Loading...
HomeMy WebLinkAboutSP 144; San Diego Gas & Electric Co.; Specific Plan (SP)t CASE NO. : SP-144 DATE RECEIVED: April 7f 1982 APPLICANT: S D G & E REQUEST: Amendment - Substation Expansion ENVIRONMENTAL EXEMPT OR EXCEPTED: Posted: Cg" 7' Filed: Prior Compliance: Lo~ 7"Published: Filed: -/ 3--S 5 NEGATIVE DECLARATION: Posted:Published:Notice of Determination: HT^RQNMENTAL IMPACT REPORT: Notice of Preparation: Notice of Completion: PLANNING COMMISSION 1. Date of Hearing: Co' 2. Publication: 3. Notice to Property Owners: 4. Resolution No, (Continued to: ' ' 5. Appeal:_ _' Date: CITY COUNCIL 1, Date of Hearing: 2, Notices to City Clerk: 3, Agenda Bill: 4. Resolution No. 5. Ordinance "No. Date: Date: GDRRESPC^TDKMCE Staff Report to Applicant: Resolution to Applicant: Notice of Determination: ACTION: A) O <0 £ ACTION: . APPl|«\TION FOR COASTAL DEVELOPMENT PJmU APPENDIX B LOCAL AGENCY REVIEW FORM 0 [SECTION A (To be completed by applicant)) . CITY OF CARLSBAD Appl i cant SDGEE _ ; _ Panning Department Project description Construction of a 138/12 kV distribution substation. _ -J _ Locati on Encina Power Plant - Carlsbad, CAs(-42-QO Car!) BCBUJ Blvd.), Assessor's Parcel Number 210-01-32 [SECTION B (To be completed by local planning or building inspection department)! Zoning designation PU — f^gyud, umumg.^? N\A. du/ac General or Community Plan designation U—^Ug?u\CL umU"ng^b> A/A du/ac Local Discretionary Approvals n Proposed development meets all zoning requirements and needs no local permits other than building permits. 0Proposed development needs local discretionary approvals noted below. Needed Recei ved D D Design/Architectural review D D Variance for CD C] Rezone from d D Tentative Subdivision/Parcel Map No. D d Grading/Land Development Permit No. Q D Planned Residential /Commercial Development D Q Site Plan Review C3 D Condominium Conversion Permit D D Conditional, Special, or Major Use Permit No. E] D OtherF^LA^shKJgga QoMMi-£*5>\ovX Win T=^= CEQA Status n Categorically Exempt - Class _ Item D Negative Declaration Granted Environmental Impact Report Required, Final Report certified "7, Prepared for the City/-essfi3?-of Date .±.iiJ,'Ugi. $P>. ^^Z^ _ Title BU1EDIMG PERMIT APPLICATIONDUJLUiINC -/'•'Gty O^BAHLSBAD, CALIFORNIA )rMi Applicon t to complete nnmbeml spaces only.Phone 729-1181 Permit JOS * ^ !> " *" 'j S 1. 0 T N O . BLK T p * C f 1 E^. Ovr»£f» f *"*~"*i MAIL ADDRESS2 =c~-ri, /"v;'<7<r> /r"* "D t^-'yi c~ r.-A 'VL r7c c^ - '.Cy, ho\ /*.</. J> J- CONTPAC roH ' . - MAIL AOD»£S3 A»CHITeCr OH OEaiCNt*^ • .. f ' MAIL. AOD»E33 • ••• 3 /— './ / f r>f?i P f <^n-s-&R." > w(L - .-J?OO W, /A o«i COMPENSATION IN3. CARRIER MAIL »po»£3S 6 ••: Tcry- *= '" • " ^S^^ATiMC, RA^ Uwrr^SV^SrA 3 --Classofwork:--.. !^7lEw" L^TCHmTION DALTERATION 9 . Describs'work: -^ '-. ^ ^ .'••••• " • IB"' Changs of use from •' " . : ; Changa of use to^K:~. , •.,;"-'. ., ...:;": .. - . ..:•--..:— ^ ....-..._. p £••) • 11--. Valustioi) of workrS / X &f\f} f^ O f)" / - ^ ' ^- » ^V"C^ # * y ^ vX S?HC!AL CONDITIONS: - ' ' " •-. ^ i. . •-.-.. ••; ...... •..-vv-VN^ •./•'• 'i:----'>' - .-.-:;r-.. . •f - . ; ";;:"f"^" ,-' •;'•-'•?• '• • ' "'"-'.-. • • -&(.:-- '/ -.-!•.;>-—- - • -• ' • A>.>t.ic»fiOf.AcrE»rso8y^. J^NS^HECKED.BY. . -. . . Ap?Bov_ED*oBj>ss*jANce BV o^^0^^^^': OArt^^-?^. .-^k-. ' ' •-•:S-^?,;.-. NOTtCE> ' •- "--^V: SEPAHATE PERMI-TS ARE REQUIHHD FOR ELECTRICAL", PLUMB- ING, H5ATING,. VENTILATING OH AIH CONDITIONING. TION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS.OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A MENCeD. • 1 !-)E~PfE3Y- CERTIFY THAT 1 HAVE READ AND EXAMINED THIS ALL 'PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS HEREIN OH NOT. THE GRANTING OF A PERMIT DOES NOT PROVISIONS Or ANY OTHER STATE OR LOCAL LAW REGULATING •• •JX/VXj.vft , \-i V. .VoW,, 7/:> 2 /7f^ \ ^^> ASSESSOR'S PARCEL NUMBER - _ >, BOOK PACE PAR. Z 1 " PMOf*t • . . . ' ' * PHONE STATE LIC. NO. CITY LIC. NO. PHONE'.' - LIC£»3E HO. t \} f A^^> /Pc5~ •f^-fif~^'r*' . \fl^ i{* f*-^*~7 *} t i£~ £^ £*? £/{j*&lf PHONE -' LICENSE NO. BRANC'* . . . . - - ( ^ NO. BDRMS NO. BATHS D REPAIR DMOVE D REMOVE - >.. • :...1, ••••.•'•"-' • ' ': '••;: ,-..- •;. : -.-' - / '.••'••'".- :^''/':-- ."-.".' : •' ' ':::-~:'cc--\'-'' -'-..- ' . ' .- " ;-' ".-'-"^-r."-~''V;.-" ." "• - •"^•'-r.V;^'*''- .'•"•-. -~ PLAN CHECK FEE 5 £•£ ~£ / ^ ' Tt PERMIT F=E 5 / /A 1 ^s f MICRO FILM FTTS-'Tyo* of -^T~ Occupancy ^~~" • . ' '. '• Const. f '• Group ^P" "'•"'. ^^ r°?;C~*5V»f3/«\> T"T-; Size of Bldg. :""".' "- No. of . :.'- Max. -. -~'--.- "•V-/'"~!: "•' •' (Toial) Sq. Ft.. ''•-.-' " ' Stories • -• •...'•!: Oce. Load-, 'v^-V-vC- : ' Firs . •- . .. ' Use " '.' • •'.'*•'.; . Fire Sorinklars -,'•"••' -::'-: " Zone ' . - ... • Zone . -".:..;". Required Oves - DNO OFFSTREET PARKING SPACES:. . •'-';-'**.* -••NO. Of ." -" f^~\ -•' ••-• •:--.-.:••..-.. . -L...--'-'Z,--"' •'•'"'." Dwe.l.ngUnit, <^S • ^eVed "•'"'" ' Sq/Ft^^ (Opirv V-'^^^^"' — Special Approvals Required . Received. .-• Not Required PLANNING DSPT. " • - - " ' ".-"•• '." --'-'-"•'- ' " '. •.'-.' '::''-'• '••- HEALTH DEPT.. • ' - -.-.-.:-•.--•.- — „_,. ^ . • FIRE OEPT. .... -.-•-. SOIL REPORT ' , OTHER (Speci(y) ENCIMEEHI.NG DEPT. . ' ..... ...•-..• WATER DEPT. ' - - - . . - • .- ' •- WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT PLAN CHECK VALIDATION CK.M.O. . CASH PERMIT VALIDATION CK.M.O.CASH. . _, TOTAL FEES S INSPECTOR ENCINA SPECIFIC PLAN CHRONOLOGY OF EVENTS 04/06/71 Ordinance 9268 established the P-U (Public Utility) Zone with permitted use, Specific Plan and development regulation requirements. 06/22/71 Planning Commission Resolution No. 711 recommending pre- annexation change of zone from R-A, R-3 and M zones to P- U zoning and adoption of Specific Plan for 680 acre SDG&E ownership. 08/03/71 Ordinance 9279 adopting a Specific Plan (SP-144) and associated exhibits, an 11 x 19 color graphic and 400- scale velum drawing dated 1/9/70, for the 680 acre SDG&E ownership subject to 13 conditions of approval. 08/03/71 Ordinance 9280 approving the rezoning of 680 acre SDG&E ownership from zones R-A, R-3 and M to P-U zoning and pre-annexation zoning from country zoning to P-U zoning. 00/00/73 Grading Permit approved for installation of Fuel Oil Storage Tank No. 6. Approved use consistent with adopted Specific Plan map 144 (SP-144). 11/13/73 Planning Commission Resolution No. 986 recommending approval of amendment to SP-144 to permit the construc- tion of a 400 foot stack to replace the four (4) existing power plant stacks subject to 11 conditions of approval. 12/04/73 Ordinance 9372 amends Ordinance 9279 to permit the construction of a 400 foot stack to replace four (4) existing stacks at the power plant as a method of dispersing power plant emissions subject to amendment of Section 2 of Ordinance 9279 as follows: * Replace SP-144 with SP-144A 4 Add Condition 14 requiring incorporation of Condi- tions 1-9 and 11 of Planning Commission Resolution 986. [ENCIADAT.A24] 4 Add Condition 15 requiring review of the approval on a five year basis and providing for SDG&E/City Council determination of a report describing the "state of the art" of alternative emission control systems that could be utilized in lieu of the 400 foot stack is appropriate. An Environmental Impact Report was prepared and accepted for the project. Ordinance 9372 and its amendment of Ordinance 9279 became null and void on December 4, 1974 because of SDG&E's inability to commence construction of the project within one (1) year of the approval of Ordinance 9372 as required by Condition No. 3 of Planning Commission Resolution 986. 09/03/75 Grading Permit approval for installation of Fuel Oil Storage Tank No. 7. Approved use consistent with adopted SP-144. 10/07/75 CPUC approves Certificate of Public Convenience and Necessity for Encina Unit 5 including the 400 foot stack and associated transmission line facilities. 11/10/75 City Council Resolution No. 3780 approving a park site lease and exhibit dated 11/10/75 and authorizing the Mayor to execute the lease with SDG&E. 11/18/75 California Coastal Commission approval of Encina Unit 5 including the 400 foot stack and associated transmission line facilities. 05/04/76 Ordinance 9456 amends Ordinance 9279 to permit construc- tion of a 400 foot stack to replace four (4) existing stacks as a method of dispersing power plant emissions subject to amendment of Section 2 of Ordinance 9279 as follows: * Replacement of SP-144 with revised Specific Plan map SP-144B dated 11/10/75. + Add Condition No. 14 incorporating Conditions of approval A-L. 07/20/76 City Council reaffirms Ordinance 9456, the stack amend- ment, and declares it reinstated in full force and effect and not subject to the referendum process. [ENCIADAT.A24] 07/21/76 Grading Permit approval for the construction of Unit 5 and the 400 foot stack. 07/22/76 Building Permit (No. 76-45) approval for the construction of Unit 5 and the 400 foot stack. 08/17/76 Execution of Carlsbad Boulevard Improvements Agreement as required by Section 2, Condition 13 (A) of Ordinance 9279. 03/09/77 Planning Commission Resolution No. 1338 recommending approval of amendment to Specific Plan 144 (SP-144B) to allow construction of Water Treatment Facilities and a Maintenance Building subject to Conditions A and B, 1-4. 05/03/77 Ordinance 9481 amends Ordinance Nos. 9279 and 9456 to permit the construction of Wastewater Treatment Facili- ties and a Maintenance Building subject to the amendment of Section 2 of Ordinance 9279 as follows: * Replace SP-144B with a revised Specific Plan map SP-144C, dated 4/5/77. * Add Condition 15 and parts A & B. Condition 15 indicates that construction shall also be in com- pliance with the project plot plan exhibit dated 1/31/77. 06/00/77 Building Permit approval to allow construction of 50* x 16' Wastewater Treatment Maintenance Building (Control Room). Use permitted by Ordinance 9481 and SP-144C. 02/07/78 City Council Resolution 5302 finding that the power plant particulate fallout problem is controlled to the satis- faction of the City Council and Air Pollution Control Officer and that Condition No. 14 (H) of Ordinance 9456 has been satisfied contingent upon SDG&E continuing to pay for property damage resulting from the fallout until final building permit clearance occurs for Encina Unit 5. 02/28/78 SDG&E requests suspension of proposed Specific Plan Amendment providing for connection of Unit 5 to the 400 foot stack. Amendment not required because Ordinance 9456 and the CPUC approval of Unit 5 and their respective environmental impact reports establish the connection of Unit 5 to the stack. [ENCIADAT.A24] 03/12/79 Building Permit (No. 79-889) approval to allow the installation of 2930 feet of fencing around the fuel oil tanks, water treatment facilities, water intake facili- ties, warm water discharge pond and its associated ocean jetty. 05/18/82 City Council accepts final report on air quality from APCD as required by Ordinance 9456, Condition 14 (F). 05/18/82 City Council Resolution 6877 adopting the Land Use portion of the Agua Hedionda local Coastal Program including the following findings: f The Land Use Plan is consistent with existing Specific Plans in the areas affected by the Agua Hedionda Land Use Plan, and incorporates by refer- encing the provisions of Carlsbad Specific Plans 144, 144(A), 144(B), 144(C). 06/23/82 Staff Administrative Determination of consistency with SP-144C and Planning Commission concurrence to allow construction of a 138/12kV electrical distribution substation with an ultimate capacity of 48 megawatts. 10/09/84 Staff Administrative Determination of consistency with SP-144C to allow construction of a 6,167 square foot replacement administration building and the conversion/ remodel of an existing building to a storage/repair maintenance facility. 07/02/85 Building Permit (No. 85-420) approval to allow construc- tion of crib wall along the bluff adjacent to the outer Agua Hedionda Lagoon. 07/05/85 Building Permit (No. 85-170) approval to allow the remodel of the existing power plant electrical shop. 10/16/85 Certificate of Compliance granted by City Engineer to establish SDG&E property bisected by Interstate 5 as two (2) legal parcels as described by Exhibits A and B. 01/31/86 Building Permit (No. 85-608A) approval for construction of 6,168 square foot replacement administration building consistent with 10/9/84 administrative determination. 01/31/86 Building Permit (No. 85-608B) approval for construction of remodel of existing power plant lunch room. [ENCIADAT.A24] 01/31/86 Building Permit (No. 85-608C) approval for conversion of existing building to storeroom/repair facility consistent with 10/9/84 administrative determination. 04/21/86 Staff Administrative Determination of consistency with SP-144C for installation of 20' x 40' x 60' storage shed for gas poly pipe shed on the Northcoast Operations Center site. 09/16/86 Staff Administrative Determination of consistency with SP-144C for installation of 20' x 40' x 14' metal paint shop structure. 10/01/86 Staff Administrative Determination of consistency with SP-144C and Planning Commission concurrence for the installation of microwave and mobile radio telecommunica- tion equipment on the 400 foot stack. 04/09/87 SDG&E withdrawal of February 4, 1986 application to amend Specific Plan Ordinance 9279 and SP-144C to provide for the installation of a 50,000 square foot Service Center office and varied ancillary facilities on the Northcoast Operations Center site and to revise SP-144C to show previously approved facilities. 07/15/87 Staff Administrative Determination of consistency with SP-144C to allow the installation of two (2) temporary office trailers on the Northcoast Operations Center site. 06/09/89 Building Permit (No. 89-225) approval for construction of 30' x 40' x 14' metal paint shop structure consistent with 9/16/86 staff administrative determination. 07/19/89 Planning Commission Resolution 2859 approving the minor amendment of Specific Plan 144C to allow the construction of six (6) wastewater treatment tanks and accessory facilities to replace existing wastewater ponds subject to conditions of approval 1-15. 07/24/89 Planning Director letter informing SDG&E that any future request for improvement to the Encina Power Plant will require a major amendment to the adopted Specific Plan. 10/10/89 Grading Permit (No. 2-88-34) approval for installation of six (6) steel wastewater treatment tanks as approved by Planning Commission Resolution 2859. 12/11/89 Building Permit (No. 89-1362) approval for construction of six (6) steel wastewater tanks and concrete founda- tions approved by Planning Commission Resolution 2859. [ENCIADAT.A24] 01/23/90 Interim Ordinance NS-108 adopted by City Council estab- lishing an emergency moratorium on SDG&E expansion activities pending studies and possible changes in the General Plan, local Coastal Plan and the Zoning Ordi- nance. Intent and purpose of the Interim Ordinance is to prohibit the increase in size, location or generating capacity of the existing power plant. 02/13/90 Ordinance NS-111 extending Interim Ordinance NS-108 prohibiting the expansion of gas and electric utility facilities within the public utility zone pending studies and changes in the General Plan and zoning for a period of 22 months and 15 days. NS-111 also provided clarifi- cation of the affect of the ordinance upon certain existing and proposed activities at the power plant. 04/17/90 Staff Administrative Determination of consistency with adopted Specific Plan 144C to enlarge an existing shift supervisor's office inside the power plant building to accommodate increased storage and equipment requirements and minor convenience improvements. 08/22/90 Building Permit (No. 90-1107) approval for construction of shift supervisor's office enlargement within the power plant building consistent with 04/17/90 staff administra- tive determination. 11/05/90 Staff clarification on the processing of "BLUFFTOP PROPERTY" adjustment plat with regard to applicable city land use controls. 12/11/90 Staff Administrative Determination that proposed deminer- alization regeneration tank is consistent with replace- ment wastewater treatment improvements (tanks) authorized by 7/19/89 Planning Commission Resolution 2859 and not subject to Emergency Moratorium Ordinance NS-111. Per staff request, replacement exhibit submitted on 12/10/90 showing removal of the wastewater ponds and the location of the new wastewater tanks and deminerlizer regeneration tank utilizing exhibit filed for complying with condition of approval 3 of Planning Commission Resolution 2859. [ENCIADAT.A24] aura fc*0/^*DV I I V OUTKB LA600H cvrmm LACOOH LAGOON WATER AREAS PUBLIC BEACH AREAS EXISTING FACILITIES PROPOSED FACILITIES PROPOSED & EXISTING LANDSCAPING COMMUNITY PARK OPEN SPACE - UTILITY CORRIDOR AREA SUB USE AGRICULTURE COMMERCIAL DESIGNATION RESIDENTIAL DESIGNATION FACILITIES —I (ic*^1 f • 7 C'7-|'5?| INW T I/ YA.UUf ,. •:;>'-i;v^, .'- • -'•"' .'"' •.,' ~'rj. • '• '.'-' *' ' ^-^"^•'•'^'.'-^ •'./-,' ' .—ri'i-Zil!c~-ii"ZI_ J^Eg'Errl'ir- ^i DATI RCVIStOMl lltt XCK UIIT1HO IMIi MIIT1M8 LAHD Vtll VMOPOIID LAND Ull| TOTKL •UtUltHQ WVIHAOl iUlLDIMlJ IQUMt rtUCCKT LMfDICArlW U.G. TELEPHONE CONDUIT ~/:-£mFfi*fes~±^; CITY OF CARLSBAD APPLICATION FOR ADOPTION OF SPECIFIC 9ft • ?1ft- DATE: _ SPECIFIC PLAN MO. FILING FEE RECEIPT MO. (for official use) A RtQUhST IS HEREBY MADE TO ADOPT AN AMENDED SPECIFIC PLAN (Specific or Master Plan) FOR PROPERTY DESCRIBED AS: (exact legal description)- A portion of Lot F of Rancho Agua Hedionda, in the County of San Diego» and a portion of Lot H of Rancho Agua Hedionda, Map 825> in the City of Carlsbad, and a portion of Block "W", of Palisades No. 2, Map 1803 in the City of Carlsbad, County of San Diego, State of California; Also, being Parcel 6, page 01, Book 206; Parcels 24, 25, 26 and 21, Page 01, Book 210; Parcel 21, page 21, Book 211, and parcel 14, page 01, Book 212, of the Assessor's Map of San Diego County. THE PROPERTY DESCRIBED HEREIN IS ADDRESSED AS 4600 Carlsbad Boulevard AND IS LOCATED ON THE West (North, South, East, West) SIDE OF Carlsbad Boulevard BETWEEN Cannon Road ' AND (Name of Street)(Name of Street) Chinquapin Avenue • Name of Street) II. I Jhe undersigned state that San Diego Gas & Electric ( I, We)( I AM, WE ARE ) Company is /the Owner of the property described herein and hereby (Owner/Owners) . give our authorization to the filing of this application: (My, Our) Name : San Diego Gas & Electric Company, a corporation (Typed or Printed as shown on Recorded Deed) Signature: Name: . ( Typed or Printed as shown on Recorded Deed) Signature: Name: . (Typed or Printed as shown on Recorded Deed) Signature: 4 (Typed or Printed as shown on Recorded Deed) Signature: Specific/Master Plan Arn11 cation Page Two III. EXISTING ZONE OF SUBJECT PROPERTY Public Utility (P-U) HAS A MASTER PLAN BEEN APPROVED?Yes. YES No. DATE: August 3, 1971 OWNER AND/OR OWNER'S AUTHORIZED AGENT AFFIDAVIT STATE OF CALIFORNIA) COUNTY OF SAN DIEGO) SS CITY OF San Diego ) I, (we), Harold E. Richmond (name) declare to the best of my (my, our ) and correct under the penalty of purjury: being duly sworn depose and _knowledge that the foregoing is true EXECUTED AT San Diego, (city) DATE Californiailornxa (State) ~(Month)(Day](Year) APPLICANT, OWNER AMD/OR OWNER'S AUTHORIZED AGENT: Harold E. Richmond (Print Name) SUBSCRIBED AND SWORN TO BEFORE ME THIS (Signature) Post Office Box 1831 (Mailing Address) Sail Diego, California 92112 (City and State) (Area Code) DAY OF (Telephone Number) (Notary Public) *f SPECIFIC/MASTER PLAN APPLICATION EXHIBIT "A1 ]- FILING FEES: $100.00 plus $2.00 for each dwelling unit. 2. THIS APPLICATION SHALL BE FORMALLY FILED ON THE FIRST MONDAY OF THE MONTH. 3. THE PUBLIC HEARING AT THE PLANNING COMMISSION LEVEL WILL BE HELD ON THE SECOND TUESDAY OF THE FOLLOWING MONTH. 4. IN ADDITION TO HAVING THIS APPLICATION COMPLETELY FILLED OUT, THE FOLLOWING ITEMS MUST BE ATTACHED: A. SPECIFIC PLAN prepared in accordance with Chapter 21.38.060 of the Carlsbad Municipal Code. (28 copies & 1 sepia) B. 3QQ FOOT RADIUS.MAP - A map to scale not less than 1"=200' showing each lot within 300 feet of the exterior boundaries of the subject property, the zone classification of each within 300 feet of the exterior boundaries of the subject property, and each lot within 300 feet of the exterior boundaries of the subject property shall be consecutively numbered to correspond with the property owners' list. C. PROPERTY OWNERS' LIST - A typewritten list showing the number of each lot from item 2 above, followed by the owner's name and address. In addition, the applicant must file an affidavit that it is an accurate list taken from the latest equalized assessment roll on file in the office of the Assessor of San Diego County, 855 Williamston Street, Vista, California, (phone: (714) 724-8571). ?r~ ********************* OFFICIAL USE ONLY DATE RECEIVED: FORMAL FILING DATE: APPROVED FOR FILING WITH THE PLANNING COMMISSION BY: (Planning Department) CITY OF CARLSBAD, CALIFORNIA ZONE CHANGE & SPECIFIC PLAN "PROCESSING PROCEDURE December 12, 1972 II. PRE-FILING MEETING Applicant, Ping & Engr. etal EIA short form to be filed. 2-5 days Pin. Dept. notify applicant re. EIA requirements (if any) FORMAL FILING OF APPLICATION A. Application complete B. EIS as required. 2nd Tuesday of Following month._ i III.PUBLIC HEARING ( Planning Commission) A. their findings shall be by Resolution 7 days max. TRANSMIT RESOLUTION TO CITY COUNCIL IV.PUBLIC HEARINGS (City Council) A. this public hearing shall be held within 30 days after receipt of the P.C.Res. 1st Monday of Month = Day X. 1st Tues. after Day X.i Send Material to Review Comm., to include Coast Zone Reg. Comm., Response req. by 3rd Mon. after Day X, 1st Thur. after Day X. ! mi Pin. Dept. notify Staff of pending applications. 4th Thur. after Day X. Preliminary report to the Review Comm (applicant present) EIA to be included. 13 days prior to PC Meeting (min.) Notification Publish & mail to property owners in 300' radius (10 days prior to Public Hearing Minimum Req.) 1st Fri. prior to meeting. Pin. Dept. mail Final Report to Planning Commission & Applicant (to include EIS). NOTIFICATION OF RESULTS: City will notify the applicant within 7 days after their findings of fact.