HomeMy WebLinkAboutSDU 94-03; Osburn Second Dwelling Unit; Second Dwelling Unit (SDU) (6)CITY OF CARLSBAD
ENGINEERING DEPARTMENT
LAND USE REVIEW
TO: SENIOR PLANNER - CHRIS DECERBO Date: November 21, 1994
From: Assistant Engineer - Land Use Review Project ID: SDU 94-03
Via: Assistant City Engineer
w
OSBURN SECOND DWELLING UNIT
PROJECT REPORT AND CONDITIONS TRANSMITTAL
The Engineering Department has completed its review of the above referenced project
and is recommending:
X That the project be approved subject to the conditions as listed on the attached
sheet.
- That the project be denied for the following reasons:
X The following is a final Land Use Review project report for inclusion in the staff
report for this project.
LAND USE REVIEW SECTION
PROJECT REPORT
PROJECT ID: SDU 94-03 PREPARED BY: MICHAEL J. SHIREY~
PROJECT NAME: OSBURN SECOND UNIT APPROVED BY: &Acc' U
LOCATION: EAST SIDE OF ADAMS STREET NORTH OF CHESTNUT
AVENUE.
BRIEF DESCRIPTION: PROPOSE CONSTRUCTION OF SECOND
DWELLING UNIT.
ENGINEERING ISSUES AND DISCUSSION:
Traffic and Circulation:
Projected Average Daily Traffic (ADT): 6 Ipd"
Traffic Study Performed by: N/A
There are no major Traffic and Circulation issues associated with this project.
SEWER
Sewer District: Carlsbad
Sewer EDU's Required: 1
There are no major Sewer issues associated with this project.
WATER
Water District: Carlsbad
EDU's Required: 1
GPD Required: 220
There are no major Water issues associated with this project.
GRADING
Quantities: Cut: 0 cy Fill: 0 cy
Permit Required: NO
Offsite Approval required/obtained: N/A
Hillside Grading Requirements met: N/A
Preliminary Geotechnical Investigation Performed by: N/A
There are no major Grading issues associated with this project. The only
grading that is required is for foundation trenching.
DRAINAGE AND EROSION CONTROL:
Drainage Basin: A
Preliminary Hydrology Study Performed by: N/A
Erosion Potential: Low
There are no major Drainage issues associated with this project.
LAND TITLE:
Conflicts with existing easement: N/A
Easement dedication required: N/A
Site boundary coincides with Land Title: Yes
There are no major Land Title issues associated with this project.
IMPROVEMENTS:
Offsite improvements: NO
Standard Variance Required: NO
Since Adams Street currently has a 60 ft. right of way, no dedication for
improvements is required. Additionally, since the majority of Adams Street is
unimproved, at this time, a Future Improvement Agreement will be required as
a Condition of Approval for the project, for future construction of frontage
improvements.
SDU 94-03; OSBURN SECOND DWELLING UNIT
ENGINEERING CONDITIONS OF APPROVAL
Enqineerinq Conditions
34.
35.
36.
45A
48.
57.
Unless a standards variance has been issued, no variance from City Standards
is authorized by virtue of approval of this SITE PLAN.
The applicant shall comply with all the rules, regulations and design
requirements of the respective sewer and water agencies regarding services to
the project.
The applicant shall be responsible for coordination with S.D.G.&E., Pacific Bell
Telephone, and Cable TV authorities.
Prior to BUILDING PERMIT ISSUANCE the applicant shall pay all current fees
and deposits required.
Prior to BUILDING PERMIT ISSUANCE, the owner shall enter into a lien contract
for the future public improvement of Adams Street along the PROJECT frontage
for a half street width of 20 ft. Public improvements shall include, but not be
limited to, paving, base, sidewalks, curbs and gutter, medians, grading, clearing
and grubbing, undergrounding or relocation of utilities, sewer, water, fire
hydrants, street lights and retaining walls.
Prior to hauling dirt or construction materials to or from the site, the applicant
shall submit to and receive approval from the City Engineer for the proposed
haul route. The applicant shall comply with all conditions and requirements the
City Engineer may impose with regards to the hauling operation.