCM Average Control Delay
HCM Volume to Capacity ratio
Actuated Cyde Length (s)
intersection C&pacTty Utilization
Analysis Penod (mm)
c Critical Lane Group'
23.0
0 67
70.0
66 5%"
15
HCM Level of Service
Sum of lost time (s)
ICU Level of Service
16.0
C
Baseline Synchro 7 • Report
Page 4
HCM Signalized Intersection Capacity Analysis
5: La Costa Towne Ctr. & El Camino Real
Year 2030 + Project PM
5/15/2013
Lane Configurations tti» ^ ttt
Volume'(vph) ^ 64 6 1979 25 20 1732
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Total Lost time (s). "40 . 4.0 ^ ' . "' 40 ; 4.0 >:|'-^|;'7i^:''P':v^ 7^ s|:^7:'71
Lane Util Factor 0.97 0,91 I.oo" o.gT
H yl. y^ V 0 99 .'1.00 , .; ' i po' 1 op '
FliProtected^ 0,96 100 6 95 1 00
SatdjFjow (prot)''' ,,' , M3410, 5076' \,; '1770 /' 5086•~' • WWWSM i^•-A:^r^ :i;^.'i':.^.;::^y •^.i/i.i=i^/!^^;';?'L::<;:^^^r^;•<?;^
FItPermitted 0 96 1 00 0,95' lOO'
Satd,ffo«/;(pefm) " 3410 5076 1770" hoi5
Peak-hour factor, PHF 0,90 0,90 0,90 0.90 0,90 0,90
®.FisSvpliL'.. 71 7 .:?i9?7::::jr - 22', f92^1 ^
RTOR Reduction (v£h) ^
Lai?l'§?pup''|;loV(vphl
6 6 1 0 0 0 RTOR Reduction (v£h) ^
Lai?l'§?pup''|;loV(vphl ' 72 ' 3 ^ 2226'" " 0 : 22' r iggT"
Tum T^rpe
Pfo'tected'Phases
Prot Tum T^rpe
Pfo'tected'Phases :T;i^;:;i#^^
• :
liiSiiiliSiiiii
Permitted Phases
&fuIR<3fefli,;C(sl? 8i 1(4 ( 50 1236 'j;'?:^-':^s^i5.,3^,i.-'*>s:,'ji¥;:^,;
Effective Green, g (s)
Aciualed g/C Ratio
84 114.6 5.0 123,6 Effective Green, g (s)
Aciualed g/C Ratio 0 06 o¥2 0 04 r'd;88 ''', " • ' Bllilliii/liSi
Clearance Time (s) 40 4,6' ~ 4,0 4,6
Vehfde Extension (s) ' ' 30 ^ . 30 • s'o ' 30 '
Lane Grp Cap (vph) 205 4155 63 4489
v/s Ralio Prot ' ' GO 02 c044 ; 0 01 "' c0 38
v/s Ratio Perm
v/c Ratio ... 0 35 -.0 54 ; - . V 0 35 _ 0 43
Uniform Delay, d1 63,2 41 65.9 "• "l.5
Prog essio'i Fartor 100 2 21 1 IS, v'2 33 '' ' WiSSMmWyWMWfM
Incrementai Delay, d2 11 o;3 1.6 0.1
Peray.lsT^^7^' > 64.2 iiil 94 . 79 4 ' 737' - . ' ,
Level of Service E A E ' A
Approach Delay (s)'' ^ --•'-.642 ; ^ .46
Approach LOS E A A
li^^iiSilili^Sii
HCIVI Average Control Delay
yCM'VoJumeiQ Capacity ratio f ]
Actuated Cycle Length (sj
Interse;ctton ^apac%;U}ilization; %;
Analysis Pentjd (minj
c' -Critical Lafie Group ' i
8.2
"-0.52':
140.0
48 S-'o
HCM Level of Service
lliglliilliiwifpi
Sum of Iosttime (sj
* JCU Level of Service'
12.0
sas
Baseline Synchro 7 -Report
Page 5
HCM Signalized Intersection Capacity Analysis
6: Levante Street & El Camino Real
Year 2030 + Project PM
5/15/2013
Lane Configurations *i 1*
Volume (vph) ' 42 4
Ideal Rowjvphpl) 1900 1900
Totaf Lost timers) . '4^0 40
Lane UtiL Factor 100 1.00
Fri . '100' ' 0 89
Ftt Profected 0.95 100
Flow (prot) :,1770 ;1663
Ftt Permitted 0,95 100
^atd Flow (perml > ^ 1770 1663"
9
1900
110
1900
40
100
100
0.95
t770
0.95
T770
t
0
1900
f
124
1900
"4,0
100
0 85
1.00
1583
1.00
1583
20
1900
4,0'
i.OO
IDO
0,95
1770
0,95
1770
1819
1900
4.0
0. 91
0 99
1. UO
5024
100
50'24
150
1900
172
igoo
40
100
100
*0.95
0 95
1770
ttl^
1053
1900
: jiQ '
0.91
100
100
5073/,
1.00
• 5073 e
32
1900
0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0,90 0,90 0.90 0,90
'47" 4 "io; 122 ;0 '1^8 » ";22^"202i 177-Is, W-i 2f7d.^^ 36
0^' 7 0 ' "O 0 118 0 6 0 0 1 0
Peak-hour factor, PHF
Adj Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Ac|ual¥d^Gregn;Gj5r
Effective Green, g (s)
ActJatedg/C Ratio •
Clearance Time (s)
Veh de Extension (s)
Prot
6.9
" 6.9
005
-0
30
119
14,9
oil
40
s'o
Prot
124
12i
009
40'
^ 30
Perm
6
' 2Q4-.
20.4
" 015'
40
SC
Prot
3
38
3,8
'0,03
'i;o
'3.0
8
Prot
7 4
784
78 4
0,56
40
3,0
18,3
013
4.0
-•3.0
, 92 9
¥2.9
0.66
40
30
Lane Grp Cap (vph) 87 177
v/s Ratio Pmt , 0 03 0 00
v/s Ratio Perm
v/c Ratio" -7 "0 54 ^ 0 03
Uniform Delay, d1 65,0 ' "56,1
Progression Fifclor lOO" -J Op
Incremerilal Delay, d2 67 0,1
Delay (s) - K 71 7 56 1
Level of Service E E
Approa'cti Delay (s)' 68 \
Approach LOS E
157
c0,07
0 78
624
1 00-:
21,1
83,5
F''
231
c6,01
0,09
51 7
too
0.2
:5i.9v
D
48
0 01
045
67.1
.1.00
6 8
73 S
E
66 7
'E
2813
c044
078
24.0
100
22
25 3
C
26 7
C
231
C0'11
0,83
69.3
077'
20,1
65 6
"E
3366
043
0.66
14,0
194'
1,6
28 2*
C
• 31,2
C
HCM Average Control Delay
jKCMVojume to Capacity ratio
AiDtuated Cycle Length (s)
intersection fcapaaty Utilization
Analysis Period (min)
c T^rjtica! L-ane Group
315
' 0 68
140.6
»71,0%
I5
HCM Level of Service
Sum oflost time (s)
ICU Level of Service
12.0
C
Baseline Synchro 7- Report
Page 6