HomeMy WebLinkAboutSP 157; Financial Scene; Specific Plan (SP)CITY OF CARLSBAD
PLANNING DEPARTMENT
STAFF REPORT FOR
April 23, 1974
TO: PLANNING COMMISSION
REPORT ON: CONSIDERATION OF SPECIFIC PLAN
CASE NO. SP-157
APPLICANT: FINANCIAL SCENE INC.
1265 Sixth Avenue
San Diego, Ca. 92101
*• REQUEST: That the Planning Commission recommend to the
City Council approval of a Specific Plan for a 400 D.U.
Condominium Complex known as Altimira Unit #4.
11• STAFF RECOMMENDATION: That it be moved that the Planning
Commission recommend to the City Council that Specific
Plan No. SP-157 BE APPROVED subject to the conditions
outlined below: Justification is based upon:
A. Conformance to the approved Master Plan (MP-2)
B. Conformance to the General Plan Commitment as revised
C. Conformance to the requirements of Municipal Code
D. CONDITIONS OF APPROVAL:
1. The approval is granted for the land described in
the application and any attachments thereto, and as
.shown on the plot plan submitted labeled Exhibit B.
The location of all buildings, fences, signs,
roadways, parking areas, landscaping, and other
facilities or features shall be located substantially
as shown on the plot plan labeled Exhibit B, except
or unless indicated otherwise herein.
2. Unless the construction of the structure or facility
is commenced not later than one year after the date
the approval is granted and is diligently pursued
thereafter, this approval will automatically become
null and void.
3. Any minor change may be approved by the Planning
Director. Any substantial change will require the
filing of an application for an amendment to be con-
sidered by the Planning Commission.
4. All requirements of any law, ordinance or regulation
.of the State of California, City of Carlsbad, and any
other governmental entity.shall be complied with.
5. No signs or advertising of any type whatsoever shall
be erected or installed until plans therefore have
been approved by the City of Carlsbad.
6. All areas shown as parking areas shall be
surfaced with asphaltic concrete and shall
be visibly marked outlining individual
. parking spaces and traffic flow. Said
surfacing and marking shall be completed prior
to final inspection of the structure or stru-
ctures by the Building Department. The
surface shall be kept in a reasonably good
state of repair at all times.
7. Prior to obtaining a building permit and
within 30 days hereof, the applicant shall file
with the Secretary of the PlanningCommission
written acceptance of the conditions stated
herein.
8. Any mechanical and/or electrical equipment to
be located on the roof of the structure shall
be screened in a manner acceptable to the
Planning Director. Detailed plans for said
screening shall be submitted, in triplicate,
to the Planning Director.
9. All lighting shall be arranged to reflect away
from adjoining properties and streets.
10. All outside storage areas shall be screened
from adjacent property and streets.
11. An incombustible trash enclosure shall be
provided of a size and location acceptable
to.the Planning Director, and said area shall
be enclosed with a fence and/or wall of
sufficient height to adequately shield the
area. Said fence and/or wall shall include
a solid gate.
12. A detailed landscape and sprinkler plan pre-
pared by a landscape architect, shall be
submitted to the Planning Director for con-
sideration and approval.
13. Prior to final building inspection clearance,
all landscaping shall be installed. Said
landscaping shall, at all times, be maintained
in a manner acceptable to the Planning
Director.
14. All landscape areas in parking lots shall be
enclosed by a raised concrete curb or low
wall. All planters adjacent to street right-
of-way shall be constructed, with weep holes
per specifications of the City Engineer.
15. All utilities including electrical, telephone
and cable television, shall be installed
underground and/or shall be completely con-
cealed from view.
16. All public improvements shall be made in
conformance with the Subdivision Ordinance
and other City Standards, to the satisfaction
of the City Engineer, without cost to the
City of Carlsbad and free of all liens and
encumbrances.
17. Prior to any construction, the applicant shall
submit plans to the appropriate entity pro-
viding domestic water to the proposed develop-
ment, for its approval of the location, type
and adequacy of water lines, and to this
Fire Department for approval of the location
of fire hydrants.
18. The applicant shall install all required fire
hydrants and dry-stand pipes prior to framing
construction, and said fire appurtenances
shall be functional prior to commencing such
work.
19. Prior to the issuance of any permits, a
tentative map encompassing the subject property
shall be processed by the City of Carlsbad.
Said map shall also include the 6+ acres park
dedication that remains to be given to the City
of Carlsbad, pursuant to the approved Master Plan
As a part of the public improvements to be done
under said subdivision, the developer shall be
responsible for the full street improvements to
City Standards for the full frontage of the
total park site (12+ acres).
20. As a part of the submittal of the required
tentative map the developer shall provide
the $500 donation to the Parks Fund as required
(C.C. Ord. No. 9293).
21. As a part of the submittal of the required
tentative map, the applicant will investigate
with the assistance of the City's Director
of Parks and Recreation, a program for
public use, for a minimal fee, of the pro-
posed tennis courts. In return, the develop-
ment of the Ci.ty Park will include sufficient
parking to be adequate for both the physical
development of the City Park and the public
use of the proposed tennis courts.
22. Prior to the issuance of any permits, the
applicant shall submit detailed plot plans,
building elevations and floor plans of all"
buildings to the Planning Director for con-
sideration and approval. Said plans shall
include sufficient evidence to indicate
complete compliance to all requirements of
the Municipal Code and any applicable City
policies.
23. All -building roofs, shall be of the same
material.
24. The applicant, as a part of his submittal
of a tentative map request, shall revise
the proposed building locations and orien-
tation, t.o mitigate any creation of major
slopes , and of adverse impact upon the views of
the units located in the development to the
north.
III. BACKGROUND:
A. Description: A portion of Sec..21, Township 125, Range 4 W
San Bernardino Meridian.
B. Location - Northwest corner of the intersection of Lowder
(Paseo del Norte) Lane and Cameo De Las Ondas.
c- Size - G ross-20.502 Acres
Net - 17.8 Acres
D- 'Total No. of Units - 400 D.U.'s
E- Density - Gross - 19.5 D:U.'s per acre
Net - 22.5 D.U.'s per acre
Approved Density - 25 D.U.'s per acre
F. Coverage -31.7%
G. E.I.R. - The Planning Director has determined that the
'proposed project would not have a significant effect
on the environment and no additional environmental
considerations are required '
H. Existing Zoning - P.C.
I. Adjacent Zoning - North - P-C
East - P-C '
South - P-C
West - P-C
J. General Plan - As a part of the consideration of the
rezoning of the total 112 acres covered
by the Master Plan, the C.C. by Resolution
No. 1934, dated January 4, 1972 did approve
a General Plan Amendment to permit a
maximum density of 10 dwelling units to
the acre or a maximum of 1120 dwelling,
units for the total project. The proposed
development conforms to the density
allocation as approved by the Master Plan
to make an overall density of 10 D.U.'s
per acre.
K. Resource Management Districts - Not applicable
L. Parks Ordinance Compliance - With the dedication of the
12 acre park site, the re-
quirements of the Parks
Ordinance have been exceeded.
M- Parking Compliance - Since the precise type of unit
is not known, the adequacy of
parking in terms of provision for
all the needs' cannot be made.
However, with the provision of 2.25
spaces per dwelling unit on-site
would appear to be adequate for
an adult oriented development.
i
IV. DISCUSSION OF SPECIFIC ITEMS - The Specific Plan is not
complete in terms of precise dwelling unit layout. The
building footprint as shown on the plot plan is indicated
to be accurate. The total buildings proposed are nine
with a total of 400 dwelling units. Said buildings are
to be four stories on the downhill side and three stories
on the uphill side. Under the definition of building height,
this design would meet the Ordinance limitations. Garage
parking on the basis of one space per unit is to be located
on the first story. In terms of architecture, these buildings
will conform to the units under construction to the north of
this phase with white stucco and heavy beam exteriors and red
tile roofs.
The proposed recreational facilities are to consist of a
tennis club complex with eight courts to be located east of
Lewder (Paseo del Norte) Lane, a central recreation complex
with an existing ranch house as the focal point, and a
picnic grove area with shuffle board courts. The applicant
indicates that as many of the existing evergreen and palm
trees as possible will be maintained. Finally, the units
are so located to be view oriented and a number of the units
are to have individual deck areas on the ocean side of the
buildings.
There are some design problems with the development as pro-
posed which the recommended conditions require resolution
as a part of the tentative map process. The views of some
of the buildings,as oriented, would be of units proposed to
the north rather than views of the Ocean. In addition, the
grading necessary to create the layout as^ proposed would
create some tremendous banks and un-useable open space
which would be considered inappropriate.
V. ATTACHMENTS
1. Exhibit "A" to Resolution No. 3345
2. Section III Response Addendum
3. Letter from John R. Pierce Re: Specific Plan 157,
Altamira Unit No. 4 Carlsbad Municipal Water District
Exhibit "A" to Resolution N(^ 3345
"^W
fla;ne of Ap.p 1 i c an t: Pacific Scene, Inc. ;JEteee/icrVg£7g
Permit Apolied For: PC Master Plan Review «~
Location of Proposed Activity: East side of San Diego Freeway, South
of Palomar Airport Road
I. Background Information. . • " • . •
'I. Give a brief description of the proposed activity (attach.
ciny preliminary development plans). . .
A residential subdivision covering 20 acres of land which will provide 400+ dwel-
ling units in 9+ structures surrounded by 'open space lots i'ri common ownership.
Dwelling units will provide housing for older citizens in a park-like surrounding,
commonly owned recreational facilities and allowing only peripheral through traffic.
This submittal is the proposed 4th and last development increment of the Altamira
project (formerly known as "Campobelo"). Unit.No. 1 of 198 units has been
graded, improvements almost complete with over 80 dwelling units almost com-
pleted. Unit No. 2 of 128 dwelling units has been'approved. Unit #3 of 248
units has been approved and construction of the first development increment is
underway. . ' •. .
2. Describe the activity area, including.distinguish ing
natural -and manmade characteristics; also provide .pre-
cise slope analysis when appropriate.
Adjoining the east side of Interstate 5 (San Diego Freeway), from 2,000 to 4,000
feet south of Palomar Airport Road. The area was, until'summer of 1972, un-
occupied land, 50 acres of' which is flat land, at the base of a gently sloping
(12%), 80 foot high hill. The flat portion of the land- lies 15 to 5 feet above the
level of the Freeway, and was brush covered and unused agriculturally. The hill
side land was utilized for "commercial flower growing. Three rows of mature
palm trees at 40 to 80 foot intervals exist on the property as well as three
large shade trees, all of which have been incorporated into the final plans. The
sandy soil has layers of impervious clayey soil which has created swampy,
agriculturally poor soil ate the base of the hill area.
hNYiKUMHr.Nl/vL li'iPACI" AiS L SbM EN I 1-URM
Answer the following questions by placing a check in the
appropriate space. ; ' '
' . ' Yes No
Could the project significantly change present
"land uses in the vicinity of the activity?
Could the activity affect the use of a re-
creational area, or area of important
. aestheti c' value? . . • • -
3. Could the activity affect the functioning
of an established community or neighbor-
hood? • ...
4. CouTd the activity result in the displace-,
ment of community residents?
5. Are a.ny of the natural or man-made features :
in the activity area unique, that is, not
found in other parts of the County, State,
or nation? . ...
6. ''Could the activity significantly affect a
historical or archaelogical site, or its
setting? . ...
7» Could the activity significantly affect
•the potential use, extraction, or con-,
servation of a scarce natural" resource?
8.' Does the activity area serve as a habitat,
food source, nesting place, source of water,
etc. for rare or endangered"wildlife or
fish species? • •..•"'
8. Could the activity significantly affect
fish, v/ildl ife or plant 1 i fe?
10. Are there any rare or- endangered plant
species in the activity area'?
11; Could the activity change existing features
of any of the city's lagoons, bays, or • .
ticlel ands? . • . ''•'...
Ye no
12. Could'the activity char.ge existing' features
of any of the City's beaches?
13. Could the activity result in.the erosion
or elimination of agricultural lands?
•14. Could the activity serve to encourage
development of presently undeveloped
areas or intensify development of already
developed areas?
15. Will the activity require a variance from
established environrnental standards (air,
water, noise, etc)? . •
16. Will the activity require certification,
authorization or issuance of a permit
by any local, State or Federal en-
vironmental control agency? " _v
17. Hill the activity require issuance of ." .
a variance or conditional use permit
by the City? . ' •. '
18. I/ill the activity, involve the application,
" use, or disposal of potential!y hazardous
materials?
19. Hill the activity involve construction
of facilities in a flood plain?
20. Will the activity involve construction
. of facilities on a slop^e of 25 per cent
or greater?
21. Vlill the activity involve construction
of facilities in the area of an active
fault? . - - •
22. Could the activity result in the.
generation of significant amounts
of noi se? • ..-.-•.
23. Could the activity result in the gen-. " • "
eration of significant amounts of dust?
24. Will the activity involve the burning
of brush, trees, or other materials?
25. Could the activity result in a significant
change in the quality of any portion of the
region's air or water resources? (Should
note surface, ground v/atcr, off-shore). .. .
III
26. Will theriW^e a significant chang.e
27
existing orm?
(a),
(b)
indicate estimated gradinu to be
done in cubic yards.
vyJiVJJ, «**«•/' »&*•!»•percentage or al terati^ot^to tne
present land form. "~
(c) maximum height of cut or fill
si opes.
Hill the 'activity result in substantial
increases in the use of utilities,
sewers, drains or streets?
S t at_e_ o f M o Sign if i cant E n v- i r o r, m e n_t a 1 Effects
If you have answered yes to one or more of the questions in Sec
tion II but you think the activity will have no significant environmental
effects, indicate your reasons below: . •
IV.C o_nij5ien_ t s_ o r El a b or a t i o n s to_Any of the Question _s_ 1 n__S e e tion II
"H f additional space is needed for a n s w e ring" a n y q ulTsTuTnTT" Tt-
tach additional sheets as may'be needed.)
V.
S i g n a t u r K^,
Date Si
Person completing report)
Concl usions (To be completed by -the. PI anning Director). Place a
check in the appropriate box. ' .-.•;
T ^]
DATE RECEIVED:
Further information is required. . . .
It has been determined that the projsct will not have sig-
nificant environmental effects. .
f .] It has been determined that the project could have significant enviro-
mental effects. [ ] You must submit a preliminary environmental impact
statement by the followina date _ ' [ ] You should uiake an
appointment with the Planning Director to discuss further processing of
your, project, in accordance with Chapter 19. 0-":- of the Municipal Code.
BY:-
PTanriinn Director, or,
(representative)
SECTION III RESPONSE ADDENDUM
II-9 Grading on site, by necessity, will affect existing wild and
plant life on the site. Site grading is minimum on proposed
project, and this effect is an unavoidable consequence of any
development on the site.
11-14 The presence of a water service extension (already installed)
to the site might encourage development of contiguous sites.
There is no excess sewering capacity in the area, however,
except that required to serve the submitted project.
11-23 Some construction dust generation is unavoidable. All
required dust suppression techniques will be used during con-
struction period, however.
11-26 At roughly 3,000 cu. yds. per acre, this grading represents
a minimal grading operation for projects of this nature on
sloping sites where 6,000 cu. yds. per acre and more would
not be uncommon. Grade falls will be taken under structures
to avoid a "pad/bank" appearance. Finish site should closely
resemble the existing, giving a feeling similar to that of
Unit #3 now under construction.
11-27 There would necessarily be an increased use of utilities,
sewers and streets commensurate with the increased population
generated by this project. Such increase would appear to be
the unavoidable result of any site development and not peculiar
to this project. All utilities and streets to accommodate this
project have already been installed to the site.
~rlr~lH
WOODSIDS/KUBOTA & ASSOCIATES, ifcSC.
CONSULTING
..MAR 3 5 1974
CITY OF CARLSBAD
2965RooseveltSt. -P.O. Box 1095 -Carlsbad, California 92008« (714)729-1194 Planning Department
March 22, 1*974
Mr. Donald A. Agatep
Director of Planning
City of Carlsbad
1200 Elm Avenue
Carlsbad, Calif. 92008
Subject: Specific Plan 157, Altamira Unit No. 4
Carlsbad Municipal Water District
Dear Mr. Agatep:
This office has reviewed the subject project and has the
following comments:
1. This project is within the retail service area of the
Carlsbad Municipal Water District.
2. This project appears to be a condominium and as such
the developer will be required to comply with the
rules and regulations of the Carlsbad Municipal Water
District with respect to water service for condominiums
within the Carlsbad Municipal Water District.
3. This project will be subject to all of the rules and
regulations of the Carlsbad Municipal Water District.
If you have any questions or require additional information
please contact this office.
Very truly yours ,
John R. Pierce
Project Engineer
cc: Carlsbad Municipal Water District
JRP/sp
In Orange County, Santa Ana
74-302
SECTION III RESPONSE ADDENDUM
II-9 Grading on site, by necessity, will affect existing wild and
plant life on the site. Site grading is minimum on proposed
project, and this effect is an unavoidable consequence of any
development on the site.
11-14 The presence of a water service extension (already installed)
to the site might encourage development of contiguous sites.
There is no excess sewering capacity in the. area, however,
except that required to serve the submitted project.
11-23 Some construction dust generation is unavoidable. All
required dust suppression techniques will be used during con-
struction period, however.
11-26 At roughly 3,000 cu. yds. per acre, this grading represents
a minimal grading operation for projects of this nature on
sloping sites where 6,000 cu. yds. per acre and more would
notebe uncommon. Grade falls will be taken under structures
to avoid a "pad/bank" appearance. Finish site should closely
resemble the existing, giving a feeling similar to that of
Unit #3 now under construction.
11-27 There would necessarily be an increased use of utilities,
sewers and streets commensurate with the increased population
generated by this project. Such increase would appear to be
the unavoidable result of any site development and not peculiar
to this project. All utilities and streets to accommodate this
project have already been installed to the site.
Draft:
re: SP-157
Response to Condition #21 of Pacific Scene application - SP-157
The tennis courts proposed under this Specific Plan would be primarily for
the use and benefit of the residents of Carlsbad Tract 72-23, and the future
residents covered by this Specific Plan. The tennis courts will remain the
property of the Developer, and parking will be provided by the Developer,
on-site, south of the proposed tennis courts and east of Lowder Lane.
The tennis courts would also be available to the Carlsbad Parks and Recreation
Department for the use of lessons for adults only, on specific days and
specific times, for a fee. Those days, times and fees will be negotiated
between the Developer and the Carlsbad Parks and Recreation Department Director.
If additional capacity exists^in the judgement of the Developer, beyond the
capacity required for the two (2) residential tracts previously described, then
a limited number of memberships would be made available to the general public