Loading...
HomeMy WebLinkAboutSDP 98-01B; La Costa Glen Skilled Nursing Facitlity Expansion; Site Development Plan (SDP) The City of Carlsbad Planning Division A REPORT TO THE PLANNING COMMISSION Item No. Application complete date: January 27, 2012 P.C. AGENDA OF: April 18, 2012 Project Planner: Christer Westman Project Engineer: David Rick SUBJECT: SDP 98-01(B)/CUP 98-01(B)/CDP 98-04(B) LA COSTA GLEN SKILLED NURSING FACILITY EXPANSION – Request for approval of a Site Development Plan Amendment, Conditional Use Permit Amendment, and Coastal Development Permit Amendment to develop a 9,326 square foot one-story addition to an existing skilled nursing facility within the La Costa Glen retirement community to accommodate 25 new beds within 14 new skilled nursing rooms located in Planning Area 3 of the Green Valley Master Plan on the west side of El Camino Real and north of Calle Barcelona and within the East Batiquitos Lagoon/Hunt Properties Segment of the Local Coastal Program and Local Facilities Management Zone 23. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolutions No. 6874, 6875, and 6876 APPROVING Site Development Plan Amendment SDP 98-01(B), Conditional Use Permit Amendment CUP 98-01(B), and Coastal Development Permit Amendment CDP 98-04(B), based on the findings and subject to the conditions contained therein. II. INTRODUCTION La Costa Glen is a 55 acre retirement community originally approved in April of 1999. La Costa Glen is fully developed and operating according to the existing approvals. The applicant has proposed a one-story addition to the existing 70-bed skilled nursing facility located in the La Costa Glen retirement community. The project is consistent with the General Plan, the Green Valley Master Plan, and the applicable zoning regulations of the Carlsbad Municipal Code, the Local Coastal Program, and the Zone 23 Local Facilities Master Plan. III. PROJECT DESCRIPTION AND BACKGROUND The applicant is requesting approval to construct a 9,326 square foot one-story addition to an existing 33,872 square foot skilled nursing facility. The addition will include 14 skilled nursing rooms accommodating 25 beds, storage, and a nursing station. The site is designated as a Combination District with three land use designations in the General Plan. The combined designations are Community Commercial (C), Office (O), and Residential Medium-High Density (RMH). The site has a zoning classification of Planned Community (P-C) and within the Green Valley Master Plan it has a Zoning designation of Residential Density-Multiple (RD-M). The La Costa Glen community is bounded to the north by the intersection of El Camino Real and La Costa Avenue, to the south by The Forum shopping center, to the east by El Camino Real, 3 SDP 98-01(B)/CUP 98-01(B)/CDP 98-04(B) – LA COSTA GLEN SKILLED NURSING FACILITY EXPANSION APRIL 18, 2012 PAGE 2 and to the west by the City of Encinitas. The existing and proposed addition to the skilled nursing facility takes access from Calle Barcelona via Woodfern Lane. The exterior of the 25 foot tall building is designed with elements of Spanish Mission architecture, which are compatible with the existing buildings within the La Costa Glen retirement community. The building materials include clay roof tiles, pre-cast stone columns, cement plaster exterior, decorative cornices, shutters, and window headers. The required 75 project parking spaces are provided onsite. A six foot high privacy wall exists at the property line adjacent to the Calle Barcelona right-of-way and along Woodfern Lane. The project includes limited grading resulting in 225 cubic yards of export. IV. ANALYSIS The proposed project is subject to the following plans, ordinances, standards, and policies. A. General Plan: Community Commercial (C)/Office (O)/Residential Medium-High Density (RMH); B. Green Valley Master Plan: Planning Area 3; C. Conditional Use Permits (C.M.C. Chapter 21.42); D. Qualified Development Overlay (C.M.C. Chapter 21.06); E. Residential Density-Multiple (RD-M) Zone (C.M.C. Chapter 21.24); F. Parking Ordinance (C.M.C. Chapter 21.44); G. Local Coastal Program: East Batiquitos Lagoon/Hunt Properties Segment; H. Coastal Resource Protection Overlay Zone (C.M.C. Chapter 21.203); and I. Growth Management Ordinance (Local Facilities Management Zone 23). The recommendation for approval of this project was developed by analyzing the project’s consistency with the applicable policies and regulations listed above. The following analysis section discusses compliance with each of these regulations/policies utilizing both text and tables. A. General Plan The General Plan land use designation for the Green Valley property is a combination district including Community Commercial (C), Office (O), Residential Medium High (RMH), and Open Space (OS). The City Council approved the master plan in 1996 and made the finding that the Green Valley Master Plan implements the General Plan and is consistent with the goals, objectives, and policies of the General Plan. The finding was based on the fact that the master plan provides for the following: (1) the provision of the necessary circulation element roadways and improvements (Levante Street, Calle Barcelona, and El Camino Real); (2) the protection and enhancement of the wetland and upland areas within protected open space lots; (3) the construction of a (future) public trail; (4) the provisions for affordable housing; and (5) compliance with the Local Facilities Management Plan Zone 23 for public facilities and services. Based on this implementation and consistency relationship between the Green Valley Master Plan and the General Plan, it can be assumed that if the La Costa Glen project is consistent with the master plan it is also consistent with the General Plan. SDP 98-01(B)/CUP 98-01(B)/CDP 98-04(B) – LA COSTA GLEN SKILLED NURSING FACILITY EXPANSION APRIL 18, 2012 PAGE 3 The overall La Costa Glen community, including the proposed skilled nursing facility addition, is consistent with the Green Valley Master Plan land uses and continues to be consistent with the applicable policies and programs of the General Plan. Table A below indicates how the expansion project complies with these particular elements of the General Plan. TABLE A: GENERAL PLAN COMPLIANCE ELEMENT USE CLASSIFICATION, GOAL, OBJECTIVE OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY? Land Use Combination District: Within each land use designation, there exists the potential for certain unique land uses for which there are no specific designations. Such uses may include, but are not limited to churches, or hospitals. These and other unique types of uses cannot be automatically placed within any particular land use classification and must be reviewed on an individual basis through the conditional use permit process. The La Costa Glen community is comprised of living accommodations, common dining and recreation facilities, and health care components. The majority of the site functions similarly to the Residential Medium-High Density Land Use designation since it is developed with multi-story and single-story independent care units. A portion of the property functions more as a commercial land use and is developed with a skilled nursing component of which this project is an addition. Yes Circulation Minimize the number of access points to major and prime arterials to enhance the functioning of these streets as thorough-ways. The entire La Costa Glen community has been designed to utilize two points of ingress and egress. One off of El Camino Real and one off of Calle Barcelona. The nature of senior assisted care communities is that they generate fewer ADT than single family detached or multifamily attached residential units. The proposed additional skilled nursing beds will increase ADT by 75 and will not require the addition or modification to the existing points of access. Yes SDP 98-01(B)/CUP 98-01(B)/CDP 98-04(B) – LA COSTA GLEN SKILLED NURSING FACILITY EXPANSION APRIL 18, 2012 PAGE 4 TABLE A: GENERAL PLAN COMPLIANCE CONTINUED ELEMENT USE CLASSIFICATION, GOAL, OBJECTIVE OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY? Parking Provide safe, adequate and attractively landscaped parking facilities. The project has been designed in accordance with Ch. 21.44 – Parking Ordinance, to provide an adequate number of onsite covered and open parking spaces to service the entire retirement community, of which the skilled nursing facility is a component, in a safe manner. Landscaping of all of the parking lot areas are provided in accordance with the City of Carlsbad Landscape Manual. Yes Noise Pursuant to the City of Carlsbad’s Noise Guidelines Manual, hospital and nursing home uses are conditionally acceptable in areas exposed to noise levels between 60 and 65 dBA providing that interior noise levels can be mitigated to 45 dBA CNEL. The project site lies within the 55- 60 dBA contours for El Camino Real. Compliance with building code requirements will insure that interior noise levels do not exceed 45 dBA CNEL. Yes Open Space & Conservation Utilize Best Management Practices for control of storm water and to protect water quality. The project will conform to all NPDES requirements. Yes B. Green Valley Master Plan The project is located within Planning Area 3 of the Green Valley Master Plan. According to the master plan, all development within Planning Area 3 requires the approval of a Site Development Plan and a Coastal Development Permit. The Skilled Nursing Facility specifically, which is also known as a Professional Care Facility in the City’s Zoning Ordinance, requires the approval of a Conditional Use Permit. Since all of these permits were originally issued for the La Costa Glen facility, an amendment to each of the permits is required. The development standards for the proposed project are those established in Section 21.24 of the Carlsbad Municipal Code for the Residential Density-Multiple (RD-M) Zone. SDP 98-01(B)/CUP 98-01(B)/CDP 98-04(B) – LA COSTA GLEN SKILLED NURSING FACILITY EXPANSION APRIL 18, 2012 PAGE 5 C. Conditional Use Permits (C.M.C. Chapter 21.42) A Professional Care facility within the Green Valley Master Plan requires the approval of a Conditional Use Permit (CUP). Therefore, the amendment to the skilled nursing portion of the project requires an amendment to the existing CUP. The purpose of the Conditional Use Permit is to allow special consideration for certain uses to be located in zones other than those in which they are classified as permitted to assure compatibility within the zone and its surroundings because of their particular characteristics. The privileges and conditions of a Conditional Use Permit are a covenant that runs with the land and, in addition to binding the permittee, binds each successor in interest. Chapter 21.42 of the Carlsbad Municipal Code requires that four findings be made in order to approve a Conditional Use Permit or CUP amendment. All of the required findings can be made as discussed below: 1. Is the requested use necessary or desirable for the development of the community, and is it in harmony with the various elements and objectives of the general plan, including, if applicable, the certified local coastal program, specific plan or master plan? The finding can be made since a continuing care retirement community is considered an alternative for the long-term residential, social, and health care needs of California’s elderly residents, and a way to provide a continuum of care, to minimize transfer trauma, and to allow for the provision of social and health care services in an appropriately licensed setting. The project is consistent with all of the requirements of the Green Valley Master Plan, which is the implementing ordinance for the East Batiquitos Lagoon/Hunt Properties segment of the Local Coastal Program, and Final Program EIR 92-03. The City Council approved the master plan in 1996 and made the finding that the Green Valley Master Plan implements the General Plan and is consistent with the goals, objectives, and policies of the General Plan. The existing project, through implementation of the Master Plan, provided for and the proposed addition will continue to provide for the following: (1) the provision of the necessary circulation element roadway improvements on El Camino Real and Calle Barcelona; (2) the protection and enhancement of the wetland and upland areas within open space lots; (3) the construction of a public trail segment which implements the Open Space element; (4) provisions for affordable housing through the purchase of credits in the southwest quadrant; (5) implementation of the mitigation, monitoring, and reporting program for Program EIR 92-03; and, (6) compliance with the Zone 23 Local Facilities Management Plan for public facilities and services. 2. Is the requested use detrimental to existing uses or to uses specifically permitted in the zone in which the proposed use is to be located? The finding can be made that the project is a 9,326 square foot addition to an existing 33,872 square foot skilled nursing facility which will be an expansion of the existing use and will therefore complement the existing use and not be detrimental. 3. Is the site for the proposed conditional use adequate in size and shape to accommodate the yards, setbacks, walls, fences, parking, loading facilities, buffer areas, landscaping and other development features prescribed in the zoning code and required by the City Planner, planning commission or city council, in order to integrate the use with other uses in the neighborhood? The finding can be made in that the 9,326 square foot addition meets or exceeds all of the applicable City policies and the development standards of the Green Valley SDP 98-01(B)/CUP 98-01(B)/CDP 98-04(B) – LA COSTA GLEN SKILLED NURSING FACILITY EXPANSION APRIL 18, 2012 PAGE 6 Master Plan, including landscaping, pedestrian access, lot size and coverage, building setbacks, parking, and building height and that the use is isolated from other uses and does not require special features to create integration. 4. Is the street system serving the proposed project adequate to properly handle all traffic generated by the proposed use? The finding can be made since the addition of 25 beds to the existing skilled nursing facility may increase ADT by up to 75 if all beds are occupied by non-residents of the La Costa Glen community. An additional 75 ADT represents 0.375% of the 20,000 ADT design volume for Calle Barcelona which is a Secondary Arterial and is an insignificant increase that will not have an adverse impact on the roadway system. D. Qualified Development Overlay (C.M.C. Chapter 21.06) All development within Planning Area 3 of the Green Valley Master Plan requires the approval of a Site Development Plan (SDP) as described in Chapter 21.06 of the Carlsbad Municipal Code. Therefore, the amendment to the skilled nursing portion of the project requires an amendment to the existing SDP. The purpose of the SDP is to provide a process for the review and approval of project plans to insure compliance with the General Plan and applicable Master and Specific Plans, provide that development will be compatible with existing and future surrounding development, insure that development occurs with due regard to environmental factors, promote orderly, attractive and harmonious development and promote the general welfare by preventing the establishment of structures which are not properly related to or which would adversely impact their sites, surroundings, traffic circulation or environmental setting. Pursuant to Section 21.06.020 of the Carlsbad Municipal Code, four findings must be made in order to approve an SDP or SDP amendment. All of the required findings can be made as discussed below: 1. The requested use is properly related to the site, surroundings and environmental settings, is consistent with the various elements and objectives of the General Plan, will not be detrimental to existing uses or to uses specifically permitted in the area in which the proposed use is to be located, and will not adversely impact the site, surroundings or traffic circulation. The finding can be made since the 9,326 square foot addition meets or exceeds all of the applicable City policies and the development standards of the Green Valley Master Plan, including landscaping, pedestrian access, lot size and coverage, building setbacks, parking, and building height and that the use is isolated from other uses and does not require special features to create integration, it is consistent with the various objectives of the General Plan since a continuing care retirement community is considered an alternative for the long-term residential, social, and health care needs of California’s elderly residents, and a way to provide a continuum of care, to minimize transfer trauma, and to allow for the provision of social and health care services in an appropriately licensed setting. The project is consistent with all of the requirements of the Green Valley Master Plan and Final Program EIR 92-03. The City Council approved the master plan in 1996 and made the finding that the Green Valley Master Plan implements the General Plan and is consistent with the goals, objectives, and policies of the General Plan. The existing project, through implementation of the Master Plan, provided for and the proposed addition will continue to provide for the following: (1) the provision of the necessary circulation element roadway improvements on SDP 98-01(B)/CUP 98-01(B)/CDP 98-04(B) – LA COSTA GLEN SKILLED NURSING FACILITY EXPANSION APRIL 18, 2012 PAGE 7 El Camino Real and Calle Barcelona; (2) the protection and enhancement of the wetland and upland areas within open space lots; (3) the construction of a public trail segment which implements the Open Space element; (4) provisions for affordable housing through the purchase of credits in the southwest quadrant; (5) implementation of the mitigation, monitoring, and reporting program for Program EIR 92-03; and, (6) compliance with the Zone 23 Local Facilities Management Plan for public facilities and services. The project will not be detrimental to the existing use since it is an addition intended to expand the existing facility. The project does not adversely impact the site, surroundings or traffic since the addition is integrated into the existing facility through architectural compatibility and pedestrian connections. 2. The site for the intended use is adequate in size and shape to accommodate the use. The finding can be made since the 9,326 square foot addition meets or exceeds all of the applicable City policies and the development standards of the Green Valley Master Plan, including landscaping, pedestrian access, lot size and coverage, building setbacks, parking, and building height. 3. All yards, setbacks, walls, fences, landscaping, and other features necessary to adjust the requested use to existing or permitted future uses in the neighborhood will be provided and maintained. The finding can be made that the 9,326 square foot addition is isolated from surrounding development outside of the La Costa Glen community and no special adjustments are necessary to make the project compatible. 4. The street system serving the proposed use is adequate to properly handle all traffic generated by the proposed use. The addition of 25 beds to the existing skilled nursing facility may increase ADT by up to 75 if all beds are occupied by non-residents of the La Costa Glen community. The finding can be made since the additional 75 ADT represents 0.375% of the design volume for Calle Barcelona which is a Secondary Arterial and is an insignificant increase. E. Residential Density-Multiple (RD-M) Zone (C.M.C. Chapter 21.24) The project site is located within Planning Area 3 of the Green Valley Master Plan which has established Residential Density-Multiple (RD-M) as the zoning designation for the purpose of development standards. The project complies with all requirements of the RD-M Zone as shown in Table B below: TABLE B: RESIDENTIAL DENSITY-MULTIPLE (RD-M) ZONE COMPLIANCE STANDARD REQUIRED PROPOSED COMPLY? Building Height 35 feet maximum plus allowed protrusions The overall height of the project is 25 feet to the top of the roof ridge. Yes Front Yard Setback 20 feet minimum 35 feet from the Calle Barcelona right-of-way Yes Side Yard Setback 5 feet minimum 50 feet+ Yes SDP 98-01(B)/CUP 98-01(B)/CDP 98-04(B) – LA COSTA GLEN SKILLED NURSING FACILITY EXPANSION APRIL 18, 2012 PAGE 8 TABLE B: RESIDENTIAL DENSITY-MULTIPLE (RD-M) ZONE COMPLIANCE CONTINUED STANDARD REQUIRED PROPOSED COMPLY? Rear Yard Setback 10 feet minimum 150 feet Yes Lot Coverage 60 percent maximum 36 Percent Yes F. Parking (C.M.C. Chapter 21.44) Parking has been provided onsite in accordance with the requirements of the parking chapter of the Zoning Ordinance. The overall La Costa Glen retirement community includes assisted care housing for senior citizens as well as professional care units. The senior housing parking standard applicable at the time of project approval was applied to the La Costa Glen project for all of the assisted care units. The parking requirement for senior housing at that time was one resident space for every two units plus one guest space for every two units. The parking requirement for the professional care component of the project was and remains 0.45 parking spaces per bed. In summary, the parking requirement for the entire community including the skilled nursing facility and proposed expansion is 720 parking spaces (645 resident/guest spaces + 75 for the skilled nursing facility). As the community was constructed, 1,018 standard spaces were provided as well as 100 golf cart parking stalls. With the skilled nursing facility expansion, which eliminates 12 parking stalls, a net surplus of 286 standard parking spaces will be available onsite. The increase in the required number of parking spaces to satisfy the standards of the Parking Ordinance for the skilled nursing expansion is 12 (25 beds x 0.45.= 11.25) parking stalls. TABLE C: PARKING ORDINANCE COMPLIANCE STANDARD REQUIRED PROVIDED COMPLY? Senior Housing 1 resident space per two units 1 guest space per two units 645 Units = 645 spaces 931 standard spaces. Standard parking is provided by a combination of open, carport, and garage spaces. In addition, 100 golf cart spaces are provided throughout the community. Yes: Surplus of 286 standard spaces Professional Care 0.45 parking space per bed (141 existing beds + 25 proposed beds = 166 beds) 166 x 0.45 = 75 spaces 75 spaces Yes G. Local Coastal Program: East Batiquitos Lagoon/Hunt Properties Segment As they relate to the project site, the standards of the East Batiquitos Lagoon/Hunt Properties segment of the Local Coastal Program focus on the preservation of a riparian corridor and upland habitat. The preservation of environmentally sensitive habitat areas within the Green Valley SDP 98-01(B)/CUP 98-01(B)/CDP 98-04(B) – LA COSTA GLEN SKILLED NURSING FACILITY EXPANSION APRIL 18, 2012 PAGE 9 Master Plan area was established with its approval. The proposed project does not affect any area of preservation. The proposed development is in conformance with the Certified Local Coastal Program and all applicable policies in that the existing 33,872 square foot skilled nursing facility use is consistent with the land uses identified in the Local Coastal Program and was approved by a Coastal Development Permit including findings of consistency with the Local Coastal Program; and, the 9,326 square foot addition is an expansion of an existing approved land use within an area that does not have access to the coast or coastal inlets, it is in an area that is fully developed and surrounded by development, and it does not encroach into any area that has sensitive resources value. H. Coastal Resource Protection Overlay Zone (C.M.C. Chapter 21.203) The project is consistent with the provisions of the Coastal Resource Protection Overlay Zone (Chapter 21.203 of the Zoning Ordinance) in that the project will adhere to the City's Master Drainage Plan, Grading Ordinance, Storm Water Ordinance, Standard Urban Storm Water Mitigation Plan (SUSMP) and Jurisdictional Urban Runoff Management Program (JURMP) to avoid increased urban runoff, pollutants, and soil erosion. No steep slopes or native vegetation is located on the subject property and the site is not located in an area prone to landslides, or susceptible to accelerated erosion, floods, or liquefaction I. Growth Management (C.M.C. Chapter 21.90) The proposed project is located within Local Facilities Management Zone 23 in the southwest quadrant of the City. The impacts on public facilities created by this project are limited to the increase in the number of skilled nursing beds to the existing facility. Compliance with the adopted performance standards for the additional beds is summarized below in Table D: TABLE D: GROWTH MANAGEMENT FACILITY IMPACTS COMPLY? City Administration N/A Yes Library N/A Yes Wastewater Treatment Capacity - Leucadia Waste Water District 25 EDU Yes Parks N/A Yes Drainage 3.8 CFS (Basin D) Yes Circulation 75 ADT Yes Fire Fire Stations No. 2 and 6 Yes Open Space N/A Yes Schools - Encinitas Union Elementary School and San Dieguito High School Districts N/A Yes Sewer Collection System - Leucadia Waste Water District 25 EDU Yes Water - Olivenhain Water District 5,500 GPD Yes SDP 98-01(B)/CUP 98-01(B)/CDP 98-04(B) – LA COSTA GLEN SKILLED NURSING FACILITY EXPANSION APRIL 18, 2012 PAGE 10 V. ENVIRONMENTAL REVIEW Pursuant to the California Environmental Quality Act (CEQA) and the Environmental Protection Ordinance (Title 19) of the Carlsbad Municipal Code, staff has determined that the project is exempt from CEQA review per Section 15301 – Existing Facilities, since the project consists of an addition that is less than 10,000 square feet, all of the public services are available to serve the project, and the proposed addition is not located in an environmentally sensitive area. A notice of exemption will be filed upon approval of the project. ATTACHMENTS: 1. Planning Commission Resolution No. 6874 (SDP) 2. Planning Commission Resolution No. 6875 (CUP) 3. Planning Commission Resolution No. 6876 (CDP) 4. Location Map 5. Background Data Sheet 6. Local Facilities Impact Assessment Form 7. Disclosure Statement 8. Reduced Exhibits 9. Full Size Exhibits “A”-“O” dated April 18, 2012 Revised 01/06 BACKGROUND DATA SHEET CASE NO: SDP 98-01(B)/CUP 98-01(B)/CDP 98-04(B) CASE NAME: LA COSTA GLEN SKILLED NURSING FACILITY EXPANSION APPLICANT: Continuing Life Communities, LLC. REQUEST AND LOCATION: Develop a 9,326 square foot one-story addition to an existing skilled nursing facility within the La Costa Glen retirement community to accommodate 25 new beds within 14 new skilled nursing rooms located in Planning Area 3 of the Green Valley Master Plan west of El Camino Real and north of Calle Barcelona and within the East Batiquitos Lagoon/Hunt Properties Segment of the Local Coastal Program and Local Facilities Management Zone 23 LEGAL DESCRIPTION: Lot 6 of City of Carlsbad Tract No. 92-08, Green Valley, in the City of Carlsbad, County of San Diego, State of California, according to map thereof No. 13997, filed in the Office of the County Recorder of San Diego County, July 10, 2000. APN: 255-012-15 Acres: 4.54 acres Proposed No. of Lots/Units: N/A GENERAL PLAN AND ZONING Existing Land Use Designation: C/O/RMH Proposed Land Use Designation: No Change Density Allowed: N/A Density Proposed: N/A Existing Zone: Planned Community (PC) Proposed Zone: No Change Surrounding Zoning, General Plan and Land Use: Zoning General Plan Current Land Use Site PC (RDM) C/O/RMH Skilled Nursing North PC (OS) C/O/RMH La Costa Glen South PC (RDM) C/O/RMH The Forum East PC (OS) C/O/RMH La Costa Glen West PC (OS) OS La Costa Glen (OS) LOCAL COASTAL PROGRAM Coastal Zone: Yes No Local Coastal Program Segment: East Batiquitos Lagoon/Hunt Properties Within Appeal Jurisdiction: Yes No Coastal Development Permit: Yes No Local Coastal Program Amendment: Yes No Existing LCP Land Use Designation: C/O/RMH Proposed LCP Land Use Designation: N/A Existing LCP Zone: RD-M Proposed LCP Zone: N/A CITY OF CARLSBAD GROWTH MANAGEMENT PROGRAM LOCAL FACILITIES IMPACTS ASSESSMENT FORM PROJECT IDENTITY AND IMPACT ASSESSMENT: FILE NAME AND NO: La Costa Glen Skilled Nursing Facility Expansion – SDP 98- 01(B)/CUP 98-01(B)/CDP 98-04(B) LOCAL FACILITY MANAGEMENT ZONE: 23 GENERAL PLAN: C/O/RMH ZONING: Green Valley Master Plan (Planned Community) DEVELOPER’S NAME: Continuing Life Communities ADDRESS: 1940 Levante Street, Carlsbad, CA 92009 PHONE NO.: (760) 944-3091 ASSESSOR’S PARCEL NO.: 255-012-15-00 QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): 9,326 SQ. FT. A. City Administrative Facilities: Demand in Square Footage = N/A B. Library: Demand in Square Footage = N/A C. Wastewater Treatment Capacity 25 EDU D. Park: Demand in Acreage = N/A E. Drainage: Demand in CFS = 3.8 Identify Drainage Basin = D F. Circulation: Demand in ADT = 75 (3x25 BEDS) G. Fire: Served by Fire Station: 2 & 6 H. Open Space: Acreage Provided = N/A I. Schools: N/A J. Sewer: Demands in EDU 25 EDU Identify Sub Basin = A3 K. Water: Demand in GPD = 5,500 L. The Growth Management Dwelling unit allowance Is Not Applicable. 04/06/12    EXHIBIT "A" LIST OF MEMBERS AND CAPITAL CONTRIBUTIONS Members: Percentage Interest: Warren E. Spieker, Jr. Initial Member 65% Richard D. Aschenbrenner Initial Member 25% E. Justin Wilson III Initial Member 10%