HomeMy WebLinkAbout; 2500 Navarra Drive Multi-Residential Units; Soils Report; 1973-01-11BENTON ENGINEERING, INC.
PHlLlP HENKlNG BENTON
CRE*IDLNT. ClYlL ENGIr4EEr(
APPLIED ScJ,L MECHANICS -~~ FO”NDATIONS
6717 CONVOY COURT
SAN DIEGO. CALIFORNIA 82111
January 11, 1973 ,EI.EP”ON~ ,,,A, 565.l9SJ
Prover Bms. lnvestmenk
9744 Wilshire Blvd.
Suite 203
Beverly Hills, California 90212
Attention: Mr. Stan Pmver
Gentlemen:
This Is to tmnsmit to you six copies of our report of Pmlect No. 72-l l-28A entitled, “Soils
Investigation, Multi-residential Unik, 2500 Novarm Drive, La Costa Area of Son Diego
County, California,” dated January 11, 1973.
We are tmnsmitting under sepomte cover two copies to Walter Richardson Associates; two copies
hand delivered January 12, 1973 to Toups Engineering, Inc., Attention: Mr. Ed Roberts;
two copies to Title lnsumnce and Trust Company, Attention: Ruth Rogers; and two copies to
Steinbrugge and Thomas, Incorpomted.
If you should have any questions concerning any of the data presented in this report, please
contact us.
Very truly yours,
BENTON ENGINEERING, INC.
SOILS INVESTIGATION
Multi-mddential Unik
2500 Navarm Drive
La Costa Area of
Son Diego County, California
Pmver Bras. Investments
Pmlsrt No. 72-l I-2BA
January 11, lw3
BENTON EN.3INLERING. INC
BENTON ENGINEERING, INC.
APPLIED SOlL MECH*NICS -- FO”NDATIONS
6717 CONVOY COURT
SAN DIEGO. C*LIFORNIA 82111
PHlLlP HENKING BEN-ION
PRLOIDLNT CIY,L ENelNLFl
SOILS INVESTIGATION
Introduction
TELLP”(oHE (7111, 685.1855
This is to present the resulk of CI soils investigation conducted at the site of the proposed
mult-residential units and recreational facilities located at 2500 Navorm Drive, La Costa,
California, brmerly Lots 46 to 52, inclusive, of La Costa South Unit No. 1, La Costo, Son Diego
County, California.
It is understood that the proposed residential structures will consist of concrete block and
wood fmme construction with continuous footing loods varying from 2 to 8 kips per lineal foot
ond with column loods up to approximately 135 kips. In addition there is to be on underground
porking facility with the upper slob being utilized os o tennis court area. Column loads for this
facility will be on the order of 80 kips. There is to be some cut and fill required according to the
present grading plans.
The obiectives of the lnvestigotion were to determine the existing subsurface conditions
and physlcol proparties of the soils in order that recommendations could be presented for the
design of economical and safe foundation support for the pmposed structures to be located on this
site. In order to accomplish these oblectives, six borings were drilled ond representative
undisturbed ond loose soil samples were obtained for laboratory testing.
Prior gmdlng opemtions involved cutting to a fairly level grade on a portion of the front,
streetaide of Lok 46 to 48, Inclusive, and o majority of the arem of the remalnlng lok. In
addition, the eastern portion of Lot 46 was brought up to existing grade with compacted fill.
Field lnvestigotion
The six borings were drilled, each to a diameter of 24 inches, wlth a truck-mounted mtory
b&et-type drill rig at the opproxlmote loccttlons shown on the ottached Dmwing No. 1, entitled
“Location of Test Borings.” The borings were drilled to depths of 15 to 36 feet below the existing
ground surface. A continuous log of the solls encountered ln the borings wos recorded ot the time
of drilling and Is shown In detail on Dmwfng Nos. 2 to 10, Inclusive, each entitled “Summory
Sheet. ‘I
The solis were visually claolfied by field identitlcotion procedures in occordcmce with the
Unified Soil ClossiRcatlon Chort. A simpllfled descrlptlon of this clossiflcotlon system is presenhd
in the attached Appendix A at the end of this report,
Undisturbed samples were obtained at frequent intenals, where possible, in the soils ahead
of the drilling. The drop weight used for driving the sompllng tube into the rolls was the “Kelly”
bar of the drill rig which weighs 1623 pounds, and the ovemge drop was 12 inches. The general
procedures used in field sampling ore described under “Sampling” in Appendix B.
Lobomtory Tesk
Labomtory tesk were performed on all undisturbed samples of the soils in order to deter-
mine the dry density, moisture content, and sheorlng strength. The resulk of these task ore
presented on Dmwing Nos. 2 to 10, Inclusive. Consolidation tesk were performed on represent-
otlve samples in order to detenine the lood-settlement chomcteristia of the soils ond the resulk
of these tesk ore presented graphically on Dmwing Nos. 11 to 17, inclusive, each entitled
“Consolidation Curves. ”
In addition to the above lobomtory tesk, expansion tesk were performed on some of the
clayey soils encountered to determlm their volumetric chowa chomcteristlcs wlth change in
moisture content. The recorded expcpcnsions of the samples ore presented on the following poge.
BENTON ENGINEERINO. INC.
-3-
fkcent Exponslon
Under Unit Load of
Depth of 150 Pounds per Square
Borlng Sample Somple, So11 Foot from Alr Dry
No. No. In Feet Description to Satumtlon
2 1 1 .O Fine to medium sondy cloy 0.30
3 2 12.0 Fine sandy cloy 1.48
4 2 4.0 Cloy and fine sandy cloy 2.44
4 4 11.0 Flne sandy clay 2.87
5 2 4.0 Fine to medium sandy cloy 4.74
6 2 6.0 Flne to medlum sandy cloy 1.91
The geneml procedures used for the obove loboratory task ore described brlefly In
Appendix B.
Compaction tests were performed on representative samples of the soils to be exarvoted
to establish compaction criteria. The soils were tested occordlng to the A.S.T.M. D 1557-70
method of compoctlon which uses 25 blows of a 10 pound mmmer dropping 18 inches on each of
5 layers in a 4 inch dicrmater l/30 cubic foot mold. The raulk of the tests ore presented as
follows:
Maximum Optimum Mols-
brh3 eoS Depth WI Dry Density turn Content
No. Sample in Feet Description lb/c” ft %drywt
1 2 5.0 - 6.0 Clayey fine to medium 122.3 11.0
sond
1 3 9.0 - 10.0 Fine to medium sand 122.9 10.9
DISCUSSION, CONCLUSIONS AND RECOMMENDATIONS
Soil Stmta
The soil stmto encountemd at Boring 1 consisted~of a 1.2 feet layer of firm flne to medium
sandy cloy overlying 0 0.4 faot layer of firm clay. Beneath this, from 1.6 to 4.0 feet, a firm fine
to medium sondy cloy was found. From 4.0 to 5.8 feet o very flrm clayey fine to medium sand was
encountemd. Below this, to the depth of explomtion of 16.0 hot, o fin to very firm fine to
medlum sand wos found.
BENTON ENGINEERING. INC.
-4
At Boring 2, CI 1 .O foot layer of medlum soft, fine to medium sandy clay topsoil was
found overlying o 1.2 feet thick layer of very firm fine to coarse sandy cloy. A slightly clayey
fine to medium sand wus encountemd from 2.2 feet to 10.4 feet when, It merged to o very firm
fine to worse sandy clayey gravel that was found to the depth of explomtion of 15.0 feet.
At Boring 3, drilling penetmted approximately 4.0 feet of fill soil which Was gmde.d in
order to locate the drill rlg on the existing sloping natuml ground. Notuml soil was encountered
at o depth of 4.0 feet and consisted of 1.5 feet of very firm clayey fine to coorse sandy gravel.
Below this o firm clay containing occasional lenses of f7ne sandy cloy was found to o depth of
11.2 feet where it merged to o very firm fine sandy cloy. From 13.9 to 16.6 feet o medium firm
slightly clayey flne fr, medium sand was encountered. Underlying this to o depth of 18.5 feet a
medium firm clayey fine to medium sand was found. From this depth ot 24.0 feet, the dapth of
explomtion, CI very compact flne to medium sand was encountered.
At bring 4, (I medlum firm flne to medium sandy cloy wus found to o depth of 1.6 feet.
below this to a depth of 9.0 feet the soil consisted of interbedded layers of medlum firm cloy and
ffne sondy cloy. At 9.0 feet the soil merged to a medium firm to firm flne sondy cloy contoinfng
occasional thin lenses of fine and fine to medium sand. At 18.0 feet, the soil changed to Q
medium soft, silty tTne to medium sand which contained occasional thin lenses of clay. The con-
sistency of this soil changed to medlum firm to firm ot 21.5 feet. Below this from 31 .O to 33.5
feet a flrm slightly silty fine to medium sand was found. From 33.5 to 35.7 fact a firm flns sandy
silt wos encountered. Underlying this, to the depth of explomtlon of 36.0 feet, a firm slightly
clayey fine to medlum sand was found.
At Boring 5, 0.7 foot of medium compact fine to medlum sand was found overlying o very
firm slightly silty fine sand to 2.1 feet in depth. From 2.1 to 5.0 feet a very firm fine to medium
sandy clay wus encountered which merged Into a medium firm slightly clayey fine te medium sand.
Below this o very firm clayey fine to medium sand was encountered from 7.5 to 10.0 feet when, it
BENTON ENGINEERING. 1NC.
-5-
merged to a fine to coarse sandy clayey gmvel which was found to the depth of explomtion of
21 .O feet except for a layer of clayey Rne to coarse sand found from 18.5 to 19.1 feet.
At Boring 6, o 0.7 foot loyer of ff rm fine to medium sandy cloy was found overlying a
very firm clayey fine to medium sand. At 3.5 feet this soil merged to (I firm fine to medium
sandy clay. At 12.0 feet the consistency of this sandy clay changed to very firm until a depth
of 18.0 feet whem the soil met& to a very firm clayey fine to medium sand. From 23.0 to 24.7
feet o very firm fine sandy cloy was fwrxi. Below this, to the depth of explomtlon of 25.0 feet,
0 firm clay was encountered.
Ground water wos encountered at a depth of 24.0 feet in Boring 3 and below 18.0 feet
In Boring 4.
Conclusions
It is conchrded from the fleld lnvestigotlon and the resulk of the lobomtory testing thatr
1. The on-site soils ore capable of supportIng the prOposed structural loads,
provided that Footings ore designed in accordanus with the recommended
bearing values which will be presented under “Recommerxkstions” in a
subseque& sectlon of this report.
2. Some of the on-slh soils ore sufflclently expansive under condltlons of
variations in moisture content to wurmnt the adopting of certain special
design preccrutions, where these solls occur within 3 feet below flnlsh grode.
3. The load-settlement chamcterlstlcs of the soils am sufficiently fovomble
to permit the use of spmod footings.
Recomme.n&tions
1. Grading
Prior to placing coyxlcted filled ground, it is mcommended that all soft or loose soils
In areas that am to receive fill be excavated, to expose firm natural soils. iiorizontal benches
BENTON ENGINEERING. INCA
-6-
should be excavated in the sloping hillside area into firm undisturbed soils, and the then exposed
soils should be scarified to a depth of 6 inches, moistened to optimum, and then uniformly com-
pacted to ot least 90 percent of maximum dry density. Thereofter approved fill material moy
be placed and uniformly compacted to ot least 90 percent of maximum dry density.
All of the soils that om to be excavated from cut omos am suitable for use os fill materials.
However, it is moommended that the gmy-brow and yellow-brown fine to medium sandy cloy
soils, such as was encountemd between the depths of 2.0 and 5.0 feet ot Boring 5, be used only
crt depths of 3.0 feet or mom below Rnlsh gmde, or in non-building omas.
it 1s also recommended that all gmding be accomplished in occordonce with the attached
Appendix AA, entitled “Standard Specifications for Placement of Compacted Filled Ground.”
2. Footings
Due to the variations in the physical properties of the soils at the various boring locations,
mcommendations for allowable beorirlg values to be used in the design of footings for the several
different categories of footlng loadings Indicated to us by Steinbrugge 8, Thomas, Structuml
Engineers, on o dmwlng provided us by Walter Richardson Associates, Architects, will be presented
sepomtely. These mcommendotions ore as followsr
Geneml
It is recommended that no footings be founded partly on filled ground and partly on notuml
soils, and that footings be placed in fllled ground only where there is a thickness of such filled
ground below the footing at least as great as the width of the footing.
All of the recommended ollowoble bearing values given below am for deud plus live loads
only, and may be Incmased one third for combined dead, live and seismic loads.
4 Concrete Garage with Tennis Courts Over
One foot wide continuous footirqs located at a depth of one foot in the firm to very firm
fine to medlum sand t&nd below 5.8 feet at Rorirg T (below Elevotlon 61.9 feet), may be
BENTON ENGINEERING. INC
-7-
designed for on ollowoble beoring value of 2O@l pounds per squom foot. This value moy be
increased at CI mte of 925 pounds per square foot for each foot of depth in excess of one foot,
and ot on additionol mte of 450 pounds per square foot for each foot of width in excess of one
foot, to a recommended moximum value of 4ooO pounds per square foot.
Square footings that ore 3.0 feet wide and similarly located may be designed for on allow-
able bearing value of 2700 pounds per squam f&t. This value moy be incmosed ot a mte of 925
pounds per squore foot for each foot of depth In excass of one foot, ond at on additional mte of
350 pounds per square foot for each foot of width In excess of 3.0 feet to a recommended moximum
value of 5ooO pounds per square foot.
b) Combinotion Wood Frame and Concmte Block, (Northwesterly)
One foot wide continuous footings located at least one foot into the medium firm clayey
fine to medium sand such OS MIS found below Elevvation 23 feet, (below 14 feet in depth) in
Boring 3, or the medium firm c Ioy and fine sandy cloy loyers found between the depths of 1.6 and
9.0 feet ot Boring 4 moy be designed for on allowable bearing value of 4200 pounds per square foot.
This v&e may be increased at o mte of 275 pounds per squom foot for each foot of depth in excess
of one foot, ond at on additional mte of 75 pounds per square foot for each foot of width in excess
of one foot, to o recommended maximum value of 4500 pounds per squam foot.
4 Combinotion Wood Frame and Concrete Block (Northeasterly)
One foot wide continuous footings located at least one foot into the very firm slightly silty
f7ne sand such as was found between the depths of 0.8 and 2.2 feet ot Boring 5 may be designed
for on allowable beorlng value of 2OOU pounds per square foot. This value may be increased at
a rote of 275 pounds per square foot for each foot~of depth in excess of one foot, ond at on odd]-
tional mte of 75 pounds per square foot for each foot of width in excess of one foot, to a
recommended maximum volue of 3000 pounds per square foot.
BENTON ENGINEERING. INC.
-B-
4 Concrete Gamge With Wood Fmme Unik Over (Adjacent to Navorm Drive)
One foot wide continuous footings located one foot into the fim fine to medium sandy
cloy found between 3.5 and 12 .O feet at Boring 6 moy be designed for on allowable bearing
value of 2000 pounds per square foot. This value moy be increased at a mte of 350 pounds per
square foot for each Foot of depth in excess of one foot, and at on additional rate of 100 pounds
per square foot for each foot of width in excess of one foot, to a recommended maximum value
of 3OOU pounds per square Foot.
Square footings that ore 3.0 feet wide ond similarly located may be designed for on allow-
able bearing value of 2650 pounds per square foot. This value may be lncreosed at CJ mte of 350
pounds per squam foot for each foot depth In excess of one foot, and ot on additional mte of 85
pounds per squom foot for each foot of width in excess of 3.0 feet, to a recommended maximum
value of 3000 pounds per square foot.
e) Footings in Compacted Filled Ground
One foot wide continuous footings located ot o depth of one foot into properly compacted
filled ground moy be designed for on ollowoble bearing value of 2700 pounds per square foot.
Square footings that ore 3.0 feet wide and similarly located may also be designed for on
allowable bearing value of 2700 pounds per square foot.
Settlements
Estimated toto! settlements, bosed on the resulk of the load-consolidation tab, hove been
calculated for Q number of typical footings designed in accordance with the foregoing recommend-
ations. These estimoted total settlemenk am presented on the following poge.
Footing Type ond Size
1 foot wide continuous
3 feet wide sqwre
1 foot wide continuous
1 foot wide continuous
1 foot wide continuous
3 feet wide square
1 foot wide continuous
3 feet wide sqwre
Comment
Location
-9-
Deslgn Unit
Load
Wsq ff)
Concrete Gomge with
Tennis Courk Over
Concmte Gomge with
Tennis Courts Over
Combination Wood Fmme
and Concrete Block
(Northwesterly)
Comblnatlon Wood Fmme
and Concnte Block
(Northeasterly)
Concrete Garage. with
Wood Frame Units Over
Concrete Gamge with
Wood Frame Units Over
Filled Ground
Fi I led Ground
2000
2700
4200
2ooo
2000
2650
2700
2700
Estimated
Totol Settlement
Approximately l/4 inch
Approximately l/2 inch
Less than 3/B inch
Approximately l/4 inch
Approximately l/4 inch
Approximately l/2 inch
Less than l/B inch
Less than l/4 imh
It may be noted from the results of the expansion tesk that ot Ieost one somple of clayey
soil (Somple 2 of Boring 5) was found to be exponsive. It is themfom probable thot simllor
potentially exponslve soils exist within the upper 3.0 feet below finish grade, at locations other
thon those at which the borings warn drilled. It is therefore recommended that, durlng groding,
the inspecting soils technicion scmple any suspected expansive cloy soils to 3 feet below the
proposed finished gmdes, in order to evaluate the potentiol expansiveness and in order thot
appropriate mcommendotions moy be mode t%r the removal of expansive soils and the mplacament
of these with nonexpansive soils.
Respectfully submitted, ,_/‘~--
BENTON ENGINEERING, INC. Reviewed b G,
&$yJ/~- I . > /-
By x& &&
Philip H!Benton, Civil EGineer
M. V. Rathier, Civil gglneer sENTON ENGINEERING. INC. AN P/PWR/aw
E p-8 42 ;gs
ic
0 - _i B
= S - W c* w F 1*- I
c z LzA.2 z c x
z
. . ;.... .‘.
:
::
PROJECT NO. DRAWING NO.
72-l I-2BA BENTON ENGINEERING, INC. 2
SUMMARY SHEET
q ORlNG NO.
ELEVATION 6:.7' *
jroy-brown, Slightly Moist,
irm, Rootlets
tork Brown, Slightly Moist,
Firm, Rootlets
.lght Brown, Red-brown,
lightly Moist, Firm, R&lets
.ight Brown, Slightly Moist,
irm to Very Fin, Rootlets
,ight Brown, Red-brown, Dry,
irm to Very Firm, Some Zones
ran Oxide Cemented, Some
:ones Very Frioble
kcosionol Lenses of Fine to
ioorse Sond With Few Grovel,
ilightly Moist
:INE TO MEDlUh
SANDY CLAY
CLAY
4NE TO MEDIUN
SANDY CLAY
CLAYEY FINE TC
MEDIUM SAND
FINE TO
MEDIUM SAND
8.1
9.7
, 6.5
-
,g! :zi ;$I
-
- -
i7.
-
0.1
4.'
8.1 5.t - -
tb z” 5: c
$
0 -
-
12.
-
I5
?l.
95 -
5.81
I.11
1.1 - -
u - Indicates Undlsturbed Drive Sample
Cl - Indicates Loose Bog Sample
* - Elevations Shown Wem Obtoined By interpolation of Contour Lines
On Grading Plon For 2500 Novorro, doted November 22, 1972,
Provided by Toupr, Eq$neers
j ! 5
i 1 I . ! : . a B 5
SUMMARY SHEET
BORING NO.
my Firm, Occarionol Grbel FINE TO COARSE
o 2 Inches, Rootlets SANDY CLAY
3
4- o E \L,ght
I
Brown, ye~lw~mn,
_ 2 I%% Slightly Moist, Very Firm, 19.4 6.510B.5 4.52
S-
IIZII Occasional kses of Clayey
IIZIZZ Fine to Medium Sand, Fine to
,I@ 9 E~$2$!L!%~~~~.
SLIGHTLY
6 c$;;;‘~;Jf
16.2 6.1100.2 2.27
B-
9-
wwl4
Gray-brown, Yellow-brown,
Slightly Moist, Very Firm, 14.61 10.4 l l
+ 60 Percent Gravel and Cobbles FINE TO COARSE
SANDY CLAYEY
GRAVEL
l Too Rocky To Test
PROJECT NO. DRAWlNa NO.
72-l l-2BA BENTON ENGINEERING, INC. 3
L 5 i?J. Y y$ 52 SUMMARY SHEET .gt ti =t 0:s Y riuz g ggs y;i $5 f$d
: BORING NO. 3 ws i$; gq Lu+v)
p 9: i “2 ELEVATION 37- O’ C~.o >u)
Et
$2 zx r$ ::
0 u 0
A
l-
2- FILL GRADED FOR ACCESS
ROADWAY =:
3-
i;
4-
5-
6-
710
Light Gray, Yellow-brown,
Slightly Moist, Firm,
Occasional Lens of Fine Sandy
a- Clay, Few Iron Oxide Cemented
Pockets of Fine Sand
9-
O-
(~54
13.0 7.2 101.6 2.48
FINE
SANDY CLAY
v
4- I..,,:’ .,~;:.:;, Red-brown, Slightly Moist,
5- ~,.,~’ Medium Firm, Slight Clay FINE TO
‘,“~ ~: Binder, Occasional Pocket of ’ MEDIUM SAND
6 - ‘: : ,. ,’ ,’ Clay, Slightly Friable
7-@‘& A Groy, Slightly Moist, Madium cLAYEY FlNE TO 4.9 17.1 TOT.6 1.85
IZIZ.ZFI~~
s-
MEDIUM SAND
-x-LLL
9- . . Light Gray-brown, Slightly
:::.:::.:!: Moist, Very Compact, FINE TO
O- ‘::::::m.:~:‘,:‘. Occasloflal L4-s of Clayey MEDIUM SAND L.,‘.,.‘~‘~:F,~ Sad .:~
!I - I,::: .: ‘,
Continued on Drowirg No. 5
PROJECT NO. DRAWNG NO.
72-l 1-2BA BENTON ENGINEERING, INC. 4
L Y tt
z
i
21-
22
23
24
-
-
-
- -
SUMMARY SHEET
BORING NO. 3 (Cont’d)
8.1 asionol Lenses of Clayey FINE TO
MEDiUM SAND
PROJECT NO.
72-ll-28A
; Verv Moist 1 I I
\Soturated 1 /
1.65 I
DRAWING NO. BENTON ENGINEERING, INC. 5 L
SUMMARY SHEET
BORINO NO.
Occasional Lenses o;FIne and
Fin to bdium Sand, Few iron
Oxide Cemented Pockets
72-l 1-28A I
BENTON ENGINEERING, INC. I 6
SUMMARY SHEET
BORING NO. 4 (Cont’d)
rown, Satumtd, h4edium
Occasional Thin Lanses
Medium Firm to Firm
SILTY FINE TO
MEDIUM SAND
Red-brown, Saturated, Firm,
Occasional Lnnses of Fine to SILTY FINE TO
MEDIUM SAND
CLAYEY FINE TO
PROJECT NO. ORAWNG NO. BENTON ENGINEERING INC.
SUMMARY SHEET
BORING NO. 5
ELEVATlON 65*o’
1
2
:
5
7
, 0
l;‘:‘::::‘:‘:..iDark Brown, Moist, Medium -
-
-
-
-
-
-
:INE TO MEDiUh
SAND
SLIGHTLY SILTY
FINE SAND
Rootlets
Brown, Slightly Moist, Very
,Fiml M.7
13.t
-
97. :
-
i.oc -
7.21
-
3.9
Gmy-bmwn, Yeliow+mwn,
Slightly Moist, Very Finn :iNE TO MDIUF
SANDY CLAY
SLIGHTLY
:LAYEY FINE TO
MEDIUM SAND
:LAYEY FINE TO
MEDIUM SAND
Mws)
II : , A 8 El Light Gray,
Very Firm
Slightly Moist,
‘...‘I -LLLL’ lzil I
1 !
I
Gmy-bmwn Brown, Moist,
Very Firm, f 50 Percent Gravel
and Cobbles to 5 inches
4.0
6.2
5.2
.
X.8
+
2.55
l
FINE TO
COARSE SANDY
CLAYEY
GRAM L
7 inch Layer Clayey Fine to
~Coorse Sand
II I l Tao Rocky to Test
PROJECT NO.
72-l l-28A I BENTON ENGINEERING, INC. I DRAWING NO.
8
r
2-
3-
4-
5-
6-
7:
8-
9:
IO-
11:
2-
3:
4-
5-
6-
7-
8:
9-
:0 -
:1 -
Ed YE i;o SUMMARY SHEET
zg g$J $2 g
BORING NO. 6 22 ELEVATION 67.4
I G 1
m Brown, Slightly Moist, Firm, :.,. .:. INE TO h4EDiUN
SANDY CLAY ,
:LAYEY FINE TO
MEDIUM SAND
(Merses)
c*
E
=F
:::j:;. :~. 6’ . .
8.1
IO.1
0' . .
95.
00.1 3.82
FINE TO
MEDIUM SANDY
CLAY
,.~,:~ ,.,..
p ..~~.. Light Gray, Red-brown,
Slightly Moist, Very Firm,
1.4
- -
4.6 8.2
- -
34.1
-
05.;
-
FINE SANDY
CLAY
CLAYEY FINE
TO
AEDIUM SAND 3.73
- -
Continued on Dr&ing No. 10
PROJECT NO.
72-ll-28A I BENTON ENGINEERING, INC. DRAWING NO.
9
I 3 . . i , E !
3 .
; i i ;
; : 2 ; ; I--
,-
i-
I-
i-(
J 0 -2L.l L -LLL L-LL Z-LL
;;:” 4 - .., a * - -
PROJECT NO.
72-l l-28A
SUMMARY SHEET
BORING NO. 6 (Cont’d)
.ight Green-ray, Slightly
&St, Very Firm FINE SANDY
CLAY
ky, Red-brown, Slightly
Moist, Firm
b CLAY
I
BENTON ENGINEERING, INC.
CONSOLIDATION CURVES
LOAD IN KIPI PER SQUARE FOOT
moided to 90% of
,: ,‘,,, ,~ Boring I
Bog3
Depth 9’-10’
Remolded to 9@4 of
Maximum Dry Densit)
0 INDICATES PERCENT CONSOLIDATION Al FIELD NOISTUKE
. INDICATES PERCENT CONSOLIOATIOW AFTER SATURATION
PROJECT NO.
I
DRAWING NO.
72-l l-28A BENTON ENGINEERING, INC. 11
4
!!
3 5 0
z 6
Y
5
f 7
E
8
z
Y
5 9 0
F3 0
5 5
:: 1
9
2
3
4
5
t
CONSOLIDATION CURVES
LDAD IN KIPS PER SOUARL FOOT
0 INDICATES PERCENT CONSOLIDATION AT FIELD MOISTURE
. INDICATES PERCENT CONSOLIDATION AFTER SATURATION
PROJECT NO.
72-l l-28A I BENTON ENGINEERING, INC.
DRAWINS NO.
12
CONSOLIDATION CURVES
LOAD IN KIPS PER SQUARE FODT
0 INDICATES PERCENT CONSOLIDATION AT FIELD MOISTURE
. INDICATES PERCENT CONS0LIOATl0N AFTER SATURATION
PROJECT NO. DRAWINS NO.
72-l I-28A BENTON ENGINEERING, INC. 13
CONSOLIDATION CURVES
LOAD IN KIPS PER 8)PUARE FOOT
3.6
.
0.8 1.0 2 4 6
0 INDICATES PERCENT CONSOLIDATION AT FIELD NOISTURE
. \NOlCATES PERCENT CONSOLIOATION AFTER SATURATION
PROJECT NO. DRAWINQ NO.
72-l l-28A BENTON ENGINEERING, INC. 14
CONSOLIDATION CURVES
LOAD IN KIPS PER SQUARE FOOT
4 4
:: :: w w
55 55 0 0
z z
6 6
2 2 w w
a7 a7
k k
:: ::
8 8
t t
i9 i9
0 INDICATES PERCENT CONSOLIDATION AT FIELD NOISTURE
. INOICATES PERCENT CONSOLIDATION AFTER SATURATION
PROJECT NO.
72-l l -28A I BENTON ENGINEERING, INC. I DRAWINS NO.
15
2
3
4
&
5 5 u
z
6
5
(L
a 7
k
8
5
i k 9
CONSOLIDATION CURVES
LOAD IN KIPS PER SQUARE FOOT
0.6 0.8 I.0 2 4 6 0
I1111 I I I I I I
0 INDICATES PERCENT CONSOLIDATION AT FIELD NOISTURE
. INDICATES PERCENT CONSOLIDATION AFTER SATURATION t PROJECT NO. DRAWlNfJ NO.
72-l 1-28A I BENTON ENGINEERING, INC. I 16 1
CONSOLIDATION CURVES
LOAD IN NIPS PER IWARE FOOT
0.6 ! I.6
PROJECT NO.
72-l l-28A
ORAWINQ NO.
BENTON ENGINEERING, INC. 17
0 INDICATES PERCENT CON6OLlOATlON AT FIELD YOl6TURE
. INDICATE6 PERCENT CONSOLIDAtlON AFTIZR SATURATION
BENTON ENGINEERING, INC.
APPLIED SOIL MECHANICS - FO”NDATlONS
6711 EL CAJON BOULEVARD
*AN DIE00. CALIFORNIA P2115
PHlLlPHENKING BENTOf r”L~IDI*T. ClVlL LNGlUCL”
APPENDIX AA
STANDARD SPECIFICATIONS FOR PLACEMENT
OF COMPACTED FILLED GROUND
1. General Description. The objective is to obtain uniformity and adequate internal strength
in filled ground by proven engineering procedures and tests so that the proposed structures
may be safely supported. The procedures include the clearing and grubbing, removal of
existing structures, preparation of land to be filled, filling of the land, the spreading,
and compaction of the filled areas to conform with the lines, grades, and slopes as shown
on the accepted plans.
The owner shall employ a qualified soils engineer to inspect and test the filled ground as
placed to verify the uniformity of compaction of filled ground to the specified 90 percent
of maximum dry density. The soils engineer shall advise the owner and grading contractor
immediotely if any unsatisfactory conditions are observed to exist and shall have the
authority to reject the compacted filled ground until such time that corrective measures
are taken necessary to comply with the specifications. It shall be the sole responsibility
of the grading contractor to achieve the specified degree of compaction.
2. Clearing, Grubbing, and Preparing Areas to be Filled.
(a) All brush, vegetation and any rubbish shall be removed, piled, and burned or other-
wise disposed of so as to leave the areas to be filled free of vegetation and debris.
Any soft, swampy or otherwise unsuitable areas shall be corrected by draining or
removal, or both .
(b) The natural ground which is determined to be satisfactory for the support of the filled
ground shall then be plowed or scarified to a depth of at least six inches (6’7, and
until the ~surface is free from ruts, hummocks, or other uneven features which would
tend to prevent uniform compaction by the equipment to be used.
(4 Where fills are made on hillsides or exposed slope areas, greater than 10 percent,
horizontal benches shall be cut into firm undisturbed natural ground in order to pro-
vide both lateral and vertical stability. This is to provide a horizontal base so that
each layer is placed and compacted on o horizontal plane. The initial bench at the
toe of the fill shall be at least 10 feet in width on firm undisturbed natvral ground
at the elevation of the toe stake placed at the natural angle of repose or design
slope. The soils engineer shall determine the width and frequency of all succeeding
benches which will vary with the soil conditions and the steepness of slope.
(4
APPENDIX AA
-2-
After the natural ground .has been prepared, it shall then be brought to the proper mois-
ture content and compacted to not less than ninety percent of maximum density in
accordance with A.S.T.M. D-1557-66T method that uses 25 blows of a IO pound hammer
falli% from 18 inches on each of 5 layers in a 4” diameter cylimlrical mold of a 1/30th
cubic foot volume.
3. Materials and Special Requirements. The fill soils shall consist of select materials so graded
that at least 40 percent of the material passes a No. 4 sieve. This may be obtained from
the excavation of banks, borrow pik of any olher approved sources and by mixirg soils from
one or more sources. The material uses shall be free from vegetable matter, and other de-
leterious substances, and shall not contain rocks or lumps of greater than 6 inches in diameter.
If excessive vegetation, rocks, or soils with inadequate strength or other unacceptable physical
characteristics are encountered, these shall be disposed of in waste areas as shown on the
plans or as directed by the soils ewineer. If during grading operations, soils not encountered
and tested in the preliminary investigation are found, tests on these soils shall be performed to
determine their physical characteristics. Any special treatment recommended in the preliminary
or subsequent soil reports not covered herein shall become an addendum to these specifications.
The testing and specifications for the compaction of subgrade,subbase, and base #materials for
roads, streets, highways, or other public property or rights-of-way shall be in accordance
with those of the governmental agency having jurisdiction.
4. Placing, Spreading, and Compacting Fill Materials.
(4
(b)
(4
(4
The suitable fill material shall be placed in layers which, when compacted shall not
exceed six inches (6”). Each layer shall be spread evenly and shall be throughly
mixed during the spreading to insure uniformity of material and moisture in each layer.
When the moisture content of the fill material is below that specified by the soils ewineer,
water shall be added until the moisture content is near optimum as specified by the
soils engineer to assure thorough bonding duriw the compactiw process.
When the moisture content of the fill material is above that specified by the soils
eqineer, the fill material shall be aerated by blading and scarifyiw or other satis-
factory methods until the moisture content is near optimum as specified by the soils
eqineer .
After each layer has been placed, mixed and spread evenly, it shall be thoroughly
compacted to not less than ninety percent of maximum density in accordance with
A.S.T.M. D-1557-66T modified as described in 2 (d) above. Compaction shall be
accomplished with sheepsfoot rollers, multiple-wheel pneumatic-tired rollers, or other
approved types of compaction equipment, such as vibratory equipment that is specially
designed for certain soil types. Rollers shall be of such design that they will be able
5.
6.
7.
8.
(4
APPENDIX AA
-3-
to compact the RII material to the specified density. Rolling shall be accomplished
while the All material is at the specified moisture content. Rolling of each layer shall
be contlnucus over ik entire area and the roller shall make sufficient trips to insure
that the desired density has been obtained. The entire areas to be filled shall be
compacted.
Fill slopes shall be compacted by means of sheepsfoot rollers or other suitable equipment.
Compacting operations shall be continued until the slopes are stable but not too dense
for plantiw and until there is no appreciable amount of loose soil on the slopes.
Compacting of the slopes shall be accomplished by backrolliq the slopes in Increments
of 3 to 5 feet in elevation gain or by other methods producing satisfactory resutk.
Field density tests shall be taken by the solls engineer for approximately each foot in
elevation galn after compaction, but not to exceed two feet in vertical height between
tests. Field density tests may be taken at intervals of 6 inches In elevation gain if
required by the soils engineer. The location of the tests in plan shall be so spaced to
give the best posslble coverage and shall be taken no farther apart than 100 feet. Tests
shall be taken on corner and terrace Iok for each two feet In elevation gain. The soils
erglneer may take additional tests as consldered necessary to check on the uniformity
of compaction. Where sheepsfoot rollers are used, the tests shall be taken In the com-
pacted material below the disturbed surface. No additional layers of fill shall be spread
until the field density tests indicate that the specified density has been obtained.
The fi II operation shall be continued In six inch (6”) compacted layers, as specifTed
above, until the fill has been brought to the finlshed slopes and grades as shown on
the accepted plans.
9=%- Sufffclent Inspection by the soils engineer shall be maintalned during the
fl 1~ an compacting operations so that he can certify that the fill was constructed in
accordance with the accepted specifications.
seasonal Llmlk. No fill material shall be placed, spread, or rolled if weather conditions
Increase the moisture content above permissible limits. When the work Is interrupted by
rain, fill operations shall not be resumed until tleld tests by the soils engineer indicate that
the moisture content and density of the fill are as previously specified.
Limitlrg Values of Nonexpansive Soils. Those soils that expand 2 5 percent or less from
air dry to saturation under a unl t load of 500 pounds per square foot are considered to be
nonexpansive.
All recommendations presented in the “Conclusions” section of the attached report are a
part of these speclflcations.
BENTON m4G,NLLRING. WC,
BENTON ENGINEERING, INC.
APPLIED SOIL HECIIANICS -~~ rOUNoAT,ONS
6744 EL CAJON ~O”LE”ARD SAN DlEGO. CALIFORHIA 87.115
PHILIP HENKING BENTON l ICc.IDIHI Cl”lL IYCTINIII APPENDIX A
Unified Soil Classification Chart*
SOIL DESCRIPTION GROUP
SYMBOL
I. COARSE GRAINED, More than half of
material IS larger than No. 200 sieve
size.** -
GRAVELS CLEAN GRAVELS
w half of
coarse fraction is
larger than No. 4
sieve size but smallerGRAVELS WITH FINES
(Appreciable amount than 3 inches
SANDS
-than holf of
coarse fraction is
smaller than No.
4 sieve size
of fines)
CLEAN SANDS
SANDS WITH FINES
(Appreciable amount
of fines)
II. FINE GRAINED, More than half of
material is smaner than No. MO
sieve size.** SILTS AND CLAYS
Liquid Limit
Less than 50
SILTS AND CLAYS
Liquid Limit
Greater thon 50
Ill. HIGHLY ORGANIC SOILS
GW
GP
GM
GC
Well graded gravels, gravel-sand mixtures,
little Q no fines.
Poorly graded grovels, gmvel-sand
mixtures, little or no fines.
Silty gravels, poorly graded grovel-
sand-silt mixtures.
Clayey gmvels, poorly graded gravel-
sand-cloy mixtures.
SW
SP
SM
SC
Well graded sand, gravelly sands, little
or no fines.
Poorly graded sands, gravelly sands,
little cr no fines.
Silty sands, pocrly graded sand-silt
mixtures.
Cloyey sands, poorly graded sand-clay
mixtures.
ML
CL
OL
MH
Inorganic silts and very fine sands, rock
flour, sandy silt or clayey-silt-sand
mixtures with slight plasticity.
Inorganic cloys of low to medium plas-
ticity, gmvelly clays, sandy clays,
silty cloys, lean clays.
Organic silts and aganic silty-clays of
low plasticity.
lncrgonic silts, micoceous cr diotoma-
ceous fine sandy or silty soils, elastic
silk.
CH
OH
Inorganic clays of high plasticity, fot
clays.
Organic clays of medium to high
plasticity.
PT Peat and other highly organic soils.
TYPICAL
NAMES
*A” DISCO S.S.,~~‘ L. *rs1: 4(1S.S6S.
* Adapted by the Carps of Engineers and Bureau of Reclamation in January, 1952.
** All C~LYP minx m thic rhnrt nra II-S. Ctnnrhrd.
BENToN ~NGINEIxING. INC.
APPLIED 501L MECHANlCS FOUNDATIONS
6741 EL CAIJON BOULEVARD
*AN DIEGO. CALIFORNIA 92115
PYlLlP HENKING eENTON
wlCSIOC”T C\“>L E”GIULE* APPENDIX B SAW DILGO. 5113.566. L. ML%*: 469.,654
Sampling
The undisturbed soil samples ore obtained by forcing a special sampling tube into the
undisturbed soils at the bottom of the boring, at frequent intervals below the ground surface.
The sampling tube consists of a steel barrel 3.0 inches outside diameter, with a special cut-
ting tip on one end and a double ball valve on the other, and with a lining of twelve thin
brass rings, each one inch long by 2.42 inches inside diameter. The sampler, connected to a
twelve inch long waste barrel, is either pushed or driven approximately 18 inches into the soil
and a six inch section of the center portion of the sample is taken for laboratory tests, the soil
being still confined in the brass rings, after extraction from the sampler tube. The samples are
taken to the laboratory in close fitting waterproof containers in order to retain the field mois-
ture until completion of the tests. The driving energy is calculated as the overage energy in
foot-kips required to force the sampling tube through one foot of soil at the depth at which the
sample is obtained.
Shear Tests
The shear tests are run using a direct SheOr machine of the strain control type in which
the rote of deformation is approximately 0.05 inch per minute. The machine is so designed that
the tests ore made without removing the samples from the brass liner rings in which they are se-
cured. Each sample is sheared under a normal load equivalent to the weight of the soil above the
point of sampling. In some instances, samples are sheared under various normal loads in order to
obtain the internal angle off friction and cohesion. Where considered necessary, samples are
saturated and drained before shearing in order to simulate extreme field moisture conditions.
Consolidation Tesk
The apparatus used for the consolidation tests is designed to receive one of the one inch
high rings of soil as it comes from the field. Loads are applied in several increments to the upper
surface of the test specimen and the resulting deformations ore recorded at selected time intervals
for each increment. Generally, each increment of load is maintained on the sample until the
rate of deformation is equal to or less than l/10000 inch per hour. Porous stones ore placed in
contact with the tap ond bottom of each specimen to permit the ready addition or release of water.
Expansion Tests
One inch high samples confined in the brass rings ore permitted to oir dry at 105°F for
at least 48 hours prior to placing into the expansion apparatus. A unit load of 500 pounds per
squore foot is then applied to the upper porous stone in contact with the top of each sample.
Water is permitted to contact both the top ond bottom of each sample through porous stones.
Continuous observations are made until downward movement stops. The dial reading is recorded
and expansion is recorded until the rate of upward movement is less than 1/10000 inch per hour.