Loading...
HomeMy WebLinkAboutSDU 95-02; Burt Second Dwelling Unit; Second Dwelling Unit (SDU) (2)CITY OF CARLSBAD ENGINEERING DEPARTMENT LAND USE REVIEW TO: SENIOR PLANNER - CHRIS DECERBO DATE: July 26, 1995 FROM: VIA: Associate Engineer - Michael J. Shirey @ PROJECT ID: SDU 95-01 BURT SECOND DWELLING UNIT " PROJECT REPORT AND CONDITIONS TRANSMITTAL The Engineering Department has completed its review of the above referenced project and is recommending: X That the project be approved subject to the conditions as listed on the attached sheet. - That the project be denied for the following reasons: X The following is a final Land Use Review project report for inclusion in the staff report for this project. I LAND USE REVIEW SECTION PROJECT REPORT PROJECT ID: SDU 95-02 PREPARED BY: Michael J. Shireye PROJECT NAME: Burt Second Dwelling APPROVED BY: Unit + LOCATION: South side of Santa Clara Way, between Carlsbad Village Drive and Chestnut Avenue. BRIEF DESCRIPTION: Propose Construction of a Second Dwelling Unit. ENGINEERING ISSUES AND DISCUSSION: Traffic and Circulation: Projected Average Daily Traffic (ADT): 16 Traffic Study Performed by: N/A Comment: No major traffic and circulation issues are associated with this proposed project. Sewer: Sewer District: Carlsbad Sewer EDU's Required: 1 Comment: No major sewer issues are associated with this proposed project. I Water: Water District: Carlsbad EDU's Required: 1 GPD Required: 220 Comment: No major water issues are associated with this proposed project. LAND USE REVIEW - PROJECT REPORT SDU 95-02 - BURT SECOND DWELLING UNIT C. DECERBO MEMO; JULY 26, 1995 Page: 2 Grading: Quantities: Cut = 0 cy ; Fill = 0 cy Permit Required: NO Offsite Approval required/obtained: N/A Hillside Grading Requirements met: N/A Preliminary Geotechnical Investigation Performed by: N/A Comment: No major grading issues are associated with this proposed project. The only grading required will be minimal foundation grading for the second dwelling unit. Drainage and Erosion Control: Drainage Basin: B Preliminary Hydrology Study Performed by: N/A Erosion Potential: Low Comment: No major drainage issues are associated with this proposed project. Land Title: Conflicts with existing easement: NO I Easement dedication required: NO Site boundary coincides with land title: YES Comment: No major land title issues are associated with this proposed project. Improvements: Offsite improvements: NO Standard Variance Required: NO Comment: No improvement issues are associated with this proposed project. All adjacent infrastructure exists. SDU 95-02; BURT SECOND DWELLING UNIT ENGINEERING CONDITIONS OF APPROVAL Engineerinn Conditions Code Reminder: 57. Prior to hauling dirt or construction materials to or from the site, the developer shall submit to and receive approval from the City Engineer for the proposed haul route. The developer shall comply with all conditions and requirements the City Engineer may impose with regards to the hauling operation.