HomeMy WebLinkAboutSDU 95-03; McDermed Second Dwelling Unit; Second Dwelling Unit (SDU) (2)July 31, 1995
TO: BRIAN HUNTER, SENIOR PLANNER
FROM: Associate Engineer
VIA: Principal Civil Engineer qw
COMPLETENESS REVIEW AND INITIAL ISSUES STATEMENT
MCDERMED SECOND DWELLING UNIT, SDU 95-03
The Engineering Department has completed its review of the subject project for application
completeness. The application and plans submitted for this project are complete and suitable
for continued review.
In addition, the Engineering Department made a preliminary review of the project for Engineering
issues. Engineering issues which need to be resolved or adequately addressed prior to
conditioning of the project are as follows:
1. The site plan should indicate that the project includes a paved walkway that provides
access to the second dwelling unit from Santa Clara Way. This walkway can be joined
to an existing walkway that serves the main residence.
2. To minimize drainage along the retaining wall, Detail 4 on Sheet 1 should indicate a 3'
wide concrete drainage ditch at the toe of the slope, along with the proposed 4" diameter
perforated PVC pipe. This drainage ditch should be in accordance with San Diego
County Regional Standard Drawing D-75.
Attached is a redlined check print set of the project. Please forward this plan set to the applicant
for corrections and changes as noted. The applicant must return this plan set with the corrected
plans to assist us in our continued review.
If you have questions regarding any of the comments above, please contact me at extension
4380.
KENNETH W. WON
Associate Engineer