Loading...
HomeMy WebLinkAboutSUP 07-06; Bressi Ranch Lots 10-13; Conditional Use Permit (CUP)The City of Carlsbad Planning Department A REPORT TO THE PLANNING COMMISSION P.C. AGENDA OF: July 16, 2008 Item No. ( 4 Application complete date: January 23, 2008 Project Planner: Greg Fisher Project Engineer: David Rick SUBJECT: SUP 07-06 - BRESSI RANCH LOTS 10-13 - Request for a determination that the project is within the scope of the previously certified Bressi Ranch Master Plan Program EIR and that the Program EIR adequately describes the activity for the purposes of CEQA; and approval of a Scenic Corridor Special Use Permit (SUP 07-06) for the subdivision of 9.9 acres of land into three industrial lots, and the development of 143,100 square feet of planned industrial/office space within two three-story buildings generally located south of Palomar Airport Road, east of El Camino Real at the northwest corner of Gateway Road and Campbell Place in Local Facilities Management Zone 17. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 6430 APPROVING Special Use Permit SUP 07-06, based on the findings and subject to the conditions contained therein. II.INTRODUCTION The applicant has requested approval of a Special Use Permit for the subdivision of 9.9 acres of land into three industrial lots and the development of 143,100 square feet of planned industrial space within two buildings. The two buildings are intended to be occupied by ViaSat Inc. The Special Use Permit is required because the site is located within a Scenic Preservation Overlay Zone. The project site is located on Lots 10 through 13 of Planning Area 3 (PA3) within the Bressi Ranch Master Plan (MP 178). The site has a General Plan Land Use designation of PI (Planned Industrial) and is Zoned P-M (Planned Industrial). The proposed project is consistent with the El Camino Real Corridor Development Standards, the City's General Plan, the development standards of the Bressi Ranch Master Plan, the relevant zoning regulations of the Carlsbad Municipal Code, the Airport Land Use Compatibility Plan (ALUCP) for McClellan- Palomar Airport, and the Zone 17 Local Facilities Management Plan. III. PROJECT DESCRIPTION AND BACKGROUND The proposed project re-subdivides a four-lot, 9.9 acre site located within Planning Area 3 (PA3) of the Bressi Ranch Master Plan (BRMP) at the northwest corner of Gateway Road and Campbell Place into three industrial lots. Lots 10-13 will be consolidated into three large lots, accommodating two proposed three story buildings, with 540 parking spaces, site landscaping, large central plaza area, and a mechanical/satellite antenna yard. The minor subdivision will replace lots 10-13 with parcels 1-3. Parcel 1 will consist mostly of a parking lot to serve buildings 8 and 9, a mechanical equipment enclosure, satellite antenna enclosure, trash SUP 07-06 - BRESSI RANCH LOTS 10-13 July 16, 2008 Page 2 enclosure, and generator enclosure. Building No. 8, the larger of the two proposed industrial/office buildings will be located on parcel 2, as well as additional parking. The second building, (Building No. 9) and the central plaza area will be located on parcel 3. The 9.9 acre project site has been previously mass graded into four existing development pads. The project is now proposing to re-grade the site in order to accommodate a comprehensively designed "campus type" project. Balanced grading is proposed with approximately 6,600 cubic yards of cut, and 6,600 cubic yards of fill. The two proposed industrial buildings are three-stories tall and are 65,700 square feet (Parcel 3) and 77,400 square feet (Parcel 2) in size. The buildings will contain a combined 111,042 square feet of professional office space and 32,058 square feet of manufacturing space. There will be a total building area of 143,100 square feet. The two buildings will be positioned closer to the corner of Gateway Road and Campbell Place with a large centralized plaza area provided between the two buildings, becoming a dominant visual element of the site. The parking lot areas are located to the sides and rear of the buildings where their visual impacts will be minimized. The project site can be accessed from either Gateway Road or Campbell Place. Enhanced paving is used at each vehicular entrance. The project may be constructed in two phases with the westernmost building (building 8) being built first. Both buildings will be leased by ViaSat Inc. The two buildings are similar in design and will consist primarily of painted concrete tilt-up construction with smooth wall panels, stone tile accent features, and large green tinted window openings. Each building will be accented with stone veneer siding and feature wide cantilevered metal panel-clad canopies over the main entry ways. The proposed architectural and building design achieves a visual connection to ViaSat's existing five building campus located on the west side of El Camino Real directly across from the proposed site. The design mimics the basic forms and massing, yet creates an updated look by introducing larger metal panel-clad canopies, bolder curtainwall detailing with vertical metal panel-clad columns, larger format limestone cladding and modernized paint colors. Parking for the project will be provided on-site in the form of surface parking. Most of the parking has been oriented toward the rear of the project thereby reducing the visual impact created by the parking/drive aisles from Gateway Road. The small number of parking spaces located adjacent to a public street will have a minimum three foot tall vegetation screen at the front of each parking aisle/stall to help screen the front of the cars. Located near the rear portion of the site within the parking lot will be a mechanical equipment room, trash enclosure, and satellite antenna enclosure. These structures will be designed and constructed to match the proposed office industrial buildings. The General Plan Land Use designation for the site is Planned Industrial (PI) and the Zoning for the site is Planned Industrial (P-M). The properties to the north, south, and east have similar Planned Industrial General Plan Land Use and Zoning designations, and are also located in the Bressi Ranch Master Plan area. The property to the north is developed with a Self Storage Facility, while an industrial/office building is under construction to the east, and the property to the south is vacant. The property located to the west of the project site is also designated Planned Industrial and is developed with a multi building industrial/office complex occupied by ViaSat Inc. The proposed project will be compatible with the surrounding Planned Industrial uses (industrial/office buildings). :HLCSUP 07-06 - BRESSI RANCH LOTS 10-13 July 16, 2008 Page 3 The project site is located within the boundaries of the McClellan-Palomar Airport Influence Area (AIA) and partially within the Flight Activity Zone (FAZ) and therefore is subject to the McClellan-Palomar Airport Land Use Compatibility Plan (ALUCP). The project requires the processing of a Special Use Permit as it is within Area 4 of the El Camino Real Scenic Corridor, and as such is subject to the El Camino Real Corridor Development Standards. The corridor development standards are applicable to the portion of the project fronting El Camino Real and extending to a depth of 300 feet into the site. One of the proposed buildings (Building No. 8) is located 290 feet from El Camino Real. The project also requires approval of a Planned Industrial Permit (PIP 07-06), Non-Residential Planned Development Permit (PUD 08-06), Minor Conditional Use Permit (MCUP 08-08), and a Minor Subdivision (MS 07-10). The MCUP is for multiple satellite antennas located in an equipment enclosure located in the parking lot. The PIP, PUD and MCUP are administrative permits and will be acted upon by the Planning Director subsequent to the Planning Commission's action on the Special Use Permit. Since the project consists of only three lots, the Engineering Department will be administratively processing a Minor Subdivision (MS 07-10) subsequent to the Planning Commission's action on this project. IV. ANALYSIS The proposed project is subject to the following plans, ordinances, standards, and policies: A. General Plan - Planned Industrial (PI) Land Use designation; B. Bressi Ranch Master Plan, Planning Area 3 (MP 178); C. Planned Industrial Zone (P-M), (CMC Chapter 21.34); D. Parking Ordinance, (CMC Chapter 21.44); E. Special Use Permit - Scenic Preservation Overlay Zone regulations (CMC Chapter 21.40 and the El Camino Real Corridor Development Standards); F. Conditional Use Permit Regulations (CMC Chapter 21.42); G. McClellan-Palomar Airport Land Use Compatibility Plan (ALUCP); H. Subdivision Ordinance (CMC Title 20); and I. Growth Management Ordinance (CMC Chapter 21.90) and Local Facilities Management Plan (Zone 17). The recommendation for approval of this project was developed by analyzing the project's consistency with the applicable regulations and policies. The project's compliance with each of the above regulations is discussed in the sections below. A. General Plan The project site is located within PA 3 of the Bressi Ranch Master Plan and has a General Plan Land Use designation of Planned Industrial (PI), which allows for manufacturing, warehousing, storage, research and development, office, and utility uses. The Bressi Ranch Master Plan was found to comply with the applicable General Plan Goals, Objectives and Policies. The project is in conformance with the Master Plan and is therefore also in compliance with the General Plan. The proposed office park project complies with the Elements of the General Plan as outlined in Table A below. SUP 07-06 - BRESSI July 16, 2008 Page 4 RANCIiL.OTS 10-13 TABLE A - GENERAL PLAN COMPLIANCE ELEMENT Land Use Noise Circulation Parks Public Safety USE, CLASSIFICATION, GOAL, OBJECTIVE OR PROGRAM Site is designated for industrial uses including office uses. Utilize noise standards contained in the Noise Guidelines Manual. Require new development to construct roadway improvements needed to serve proposed development. Payment of nonresidential park fee. Provision of emergency water systems and all- weather access roads. PROPOSED USES & IMPROVEMENTS Office/industrial buildings. The project is located outside the 60 dBA CNEL noise contour of the McClellan-Palomar Airport Land Use Compatibility Plan (ALUCP), and the buildings will meet the 55 dBA CNEL interior noise level standards for non- residential construction. All roadways and improvements necessary to serve the development exist, and no additional improvements are required. The project is conditioned to pay the non-residential park-in-lieu fee. All necessary water mains, fire hydrants and appurtenances must be installed prior to occupancy of any building and all-weather access roads must be maintained throughout construction. COMPLIANCE Yes Yes Yes Yes Yes B. Bressi Ranch Master Plan (MP 178) Planning Area 3 is the largest of the five industrial planning areas located within the Bressi Ranch Master Plan with a gross area of 47 acres. PA3 is bordered by Palomar Airport Road to the north, Gateway Road to the south, Innovation Way to the east, and El Camino Real to the west. According to the Master Plan's Vision and Goals, the purpose of this planning area, including its design standards and allowed uses, is to provide for office or industrial/warehouse uses. The proposed project is consistent with this goal by providing 143,100 square feet of industrial/office use in a convenient and accessible location to El Camino Real and to the Bressi Ranch community. :HL<SUP 07-06 - BRESSI RANCH LOTS 10-13 July 16, 2008 PageS Furthermore, the project is consistent with Goal 2 of the Master Plan, in that it offers residents of the Bressi Ranch community convenient pedestrian access using existing sidewalks along public streets, as well as by way of the internal pedestrian circulation system. Unless otherwise modified by the BRMP, all development within PAS shall comply with the development standards of the Planned Industrial (P-M) Zone (C.M.C. 21.34). No special Master Plan development standards were adopted for PA3. Compliance with the P-M Zone is discussed below in Section C of this report. General design guidelines were established for the development of the Bressi Ranch industrial planning areas. Guidelines include buffering from residential neighborhoods, orientation of entries and windows to the street, enhanced vehicular and pedestrian site entries, onsite plazas, and breaks in building massing. The project complies with the general design guidelines of the Bressi Ranch Master Plan by: orienting the buildings close to the street (Gateway Road) and allowing the buildings to become the dominant visual element of the site while the parking areas are moved to the sides and rear of the buildings where their visual impacts are mitigated; providing a strong pedestrian circulation system throughout the project and enhanced paving at site entries; creating a large plaza area with outdoor eating and sitting areas for employees; and limiting building massing through the use of a paint color palette that emphasizes the vertical "tower" elements which flank the primary entries, and extending the secondary entries (ends of buildings) outward creating a shadow effect. C. Planned Industrial Zone (P-M) The following Table B illustrates the development standards applicable to the site and the project's compliance with those standards. SUP 07-06 - BRESSI RANG July 16, 2008 Page 6 m.OTS 10-13 TABLE B - PLANNED INDUSTRIAL ZONE DEVELOPMENT STANDARDS Standard Building Height Building setbacks Lot coverage Employee eating areas Landscaping in parking areas Required 35 feet maximum (building height may be increased to 45 feet if building is no more than three stories and all required setbacks are increased by one foot for each foot of height increase above 35 feet). Allowed height protrusions including architectural features may be permitted up to 55 feet as long as (1) they do not function to provide usable floor space; (2) do not accommodate and/or screen building equipment; (3) do not adversely impact adjacent properties; and (4) are necessary to ensure a building's design excellence. 50 feet from El Camino Real. 35 foot average and 25 foot minimum from Gateway Road and 25 foot minimum from Campbell Place. 1 0 foot sideyard 1 0 foot rearyard Maximum 50% of lot area Minimum 300 square feet per 5,000 square feet of building. 8,580 square feet is required. 1 0% minimum Provided 45 feet to top of finished roof. 46.6 feet to top of parapet wall. 52.6 feet to top of architectural feature. Buildings are three stories tall. All required setbacks were increased by 1 0 feet to reflect increase in building height up to 45 feet. >50 feet from El Camino Real. 45 foot average and 35 foot minimum from Gateway Road and 35 foot minimum from Campbell Place. >20 foot sideyard >20 foot rearyard Overall lot coverage is 1 1%. 5,148 square feet of outdoor and 3,432 square feet of indoor eating area is provided (8,580 sq ft. total). 30% provided Comply Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes D. Parking Ordinance (CMC Chapter 21.44) Onsite parking is required at the various ratios for office and manufacturing. Pursuant to Section 21.44 of the CMC, professional office is required to provide one parking space per 250 square feet of gross floor area and the requirement for manufacturing is one parking space per 400 square feet of gross floor area. Based on the total area of professional office and manufacturing square footage proposed, 524 total parking spaces are required and a total of 540 spaces will be provided on-site. The total number of compact parking spaces allowed onsite shall not exceed SUP 07-06 - BRESSI July 16, 2008 Page? RANCIiLLOTS 10-13 25% of the total required parking spaces. The percentage of compact parking spaces proposed is 23% (120 spaces) which complies with this standard. E. S-P Scenic Preservation Overlay Zone Regulations (CMC Chapter 21.40) and El Camino Real Corridor Development Standards Special Use Permits are required whenever a site is located within a Scenic Preservation or Floodplain Overlay Zone. The proposed project is located within the El Camino Real Scenic Corridor Overlay Zone. The El Camino Real Corridor Development Standards were adopted in 1984. The intent of these standards is to maintain and enhance the appearance of the roadway by setting standards for setbacks, signs, building height, grading, and design. The document is also intended to further the goals of the Land Use and Circulation Elements of the General Plan with the objective of preserving unique city resources as they relate to highways and arterials. The proposed project is in Area 4 (College Avenue intersection to Sunfresh Rose Company) of the El Camino Real Corridor, where research facilities, business parks and the airport dominate this central portion of the city. The one common characteristic that melds the various components of this corridor is a "campus" look. The proposed project is consistent with the development standards and intent of those standards with regard to aesthetic considerations. Each of the requirements and responses to the requirements is addressed in Table C below. TABLE C - EL CAMINO REAL CORRIDOR STANDARDS COMPLIANCE STANDARD Design Theme Sidewalks Signs REQUIRED/ALLOWED Campus type As determined by staff Free standing monument, not to exceed 5' above street grade. PROVIDED The two three-story buildings have a professional office "campus type" design theme. The two building are grouped in a campus format providing headquartering opportunities to large corporations such as ViaSat Inc. A strong pedestrian corridor runs through the center of the site connecting the proposed buildings to Lot 15, another building site to be occupied by ViaSat Inc. Outdoor eating areas, patios and a large centralized plaza have been provided between the two proposed buildings promoting pedestrian interaction and activity. Existing Signs will be permitted per the Bressi Ranch Sign Program, El Camino Real Corridor Development Standards, and City's Sign Ordinance. Comply Yes Yes Yes SUP 07-06 - BRESSI RANG July 16, 2008 PageS MLLOTS 10-13 TABLE C - EL CAMINO REAL CORRIDOR STANDARDS COMPLIANCE CONTINUED STANDARD Max. Building Height Max. Grading Change Min. Setback from El Camino Real (ECR) Roof Equipment REQUIRED/ALLOWED 35' from pad grade. Increased building height to 45' with an increase in all required building setbacks. No cut or fill exceeding 15' from original. 30' (assumes above-grade structures). No roof equipment can be visible from adjacent streets. PROVIDED 45 feet to top of finished roof (with increased setbacks per CMC Section 21.34.070(1)). 46.6 feet to top of parapet wall. 52.6 feet to top of architectural feature setbacks per CMC Section 21.34.070(l)(d)). Proposed grading is within 1 5 feet of original grade as approved by CT 00- 06 (Bressi Ranch Master Plan). >30 foot setback from ECR. Most of the mechanical equipment is located within a mechanical yard located within the parking lot. Any proposed roof equipment will be located within a depressed roof well and will not be visible. Comply Yes Yes Yes Yes F. Conditional Use Permit Regulations (CMC Chapter 21.42) A Minor Conditional Use Permit (MCUP) is required for the project whenever more than one satellite antenna is proposed on a site within the P-M Zone. The project proposes multiple satellite antennas therefore the approval of a MCUP is required. The MCUP is an administrative permit and will be acted upon by the Planning Director subsequent to the Planning Commission's action on the Special Use Permit. As proposed, the project complies with CMC Section 21.53.130(e)(l) which regulates the location and installation of satellite antennas within commercial and industrial zones. The ground mounted antennas are consistent with the standards as they are located in the rear fifty percent of the lot; will not exceed twenty feet in height; will not be used as a sign or advertising; will be screened from adjacent properties; and will not be located in any required parking area. G. McClellan-Palomar Airport Land Use Compatibility Plan (ALUCP) The project site is located southeast of the McClellan-Palomar Airport. It is entirely within the Airport Influence Area (AIA) and partially within the Flight Activity Zone (FAZ). The area that is located within the FAZ is a parking lot which is located at the northern most portion of the site. No buildings are proposed within the FAZ. The AIA is generally the area in which current and future airport-related noise, overflight, safety and/or airspace protection factors may affect land uses or necessitate restrictions on use. The FAZ identifies properties that, in addition to the considerations of the AIA, should be held free of intensive development. RANClfT(SUP 07-06 - BRESSI RANCITLOTS 10-13 July 16, 2008 Page 9 The project site is well outside of the plotted airport noise contours in the Airport Land Use Compatibility Plan. Airspace protection has already been implemented for the site in that an avigation easement in favor of the airport has been recorded over the property. The site is, however, subject to limitations on intensity of use because it is partly in the FAZ and Runway Protection Zone (RPZ). As such, all assembly areas defined as Group "A" by the 2001 California Building Code are limited to a maximum occupancy of 100 persons. In addition, higher intensity uses such as hotels, motels, childcare centers, athletic clubs, public and private schools are prohibited uses within the FAZ and RPZ. These restrictions have been recorded over all of those portions of Bressi Ranch that are within the FAZ and RPZ. The project is consistent with the Bressi Ranch Master Plan and Planned Industrial zoning. The project is therefore also consistent with the Airport Land Use Compatibility Plan since all of the anticipated tenants of the office park will not fall into any of the aforementioned prohibited "intense land use" categories. The San Diego Regional Airport Authority Airport Land Use Commission reviewed the Bressi Ranch Master Plan for consistency with the McClellan- Palomar Airport Land Use Compatibility Plan (ALUCP). The Master Plan was found to be consistent with the ALUCP. Subsequent projects consistent with the Master Plan are therefore not required to be reviewed by the Airport Land Use Commission for ALUCP consistency. Furthermore, the Federal Aviation Administration (FAA) completed an aeronautical study under the provisions of the Code of Federal Regulations, Part 77 in April of 2008. The aeronautical study found that the proposed project does not exceed obstruction standards, would not be a hazard to air navigation, and no special lighting or markings on the buildings are necessary for aviation safety. H. Subdivision Ordinance The Engineering Department has reviewed the proposed Tentative Parcel Map (MS 07-10) associated with this project and has concluded that the subdivision, as conditioned, complies with all the applicable requirements of the Subdivision Map Act and the City's Subdivision Ordinance. Gateway Road and Campbell Place are publicly dedicated roadways and no additional improvements or dedication of streets is required. All infrastructure improvements including frontage and project-related roadways, and the extension of existing drainage and sewer facilities, are being installed concurrent with development. General utility, access easements and water/reclaimed water easements will be dedicated with recordation of the parcel map. The Engineering Department will act on the Minor Subdivision subsequent to the Planning Commission's action on this project. I. Growth Management Ordinance The proposed project is located within Local Facilities Management Zone 17 in the southeast quadrant of the City. The attached Local Facilities Impact Assessment Form (see Attachment No. 4) indicates that all impacts to the public facilities and services are adequately mitigated. The Zone 17 LFMP requires a park fee in the amount of $0.40 per square foot of floor area be paid prior to issuance of a building permit. A condition satisfying this requirement will be included as part of the Planned Industrial Permit (PIP 07-06). RANCITLCSUP 07-06 - BRESSI RANCtTLOTS 10-13 July 16, 2008 Page 10 V. ENVIRONMENTAL REVIEW The proposed project has been reviewed pursuant to the California Environmental Quality Act (CEQA). Staff concluded that no potentially significant impacts would result with the implementation of the project that were not previously examined and evaluated in the Final Program Environmental Impact Report for the Bressi Ranch Master Plan MP 178 (EIR 98-04), dated July 9, 2002. EIR 98-04 evaluates the potential environmental effects of the development and operation of the "Bressi Ranch Master Plan" including, analysis of traffic circulation, water quality and compliance with SB 221 and SB 610 regarding water availability, biological resources, and land use and associated actions inclusive of the proposed planning area project reviewed here. The City Council certified EIR 98-04 on July 9, 2002. At that time, CEQA Findings of Fact, a Statement of Overriding Considerations, and a Mitigation Monitoring and Reporting Program were approved. All mitigation measures contained in the adopted Mitigation Monitoring and Reporting Program from EIR 98-04 applicable to the proposed project have been completed, incorporated into the project design or are required as conditions of approval for the project. The EIR 98-04 "Findings of Fact and Statement of Overriding Considerations" applies to all subsequent projects covered by the Bressi Ranch Master Plan Final Program EIR. The proposed activities would have no effects beyond those analyzed in the program EIR, as they are a part of the program analyzed earlier. This project is within the scope of Final Program EIR 98-04 and no further CEQA compliance is required. EIR 98-04 is available at the Planning Department. ATTACHMENTS: 1. Planning Commission Resolution No. 6430 2. Location Map 3. Background Data Sheet 4. Local Facilities Impact Assessment Form 5. Disclosure Statement 6. Reduced Exhibits 7. Full Sized Exhibits "A" - "P" dated July 16, 2008 ;sS SITEMAP NOT TO SCALE Bressi Ranch Lots 10-13 SUP 07-06 BACKGROUND DATA SHEET CASE NO:SUP 07-06 CASE NAME: BRESSI RANCH LOTS 10-13 APPLICANT: Smith Consulting Architects REQUEST AND LOCATION: Request for a determination that the project is within the scope of the previously certified Bressi Ranch Master Plan Program EIR and that the Program EIR adequately describes the activity for the purposes of CEQA; and approval of a Special Use Permit (SUP 07-06) for the subdivision of 9.9 acres of land into three industrial lots, and the development of 143,100 square feet of Planned Industrial space within two three-story buildings generally located south of Palomar Airport Road, East of El Camino Real at the northwest corner of Gateway Road and Campbell Place in Local Facilities Management Zone 17. LEGAL DESCRIPTION: Lots 10-13 of Carlsbad Tract CT 02-15 Bressi Ranch, in the City of Carlsbad, County of San Diego, State of California, according to Map thereof No. 14960, filed in the Office of the County Recorder of San Diego County, February 4, 2005 APN: 213-261-01,02.03 & 04 Acres: 9.9 Proposed No. of Lots: 3 GENERAL PLAN AND ZONING Existing Land Use Designation: PI Proposed Land Use Designation: N/A Density Allowed: N/A Density Proposed: N/A Existing Zone: PG(P-MinMP 178) Proposed Zone: N/A Surrounding Zoning, General Plan and Land Use: Zoning General Plan Site PC(P-MinMP 178) North PC (P-M in MP 178) South PC (P-M in MP 178) East PC (P-M in MP 178) West C-T-Q & PM PI PI PI PI T-R & PI Current Land Use Vacant Self Storage Facility Vacant Industrial/Office Olympic Resort & Industrial/Office LOCAL COASTAL PROGRAM Coastal Zone: | | Yes IXI No Local Coastal Program Segment: N/A Within Appeal Jurisdiction: | | Yes IXI No Coastal Development Permit: [~~| Yes IXI No Local Coastal Program Amendment: F] Yes [X] No Existing LCP Land Use Designation: N/A Existing LCP Zone: N/A Proposed LCP Land Use Designation: N/A Proposed LCP Zone: N/A Revised 01/06 PUBLIC FACILITIES School District: Carlsbad Water District: Carlsbad Sewer District: Carlsbad Equivalent Dwelling Units (Sewer Capacity): 79 ENVIRONMENTAL IMPACT ASSESSMENT E3 Certified Environmental Impact Report (EIR 98-04), dated December 2001 Revised 01/06 CITY OF CARLSBAD GROWTH MANAGEMENT PROGRAM LOCAL FACILITIES IMPACTS ASSESSMENT FORM (To be Submitted with Development Application) PROJECT IDENTITY AND IMPACT ASSESSMENT: FILE NAME AND NO: BRESSI RANCH LOTS 10 - 13 - SUP 07-06 LOCAL FACILITY MANAGEMENT ZONE: 17 GENERAL PLAN: PI_ ZONING: PC (P-M in MP 178} DEVELOPER'S NAME: Smith Consulting Architects ADDRESS: 12220 El Camino Real Suite 200. San Diego, CA 92130 PHONE NO.: 858-793-4777 ASSESSOR'S PARCEL NO.: 213-261-01, 02. 03 & 04 QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): 9.9 Acres ESTIMATED COMPLETION DATE: 2009 A. City Administrative Facilities: Demand in Square Footage = N/A B. Library: Demand in Square Footage = N/A C. Wastewater Treatment Capacity (Calculate with J. Sewer) 79 EDU D. Park: Demand in Acreage = N/A E. Drainage: Demand in CFS = 17.380GPM Identify Drainage Basin = Encinas Creek (Identify master plan facilities on site plan) F. Circulation: Demand in ADT= 1,683 (Identify Trip Distribution on site plan) G. Fire: Served by Fire Station No. = #2 H. Open Space: Acreage Provided = N/A I. Schools: N/A J. Sewer: Demands in EDU 79 Identify Sub Basin = 17A (Identify trunk line(s) impacted on site plan) K. Water: Average Demand in GPD = 32.858 (Peak = 67 GPM) City of Carlsbad Planning Department DISCLOSURE STATEMENT Applicant's statement or disclosure of certain ownership interests on ail applications which will require discretionary action on the part of the City Council or any appointed Board. Commission or Committee. The following information MUST be disclosed at the time of application submittal. Your project cannot be reviewed untH this information is completed. Please print. Note: Person is defined as "Any individual, firm, co-partnership, joint venture, association, social club, fraternal organization, corporation, estate, trust, receiver, syndicate, In this and any other county, city and county, city municipality, distn'ct or other political subdivision or any other group or combination acting as a unit" Agents may sign this document; however, the legal name and entity of the applicant and property owner must be provided below. 1. APPLICANT (Not the applicant's agent) Provide the COMPLETE. LEGAL names and addresses of ALL persons having a financial interest in the application. If the applicant includes a corporation or partnership, include the names, title, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a pubticlv-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary/) Person_ Title v'i Address %Av\ D>i£<ic i <-t\2. OWNER (Not the owrteffe agent) Provide the COMPLETE. LEGAL names and addresses of ALL persons having any ownership interest in the property involved. Also, provide the nature of the legal ownership (i.e. partnership, tenants in common, non-profit, corporation, etc.). If the ownership includes a corporation or partnership, include the names, title, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person Title Address Corp/Part. -*ttte- in Address ' , I i &b[ * fy *- e *>' P** c-f- uiVtW J H ye rhvlin . H i i^. AT. 1635 ftraday Avenue • Cartebad. CA 92006-7314 • (760) 602-4600 • FAX (760) 602-8559 « www.cl.eartsbad.ca.us t» 3. NON-PROFIT ORGANIZATION OR TRUST If any person identified pursuant to (1) or (2) above is a nonprofit organization or a trust, list the names and addresses of ANY person serving as an officer or director of the non-profit organization or as trustee or beneficiary of the. Non Profit/Trust V I A Non Profit/Trust to I A- Title _ Title Address_ __ _ _ Address 4. Have you had more than $500 worth of business transacted with any member of City staff, Boards, Commissions, Committees and/or Council within the past twelve (12) months? Yes No If yes, please indicate person(s}:_ NOTE: Attach additional sheets if necessary. I certify that all the above information is true and correct to the best of my knowledge. , / > of owner/date Signature of applicant/date Print or type name of owner Print or type name of applicant Signature of owner/applicant's agent if applicable/date Print or type name of owner/applicant's agent H:AOM!N\COUNTER\DISCLOSURE STATEMENT 12/06 Page 2 Of 2 LEGAL DESCRIPTION LOTS e-ra of <: saw &* so. ST^ ^9L5BiD tiwct ct e;-» 69Essi cine" iw THE ctrr of cAiJiseap. ceiM'' w' APN Lot 10 Loll2 Nets. P^S*-P.^<. diiuwtga KM ~~"~* 213-261-Ot LolM 213-261-02 213-261-03 Lot 13 213-261-04 si tMi a«c* 'or <*f iMB-blij er Isrgs graft et psopte («we t»*> «O •"j g>cup>> * 1«b>« to-* - «»-u« Ea-»t ««(!*•-•«>. PROJECT DATA .iwm™* pup) (MCTIP) E*»aJ!L MCUP 08-08 PIP 07-06 SUP 07-06 MS 07-10 PUD 08-06 PROJECT DIRECTORY SHEET INDEX i' SITE MCtKXJ i>lp EN PROJECT SITE CO O o<a> If sis 3 .C £ED Planning SUnvttal 12 13.07 Planning Resubmlttal 04.M.OB Pl»ml^! Resubmittal 05.27.0S PtanChed. Pern* Set Conrtnjction Sel D™^EDSrte OS.27.08 Sheet Number A1 MCUP _J>(W>8 PIP 07-06 SUP 07-06 MS 07-10 PUD 08-O6 CMipBEtbPtAGE- l-VYV^HH™ \m ft ^:i±HtfliKBtfriltio C/j --o <O)_c .* — r"^5 COc S sd **"°-ts< 6 s ifi co iSili CO 5 I 1cd(£ A A_ Planning SutmtOl 12.13.07 Ptirrtng Rwubmlttst 04.D4.DB Planning RKLfcnAtal 05,27.08 PtanOedt PemrtSet A2 MCUP 08-08 PIP 07-06 SUP 07-06 MS 07-10 PUD 08-06 eAMPBEttPUGE- \ PJLCT1AB JgFCBTP^j 1 SITE PLAN LEGEND o < CO COc CO lllll filli" to 5 Ptawi"^ Sutmitt*! 17.13.07 Ptortng ReiubmNtal 04.M.08 Planning ResubmitM 05.27.08 HanO«di Permit Set Construction Set Sheet Number A3 ELCAMINOREAL -f ^ =H^ Vf • 'v^x'-^^H^^--"—' II _„ i ': \, GENERATOR, MECHANICAL YARD, AND TRASH ENCLOSURE PLAN SOUTH \ >t GENERATOR, MECHANICAL YARD, AND TRASH ENCLOSURE ELEVATIONS CD ID 00c g , £ I sifi E Ssi" CO IllII to 5 S3 teue Dates PUinlr^ Subm'frf 12.13.07 Planning R«ubmltW 04 .M.OB PbnninK RenAmind 05,27.08 PtanChedt A4 MCUP __OJbP8_ PIP 07-06 SUP __OJM>6__ MS 07-10 PUD OB-06 O <D) 13CO Urn •— -EE p BUILDING 8 - SECOND AND THIRD FLOOR PLAN~~~ to 5 'in(/) I A Pbrwm^S^jNniftit 12.13.07 Placing Ftesubmitta! W.04.08 Ptoviry ReubmMal 05,27.09 PUnOwt Ptrrr^S^ Constrwtbn Set OwckBy Drawn By A5 \—rsn BUILDING 8 - WEST ELEVATION FINISH LEGEND I S-l I ir^4- UGOS RUE UUtSTONE. . PAWL OC GOID. fTTI PAINTCD COWCffErt: RfAJtE 0. 78S3M '(lUTIED' |_*J HOOT LNE (OASMTD). | 91 I FVTWt SKMAGC IOC* ION - SEPARATE PtRMT I I . . I muD \T»EAiinf GIKEN TOCW cuss wm winL*iU wwow muc$ wtrwsHtn WAUPAGNE two. rTcTl PAW7TD MQUOK MtlAL DOOR, COlOfi 10 MATCH nHJH PKFWSIED «T*I inwus. COLOR TO HATCH f MCUP 08-08 r»W A1.UWWU WOW PIP Q7-Q8 -SUP 07-06 MS 07-10 PUD 06-06 CO I s" < O)c: COcz SU A CO O eCD stieivn.nins SEEL. c* wens AMP SWUBS imLtdraBT•Lie: Pbrrtns Submitttl 12.13.07 PlsnrJng Resubminal CM. 04. 08 Planr** R«ubmittal 05.37 .08 Check By Drawn By ELEVATION VIEW FROM EL CAMINO REAL Sheet Number A6 KJTjfCjM^Kpt^f-.. BUILDING 9 - SECOND AND THIRD FLOOR PLAN ' "-*!' MCUP 08-08 PIP _O74G_ SUP 07-06 MS _Q7:10 PUD 08-06 CO 1 § o H o < O) O)co PlanJngSubmitlal 13.13.07 Plimtng RMUbmta! 04.04.0G P1arw*s Re<iityn«ml 05.17.OB PlanOeck FeTmilS« A7 CED—' BUILDING 9 - SOUTH ELEVATION FINISH LEGEND PsTl re-rtf IXXS BWE \KSTOME. r-jrn METAl PAKtl CLAD CANOPY »TO COUIMKSUtLJ CHAMPAGNE eao. HP-' I PAJNTID CONCRETE FROJtE O. 1B5JU 'ail I PAWttD CWCtETt FRAZIE O. 3S54D "WOOD ASH* TOOT LKE (DASHED). ) ruiwt SWAGE LOCAHON - ETPABAIE PEPUTT Ptaw MCUP 08-06 PIP 07-06 SUP _P7J>6_ MS 07-10 PUD 08-06 j^ HO | ""WWTEO MOUOW UtTAL KX». CO.OH TO HATCH P-l, QU1¥ I PBEHMigitD WTAL IOW»S COM TO WATCH P-l. AW . __PANSPARDJCY, CCUJfl T( O O O) COczoo _C llill CO5 Ii a: 1£ Planning Sbbmiltal 12.13.07 Manning Pesi6mitta( W-M-OB Pttnrrfnj. RnubmHTal 05.27,05 PtmO*d( P«mitS« Conrtmrtbn Set A8 ~o"piS»PE I BUILDING 9 - ROOF PLAN Pi52pFl MCUP 08-08 PIP 07-06 SUP 07-06 MS 07-10 PUD 08-06 CO J S aI ' & rj <•> I 8^CD 3 °^^4=! »|.&RR•^ S » osff•g II5SS D) C CO Si ^i!CO li OI•g£ 12,1307 a) 04.04.08 tal 05.77,08 A9 Landscape Site Plan CO t3CD CJ)_c —- CO CoQ s a SR6 5** S| I--W- /"IT- AAAA' "A "" Check By Drawn By Sate Job Number 5*« Number L1