Loading...
HomeMy WebLinkAboutSUP 13-03; Viasat Expansion; Special Use Permit (SUP) The City of Carlsbad Planning Division A REPORT TO THE PLANNING COMMISSION Item No. Application complete date: October 24, 2013 P.C. AGENDA OF: January 15, 2014 Project Planner: Greg Fisher Project Engineer: David Rick SUBJECT: SUP 13-03/SUP 98-03(C)/SDP 13-05/PUD 13-09/MCUP 13-13/MS 13-07 – VIASAT EXPANSION – Request for a determination that the project is within the scope of the previously certified Bressi Ranch Master Plan Program EIR and that the Program EIR adequately describes the activity for the purposes of CEQA; and approval of a Scenic Corridor Special Use Permit, Scenic Corridor Special Use Permit Amendment, Minor Site Development Plan, Non-Residential Planned Development Permit, Minor Conditional Use Permit, and Tentative Parcel Map for the reconfiguration of four industrial lots on 9.9 acres of land, the development of 143,100 square feet of planned industrial/office and manufacturing space within two, three-story buildings, a 3,995 SF satellite antenna enclosure, a 5,386 SF mechanical and trash enclosure, at-grade parking and a large centralized plaza. The project also includes the installation of a pedestrian traffic signal with cross walk, a bus stop with turnout, miscellaneous improvements within the El Camino Real public right-of-way, and minor modifications to ViaSat’s existing campus on property generally located south of Palomar Airport Road, on both the east and west sides of El Camino Real, just north of Gateway Road in Local Facilities Management Zone 17. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7030 APPROVING Scenic Corridor Special Use Permit (SUP 13-03), Scenic Corridor Special Use Permit Amendment (SUP 98-03(C), Minor Site Development Plan (SDP 13-05), Non-Residential Planned Unit Permit (PUD 13-09), Minor Conditional Use Permit (MCUP 13-13) and Tentative Parcel Map (MS 13-07), based on the findings and subject to the conditions contained therein. II. PROJECT DESCRIPTION AND BACKGROUND Project Description: A) ViaSat Expansion Buildings 10 & 11; Pedestrian Traffic Signal; Bus Stop; Miscellaneous Improvements within the El Camino Real public right-of-way This portion of the proposed project re-subdivides a four-lot, 9.9 acre site located within Planning Area 3 (PA3) of the Bressi Ranch Master Plan (BRMP) at the northeast corner of El Camino Real and Gateway Road into four industrial parcels. Bressi Ranch Lots 10 - 13 of CT 00-06 will be reconfigured into parcels 1-4 to accommodate two proposed three story buildings with 527 parking spaces, site landscaping, large central plaza area, a mechanical equipment/trash enclosure and a satellite antenna enclosure. Building No. 10, the larger of the two proposed industrial/office buildings, will be located on Parcel 1. Parcel 2 consists mostly of a parking lot and a large central plaza area. Parcel 3 consists of additional parking and 2 SUP 13-03/SUP 98-03(C)/SDP 13-05/PUD 13-09/MCUP 13-13/MS 13-07 – VIASAT EXPANSION January 15, 2014 Page 2 a satellite antenna enclosure, mechanical equipment enclosure, and trash enclosure. The second building, Building No. 11, and additional parking will be located on Parcel 4. The 9.9 acre project site has been previously mass graded into four existing development pads. The project is now proposing to re-grade the site in order to accommodate a comprehensively designed “campus type” project. Proposed grading quantities include approximately 17,500 cubic yards of cut, 14,040 cubic yards of fill, and 3,460 cubic yards of net export. The two proposed industrial buildings are three-stories tall and are 77,400 square feet (Parcel 1) and 65,700 square feet (Parcel 4) in size. The buildings will contain a combined 111,042 square feet of professional office space and 32,058 square feet of manufacturing space. There will be a total building area of 143,100 square feet. There will be two additional buildings including a 5,386 SF mechanical equipment and trash enclosure (5,386 SF) and satellite antenna enclosure (3,995 SF). The two office/manufacturing buildings will be positioned within 45 feet of Gateway Road consistent with the BRMP Design Criteria with a large centralized plaza area provided between the two buildings, becoming a dominant visual element of the site. Building 10 is also located near the corner of El Camino Real and Gateway Road providing a visual connection to ViaSat’s existing campus (Building 1) located on the west side of El Camino Real. A deviation from the El Camino Real Corridor Development Standards is proposed to allow for a 10 foot increase in building height for Building 10. The deviation will allow Building 10 to be constructed to its proposed building height of 45 feet similar to Building 11. The findings to support the deviation were able to be made and are discussed below within Section F of the staff report. The two buildings are similar in design and will consist primarily of painted (beige tones) concrete tilt-up construction with smooth wall panels, stone tile accent features, and large green tinted window openings. Each building will be accented with stone veneer tile and feature wide cantilevered metal panel-clad canopies over the main entry ways. Parapet walls varying in height and up to 46.6’ tall and vertical tower architectural elements (52.6’ tall) flanking the main entries have been integrated into the building design to help reduce massing and create a visual interest by varying roof heights. The proposed architectural and building design achieves a visual connection to ViaSat’s existing five building campus located on the west side of El Camino Real directly across from the proposed site. The design mimics the basic forms and massing of the original campus buildings, yet creates an updated look by introducing larger metal panel-clad canopies with clad columns, introduction of curtain wall glazing at stair enclosures, large formal limestone cladding and modernized paint colors. Parking (527 spaces) for the project will be provided on-site in the form of surface parking. Most of the parking has been oriented toward the rear of the project (relative to Gateway Road) thereby reducing the visual impact created by the parking/drive aisles from Gateway Road. The small number of parking spaces located adjacent to a public street will have a minimum three foot tall vegetation screen and landscape berms at the front of each parking aisle/stall to help screen the front of the cars. The project site can be accessed from either Gateway Road or Campbell Place. Enhanced paving is used at each vehicular entrance. The project may be constructed in two phases with the western-most building (Building 10) being built first. Both buildings will be leased by ViaSat Inc. Located near the rear portion of the site (relative to Gateway Road) within the parking lot will be a 12.5’ tall, 5,386 SF mechanical equipment room and trash enclosure, and a 17’ tall, 3,995 SF satellite antenna enclosure. These structures will be designed and constructed to match the proposed office industrial buildings. SUP 13-03/SUP 98-03(C)/SDP 13-05/PUD 13-09/MCUP 13-13/MS 13-07 – VIASAT EXPANSION January 15, 2014 Page 3 In addition to the proposed on-site improvements discussed above, the following improvements are proposed in the Gateway Road and El Camino Real right-of-way:  a signalized cross walk across El Camino Real at Gateway Road with an added opening in the raised median and enhanced landscape, pavement and architectural features;  the addition of a raised median shaped to further clarify and force right-in and right-out vehicle turns at the Gateway Road/El Camino Real intersection; and  a bus stop and turnout on southbound El Camino Real. The pedestrian cross walk will link ViaSat’s main campus located at 6155 El Camino Real (west side of ECR) to the newly proposed Bressi Ranch campus. The improvements include decorative concrete flanking each side of the 20-foot wide cross walk, a median trellis structure and landscaping within the median and at each end of the crosswalk. The pedestrian signal will interconnect with the traffic signal at the intersection of Palomar Airport Road and El Camino Real to allow controlled phasing of the signals to minimize conflicts between vehicles and pedestrians. The signalized crosswalk design is conceptual and will require approval of detailed improvement plans subject to the approval of the City Engineer. The transportation division has reviewed the plans and supports the conceptual design. The proposed bus stop for southbound El Camino Real will replace the bus stop that, according to North County Transit District staff, was removed when the Lowe’s shopping center was recently constructed at the southwest corner of EL Camino Real and Palomar Airport Road. The bus stop will front the ViaSat campus just north of the proposed crosswalk and also provide convenient access to the Lowe’s shopping center. A turnout will be added as well as benches and shade trellis. The applicant has been in contact with North County Transit District to develop an acceptable design at the proposed location. Project Description: B) Modifications to ViaSat’s existing campus (Parcel 1) The second component of the project consists of minor modifications to ViaSat’s existing campus located on the west side of El Camino Real (Parcel 1/Building 1) which is one of the five parcels/buildings that make up ViaSat’s main campus. This modification requires an amendment to SUP 98-03. The existing site plan for Parcel 1 will be modified to create a new accessible connection from Building 1’s main entry to El Camino Real. The accessible connection path will include enhanced paving, a shade trellis, and accent landscape materials. Several parking spaces will also be relocated to accommodate the accessible connection path. The proposed accessible connection will provide a visual as well as physical link between ViaSat’s main campus and proposed Bressi Ranch Buildings 10 & 11. Background: The applicant received approval from the Planning Commission on February 18, 2009 for a similar project to what is being proposed with the exception of the pedestrian traffic signal, bus stop turn out and minor modifications to the existing campus. That project was never constructed. Although that project is still valid, a new application was submitted to reflect the current project description. Table A below includes the General Plan designations, zoning and current land uses of the project site and surrounding properties. SUP 13-03/SUP 98-03(C)/SDP 13-05/PUD 13-09/MCUP 13-13/MS 13-07 – VIASAT EXPANSION January 15, 2014 Page 4 TABLE A Location General Plan Designation Zoning Current Land Use Site PI P-M Vacant North PI P-M Storage Facility South PI P-M Vacant East PI P-M Industrial/Office West PI P-M Industrial/Office III. ANALYSIS The proposed project is subject to the following plans, ordinances, standards, and policies: A. General Plan – Planned Industrial (PI) Land Use designation; B. Bressi Ranch Master Plan, Planning Area 3 (MP 178); C. Planned Industrial Zone (P-M), (CMC Chapter 21.34); D. Parking Ordinance, (CMC Chapter 21.44); E. Non-Residential Planned Developments (CMC Chapter 21.47); F. Special Use Permit - Scenic Preservation Overlay Zone regulations (CMC Chapter 21.40 and the El Camino Real Corridor Development Standards); G. Site Development Plan findings for the Qualified Development Overlay Zone (CMC Chapter 21.06); H. Conditional Use Permit Regulations (CMC Chapter 21.42); I. McClellan-Palomar Airport Land Use Compatibility Plan (ALUCP); J. Subdivision Ordinance (CMC Title 20); and K. Growth Management Ordinance (CMC Chapter 21.90) and Local Facilities Management Plan (Zone 17). The recommendation for approval of this project was developed by analyzing the project’s consistency with the applicable regulations and policies. The project’s compliance with each of the above regulations is discussed in the sections below. A. General Plan The project site is located within PA 3 of the Bressi Ranch Master Plan and has a General Plan Land Use designation of Planned Industrial (PI), which allows for manufacturing, warehousing, storage, research and development, office, and utility uses. The Bressi Ranch Master Plan was found to comply with the applicable General Plan Goals, Objectives and Policies. The project is in conformance with the Master Plan and is therefore also in compliance with the General Plan. The proposed office park project complies with the Elements of the General Plan as outlined in Table B below. SUP 13-03/SUP 98-03(C)/SDP 13-05/PUD 13-09/MCUP 13-13/MS 13-07 – VIASAT EXPANSION January 15, 2014 Page 5 TABLE B – GENERAL PLAN COMPLIANCE ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLIANCE Land Use Site is designated for industrial uses including office uses. Office/industrial buildings. Yes Noise Utilize noise standards contained in the Noise Guidelines Manual. The project is located outside of the 60 dBA CNEL noise contour of the McClellan- Palomar Airport Land Use Compatibility Plan (ALUCP), and the buildings will meet the 55 dBA CNEL interior noise level standards for non- residential construction. Yes Circulation Require new development to construct roadway improvements needed to serve proposed development. Promote, encourage, and accommodate a variety of transportation modes as alternatives to the automobile. All roadways and improvements necessary to serve the development exist, and no additional improvements are required. The project proposes a pedestrian traffic signal with cross walk at the intersection of El Camino Real and Gateway Road. The proposed infrastructure will provide a physical link between ViaSat’s main campus and proposed Bressi Ranch Buildings 10 & 11 accommodating pedestrians, bicycles, and other non- automobile modes of transportation. Yes Parks Payment of nonresidential park fee. The project is conditioned to pay the non-residential park- in-lieu fee. Yes Public Safety Provision of emergency water systems and all- weather access roads. All necessary water mains, fire hydrants and appurtenances shall be installed prior to occupancy of any building and all- weather access roads shall be maintained throughout construction. Yes SUP 13-03/SUP 98-03(C)/SDP 13-05/PUD 13-09/MCUP 13-13/MS 13-07 – VIASAT EXPANSION January 15, 2014 Page 6 B. Bressi Ranch Master Plan (MP 178) Planning Area 3 is the largest of the five industrial planning areas located within the Bressi Ranch Master Plan with a gross area of 47 acres. PA3 is bordered by Palomar Airport Road to the north, Gateway Road to the south, Innovation Way to the east, and El Camino Real to the west. According to the Master Plan’s Vision and Goals, the purpose of this planning area, including its design standards and allowed uses, is to provide for office or industrial/warehouse uses. The proposed project is consistent with this goal by providing 143,100 square feet of industrial/office use and associated satellite antenna and mechanical equipment/trash enclosures in a convenient and accessible location to El Camino Real and to the Bressi Ranch community. Furthermore, the project is consistent with Goal 2 of the Master Plan, in that it offers residents of the Bressi Ranch community convenient pedestrian access using existing sidewalks along public streets, as well as by way of the internal pedestrian circulation system. Unless otherwise modified by the BRMP, all development within PA3 shall comply with the development standards of the Planned Industrial (P-M) Zone (C.M.C. 21.34). No special Master Plan development standards were adopted for PA3. Compliance with the P-M Zone is discussed below in Section C of this report. General design guidelines were established for the development of the Bressi Ranch industrial planning areas. Guidelines include buffering from residential neighborhoods, orientation of entries and windows to the street, enhanced vehicular and pedestrian site entries, onsite plazas, and breaks in building massing. The project complies with the general design guidelines of the Bressi Ranch Master Plan by: orienting the buildings close to the street (Gateway Road) and allowing the buildings to become the dominant visual element of the site while most of the parking areas are moved to the sides and rear of the buildings where their visual impacts are mitigated; providing a strong pedestrian circulation system throughout the project including a crosswalk connection to ViaSat’s existing campus (Parcel 1); providing enhanced decorative paving at each site entry; creating a large plaza area with outdoor eating and sitting areas for employees; and limiting building massing through the use of a paint color palette that emphasizes the vertical “tower” elements which flank the primary entries, and extending the secondary entries (ends of buildings) outward creating a shadow effect. C. Planned Industrial Zone (P-M) The following Table C illustrates the development standards applicable to the site and the project’s compliance with those standards. SUP 13-03/SUP 98-03(C)/SDP 13-05/PUD 13-09/MCUP 13-13/MS 13-07 – VIASAT EXPANSION January 15, 2014 Page 7 TABLE C - PLANNED INDUSTRIAL ZONE DEVELOPMENT STANDARDS Standard Required Provided Comply Building Height 35 feet maximum (building height may be increased to 45 feet through the approval of a Minor Site Development Plan if building is no more than three stories and all required setbacks are increased by one foot for each foot of height increase above 35 feet). Allowed height protrusions including parapets and architectural features may be permitted up to 55 feet as long as (1) they do not function to provide usable floor space; (2) do not accommodate and/or screen building equipment; (3) do not adversely impact adjacent properties; and (4) are necessary to ensure a building’s design excellence. 45 feet to top of finished roof. 46.6 feet to top of parapet wall. 52.6 feet to top of architectural feature. Buildings are three stories tall. All required setbacks were increased by 10 feet to reflect increase in building height up to 45 feet. The architectural features and parapet: (1) do not provide useable floor space, (2) do not accommodate or screen building equipment (3) do not adversely impact adjacent properties and (4) are necessary to ensure the building’s design excellence. Yes Yes Yes Building setbacks 50 feet from El Camino Real. 35 foot average and 25 foot minimum from Gateway Road and Campbell Place. 10 foot side yard 10 foot rear yard 105 feet from El Camino Real. 45 foot average and 35 foot minimum from Gateway Road and Campbell Place. >20 foot side yard >20 foot rear yard Yes Yes Yes Yes Lot coverage Maximum 50% of lot area Overall lot coverage is 11%. Yes Employee eating areas Minimum 300 square feet per 5,000 square feet of building. 8,586 square feet is required. 5,340 square feet of outdoor and 3,282 square feet of indoor eating area is provided (8,622 sq. ft. total). Yes Landscaping in parking areas 10% minimum 30% provided Yes D. Parking Ordinance (CMC Chapter 21.44) Onsite parking is required at the various ratios for office and manufacturing. Pursuant to Section 21.44 of the CMC, professional office is required to provide one parking space per 250 square feet of gross floor area and the requirement for manufacturing is one parking space per 400 square feet of gross floor area. Based on the total area of professional office (111,042 SF) and manufacturing (32,058 SF) proposed, 525 total parking spaces are required and a total of 527 spaces will be provided on-site. The total number of compact parking spaces allowed onsite shall not exceed 25% of the total required parking spaces. The percentage of compact parking spaces proposed is 24.8% (130 spaces) which complies with this standard. SUP 13-03/SUP 98-03(C)/SDP 13-05/PUD 13-09/MCUP 13-13/MS 13-07 – VIASAT EXPANSION January 15, 2014 Page 8 E. Non-Residential Planned Development (CMC Chapter 21.47) The intent and purpose of the Non-Residential Planned Development regulations are to: 1. Ensure that non-residential projects develop in accordance with the general plan and applicable specific and master plans; 2. Provide for non-residential projects which are compatible with surrounding developments; 3. Provide a method to approve separate ownership of units within multiple-unit buildings or upon a parcel of land containing more than one unit; 4. Provide a method to approve separate ownership of planned unit development lots; and 5. Provide for conversion of existing developments to condominiums. The proposal to create separate ownership planned unit development lots necessitates that a Non- Residential Planned Development Permit be processed to supplement the proposed Tentative Parcel Map (MS 13-07). The four non-residential planned unit development lots will share common driveway access, parking areas, landscaping, and outdoor eating areas, which will be commonly maintained by an owners association. The project complies with the General Plan, Zoning and Planning Area 3 of the Bressi Ranch Master Plan as discussed above. The subdivision, by nature of the industrial/office/manufacturing uses, will not be detrimental to the health, safety or welfare of the surrounding occupants of the area and the industrial/office/manufacturing use is similar to adjacent uses. No modifications to the development standards are required to protect public health, safety, and general welfare. There are no size or configuration standards for non-residential planned development units beyond those imposed as a part of the permit, except that they shall be reasonable as to the intended use and relation to the project. F. S-P Scenic Preservation Overlay Zone Regulations (CMC Chapter 21.40) and El Camino Real Corridor Development Standards Special Use Permits are required whenever a site is located within a Scenic Preservation or Floodplain Overlay Zone. The proposed project is located within the El Camino Real Scenic Corridor Overlay Zone. The El Camino Real Corridor Development Standards were adopted in 1984. The intent of these standards is to maintain and enhance the appearance of the roadway by setting standards for setbacks, signs, building height, grading, and design. The document is also intended to further the goals of the Land Use and Circulation Elements of the General Plan with the objective of preserving unique city resources as they relate to highways and arterials. The proposed project is in Area 4 (College Avenue intersection to Sunfresh Rose Company (Cassia Road)) of the El Camino Real Corridor, where research facilities, business parks and the airport dominate this central portion of the city. The one common characteristic that melds the various components of this corridor is a “campus” look. The proposed project with the exception of Building 10’s building height is consistent with the development standards and intent of those standards with regard to aesthetic considerations. Each of the requirements and responses to the requirements are addressed in Table D below. SUP 13-03/SUP 98-03(C)/SDP 13-05/PUD 13-09/MCUP 13-13/MS 13-07 – VIASAT EXPANSION January 15, 2014 Page 9 TABLE D – EL CAMINO REAL CORRIDOR STANDARDS COMPLIANCE STANDARD REQUIRED/ALLOWED PROVIDED Comply Design Theme Campus type The two, three-story buildings have a professional office “campus type” design theme. The two building are grouped in a campus format providing headquartering opportunities to large corporations such as ViaSat Inc. The proposed architectural and building design achieves a visual connection to ViaSat’s existing five building campus located on the west side of El Camino Real directly across from the proposed site. In addition, a strong pedestrian corridor runs through the center of the site connecting the proposed buildings to Lot 15, another building site occupied by ViaSat Inc. Outdoor eating areas, patios and a large centralized plaza have been provided between the two proposed buildings promoting pedestrian interaction and activity. Yes Sidewalks As determined by staff Existing Yes Signs Free standing monument, not to exceed 5’ above street grade. Signs will be permitted per the Bressi Ranch Sign Program, El Camino Real Corridor Development Standards, and City’s Sign Ordinance. Yes Max. Building Height 35' from pad grade. *45 feet to top of finished roof (with increased setbacks per CMC Section 21.34.070(A)(1) and El Camino Real Corridor Standards deviation findings). 46.6 feet to top of parapet wall and 52.6 feet to top of architectural feature per CMC Section 21.34.070(A)(2)(a)(ii). Yes Max. Grading Change No cut or fill exceeding 15' from original. Proposed grading is within 15 feet of original grade as approved by CT 00-06 (Bressi Ranch Master Plan). Yes Min. Setback from El Camino Real (ECR) 30' (assumes above- grade structures). 105 foot setback from ECR. Yes Roof Equipment No roof equipment can be visible from adjacent streets. Most of the mechanical equipment is located within a mechanical yard located within the parking lot. Any proposed roof equipment will be located within a depressed roof well and will not be visible. Yes *When practical application of the El Camino Real Corridor Standards is not feasible and not in the best interest of good planning practices, deviations to the standards may be approved by the Planning Commission. The required findings to allow a deviation in building height for Building 10 can be made and are contained within Planning Commission Resolution No. 7030. SUP 13-03/SUP 98-03(C)/SDP 13-05/PUD 13-09/MCUP 13-13/MS 13-07 – VIASAT EXPANSION January 15, 2014 Page 10 G. Qualified Development Overlay Zone (CMC Chapter 21.06) Pursuant to Sections 21.34.050 and 21.34.070 (2)(a) of the CMC, a Minor Site Development Plan is required to be processed for this office/industrial project pursuant to Chapter 21.06.030, the Qualified Development Overlay Zone, of the Carlsbad Municipal Code. No building permit or other entitlement shall be issued for any use in the Q zone unless there is a valid site development plan approved for the property. The required findings and justifications for each are contained in Planning Commission Resolution No. 7030. This section summarizes the necessary findings and support for each. The requested development is consistent with the Planned Industrial (PI) Land Use designation and the Bressi Ranch Master Plan as demonstrated in sections “A” & “B” of this staff report, and all applicable provisions of Title 21 except for building height which is addressed in section “E” of this staff report. The requested use is properly related to the site, surroundings and environmental setting and will not be detrimental to existing development as the project design complies with requirements of the Bressi Ranch Master Plan as demonstrated in section “B” of this report. All required building and landscape setbacks have been incorporated into the project design. The site is also adequate in size and shape to accommodate the use as all other applicable code requirements have been met, with the exception of the height of Building 10, for which findings to support this deviation can be made (See PC Resolution No. 7030) including the parking and building coverage standards. Approximately 14 percent of the parking area will be landscaped while only 10 percent is required. A total of 30 percent of the site will be landscaped. Building coverage is proposed at 11 percent of the site area. All features necessary to adjust the use to existing and permitted future uses will be provided. Landscaping and earth berm techniques are proposed to screen the parking areas. Adequate vehicle circulation has been provided to accommodate safety and truck turning movements. Access to the site will be provided by three separate driveways onto Gateway Road and Campbell Place. The existing street system is adequate to handle all traffic generated by the proposed use. The proposed use is consistent with the uses analyzed in the circulation analysis prepared for Program EIR 98-04 for the Bressi Rancho Master Plan. H. Conditional Use Permit Regulations (CMC Chapter 21.42) A Minor Conditional Use Permit (MCUP) is required for the project whenever more than one satellite antenna is proposed on a site within the P-M Zone. The project proposes multiple satellite antennas therefore the approval of a MCUP is required. As proposed, the project complies with CMC Section 21.53.140(e)(1) which regulates the location and installation of satellite antennas within commercial and industrial zones. The ground mounted antennas are consistent with the standards as they are located in a 17’ tall, 3,995 SF satellite enclosure located in the rear fifty percent of the lot; will not exceed twenty feet in height; will not be used as a sign or advertising; will be screened from adjacent properties; and will not be located in any required parking area. I. McClellan-Palomar Airport Land Use Compatibility Plan (ALUCP) The project site is located southeast of the McClellan-Palomar Airport. It is entirely within the Airport Influence Area (AIA) and partially within the Flight Activity Zone (FAZ). The area that is located within the FAZ is a parking lot which is located at the northern most portion of the site. No buildings are proposed within the FAZ. The AIA is generally the area in which current and future airport-related noise, SUP 13-03/SUP 98-03(C)/SDP 13-05/PUD 13-09/MCUP 13-13/MS 13-07 – VIASAT EXPANSION January 15, 2014 Page 11 overflight, safety and/or airspace protection factors may affect land uses or necessitate restrictions on use. The FAZ identifies properties that, in addition to the considerations of the AIA, should be held free of intensive development. The project site is well outside of the plotted airport noise contours in the Airport Land Use Compatibility Plan. Airspace protection has already been implemented for the site in that an avigation easement in favor of the airport has been recorded over the property. The site is, however, subject to limitations on intensity of use because it is partly in the FAZ and Runway Protection Zone (RPZ). As such, all assembly areas defined as Group “A” by the 2001 California Building Code are limited to a maximum occupancy of 100 persons. In addition, higher intensity uses such as hotels, motels, childcare centers, athletic clubs, public and private schools are prohibited uses within the FAZ and RPZ. These restrictions have been recorded over all of those portions of Bressi Ranch that are within the FAZ and RPZ. The project is consistent with the Bressi Ranch Master Plan and Planned Industrial zoning. The project is therefore also consistent with the Airport Land Use Compatibility Plan since all of the anticipated tenants of the office park will not fall into any of the aforementioned prohibited “intense land use” categories. The San Diego Regional Airport Authority Airport Land Use Commission reviewed the Bressi Ranch Master Plan for consistency with the McClellan-Palomar Airport Land Use Compatibility Plan (ALUCP). The Master Plan was found to be consistent with the ALUCP. Subsequent projects consistent with the Master Plan are therefore not required to be reviewed by the Airport Land Use Commission for ALUCP consistency. Furthermore, the Federal Aviation Administration (FAA) completed an aeronautical study under the provisions of the Code of Federal Regulations, Part 77 in December of 2013. The aeronautical study found that the proposed project does not exceed obstruction standards, would not be a hazard to air navigation, and no special lighting or markings on the buildings are necessary for aviation safety. J. Subdivision Ordinance The Land Development Engineering Division has reviewed the proposed Tentative Parcel Map and has concluded that the subdivision, as conditioned, complies with all the applicable requirements of the Subdivision Map Act and the City’s Subdivision Ordinance. Gateway Road and Campbell Place are publicly dedicated roadways and no additional improvements or dedication of streets is required. All utility infrastructure is being installed concurrent with development. Public water and utility easements will be dedicated on the parcel map. K. Growth Management Ordinance and Local Facilities Management Plan The proposed project is subject to the provisions of the Growth Management Program, as contained in Chapter 21.90 of the Zoning Ordinance and the approved Zone 17 Local Facilities Management Plan (LFMP). The proposed project public facility demand is in compliance with the public facility assumptions of the Zone 17 LFMP. The impacts to public facilities created by the project, and its compliance with the adopted performance standards are summarized in Table “E” below. The Zone 17 LFMP requires a $.40/square foot park impact fee to be paid prior to building permit issuance. The project is conditioned to pay the appropriate public facilities fee, water and sewer connection fees, traffic impact, park, and school fees to mitigate its impact on these respective facilities. As conditioned, all facility improvements necessary to accommodate the development will be in place prior to, or concurrent with, development. Therefore, the proposed development is consistent with the Zone 17 LFMP. SUP 13-03/SUP 98-03(C)/SDP 13-05/PUD 13-09/MCUP 13-13/MS 13-07 – VIASAT EXPANSION January 15, 2014 Page 12 TABLE E: GROWTH MANAGEMENT COMPLIANCE STANDARD IMPACTS COMPLIANCE City Administration N/A Yes Library N/A Yes Waste Water Treatment 17,600 GPD Yes Parks $.40/sq. ft. Yes Drainage 41 cfs Yes Circulation 2,004 ADT Yes Fire Station No. 5 Yes Open Space N/A Yes Schools – Carlsbad Unified School District N/A Yes Sewer – Carlsbad Waste Water District 80 EDU Yes Water – Carlsbad Municipal Water District 32,890 GPD Yes IV. ENVIRONMENTAL REVIEW The proposed project has been reviewed pursuant to the California Environmental Quality Act (CEQA). Staff concluded that no potentially significant impacts would result with the implementation of the project that were not previously examined and evaluated in the Final Program Environmental Impact Report for the Bressi Ranch Master Plan MP 178 (EIR 98-04), dated July 9, 2002. EIR 98-04 evaluates the potential environmental effects of the development and operation of the “Bressi Ranch Master Plan” including, analysis of traffic circulation, water quality and compliance with SB 221 and SB 610 regarding water availability, biological resources, and land use and associated actions inclusive of the proposed planning area project reviewed here. The City Council certified EIR 98-04 on July 9, 2002. At that time, CEQA Findings of Fact, a Statement of Overriding Considerations, and a Mitigation Monitoring and Reporting Program were approved. All mitigation measures contained in the adopted Mitigation Monitoring and Reporting Program from EIR 98-04 applicable to the proposed project have been completed, incorporated into the project design or are required as conditions of approval for the project. The EIR 98-04 “Findings of Fact and Statement of Overriding Considerations” applies to all subsequent projects covered by the Bressi Ranch Master Plan Final Program EIR. The proposed activities would have no effects beyond those analyzed in the program EIR, as they are a part of the program analyzed earlier. This project is within the scope of Final Program EIR 98-04 and no further CEQA compliance is required. EIR 98-04 is available at the Planning Department. ATTACHMENTS: 1. Planning Commission Resolution No. 7030 2. Location Map 3. Disclosure Statement 4. Reduced Exhibits 5. Full Sized Exhibits “A” – “GG” dated January 15, 2014 EL CAMINO REALG A T E W A Y R D TOWN GARDEN RD P A L O M A R A I R P O R T R D CAMPBELL PLALICANTE RDSUP 13-03 / SUP 98-03(C) / SDP 13-05 / PUD 13-09 / MCUP 13-13 / MS 13-07 ViaSat Expansion SITE MAPEL CAM REALC A R LSB AD VILL AGE DR CARLSBA D BLL A COSTA AVMELR OSE DRAVI ARA PY RAN CHO S AN TA FE RDCOLL EGE BLEL CAMINO REALSITE Design Development Construction Set Sheet Number Job Number Scale Drawing Date Check By Drawn By Plan Check Permit Set Planning Bid Set Issue Dates Revision Dates 2 0 1 3 S m i t h C o n s u l t i n g A r c h i t e c t s - MM AS NOTED 12085.S01 01/06/2014 (4th) 12/13/2013 - Drive South - Ste 125 13280 Evening Creek (858) 793 - 4777 (858) 793 - 4787 Fax San Diego, CA 92128 ConsultingSmith Architects Design Development Construction Set Sheet Number Job Number Scale Drawing Date Check By Drawn By Plan Check Permit Set Planning Bid Set Issue Dates Revision Dates 2 0 1 3 S m i t h C o n s u l t i n g A r c h i t e c t s - MM AS NOTED 12085.S01 01/06/2014 (4th) 12/13/2013 - Drive South - Ste 125 13280 Evening Creek (858) 793 - 4777 (858) 793 - 4787 Fax San Diego, CA 92128 ConsultingSmith Architects Design Development Construction Set Sheet Number Job Number Scale Drawing Date Check By Drawn By Plan Check Permit Set Planning Bid Set Issue Dates Revision Dates 2 0 1 3 S m i t h C o n s u l t i n g A r c h i t e c t s - MM AS NOTED 12085.S01 01/06/2014 (4th) 12/13/2013 - Drive South - Ste 125 13280 Evening Creek (858) 793 - 4777 (858) 793 - 4787 Fax San Diego, CA 92128 ConsultingSmith Architects Design Development Construction Set Sheet Number Job Number Scale Drawing Date Check By Drawn By Plan Check Permit Set Planning Bid Set Issue Dates Revision Dates 2 0 1 3 S m i t h C o n s u l t i n g A r c h i t e c t s - MM AS NOTED 12085.S01 01/06/2014 (4th) 12/13/2013 - Drive South - Ste 125 13280 Evening Creek (858) 793 - 4777 (858) 793 - 4787 Fax San Diego, CA 92128 ConsultingSmith Architects Design Development Construction Set Sheet Number Job Number Scale Drawing Date Check By Drawn By Plan Check Permit Set Planning Bid Set Issue Dates Revision Dates 2 0 1 3 S m i t h C o n s u l t i n g A r c h i t e c t s - MM AS NOTED 12085.S01 01/06/2014 (4th) 12/13/2013 - Drive South - Ste 125 13280 Evening Creek (858) 793 - 4777 (858) 793 - 4787 Fax San Diego, CA 92128 ConsultingSmith Architects Design Development Construction Set Sheet Number Job Number Scale Drawing Date Check By Drawn By Plan Check Permit Set Planning Bid Set Issue Dates Revision Dates 2 0 1 3 S m i t h C o n s u l t i n g A r c h i t e c t s - MM AS NOTED 12085.S01 01/06/2014 (4th) 12/13/2013 - Drive South - Ste 125 13280 Evening Creek (858) 793 - 4777 (858) 793 - 4787 Fax San Diego, CA 92128 ConsultingSmith Architects 48"x60"48"x60"8"x60" 48"x180" 48"x60" 48"x60"48"x60" Design Development Construction Set Sheet Number Job Number Scale Drawing Date Check By Drawn By Plan Check Permit Set Planning Bid Set Issue Dates Revision Dates 2 0 1 3 S m i t h C o n s u l t i n g A r c h i t e c t s - MM AS NOTED 12085.S01 01/06/2014 (4th) 12/13/2013 - Drive South - Ste 125 13280 Evening Creek (858) 793 - 4777 (858) 793 - 4787 Fax San Diego, CA 92128 ConsultingSmith Architects Design Development Construction Set Sheet Number Job Number Scale Drawing Date Check By Drawn By Plan Check Permit Set Planning Bid Set Issue Dates Revision Dates 2 0 1 3 S m i t h C o n s u l t i n g A r c h i t e c t s - MM AS NOTED 12085.S01 01/06/2014 (4th) 12/13/2013 - Drive South - Ste 125 13280 Evening Creek (858) 793 - 4777 (858) 793 - 4787 Fax San Diego, CA 92128 ConsultingSmith Architects 8"x60"48"x60" Design Development Construction Set Sheet Number Job Number Scale Drawing Date Check By Drawn By Plan Check Permit Set Planning Bid Set Issue Dates Revision Dates 2 0 1 3 S m i t h C o n s u l t i n g A r c h i t e c t s - MM AS NOTED 12085.S01 01/06/2014 (4th) 12/13/2013 - Drive South - Ste 125 13280 Evening Creek (858) 793 - 4777 (858) 793 - 4787 Fax San Diego, CA 92128 ConsultingSmith Architects Design Development Construction Set Sheet Number Job Number Scale Drawing Date Check By Drawn By Plan Check Permit Set Planning Bid Set Issue Dates Revision Dates 2 0 1 3 S m i t h C o n s u l t i n g A r c h i t e c t s - MM AS NOTED 12085.S01 01/06/2014 (4th) 12/13/2013 - Drive South - Ste 125 13280 Evening Creek (858) 793 - 4777 (858) 793 - 4787 Fax San Diego, CA 92128 ConsultingSmith Architects Design Development Construction Set Sheet Number Job Number Scale Drawing Date Check By Drawn By Plan Check Permit Set Planning Bid Set Issue Dates Revision Dates 2 0 1 3 S m i t h C o n s u l t i n g A r c h i t e c t s - MM AS NOTED 12085.S01 01/06/2014 (4th) 12/13/2013 - Drive South - Ste 125 13280 Evening Creek (858) 793 - 4777 (858) 793 - 4787 Fax San Diego, CA 92128 ConsultingSmith Architects (E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E(E)(E)(E)(E)(E)(E)E(E)(E)( )E)(E)(E( )(E)(E)(E)(E)( )(E)(E)(E)(EE)(E)(E)(E)(E(E)(E)E)(E)(E)(E)(E)(E)(E)(E)E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E))(E)(E)E)(E)(E)(E)(E(E)(E)(E)(E)(E)(E(E)(E)(E)C A M P B E L L P L A C EC A M P B E L L P L A C EBUILDING 10PHASE 13-STORY OFFICEBUILDINGBUILDING 11PHASE 23-STORY OFFICEBUILDINGG A T E W A Y R O A D E L C A M I N O R E A L PLANTING LEGENDSYMBOLBOTANICAL / COMMON NAMETREES:ARBUTUS X 'MARINA' /STRAWBERRY TREECERCIS CANADENSIS /EASTERN REDBUDLOPHOSTEMON CONFERTUS /BRISBANE BOXPINUS ELDARICA /AFGHAN PINEPLATANUS MEXICANA 'ALAMO' /MEXICAN SYCAMOREQUERCUS AGRIFOLIA /COAST LIVE OAKTIPUANA TIPU /TIPU TREEOLEA EUROPEA 'SWAN HILL' /FRUITLESS OLIVE- OR -PYRUS CALLERYANA 'ARISTOCRAT' /ARISTOCRAT ORNAMENTAL PEAR HDC A PEG EL A NR ISDTCE SICRA Twww ridgela com8841 Research DriveIrvine, CA 92618Tel 949 387 1323Suite 200RSLADesign DevelopmentConstruction SetSheet NumberJob NumberScaleDrawing DateCheck ByDrawn ByPlan CheckPermit SetPlanningBid SetIssue DatesRevision DatesAS NOTED12085.S0112/17/201310/17/2013-13-0398-03C13-0513-1313-0713-09SUPSUP AMENDMENTSDPMCUPMSPUDNOTE: FOR COMPLETE PLANTINGLEGEND, SEE SHEET L3PROJECT ENTRY WITHENHANCED PAVING -COLORED CONCRETEWITH SAWCUTSCORES35' LANDSCAPEEASEMENT ALONGGATEWAY ROADSIGHT DISTANCETRIANGLE NO PLANTMATERIAL IN EXCESSOF 30" TALL,TYP.PROPERTY LINE /RIGHT-OF-WAYLINE, TYP.LARGE SHRUBS (3' MIN.) ANDLANDSCAPE BERMS TOSCREEN ALL PARKING AREASFROM ADJACENT PROPERTYOR STREET, TYPWOODY SHRUBS PLANTED OVERHERBACEOUS GROUNDCOVERTO COVER 60% OF GROUND ATMATURITY WITHIN PERIMETERSLOPE AREAS ONLYEXISTINGSIDEWALK, TURFPARKWAY ANDSTREET TREESTO REMAIN,TYPICALBIO-RETENTION AREAPER CIVIL ENGINEER'SPLANS, PLANTED WITHAPPROPRIATEVEGETATION, TYPICALNEW ACCESSIBLEPEDESTRIANCONNECTION TOCAMPBELL PL.EXISTINGSIDEWALK, TURFPARKWAY ANDSTREET TREES TOREMAIN, TYPICALLANDSCAPE SITE CALCULATIONSTOTAL DEVELOPED SITE AREA431,505 SFTOTAL LANDSCAPE AREA131,174 SFPERCENTAGE OF SITE LANDSCAPED30.4%TOTAL PARKING LOT AREA172,746 SFPARKING LOT LANDSCAPE REQUIRED (10%) 17,275 SFPARKING LOT LANDSCAPE PROVIDED (10.9%) 18,827 SFTOTAL PARKING STALLS PROPOSED527PARKING LOT TREES REQUIRED (1 PER 4 STALLS) 132PARKING LOT TREES PROVIDED149WOODY SHRUBS PLANTED OVERHERBACEOUS GROUNDCOVERTO COVER 60% OF GROUND ATMATURITY WITHIN PERIMETERSLOPE AREAS ONLY35' LANDSCAPEEASEMENT ALONGCAMPBELL PLACEPARKING LOT LIGHTFIXTURE, TYP.SECURITYBOLLARDS AT 0"CURB BUILDINGENTRY AREAS, TYP.SECURITY BOLLARDSAT 0" CURB BUILDINGENTRY AREAS, TYP.LARGE SHRUBS (3' MIN.) AND LANDSCAPEBERMS TO SCREEN ALL PARKING AREAS FROMADJACENT PROPERTY OR STREET, TYP.WOODY SHRUBSPLANTED OVERHERBACEOUSGROUNDCOVER TOCOVER 60% OFGROUND ATMATURITY WITHINPERIMETER SLOPEAREAS ONLYBIO-RETENTION AREA PERCIVIL ENGINEER'S PLANS,PLANTED WITHAPPROPRIATE VEGETATION,TYPICALOUTDOORAMENITYSPACE WITHTABLES ANDCHAIRSOUTDOOR AMENITY SPACEWITH SITE FURNISHINGS,TABLES, CHAIRS, BBQAREA, SHADE TRELLISESAND WATER ELEMENTNEW ACCESSIBLEPEDESTRIANCONNECTION TOEL CAMINO REALNEW ACCESSIBLEPEDESTRIANCONNECTION TOGATEWAY ROADSIGHT DISTANCETRIANGLE - NO PLANTMATERIAL IN EXCESSOF 30" TALL, TYP.EXISTING TREES,LANDSCAPE ANDIRRIGATION WESTOF THE EXISTINGD.G. PATH TOREMAIN, TYPICALEXISTING D.G.PATH TOREMAIN,RELOCATED BRESSI RANCHSIGNAGE WITH NEWOVERHEAD SHADEELEMENT AND ACCENTPLANTINGPROPERTY LINE /RIGHT-OF-WAYLINE, TYP.NEW BUS STOPAND SHADESTRUCTUREENHANCEDPAVING ATBUILDING ENTRY /DROP-OFF AREADECORATIVE TRAFFIC SIGNAL,ACCENT MEDIAN PLANTING,PAINTED PAVING PATTERN ANDSHADE STRUCTURES ATSTREET CROSSINGNEW ACCESSIBLE CONNECTION TO ELCAMINO REAL WITH ENHANCED PAVING,SHADE TRELLIS AND ACCENT PLANTINGNO TREES LOCATEDWITHIN WATEREASEMENT, TYP.BIO-RETENTION AREA PERCIVIL ENGINEER'S PLANS,PLANTED WITH APPROPRIATEVEGETATION, TYPICALNOTE:DEVELOPMENT WITHIN THE BOUNDARIES OF THE AIRPORT'S FLIGHT ACTIVITYZONE IS RESTRICTED IN ACCORDANCE WITH THE REQUIREMENTS OF THECOMPREHENSIVE LAND USE PLAN FOR MCCLELLAN-PALOMAR AIRPORT.SIGHT DISTANCETRIANGLE - NO PLANTMATERIAL IN EXCESSOF 30" TALL, TYP.NOTE:AN ENCROACHMENT AGREEMENT WILL BE REQUIRED FOR THE INSTALLATIONOF ENHANCED PAVING WHERE LOCATED EITHER WITHIN THE RIGHT-OF-WAYOR PUBLIC UTILITY EASEMENTS.NOTE:ALL TREES BORDERING DESIGNATEDFIRE LANES SHALL BE MAINTAINEDSO THAT THEIR LOWEST BRANCHESARE 13'-6" CLEAR OF THE FINISHEDPAVE SURFACE OF THE FIRE LANE.STATEMENT OF COMPLIANCEI AM FAMILIAR WITH THE REQUIREMENTS FOR LANDSCAPE AND IRRIATIONPLANS CONTAINED IN THE CITY OF CARLSBAD'S LANDSCAPE MANUAL ANDWATER EFFICIENT LANDSCAPE REGULATIONS. I HAVE PREPARED THIS PLANIN COMPLIANCE WITH THOSE REGULATIONS AND THE LANDSCAPE MANUALAND AGREE TO COMPLY WITH ALL REQUIREMENTS WHEN SUBMITTINGCONSTRUCTION DOCUMENTS. I CERTIFY THAT THE PLAN IMPLEMENTSTHOSE REGULATIONS TO PROVIDE EFFICIENT USE OF WATER.___________ _____________ _________________________ _____________JAMES L. RIDGE, LANDSCAPE ARCHITECT - LIC. NO. 2809 DATE11/25/2013660' LINEOF SIGHT300' LINEOF SIGHT300' LINEOF SIGHT300' LINEOF SIGHTEXISTINGR.O.W.EXISTINGLANDSCAPEMAINTENANCEEASEMENTDEDICATED TOBRESSI RANCHCORPORATEOWNERASSOCIATION (E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)TEMPORARY IRRIGATION AND HYDROSEEDCOVER CROP OVER 100% OF UNIMPROVEDPAD UPON CITY DIRECTIONTEMPORARY IRRIGATION AND HYDROSEEDCOVER CROP OVER 0% OF UNIMPROVEDPAD UPON CITY DIRECTION(E)(E)(E)(E)(E)(E)(E)E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(ESOIL SAMPLELOCATION 1 OF 3SOIL SAMPLELOCAT ON 2 OF 3SO SAMPLELOCAT ON 3 OF 3(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E(E)(E)(E(E)(E)(E(E)(E)(E)E)(E)( )(E)( )(E)E)C A M P B E L L P L A C EC A M P B E L L P L A C EBUILDING 10PHASE 13-STORY OFFICEBUILDINGG A T E W A Y R O A D E L C A M I N O R E A L PLANTING LEGENDSYMBOLBOTANICAL / COMMON NAMETREES:ARBUTUS X 'MARINA' /STRAWBERRY TREECERCIS CANADENSIS /EASTERN REDBUDLOPHOSTEMON CONFERTUS /BRISBANE BOXPINUS ELDARICA /AFGHAN PINEPLATANUS MEXICANA 'ALAMO' /MEXICAN SYCAMOREQUERCUS AGRIFOLIA /COAST LIVE OAKTIPUANA TIPU /TIPU TREEPYRUS CALLERYANA 'ARISTOCRAT' /ARISTOCRAT ORNAMENTAL PEAR COVER CROP SEED MIXSEED*Contains:xAgrostis pallens (Bent Grass) 8 LBS/ACRExEschscholzia maritima (California Poppy)2 LBS/ACRExFestuca microstachys (Small Fescue8 LBS/ACRExFestuca rubra 'Molate' (Molate Red Fescue)25 LBS/ACRE* SEED AVAILABLE AT S&S SEEDS (805) 684-0436HDC A PEG EL A NR ISDTCE SICRA Twww ridgela com8841 Research DriveIrvine, CA 92618Tel 949 387 1323Suite 200RSLADesign DevelopmentConstruction SetSheet NumberJob NumberScaleDrawing DateCheck ByDrawn ByPlan CheckPermit SetPlanningBid SetIssue DatesRevision DatesAS NOTED12085.S0112/17/201310/17/2013-13-0398-03C13-0513-1313-0713-09SUPSUP AMENDMENTSDPMCUPMSPUDNOTE: FOR COMPLETE PLANTINGLEGEND, SEE SHEET L335' LANDSCAPEEASEMENTALONGGATEWAYROADSIGHT DISTANCETRIANGLE NO PLANTMATERIAL IN EXCESSOF 30" TALL, TYP.PROPERTY LINE /RIGHT-OF-WAYLINE, TYP.WOODY SHRUBS PLANTED OVERHERBACEOUS GROUNDCOVERTO COVER 60% OF GROUND ATMATURITY WITHIN PERIMETERSLOPE AREAS ONLYNEW ACCESSIBLEPEDESTRIANCONNECTION TOCAMPBELL PL.SECURITY BOLLARDSAT 0" CURB BUILDINGENTRY AREAS, TYP.WOODY SHRUBSPLANTED OVERHERBACEOUSGROUNDCOVER TOCOVER 60% OFGROUND ATMATURITY WITHINPERIMETER SLOPEAREAS ONLYBIO-RETENTION AREA PERCIVIL ENGINEER'S PLANS,PLANTED WITHAPPROPRIATE VEGETATION,TYPICALOUTDOOR AMENITY SPACEWITH SITE FURNISHINGS,TABLES, CHAIRS, BBQAREA, SHADE TRELLISESAND WATER ELEMENTSIGHT DISTANCETRIANGLE - NO PLANTMATERIAL IN EXCESSOF 30" TALL, TYP.RELOCATED BRESSI RANCHSIGNAGE WITH NEWOVERHEAD SHADE ELEMENTAND ACCENT PLANTINGNEW BUS STOPAND SHADESTRUCTUREENHANCEDPAVING ATBUILDING ENTRY /DROP-OFF AREADECORATIVE TRAFFIC SIGNAL,ACCENT MEDIAN PLANTING,PAINTED PAVING PATTERN ANDSHADE STRUCTURES ATSTREET CROSSINGNEW ACCESSIBLE CONNECTION TO ELCAMINO REAL WITH ENHANCED PAVING,SHADE TRELLIS AND ACCENT PLANTINGNO TREES LOCATEDWITHIN EASEMENT,TYP.PARKING LOT LIGHTFIXTURE, TYP.BIO-RETENTION AREA PERCIVIL ENGINEER'S PLANS,PLANTED WITH APPROPRIATEVEGETATION, TYPICALNOTE:DEVELOPMENT WITHIN THE BOUNDARIES OF THE AIRPORT'S FLIGHT ACTIVITYZONE IS RESTRICTED IN ACCORDANCE WITH THE REQUIREMENTS OF THECOMPREHENSIVE LAND USE PLAN FOR MCCLELLAN-PALOMAR AIRPORT.NOTE:AN ENCROACHMENT AGREEMENT WILL BE REQUIRED FOR THE INSTALLATIONOF ENHANCED PAVING WHERE LOCATED EITHER WITHIN THE RIGHT-OF-WAYOR PUBLIC UTILITY EASEMENTS.NOTE:ALL TREES BORDERING DESIGNATEDFIRE LANES SHALL BE MAINTAINEDSO THAT THEIR LOWEST BRANCHESARE 13'-6" CLEAR OF THE FINISHEDPAVE SURFACE OF THE FIRE LANE.LARGE SHRUBS (3' MIN.) AND LANDSCAPEBERMS TO SCREEN ALL PARKING AREAS FROMADJACENT PROPERTY OR STREET, TYP.NEW ACCESSIBLEPEDESTRIANCONNECTION TOEL CAMINO REALEXISTING TREES,LANDSCAPE ANDIRRIGATION WESTOF THE EXISTINGD.G. PATH TOREMAIN, TYPICALEXISTING D.G.PATH TOREMAIN,PROPERTY LINE /RIGHT-OF-WAYLINE, TYP.660' LINEOF SIGHT300' LINEOF SIGHT300' LINEOF SIGHTPROJECT ENTRY WITHENHANCED PAVING -COLORED CONCRETEWITH SAWCUTSCORESEXISTINGSIDEWALK, TURFPARKWAY ANDSTREET TREESTO REMAIN,TYPICAL300' LINEOF SIGHTEXISTINGLANDSCAPEMAINTENANCEEASEMENTDEDICATED TOBRESSI RANCHCORPORATEOWNERASSOCIATION PLANTING LEGENDSYMBOLBOTANICAL / COMMON NAMEMINIMUM SIZECOMMENTSDESCRIPTIONQTY.WUCOLSTREES:ARBUTUS X 'MARINA' /24" BOX 5'H X 4'W X 1-1/2" CAL. FLOWERING 35 MOD.STRAWBERRY TREESTD.ACCENT(0.4-0.6)CERCIS CANADENSIS /24" BOX 8'H X 4'W X 1-1/4" CAL. FLOWERING7 MOD.EASTERN REDBUDSTD.ACCENT(0.4-0.6)LOPHOSTEMON CONFERTUS /15 GAL. 7'H X 2'W X 1-1/4" CAL. PERIMETER54 MOD.BRISBANE BOXSTD.SCREENING(0.4-0.6)PINUS ELDARICA /15 GAL. 6'H X 2'W X 1-1/4" CAL. PERIMETER25 LOWAFGHAN PINESTD.SCREENING(0.1-0.3)PLATANUS MEXICANA 'ALAMO' /24" BOX 9'H X 4'W X 1-1/2" CAL. PARKING LOT33 MOD.MEXICAN SYCAMORESTD.CANOPY TREE(0.4-0.6)QUERCUS AGRIFOLIA /24" BOX 12'H X 7'W X 2" CAL. PARKING LOT40 LOWCOAST LIVE OAKSTD.CANOPY TREE(0.1-0.3)TIPUANA TIPU /24" BOX 10'H X 5'W X 1-1/4" CAL. PARKING LOT45 MOD.TIPU TREESTD.CANOPY TREE(0.4-0.6)OLEA EUROPEA 'SWAN HILL' /36" BOX 10'H X 8'W X 2" CAL. SPECIMEN55 LOWFRUITLESS OLIVEMULTI-TRUNKACCENT(0.1-0.3)- OR -PYRUS CALLERYANA 'ARISTOCRAT' / 36" BOX 14'H X 6'W X 2" CAL.LOWARISTOCRAT ORNAMENTAL PEAR STD.(0.1-0.3)SHRUBS, VINES & GROUNDCOVERS:ZONE 2 - REFINED LANDSCAPE (100% OF TOTAL LANDSCAPE AREA)AGAVE ATTENUATA /5 GAL.PLANT 30" O.C.SUCCULENT43 LOWFOX TAIL AGAVEACCENT(0.1-0.3)PHORMIUM T. 'MARGARET JONES' / 5 GAL.PLANT42" O.C.STRAPPY 922 LOWMARGARET JONES NEW ZEALAND FLAXACCENT(0.1-0.3)ALOE STRIATA /1 GAL.PLANT 2' O.C.SUCCULENT630 LOWCORAL ALOELOW MASS(0.1-0.3)BOUGAINVILLEA 'OO-LA-LA' /5 GAL.PLANT 3' O.C.FLOWERING1,207 LOWDWARF BOUGAINVILLEASHRUB MASS(0.1-0.3)CALLISTEMON 'LITTLE JOHN' /5 GAL.PLANT 30" O.C.FLOWERING54 MOD.DWARF BOTTLEBRUSHSHRUB MASS(0.4-0.6)CAREX DIVULSA /1 GAL.PLANT 2' O.C.ORNAMENTAL 2,227 MOD.BERKELEY SEDGEGRASS(0.4-0.6)CEANOTHUS 'CONCHA' 5 GAL.PLANT 5' O.C.LARGE FLOWERING 454 LOWCALIFORNIA LILACSHRUB MASS(0.1-0.3)DIANELLA 'LITTLE REV' /1 GAL.PLANT 2' O.C.STRAPPY1,143 MOD.LITTLE REV FLAX LILYACCENT(0.4-0.6)DYMONDIA MARGARETAE /FLATSPLANT 8" O.C.FLOWERINGPER MOD.DYMONDIAGROUNDCOVER PLAN (0.4-0.6)FESTUCA MAIREI /1 GAL.PLANT 2' O.C.ORNAMENTAL 610 LOWATLAS FESCUEGRASS(0.1-0.3)LANTANA MONTEVIDENSIS /5 GAL.PLANT 3' O.C.FLOWERING940 LOWLANTANASHRUB MASS(0.1-0.3)FICUS PUMILA /5 GAL.PLANT PER PLAN SCREENING VINE 51 MOD.CREEPING FIGSTAKED(0.4-0.6)PENNISETUM M. 'RED BUNNY TAILS' / 5 GAL.PLANT 2' O.C.ORNAMENTAL 318 LOWDWARF RED FOUNTAIN GRASSGRASS(0.1-0.3)PHORMIUM TENAX 'PINK STRIPE' / 5 GAL.PLANT 4' O.C.STRAPPY451 LOWPINK STRIPE NEW ZEALAND FLAXACCENT(0.1-0.3)PODOCARPUS GRACILIOR15 GAL. PLANT 4' O.C.VERTICAL59 MOD.FERN PINESCREEN(0.4-0.6)RHAMNUS CALIFORNICA /5 GAL.PLANT 4' O.C.LARGE NATIVE 455 VERY LOWCOFFEEBERRYSHRUB MASS(<0.1)RHAPHIOLEPIS UMBELLATA 'MINOR' / 5 GAL.PLANT 3' O.C.FLOWERING197 MOD.DWARF YEDDO HAWTHORNSHRUB MASS(0.4-0.6)ROSMARINUS O. 'PROSTRATUS' / FLATSPLANT 18" O.C.FLOWERINGPER LOWPROSTRATE ROSEMARYGROUNDCOVER PLAN (0.1-0.3)WESTRINGIA FRUTICOSA /5 GAL.PLANT 4' O.C.FLOWERING153 LOWCOAST ROSEMARYSHRUB MASS(0.1-0.3)5 GALLON SHRUBS = 4,329 (49%)1 GALLON SHRUBS = 4,610 (51%)BIO-RETENTION AREAS:BUCHLOE DACTYLOIDES 'UC VERDE' / PLUGS PLANT 12" O.C.--PER MOD.UC VERDE BUFFALO GRASSPLAN (0.4-0.6)JUNCUS PATENS /4" POTS PLANT 2' O.C.--6,060 MOD.CALIFORNIA GRAY RUSH(0.4-0.6)MUHLENBERGIA RIGENS /1 GAL.PLANT 3' O.C.--1,003 LOWDEER GRASS(0.1-0.3)EXISTING TREE LEGENDSYMBOLBOTANICAL / COMMON NAMEBOTANICAL / COMMON NAMEARBUTUS X 'MARINA' /PODOCARPUS GRACILIOR /STRAWBERRY TREEFERN PINEEUCALYPTUS SPP. /PYRUS CALLERYANA /EUCALYPTUSORNAMENTAL PEARACACIA MELANOXYLON /TABEBUIA IMPETIGINOSA /BLACKWOOD ACACIAPINK TRUMPET TREELOPHOSTEMON CONFERTUS /TIPUANA TIPU /BRISBANE BOXTIPU TREEMELALEUCA QUINQUENERVIA /WASHINGTONIA ROBUSTA /PAPERBARK TREEMEXICAN FAN PALMPLATANUS ACERIFOLIA /LONDON PLANE TREEEXISTING PYGMY DATE PALMSEXISTING SHRUBS, VINES AND GROUNDCOVERSEXISTING TURFHDC A PEG EL A NR ISDTCE SICRA Twww ridgela com8841 Research DriveIrvine, CA 92618Tel 949 387 1323Suite 200RSLADesign DevelopmentConstruction SetSheet NumberJob NumberScaleDrawing DateCheck ByDrawn ByPlan CheckPermit SetPlanningBid SetIssue DatesRevision DatesAS NOTED12085.S0112/17/201310/17/2013-13-0398-03C13-0513-1313-0713-09SUPSUP AMENDMENTSDPMCUPMSPUDLANDSCAPE PLANTING - GENERAL NOTES1. A COMBINATION OF TREES, SHRUBS, ORNAMENTAL GRASSES, VINES, GROUNDOVERS, AND TURF WILL BEINCORPORATED TO COMPLY WITH AND COMPLIMENT THE CHARACTER AND INTENT OF THE BRESSIRANCH MASTER PLAN, COMPLIMENT THE ARCHITECTURAL CHARACTER THROUGHOUT THE PROJECT SITE,ENHANCE PEDESTRIAN AND VEHICULAR CIRCULATION, FACILITATE THE APPROPRIATE PROJECTPROGRAM ELEMENTS, AND RESPECT THE EXISTING LANDSCAPE.2. THE PLANTINGS SHALL PROVIDE A YEAR-ROUND AESTHETICALLY PLEASING EXPERIENCE.3. THE USE OF DROUGHT-TOLERANT PLANTS WILL BE UTILIZED AS MUCH AS PRACTICAL IN AN EFFORT TOCONSERVE WATER AND PROVIDE A SUSTAINABLE, LOW MAINTENANCE LANDSCAPE.4. SAFETY FOR THE USERS, AND MAINTENANCE PERSONNEL, AND THE GENERAL PUBLIC WILL BE THEPRIMARY CONSIDERATION FOR ALL PLANTING DESIGN ELEMENTS, POTENTIAL PUBLIC EXPOSURE TOTHORNS AND PROXIMITY TO BEE ATTRACTING PLANTINGS WILL BE FACTORS IN THE SELECTIONPROCESS.5. PLANT MATERIALS SHOWN ON THE PLAN ARE APPROPRIATE SUGGESTIONS ONLY FOR THIS STAGE OFDESIGN. PLANT MATERIALS WERE SELECTED FOR THEIR LOW-WATER DEMAND FOR MOST AREAS, FINALSELECTIONS AND EXACT LOCATIONS FOR THE FINAL PLAN ARE TO BE DETERMINED BY THE LANDSCAPEARCHITECT AT FINAL DESIGN, IN ACCORDANCE WITH THE PERCENTAGES REPRESENTED ON THISCONCEPT PLAN.6. THE SITE SHALL BE IRRIGATED WITH A PERMANENT AUTOMATICALLY-CONTROLLED UNDERGROUNDIRRIGATION SYSTEM THAT WILL COVER ALL NEWLY INSTALLED VEGETATED AREAS TO SUSTAIN ANDPROMOTE HEALTHY GROWTH.7. THE IRRIGATION DESIGN AND EQUIPMENT SPECIFIED SHALL INCORPORATE PROVEN WATER AND SOILCONSERVATION METHODS AND PRINCIPLES THAT ARE A CURRENT STANDARD IN THE PROFESSION, SUCHAS (YET NOT ALL INCLUSIVE), AN AUTOMATIC IRRIGATION CONTROLLER WITH MULTIPLE DAILY RUN TIMESAVAILABLE FOR EACH STATION, CONTROLLER DURING RAINY PERIODS, A MASTER CONTROL VALVE ANDTHE FLOW SENSING DEVICE WITH BREAK PROTECTION FEATURES FOR THE MAINLINE PIPE AND LATERALLINE PIPE, 'HEAD-TO-HEAD' SPRINKLER LAYOUT TO INCREASE DISTRIBUTION UNIFORMITY (D.U.), MATCHEDPRECIPITATION RATE SPRINKLER NOZZLES TO DECREASE THE PROBABILITY OF SURFACE RUNOFF, ANDSEPARATE IRRIGATION HYDROZONES (STATIONS GROUPED TOGETHER ACCORDING TO SUN EXPOSURE,TOP AND BOTTOM OF SLOPES, SHRUB AREAS, TURF, AND GROUND COVER AREAS). THE AUTOMATICCONTROLLER SHALL BE CAPABLE OF IRRIGATING FREQUENTLY FOR RELATIVELY SHORT PERIODS OFTIME DURING EVENING HOURS TO ALLOW FOR DEEP SOIL PENETRATION, IN GENERAL, THE IRRIGATIONSYSTEM SHALL BE DESIGNED TO APPLY WATER SLOWLY AND UNIFORMLY, IN AN EFFORT TO MINIMIZESOIL EROSION AND EMPLOY BEST WATER MANAGEMENT PRACTICES FOR WATER CONSERVATION.8. IRRIGATION SYSTEM SHALL BE DESIGNED FOR THE USE OF RECLAIMED WATER.9. IRRIGATION SYSTEM DESIGN WILL CONFORM TO THE CITY OF CARLSBAD LANDSCAPE MANUAL ANDEQUIPMENT USED WILL CONFORM TO CITY OF CARLSBAD STANDARDS.10.$ 7+5((,1&+ ´ '(37+ /$<(5 2) 25*$1,& %$5. 08/&+ 6+$// %( 63(&,),(' )25 ,167$//$7,21 ,1ALL NON-TURF PLANTING AREAS, WHERE ADJACENT TO BACK OF CURBS, THE THICKNESS SHALL TAPER'2:1 72 21(,1&+ ´ '(37+ 5227 %$55,(56 6+$// %( ,167$//(' :+(5(9(5 75((6 $5( 3/$17('WITHIN 5' OF SIDEWALKS OR HARDSCAPE.11. ALL PROPOSED PLANTING AREAS SHALL INCORPORATE SOIL CONDITIONERS TO HELP INCREASE ANDRETAIN SOIL MOISTURE.12. SOIL TESTS BY AN APPROPRIATELY QUALIFIED LABORATORY SHALL FURTHER INFLUENCE AND DIRECTSOIL AMENDMENT PREPARATIONS AND INSTALLATION TECHNIQUES.13. STORMWATER AND EROSION CONTROL METHODS TO BE SPECIFIED ON SLOPE AREAS DURING THEPLANTING PROCESS SHALL ASSIST IN BEST MANAGEMENT PRACTICES, IN ORDER TO MINIMIZE SOILEROSION AND HELP PRESERVE PRECIOUS NATURAL RESOURCES. THIS INCLUDES SUCH ELEMENTS AS(YET NOT ALL INCLUSIVE) THE USE OF FIBER ROLLS, EROSION CONTROL BLANKETS, AND BONDED FIBERMATRIX (BPM) APPLICATIONS.14. ALL PROPOSED LANDCAPING DEPICTED ON THESE PLANS SHALL BE MAINTAINED BY THE OWNER AND THECOMMUNITY MASTER ASSOCIATION.15. LANDSCAPE AND IRRIGATION MAINTENANCE WILL BE THE OWNER'S RESPONSIBILITY.16. PROVIDE POSITIVE SURFACE DRAINAGE (2% GRADE MINIMUM IN PLANTING AREAS) AWAY FROMSTRUCTURES AND TERMINATING IN AN APPROVED DRAINAGE SYSTEM.17. ALL UTILITIES ARE TO BE SCREENED. LANDSCAPE CONSTRUCTION DRAWINGS FOR THESE PROPOSEDIMPROVEMENTS SHALL SHOW AND LABEL ALL UTILITIES AND PROVIDE APPROPRIATE SCREENING TO THESATISFACTION OF THE CITY.SLOPE RE-VEGETATION NOTESSLOPES 6:1 OR STEEPER REQUIRING EROSION CONTROL MEASURES AS SPECIFIED HEREIN SHALLBE TREATED WITH ONE OR MORE OF THE FOLLOWING PLANTING STANDARDS: A. STANDARD #1 - COVER CROP/REINFORCED STRAW MATTING:xCOVER CROP SHALL BE A SEED MIX TYPICALLY MADE UP OF QUICK GERMINATING ANDFAST COVERING GRASSES, CLOVER, AND/OR WILD FLOWERS. SUBMIT THE SPECIFICSEED MIX FOR CITY APPROVAL PRIOR TO APPLICATION. THEN COVER CROP SHALL BEAPPLIED AT A RATE AND MANNER SUFFICIENT TO PROVIDE 90% COVERAGE WITHINTHIRTY (30) DAYS.xTYPE OF REINFORCE STRAW MATTING SHALL BE AS APPROVED BY THE CITY ANDSTAKED TO THE SLOPE AS RECOMMENDED BY THE MANUFACTURER.xREINFORCED STRAW MATTING SHALL BE REQUIRED WHEN PLANTING OCCURS BETWEENAUGUST 15 AND APRIL 15. THE COVER CROP AND/OR REINFORCED STRAW MAT SHALLBE USED THE REMAINDER OF THE YEAR. B. STANDARD #2 - GROUND COVERxONE HUNDRED (100%) PERCENT OF THE AREA SHALL BE PLANTED WITH A GROUNDCOVER KNOWN TO HAVE EXCELLENT SOIL BINDING CHARACTERISTICS (PLANTED FROMA MINIMUM SIZE OF FLATTED MATERIAL AND SPACED TO PROVIDE FULL COVERAGEWITHIN ONE YEAR). C. STANDARD #3 - LOW SHRUBSxLOW SPREADING WOODY SHRUBS (PLANTED FROM A MINIMUM OF 2-3/4 INCH LINERS)SHALL COVER A MINIMUM OF SEVENTY (70%) PERCENT OF THE SLOPE FACE (AT MATURESIZE). D. STANDARD #4 - TREES AND/OR LARGE SHRUBSxTREES AND/OR LARGE SHRUBS SHALL BE (PLANTED FROM A MINIMUM OF 1 GALLONCONTAINERS) AT A MINIMUM RATE OF ONE (1) PER TWO HUNDRED (200) SQUARE FEET.SLOPES - 6:1 OR STEEPER AND:A. 3' OR LESS IN VERTICAL HEIGHT AND ARE ADJACENT TO PUBLIC WALKS OR STREETSREQUIRE AT MINIMUM STANDARD #1 (COVER CROP OR EROSION CONTROL MATTING).B. 3' TO 8' IN VERTICAL HEIGHT REQUIRE STANDARDS #1 (EROSION CONTROL MATTING SHALLBE INSTALLED IN LIEU OF A COVER CROP), #2 AND #3.C. IN EXCESS OF 8' IN VERTICAL HEIGHT REQUIRE STANDARDS #1 (EROSION CONTROLMATTING SHALL BE INSTALLED IN LIEU OF A COVER CROP), #2, #3 AND #4.AREAS GRADED FLATTER THAN 6:1 REQUIRE STANDARD #1 (COVER CROP) WITH TEMPORARYIRRIGATION WHEN THEY HAVE ONE OR MORE OF THE FOLLOWING CONDITIONS:A. SHEET GRADED PADS NOT SCHEDULED FOR IMPROVEMENTS WITHIN 6 MONTHS OFCOMPLETION OF ROUGH GRADING.B. A POTENTIAL EROSION PROBLEM AS DETERMINED BY THE CITY.C. IDENTIFIED BY THE CITY AS HIGHLY VISIBLE AREAS TO THE PUBLIC OR HAVE SPECIALCONDITIONS THAT WARRANT IMMEDIATE TREATMENT. C A M P B E L L P L A C EC A M P B E L L P L A C EBUILDING 10PHASE 13-STORY OFFICEBUILDINGBUILDING 11PHASE 23-STORY OFFICEBUILDINGG A T E W A Y R O A D E L C A M I N O R E A L LEGEND:SYMBOLDESCRIPTIONCRITERIAZONE 2 - REFINED LANDSCAPEZone 2 should have an unmanicured appearance, notunkept, but rather a landscape designed to requireless intensive types of maintenance such as mowing,pruning, fertilizing, and watering. Plant materialwhose appearance is not dependent on heavywatering and maintenance care.It stresses continually low maintenance by designedplant combinations with matched growthrequirements. This zone's water requirement for amature landscape is estimated between 10" and 30"of supplemental irrigation water annually. WATER FEATURE Potable water use.HDC A PEG EL A NR ISDTCE SICRA Twww ridgela com8841 Research DriveIrvine, CA 92618Tel 949 387 1323Suite 200RSLADesign DevelopmentConstruction SetSheet NumberJob NumberScaleDrawing DateCheck ByDrawn ByPlan CheckPermit SetPlanningBid SetIssue DatesRevision DatesAS NOTED12085.S0112/17/201310/17/2013-13-0398-03C13-0513-1313-0713-09SUPSUP AMENDMENTSDPMCUPMSPUDWATER CONSERVATION NOTESTHE FOLLOWING WATER CONSERVATIN TECHNIQUES SHALLBE EMPLOYED IN THIS PROJECT:A. WATER CONSERVING PLANTS AND PLANTS NATIVE TOHOT, DRY SUMMERS TO BE UTILIZED IN 75% OF THETOTAL PLANTED AREA.B. USE OF HYDROZONES WITH PLANTS GROUPED BASEDUPON AMOUNT OF WATER NEEDED TO SUSTAIN THEM.C. MULCH 3/4" - 1" SIZE UTILIZED IN THE LANDSCAPE; 3"DEPTH MINIMUM.D. SOIL AMENDMENTS UTILIZED TO IMPROVE WATERHOLDING CAPACITY OF SOIL.E. AUTOMATIC IRRIGATION SYSTEM ADJUSTEDSEASONALLY AND WITH WATERING HOURS BETWEEN10:00 P.M. AND 6:00 A.M.F. IRRIGATION SYSTEM DESIGNED TO WATER DIFFERENTAREAS OF THE LANDSCAPE BASED ON WATERING NEED.G. IRRIGATION DESIGN SENSITIVE TO SLOPE FACTORS.H. RAIN SENSORS USED IN CONJUNCTION WITH THEAUTOMATIC IRRIGATION SYSTEM.I. RECOMMENDATIONS GIVEN FOR ANNUAL IRRIGATIONSCHEDULE.J. LANDSCAPE WATER USE CERTIFICATION WITHSUPPORTING DATA IN COMPLIANCE WITH STATE OFCALIFORNIA WATER EFFICIENCY ORDINANCE FORAPPROVAL SHALL BE SUBMITTED WITH LANDSCAPECONSTRUCTION DOCUMENT SUBMITTAL TO THE CITY.K. AN AUTOMATIC IRRIGATION SYSTEM WILL BE PROVIDEDWITH ALL EQUIPMENT SUITABLE FOR THE USE OFRECLAIMED WATER AND HEALTH DEPARTMENTREQUIREMENTS RELATIVE TO RECLAIMED USE WILLAPPLY TO THE PROJECT.L. ONLY LOW VOLUME OR SUBSURFACE IRRIGATION SHALLBE USED TO IRRIGATE ANY VEGETATION WITHINTWENTY-FOUR INCHES OF AN IMPERMEABLE SURFACEUNLESS THE ADJACENT IMPERMEABLE SURFACES AREDESIGNED AND CONSTRUCTED TO CAUSE WATER TODRAIN ENTIRELY INTO A LANDSCAPED AREA. C A M P B E L L P L A C EC A M P B E L L P L A C EBUILDING 10PHASE 13-STORY OFFICEBUILDINGBUILDING 11PHASE 23-STORY OFFICEBUILDINGG A T E W A Y R O A D E L C A M I N O R E A L NOTE:PROPOSED PONDWATER FEATURE AREATO USE DOMESTIC(POTABLE) WATERRECYCLED WATER USESYMBOLDESCRIPTIONRECYCLED WATER USE - ALL AREAS EXCEPTWATER FEATURE TO BE IRRIGATED WITH RECYCLEDWATER.POTABLE WATER USE - PROPOSED WATERFEATURE ONLY.HDC A PEG EL A NR ISDTCE SICRA Twww ridgela com8841 Research DriveIrvine, CA 92618Tel 949 387 1323Suite 200RSLADesign DevelopmentConstruction SetSheet NumberJob NumberScaleDrawing DateCheck ByDrawn ByPlan CheckPermit SetPlanningBid SetIssue DatesRevision DatesAS NOTED12085.S0112/17/201310/17/2013-13-0398-03C13-0513-1313-0713-09SUPSUP AMENDMENTSDPMCUPMSPUDTOTAL DEVELOPED SITE AREA:431,505 S.F.TOTAL LANDSCAPED AREA:128,764 S.F.TOTAL AREA IRRIGATED WITH RECYCLED WATER:128,198 S.F.TOTAL WATER FEATURE AREA WITH POTABLE WATER: 566 S.F C A M P B E L L P L A C EC A M P B E L L P L A C EBUILDING 10PHASE 13-STORY OFFICEBUILDINGBUILDING 11PHASE 23-STORY OFFICEBUILDINGG A T E W A Y R O A D E L C A M I N O R E A L SHARED LANDSCAPE MAINTENANCERESPONSIBILITIES1. ALL LANDSCAPED AREAS DEPICTED ON THESE PLANS SHALL BEMAINTAINED BY EITHER THE PROPERTY OWNER OR MASTERASSOCIATION THROUGH A PRIVATE CONTRACT WITH AQUALIFIED MAINTENANCE CONTRACTOR.2. MAINTENANCE OF EXISTING LANDSCAPE AND NEW LANDSCAPEWITHIN THE LANDSCAPE EASEMENT SHALL BE THERESPONSIBILITY OF THE MASTER ASSOCIATION.3. MAINTENANCE OF THE NEW SITE LANDSCAPE AND PROJECTENTRIES SHALL BE THE RESPONSIBILITY OF THE PROPERTYOWNER.4. THERE IS A FIFTY FOOT (50') LANDSCAPE EASEMENT ALONGTHE WESTERN PROPERTY LINE ADJACENT TO EL CAMINO REALAND A THIRTY-FIVE FOOT (35') LANDSCAPE EASEMENT ALONGGATEWAY ROAD AND CAMPBELL PLACE.5. ALL EXISTING LANDSCAPE AREAS TO REMAIN THAT AREDAMAGED BY CONSTRUCTION SHALL BE REPAIRED/REPLACE INKIND.MAINTAINED BY PROPERTY OWNERMAINTAINED BY MASTER ASSOCIATIONMAINTAINED BY PARKS DIVISIONHDC A PEG EL A NR ISDTCE SICRA Twww ridgela com8841 Research DriveIrvine, CA 92618Tel 949 387 1323Suite 200RSLADesign DevelopmentConstruction SetSheet NumberJob NumberScaleDrawing DateCheck ByDrawn ByPlan CheckPermit SetPlanningBid SetIssue DatesRevision DatesAS NOTED12085.S0112/17/201310/17/2013-13-0398-03C13-0513-1313-0713-09SUPSUP AMENDMENTSDPMCUPMSPUD BLDG10BLDG11HDC A PEG EL A NR ISDTCE SICRA Twww ridgela com8841 Research DriveIrvine, CA 92618Tel 949 387 1323Suite 200RSLADesign DevelopmentConstruction SetSheet NumberJob NumberScaleDrawing DateCheck ByDrawn ByPlan CheckPermit SetPlanningBid SetIssue DatesRevision DatesAS NOTED12085.S0112/17/201310/17/2013-13-0398-03C13-0513-1313-0713-09SUPSUP AMENDMENTSDPMCUPMSPUDLANDSCAPE CONCEPT STATEMENTTHE LANDSCAPE CONCEPT IS TO CREATE AN OUTDOOR SPACEFOR EMPLOYEES THAT IS DIFFERENT THAN 'THE HUB' AND THEACTIVE RECREATION AREAS VIASAT HAS PROVIDED TO DATEON THE CAMPUS. IN ADDITION TO PROVIDING A PEDESTRIANLINKAGE BETWEEN BUILDINGS 10 AND 11, A SERIES OF SPACESWILL BE CREATED FOR THE USERS THAT COULD INCLUDE:xCONFERENCE SPACExFIRE ELEMENTxWATER ELEMENTxCOMFORTABLE SEATING FOR OUTDOOR WORK SPACESxWIFIxSPEAKERSxSHADE ELEMENTSLARGE ARRIVAL PLAZAS ARE CREATED AT THE ENTRIES TOBUILDINGS 10 AND 11 WITH ACCENT PLANT MATERIALS ANDENHANCED PAVING.PEDESTRIAN LINKTHROUGH PARKINGAREASARRIVAL PLAZA -ENHANCED PAVINGCARRIED THROUGH THEACCESSIBLE STALLS TOCREATE A GRAND ENTRYSECURITY BOLLARDS ATALL 0" CURB AREAS,TYPICALPEDESTRIAN LINKAGEPATHWAYARRIVAL PLAZA -ENHANCED PAVING(COLORED CONCRETEW/ SAWCUT SCORING)CARRIED THROUGHTHE ACCESSIBLESTALLS TO CREATE AGRAND ENTRYSECURITY BOLLARDS ATALL 0" CURB AREAS,TYPICALOUTDOOR EATINGAREA WITH BBQCOUNTER, TABLESAND CHAIRSRIPARIANTREE GROVEWATER ELEMENT -PLASTIC LINED,WITH BOULDERGROUPINGSUPPER POOL OFWATER ELEMENTWATER ELEMENT -PLASTIC LINED,WITH BOULDERGROUPINGSOUTDOORCONFERENCEAREADROUGHT-TOLERANTEVERGREEN CANOPY TREEBIO-RETENTION AREAPER CIVIL ENGINEER'SPLANS, PLANTED WITHAPPROPRIATEVEGETATION,TYPICALOUTDOOR SEATING AREA WITHSEATING, POSSIBLE FIREELEMENT AND TRELLIS SHADESTRUCTURE - SEECONCEPTUAL DETAIL BELOWSHADE STRUCTURE -METAL POSTS ANDFRAMING WITH WOODSLATS - SEE CONCEPTUALDETAIL BELOWWOOD BRIDGE WITHMETAL RAILINGSHADE STRUCTURE- SEE CONCEPTUALDETAIL BELOWWOOD BRIDGE WITHMETAL RAILINGFIRE TABLE - CONCRETE TABLE WITHGLASS OR GRAVEL INFILL ANDNATURAL GAS FIRE SOURCEBIKE RACKLOCATIONSHADE TRELLIS STRUCTURE - CONCEPTUAL DETAIL6 X 12 STEEL TUBE TRELLISFRAMEINTERIOR 3 X 12TUBULAR STEELFRAMING WITH 1 X 6WOOD LATTICELOW CONCRETE BACKDROPWALL, 3' HIGH8 X 8 TUBULAR STEELTRELLIS POSTCONCRETE SCREEN WALL,6' HIGHELEVATIONPLAN VIEWINTERIOR 3 X 12 TUBULAR STEELFRAMING WITH 1 X 6 WOOD LATTICE6 X 12 STEEL TUBE TRELLIS FRAME G A T E W A Y R O A DEXISTINGBUILDINGE L C A M I N O R E A L HDC A PEG EL A NR ISDTCE SICRA Twww ridgela com8841 Research DriveIrvine, CA 92618Tel 949 387 1323Suite 200RSLADesign DevelopmentConstruction SetSheet NumberJob NumberScaleDrawing DateCheck ByDrawn ByPlan CheckPermit SetPlanningBid SetIssue DatesRevision DatesAS NOTED12085.S0112/17/201310/17/2013-13-0398-03C13-0513-1313-0713-09SUPSUP AMENDMENTSDPMCUPMSPUDLANDSCAPE CONCEPT STATEMENTTHE PEDESTRIAN CONNECTION CONCEPT GOALS ARETO LINK THE CAMPUS ACROSS EL CAMINO REAL WITHA SAFE, DISTINCTIVE PEDESTRIAN CROSSING.PEDESTRIAN'PLANKS' LINKTHROUGH THEPARKING LOTNEW ENTRY PAVING TOEXISTING BUILDINGNEW ARRIVAL COURTYARDENHANCED PAVINGOLIVE GROVE WITH ACCENT PLANTBANDS OF DROUGHT TOLERANTSHRUBS, SUCCULENTS ANDORNAMENTAL GRASSESPROPOSEDDECORATIVETRAFFICSIGNALPROPOSEDDECORATIVETRAFFICSIGNALSUCCULENT ACCENTPLANTING DEFINESPEDESTRIAN PLAZA AREADIFFERENTIATING THISZONE FROM THE EXISTINGMEDIAN TREATMENTSUCCULENT ACCENTPLANTING DEFINESPEDESTRIAN PLAZA AREADIFFERENTIATING THISZONE FROM THE EXISTINGMEDIAN TREATMENTPEDESTRIAN CROSSING, STANDARDTHERMOPLASTIC, WHITE COLORRELOCATED BRESSIRANCH SIGNPEDESTRIANCONNECTION TOBUILDING 10EXISTING MEDIAN -STAMPED CONCRETEAND STREET TREES,TO REMAINNEW VIASATMONUMENT SIGNAND RELOCATEDFLAG POLESPROPOSED TRELLIS STRUCTURESSUBJECT TO ENCROACHMENTAGREEMENT - REFER TOARCHITECTURAL DETAIL 3, SHEET A4.2PROPOSED TRELLISSTRUCTURE - REFERTO ARCHITECTURALDETAIL 1, SHT. A4.2PROPOSED TRELLISSTRUCTURE - REFERTO ARCHITECTURALDETAIL 1, SHT. A4.2.E I TINGR O WPROPOSEDR.O.W.EXISTINGR.O.W.300' LINEOF SIGHT660' LINEOF SIGHTPRIVATELY OWNED & MAINTAINED MEDIAN TRELLISAMENITIES IN THE EL CAMINO REAL R.O.W.MEDIAN LANDSCAPING AND IRRIGATIONPEDESTRIAN CROSS WALK PAVEMENT & STRIPING AT EL CAMINOREAL AND GATEWAY ROADNORTHBOUND DECORATIVE TRAFFIC SIGNAL AND ASSOCIATEDHARDWARESOUTHBOUND DECORATIVE TRAFFIC SIGNAL AND ASSOCIATEDHARDWAREPRIVATELY OWNED & MAINTAINED WEST SIDE PEDESTRIAN TRELLISAMENITIES OUTSIDE THE EL CAMINO REAL R.O.W.EAST SIDE TRELLISBUS STOP TRELLIS AND SLAB FOR BENCH (NOTE: BENCH BY N.C.T.D.)PROPOSED MEDIAN PLANTER LANDSCAPE, IRRIGATIONAND TRELLIS STRUCTURE ARE SUBJECT TO A MEDIANINSTALLATION/MAINTENANCE AGREEMENT WITH THECITY'S FINANCE DIVISION. SEPARATE WATER/ELECTRICMETERS ARE REQUIRED TO BE INSTALLED BY THEOWNER, WITH AN AUTOMATIC IRRIGATION SYSTEMSEPARATE FROM THE CITY'S SYSTEM (RETROFIT CITY'SEXISTING IRRIGATION SYSTEM AS REQUIRED).12345678PROPOSED 24' X 8'COMMUTER WAITINGAREA WITH BENCH88PROPOSED PUBLICPEDESTRIAN EASEMENT6PROPOSEDTRUNCATED DOMESPROPOSED STEELBOLLARDS33LIMITS OFCONCRETEPAVING325433PROPOSED RAISEDMEDIAN WITHPEDESTRIAN BREAKPROPOSEDDIRECTIONAL RAMPSW/ TRUNCATED DOMESPROPOSED TRELLISSTRUCTURE - REFERTO ARCHITECTURALDETAIL 2, SHEET A4.21PROPOSEDNON-STANDARDPAINT OVERCONCRETE3LIMIT LINES - STANDARDTHERMOPLASTIC PAINT,WHITE COLOR2PROPOSED STEELBOLLARD7HATCH INDICATESAREAS OF PERVIOUSPAVING MATERIAL,TYPICAL LIGHTING FIXTURE SCHEDULE TYPE VOLTAGE* INPUT WATTAGE MOUNTING FIXTURE DESCRIPTION FIXTURE ALTERNATE ALTERNATE LAMP BALLAST NOTES MANUFACTURER CATALOG # MANUFACTURER CATALOG # MANUFACTURER CATALOG # # CODE # CODE M01A 277 142 POLE AREA POLE TOP FIXTURE TYPE III-ASYMMETRIC DISTRIBUTION. NOMINALLY 17.5IN X 17.5IN X 7IN DIE-CAST ALUMINUM HOUSING, ANODIZED ALUMINUM REFLECTOR AND IMPACT-RESISTANT GLASS LENS. 20FT MOUNTING HEIGHT ON MARINE GRADE ALUMINUM, STRAIGHT SQUARE POLE, ON 3'-0" CONCRETE BASE. UL WET LISTED. MANUFACTURERS STANDARD FINISH AS SELECTED BY ARCHITECT. PROVIDE WITH MOBILE LOW PROFILE BIRD DETERANTS MECHANICALLY ATTACHED ON TOP OF EACH FIXTURE. LITHONIA KAD-175M-R3-277 SPD 04 1 175W METAL HALIDE 1 ELECTRONIC - INTEGRAL M01B 277 284 POLE SIMILAR TO TYPE 'L01A' EXCEPT WITH (2) FIXTURE HEADS LITHONIA KAD-175M-R3-277 -SPD-04 1 175W METAL HALIDE 1 ELECTRONIC - INTEGRAL M02 277 56 POST SINGLE POST TOP FIXTURE WITH ALUMINUM COVER AND HOOD, STAINLESS STEEL SUPPORT RODS AND TYPE IV DISTRIBUTION REFRACTOR. 15FT MOUNTING HEIGHT ON MARINE GRADE ALUMINUM ROUND POLE. SELUX SAMG--MR-1-H15 0-277 1 150W METAL HALIDE 1 ELECTRONIC - INTEGRAL M03 277 42 BOLLARD DIE-CAST ALUMINUM BOLLARD LIGHT. 8" DIAMETER x 3;-6" TALL WITH WHITE TRANSLUCENT ACRYLIC SHIELDING INSIDE DIE-CAST ALUMINUM RINGS. SELUX COR-3-H070-277 1 70W METAL HALIDE 1 ELECTRONIC - INTEGRAL 2 0 1 3 S m i t h C o n s u l t i n g A r c h i t e c t s JG ND Drive South - Ste 125 13280 Evening Creek (858) 793 - 4777 (858) 793 - 4787 Fax San Diego, CA 92128 ConsultingSmith Architects Design Development Construction Set Sheet Number Job Number Scale Drawing Date Check By Drawn By Plan Check Permit Set Planning Bid Set Issue Dates Revision Dates AS NOTED 12085.S01 11/27/2013 (3rd) 11/27/2013 - C A M P B E L L P E L C A M I N O R E A LBUILDING 10 PHASE 1 3-STORY OFFICE BUILDING BUILDING 11 PHASE 2 3-STORY OFFICE BUILDING G A T E W A Y R O A D 2 0 1 3 S m i t h C o n s u l t i n g A r c h i t e c t s JG ND Drive South - Ste 125 13280 Evening Creek (858) 793 - 4777 (858) 793 - 4787 Fax San Diego, CA 92128 ConsultingSmith Architects Design Development Construction Set Sheet Number Job Number Scale Drawing Date Check By Drawn By Plan Check Permit Set Planning Bid Set Issue Dates Revision Dates AS NOTED 12085.S01 11/27/2013 (3rd) 11/27/2013 - Calculation Summary Label CalcType Units Avg Max Min Phase 1 Site Illuminance Fc 1.86 10.2 0.0C A M P B E L L P E L C A M I N O R E A LBUILDING 10 PHASE 1 3-STORY OFFICE BUILDING BUILDING 11 PHASE 2 3-STORY OFFICE BUILDING G A T E W A Y R O A D 0 2 0 7 0 4 9 0 1.2 1.1 0.5 0.7 9.7 1.3 3.3 1.0 1.1 0.9 1.5 1.1 1.3 1.3 1.6 2.0 1.3 1.1 0.6 0.7 0.9 2.3 2.2 4.4 2.0 6.2 1.6 3.4 2.9 4.1 10.1 2.7 10.2 2.9 2.0 0.8 0.9 1.2 0.8 2 5 2 6 0 9 0 8 0 7 1 0 2 5 2 2 1 6 6 3 2 1.5 2 2 1.7 0 8 1.8 1.3 0.6 0.4 0.4 0.7 1.5 1.9 1.3 1.2 9.0 2.4 2.7 1.6 0.9 0.8 0.8 1.8 1.2 0.5 0.3 0.3 0.6 1.5 1.9 1.6 1.3 1.7 2 2 2.0 1.8 2.0 1.9 1.4 0.1 2.0 1.7 0.5 0.3 0.3 0.7 2.4 2.1 1.4 1.4 1.6 3.0 2.1 1.5 1.9 2 1 1.9 1.6 0.9 0.6 1.1 1 3 0 5 0 3 0 4 0 9 1.7 1.4 1.5 1.5 1.5 2 4 2 0 1 3 1 0 1 2 1 9 2 7 1 2 0 8 0 7 3.6 3.2 1.4 2.0 2.0 1.8 1.4 1.2 1.7 2.6 1.9 1.5 1.3 1.0 1.8 1.7 1.7 1.9 1.8 2.7 2.7 1.5 1.5 2.3 2.8 3.3 2.1 1.7 1.2 0.8 1.6 2.0 1.8 2.0 2.6 3.0 3.4 1.6 2.1 2.2 2.2 2.2 2.1 2.5 1.6 1.1 0.9 1 6 1 9 1.5 1 6 2 7 3 6 3 3 6 4 0 2 9 2 2 1 8 1 8 3 2 2 9 1 8 1.7 1 2 0 8 1.5 1.2 0.9 1.0 1.4 1.9 3.0 4.0 3.1 3.2 3.1 2.1 1.8 2.2 3.1 3.6 2.4 1.8 1.3 0.7 0.5 1.0 0.8 0.7 0.9 1.2 1.4 2.4 3.4 2.5 2.9 4.2 2.9 1.6 2.0 2.2 2.1 1.9 2.6 2.1 1.1 0.7 0.7 1.4 1.0 0.8 1.1 1.2 1.4 1.7 2.5 3.0 3.7 4.2 3.5 3.3 3.3 2.5 2.0 1.7 2.1 2.4 1.7 1.4 1.2 1.2 0.9 0.2 1.4 1.4 0 9 0 8 1 6 2 0 1.5 1 8 2 3 3 0 3 0 3 6 4.1 3 5 3 4 2 9 2 0 1.7 2 4 2 4 2 5 2 8 1 8 1.5 0 9 0 5 0 3 0 3 0 3 1.5 1.3 0.8 0.7 1.3 2.7 1.9 1.6 1.7 1.7 1.6 3.4 3.6 2.4 3.3 4.3 2.9 2.6 2.6 2.2 2.1 1.8 1.6 2.5 1.5 0.6 0.6 0.6 4.9 0.9 0.1 1.3 0.9 0.6 0.6 1.0 1.8 2.2 2.6 2.4 1.9 1.9 2.4 3.1 3.2 3.8 4.1 4.0 4.2 4.0 2.8 1.9 1.1 1.1 1.7 1.7 1.2 1.8 1.6 1 4 0.9 0.6 0.5 0.6 0.8 0.4 2.4 2.9 2.7 2.5 2.4 2.0 2.1 2.8 3.6 3.6 4.1 4.1 4.6 4.2 2.5 1.6 1.2 1.0 1.3 1.3 2.0 1.8 1 2 0 8 0 5 0 4 0 4 0 7 2 3 2 0 1.4 2 2 3 2 2 3 1 8 1 9 2 0 2 6 4.1 4.4 3 9 4 0 3 5 3 2 2 0 1.4 1 3 1 0 1.5 1.1 0.5 0.3 0.2 0.7 1.1 0.8 1.1 1.7 3.2 2.6 2.3 2.1 2.0 2.4 2.8 3.7 4.1 3.6 3.5 2.8 2.0 2.1 2.3 0 7 1.5 1.5 1.1 0.5 0.2 0.3 0.4 0.6 0.7 1.0 1.8 2.8 3.0 3.5 3.1 2.7 2.6 2.0 2.0 2.2 2.1 3.1 2.5 1.3 2.1 2.7 1.2 1.1 0.6 0.3 0.2 0.2 0.3 0.4 0.5 1.0 2.0 1.7 2.5 2.3 2.1 2.2 3.0 2.7 1.7 1.2 1.3 1.6 1.9 1.5 1.3 0.7 0 6 0 5 0 4 0 3 0 2 0 3 0 3 0 4 0 4 0 8 1.4 2 0 2 1 1 6 1 6 2 0 2 8 3 5 2 0 1.7 1.4 1.1 1.4 1 8 8 8 0 7 0.5 0.5 0.4 0.3 0.3 0.3 0.5 0.5 0.2 0.6 0.8 1.2 1.3 1.2 1.6 2.3 2.5 2.7 2.2 2.7 1.9 1.4 1.3 0.5 1.0 0.9 0.6 0.4 0.4 0.4 0.6 0.7 0.2 0.9 0.7 0.7 0.8 1.0 1.6 2.3 2.2 1.3 1.8 1.2 1.1 0.9 1.7 1.5 1.1 0.8 0.6 0.7 0.9 1.3 1.4 1.2 1.0 0.6 0.6 0.8 1.1 1.8 1.9 1.3 1.6 0.9 0.6 0.6 1 4 1.5 1.5 1 2 1 2 1.5 2 1 9 1 9 2 2 1 3 0 8 0 9 0 8 0 9 1 3 1 2 1 3 1.7 0 8 0 5 0 4 1.9 1.4 1.5 1.5 1.5 1.6 1.9 1.4 1.7 2.7 1.9 1.4 1.4 1.1 1.5 1.7 1.6 1.5 1.1 0.6 0.4 0.3 1.0 2.0 2.0 1.2 1.7 2.3 2.0 2.1 1.3 1.0 1.2 1.5 1.5 1.6 1.7 1.5 1.2 1.0 0.8 1.2 1.6 2.0 1.8 1.7 1.6 2.1 2 5 2 0 2.3 1.2 0.6 0.5 0.3 0.2 1 9 2.2 1.7 2.1 3 0 3.0 2.8 1.7 1.2 1.4 1.9 1.9 2.2 2.1 2.2 2.3 1.6 1.4 1.8 2.1 2.2 2.2 1.8 1.3 1.6 1.5 1.6 2.5 1.9 1.0 0.7 0.4 1.1 2 4 3 7 2 6 2 8 3 5 2 8 3 1 2 9 2 2 2 7 2 8 2 0 3 0 2 7 2 7 3 9 3 0 2 8 3 8 3 0 3 0 3 2 2 1 1 8 1 9 1.7 1.5 1.5 1.4 1 2 0 8 0.9 1.7 3.4 3.1 2.1 1.7 1.4 1.6 2.1 2.2 2.1 1.5 1.3 1.9 2.3 2.9 3.9 3.4 3.5 3.2 2.4 2.9 4 1 3.2 3.1 3.8 3.2 2.5 1.6 1.2 1.2 0.9 1.0 1.6 3.5 2.7 1.4 0.9 0.7 0.8 1.0 1.0 1.0 0.8 0.8 1.2 1.6 2.4 3.3 2.7 3.1 3.8 2.9 3.3 4.3 3 6 4.2 3.4 3.7 4.1 2.5 1.9 1.6 1.2 1.1 2.2 3.3 2.2 1.3 0.7 0.5 0.4 0.5 0.6 0.7 0.8 0.8 1.0 1.0 1.3 1.4 1.1 1.9 2.5 2.6 2.9 2.8 2.1 4.1 3.7 3.3 4.2 3.5 3.5 2.5 1.7 1 0 2 0 2 6 1 9 1.1 0 6 0 3 0 3 0 3 0 4 0 7 0 9 1 0 1.1 1 0 1 0 1.1 1.1 1.5 1.5 1 3 1.5 1.4 1.7 2 6 3 3 4.1 3 4 3 4 3 3 2 1 2.0 3.8 2.5 0.8 0.4 0.2 0.2 0.2 0.4 0.8 1.2 1.8 2.1 1.6 1.8 2.1 1.6 1.4 1.0 0.8 0.7 0.6 1.0 1.2 1.5 1.8 1.4 2.3 2.9 1.8 1.8 4.0 2.6 0.8 0.3 0.2 0.1 0.2 0.4 0.8 1.2 2.1 3 4 3.0 3.1 2.9 1.6 1.1 0.7 0.5 0.4 0.4 0.5 0.5 0.7 0.9 0.8 1.3 1.6 1.6 1.7 2.5 1.9 0.9 0.5 0.2 0.2 0.3 0.4 0.9 1.1 2.1 3.5 3.2 3.3 2.6 1.5 1.0 0.7 0.4 0.3 0.2 0.2 0.3 0.3 0.4 0.7 1.1 1.2 1 8 2 5 1 8 0 9 0 5 0 3 0 3 0 4 0 6 1 0 1.4 2 0 2 8 2 2 2 3 2 7 1 8 1 2 0 0 0 0 0 2 0 2 0 2 0 2 0 2 0 4 0 7 1 2 1 6 1.3 3.0 2.1 1.0 0.7 0.5 0.6 0.8 1.1 1.3 1.4 1.2 1.5 1.6 1.7 1.6 1.3 1.0 0.8 0.0 0.3 0.3 0.3 0.2 0.2 0.4 0.8 1.1 1.8 1.1 2.3 2.5 1.7 1.3 0.7 1.2 1.7 1.7 2.0 1.7 1.0 1.6 1.9 2.1 2.0 1.4 0.9 0.9 0.9 0.9 0.7 0.5 0.3 0.3 0.6 1.0 1.2 2.0 1.1 2.3 2.9 3.0 3.0 2.0 2.6 3.2 3.1 3.3 2.8 1.6 3.1 3.0 3.0 3.4 2.4 1.2 1.6 1.7 1.6 1.3 0.9 0.6 0.6 0.9 1.5 1.9 0 7 1.4 2 7 2 6 2 8 3 9 3 4 3 9 3 3 2 6 3 3 4.1 3 6 4.4 3 1 2 7 3 7 3 5 3 1 3 6 2 8 2 4 2 4 1 8 1.1 1.1 1.5 1 9 1 8 0.9 2.0 3.5 2.4 2.7 3.7 3.2 4.0 3.8 3.0 3.8 4.2 3.5 4.5 3.7 3.5 4.4 3.6 3.5 3.0 2.5 2.2 3.1 3.3 2.3 2.5 2.7 2.5 2.5 1.1 2.0 2.7 2.3 2.3 2.4 1.9 2.7 3.6 3 6 3.5 2.9 1.8 3.4 3.4 3.4 3.3 1.8 3.0 3.5 2.8 2.7 3.1 3.9 3.3 4.0 2.9 2.1 2.7 1.1 2.2 2.9 2.1 1.9 1.7 1.1 2.2 3.0 2.9 3.0 2.3 1.6 2.7 2.9 2.9 2.7 1.5 2.2 2.8 3.0 3.3 3.6 3.0 3.0 3.7 2.4 1.4 1.7 2 6 2 6 2 6 1.5 3 4 3 5 3 5 3 6 3 2 2 0 3 9 3 8 3 9 3 9 1 9 3 0 3 1 2 8 2 4 2 0 1 8 2 1 2 6 2 1 1.5 1.5 1.3 1.4 1.7 1.4 1.3 1.3 1.4 9.9 0.9 0.8 0.9 0.8 1.2 3.0 0.6 0.5 0.5 0.7 3.5 0.6 0.4 0.3 0.2 0.2 2 0 1 3 S m i t h C o n s u l t i n g A r c h i t e c t s JG ND Drive South - Ste 125 13280 Evening Creek (858) 793 - 4777 (858) 793 - 4787 Fax San Diego, CA 92128 ConsultingSmith Architects Design Development Construction Set Sheet Number Job Number Scale Drawing Date Check By Drawn By Plan Check Permit Set Planning Bid Set Issue Dates Revision Dates AS NOTED 12085.S01 11/27/2013 (3rd) 11/27/2013 -