HomeMy WebLinkAbout; Broccato at Batiquitos Shores, Phase I; Compaction Test Results Remedial Grading; 1991-10-24ICG
incorporated
kan Diego
ounty Office:
9240 Trade Place,
Suite 100
Kan Diego, CA 92126
K19/536-1102
Hax: 619/536-1306
Inland Empire Office:
906 Orange Tree Lane.
Suite 240
Redlands, CA 92374
714/792-4222
•ax: 714/798-1844
Orange County Offices:
Construction Inspection
nd Testing:
;992 La Palma,
uite A
Anaheim, CA 92806
.714/632-2980
ax: 714/632-9209
Job No.04-7919-009-03-10
Log No. 1-2129
i
I
1,
I
Geotechnical:
15 Mason
rvine, CA 92718
14/951-8686
ax: 714/951-7969
ICoachella Vaiiey Office:
77-775 Jackal Drive,
puite C
Bermuda Dunes, CA 92201
t
619/772-3182
ax: 619/772-3184
October 24, 1991
Davidson Communities
12520 High Bluff Drive, Suite 300
San Diego, California 92130
Attention: Mr. George Walker
SUBJECT: COMPACTION TEST RESULTS
Remedial Grading
Broccato at Batiquitos Shores, Phase I
Carlsbad, California
Gentlemen:
This report summarizes the observation and testing performed by ICG, Inc. during
remedial grading of Phase I of the Broccato at Batiquitos Shores project in Carisbad,
California. Our services were provided in the field from August 14 to September 25, 1991.
Field densily test results are tabulated on Table 2, "Field Density Test Results". Test
locations are shown on the attached As-Graded Geotechnical Map, Plates I and 2.
orporate Office:
15 Mason
IIrvine, GA 92718
?14/951-8686
fax: 714/951-7969
I
I
I
I
I
I
I
1.0 AUTHORIZATION
This report and the associated services were performed in accordance with the
provisions of our proposal No. SDP1-5950R, dated August 14, 1991.
l.l SCOPE OF SERVICES
Field personnel were provided for this project to perform observations and
tests in order that we could develop professional opinions. Our services did
not include supervision or direction of the actual work of the contractor,
his employees, or agents. Specifically, our services involved the following:
a. Testing and observation of fill piacement.
b. Observation and mapping of cleanouts and general geologic conditions.
Geotechnical Services, Construction Inspection and Testing
Davidson Communities Job No. 04-7919-009-03-10
October 24, 1991 Log No. 1-2129
Page 2
c. Laboratory testing to determine pertinent engineering characteristics of the
soil materials.
d. Installation of three settlement monuments and analysis of settlement data.
e. Preparation of this report which summarizes our findings, opinions, and
recommendations.
2.0 PURPOSE OF GRADING
Grading was done in order to prepare fill areas in which future import materiais may be
placed. Grading during this phase of construction involved removal and recompaction of
topsoil and alluvium. Where groundwater prevented the complete removal of alluvium,
settlement monuments were installed and monitored. The site has been left in a sheet graded
condition; finished pads and street cores were not constructed during this phase of grading.
3.0 GEOLOGIC SETTING
The site is located in the coastal plain section of the Peninsular Ranges geomorphic province
of southern California. Generally, the coastal plain consists of somewhat subdued landforms
made up of relatively flat lying Cenozoic sedimentary bedrock.
Specifically, the site is underlain by the Eocene epoch Delmar Formation and Torrey
Sandstone. Alluvial deposits and topsoil overlie the formational materials. The geologic units
are described in decreasing age, in the following paragraphs.
3.1 Delmar Formation (Man Svmbol Td^
The Delmar Formation was encountered at the lower cleanout elevations on site (below
about elevation 53 feet), however it is not present at finished grade. This unit as
observed on site consists of a gray green sandy siltstone with some clay (Unified
Classification ML) with occasional silty or clayey sandstone lenses.
Davidson Communities Job No. 04-7919-009-03-10
October 24, 1991 Log No. 1-2129
Page 3
3.2 Torrev Sandstone (Man Svmbol Tt)
The Torrey Sandstone is the bedrock unit exposed at finished grade. This unit
typically consists of a light gray silty fine sandstone (Unified Classification SM).
Bedding within the Torrey Sandstone is generally massive, with occasional thin silty
interbeds. The expansion potential of these sandstone materials is typically very low.
3.3 Alluvium (Mao Svmbol OaH
Alluvium was present in the main and side canyons on site. The majority of the fill
placed in this (remedial) phase of grading was derived from alluvium. The alluvium
on site ranges from a light yellow brown silty sand (Unified Classification SM) to dark
brown clayey sand/silt (Unified Classification SC). The alluvium was removed to
either bedrock or to near groundwater in areas to receive fill. The expansion potential
of these materials is expected to be in the low to medium range.
3.4 Geologic Structure
The site is typified by mostly massive and nearly flat lying Delmar Formalion and
Torrey Sandstone sedimentary bedrock. The contact between the Delmar Formation
and the Torrey Sandstone is conformable; it varies from gradational to interfingering.
Bedding where observed in the cleanouts was generally flat lying to dipping a few
degrees towards the southwest.
Two high angle, normal faults were observed, trending roughly north-south, with at
least 4 feet of separation down dropped towards the east. No evidence of recent fault
movement (within 11,000 years) was observed during field mapping. Topsoil and
alluvium are the only geologic units on site that are younger than 11,000 years, the
time division between active and potentially active faulting. A review of aerial
photographs following geologic mapping did not indicate topographic expression
typical of active faulting on the faults discovered during grading.
Davidson Communities Job No. 04-7919-009-03-10
October 24, 1991 Log No. 1-2129
Page 4
4.0 GRADING OPERATIONS
4.1 General
The site grading operations are shown on the 40-scale grading plans developed by
O'Day Consultants, however, the pads and streets shown have not been built. The
project has been left in a sheet graded condition. Copies of the grading plan serve as
the base map for our attached As-Graded Geotechnical Maps. Site grading was
performed using normal cut and fill mass grading techniques with heavy earthmoving
equipment.
4.2 Preparation of Natural Ground
The area was cleared of any vegetation. Topsoil, alluvium and weathered bedrock
were removed to materials which were considered suitable to support fills or
structures. The removal limits are shown on the As-Graded Geotechnical Map, Plates
1 and 2. Some areas of shallower topsoil were left as natural slopes on the upper
hillsides, to be removed by future grading or benching operations. In areas where
groundwater precluded complete removal of alluvium, settlement monuments were
installed and monitored, as described in Section 4.5. Subgrade soils exposed in areas
lo receive fill were scarified, moisiure condiiioned and compactive effort was applied.
4.3 Soil Types
The soil lypes used as fill are tabulated in Table 1, "Laboratory Test Results". The
maximum dry densities and optimum moisture contents, as calculated by the modified
Proctor melhod (ASTM D 1557-78), are also included in Table 1. Soils at the site
consist of mostly silty sand (Unified Classification SM), wilh some sandy sill (Unified
Classification ML).
Davidson Communities Job No. 04-7919-009-03-10
October 24, 1991 Log No. 1-2129
Page 5
4.4 Fill Placement
FiU soils were placed in 6 to 8 inch lifts, brought to near optimum moisiure content,
and compactive effort was applied. Equipment used for compaction included rubber
lire compactors, a blade, water trucks and loaded scrapers. Density and moisture tests
were made in accordance with ASTM D2922 and D3017 (Nuclear Methods). The
moisture and density tests are tabulated in Table 2, "Results of Compaction Tests".
The elevations indicated for the tests were estimated either from field grade slakes or
from the projeci plans, and should only be considered rough estimates. The estimated
locations and elevations should not be ulilized for the purpose of preparing cross-
sections showing test locations, or in any case, for the purpose of after-the-fact
evaluation of the sequence of fill placement.
4.5 Settlement Monuments
Three settlement monuments were placed in areas where compacled fill was placed
over alluvium. The complete removal of alluvium in these areas was not practical
because of shallow groundwater being present. The settlement monuments were
inslalled in accordance wilh our referenced Addendum Grading Plan Review.
Monuments were positioned at the base of the alluvium removal areas, prior to placing
compacted fill. The monuments were surveyed at regular intervals by O'Day
Consultants for elevation. The approximate locations of the settlement monuments are
shown on the As-Graded Geotechnical Maps. For a discussion of the alluvial
settlement, see Section 5.3. The following lable summarizes the settlement monument
data.
Installation Last Reading Approximale
Monument Dale Date Total Settlement
1 8-16-91 10-7-91 0.07 feet
2 8-21-91 10-7-91 0.03 feet
3 8-26-91 10-7-91 0.28 feet
Davidson Communities Job No. 04-7919-009-03-10
October 24, 1991 Log No. 1-2129
Page 6
5.0 GEOTECHNICAL EVALUATION AND RECOMMENDATIONS
5.1 General
In our opinion, grading and compaction was performed in general accordance with the
intent of the recommendations presented in the referenced geotechnical reports for
the project and the requiremenls of the City of Carlsbad. The conclusions and
recommendations contained herein are based on our observations and testing
performed from August 14 to September 25,1991. No representations are made as to
the quality and extent of malerials not observed.
5.2 Trench and Wall Backfill
Any trench and wall backfill should be placed by mechanical compaction to a
minimum of 90 percent of the laboratory determined maximum density.
5.3 Settlement
Total settlement that has been measured by the settlement monuments has so far been
less than 0.3 feet. As expected, more settlement has occurred where greater amounts
of fill were placed. Settlement is expected to continue when the project resumes and
additional fill is placed. Settlement monuments should continue to be read as the
construction progresses, as recommended by the Geotechnical Engineer.
5.4 Foundation and Slab Recommendations
The preliminary foundation and slab recommendations contained in our referenced
reports remain valid. Final recommendations will be based on our observation and
testing during continued grading and will be provided upon completion of mass
grading.
Davidson Communities
October 24, 1991
Job No. 04-7919-009-03-10
Log No. 1-2129
Page 7
6.0 SUMMARY
Our descriptions of the compaction operations, as well as observations and testing services,
are limited to work performed between August 14 and September 25, 1991. The conclusions
contained in this report are based on our observations and testing as noted. No representations
are made as to the quality or extent of any materials or operations that were nol observed.
Based upon our observations, it is our professional opinion that the work performed has been
done in accordance with our recommendations, as well as the requirements of the regulating
agencies. This report should be subject to review by the controlling authorities.
This opportunity to be of service is sincerely appreciated. If you should have any further questions,
please do not hesitate to contact the undersigned at your convenience.
Very truly yours,
ICG Incorporated
Rod Soule, C.E.G. 1467
Registration Expires: 6-30-92
Senior Geologist
RS/AFB/pb
Attachments: Tables I and 2
Site Plan, Plates I and 2
Anthony F. Belfast, P.E. C 40333
Registration Expires: 3-31-95
Vice President/Principal Engineer
REFERENCES
1. ICG Incorporated, April 6, 1990, "Responses to Comments on Draft EIR, Broccato
at Batiquitos Shores, Revised CT89-19, Carlsbad, California", Job No.
04-8005-001-00-01.
2. ICG Incorporated, March 14, 1990, "Preliminary Foundation and Overexcavation
Recommendations, Broccato at Batiquitos Shores Revised CT89-19,
Carlsbad, California," Job No. 04-8005-001-00-01.
3. ICG Incorporated, June 30, 1989, "Addendum Grading Plan Review, Broccato at
Batiquitos Shores Revised, CT89-19, Carlsbad, California," Job No.
04-8005-001-00-01.
4. San Diego Soils Engineering, Inc., May 21, 1986, "Preliminary Geotechnical
Investigation, Proposed Multi-Family Residential Site Batiquitos Drive,
Carlsbad, California," Job No. 25052-00.
TABLE I
LABORATORY TEST RESULTS
Maximum Q:itinun
Soil Dry Density Moisture
Ixee fpcf) m
1 Medium brown silty fine to medium SAND 124.3 11.4
2 Red brown silty fine to coarse SAND 119.2 12.0
3 Dark brown silty fine to medium SAND 115.5 10.0
4 Light gray sandy SILT 111.6 14.2
Project Name:
Client Name :
Broccato
Davidson Connunities
Test
Number
TABLE 2
Field Density Test Results
Project Number: 04-7919-009-03-10
Page 1
Test
Date
Elevation
or
Location
tfeet)
Curve
Nuniber
Maximum
Dry
Density
Fill
Moisture
Content
(percent)
Fill
Dry
Density
Relative
Compaction
(percent)
Required
Compaction
(percent)
Retest
Number
Test
Method
1991
1 08/16 35 3 115.5 9.6 106.2 92 90 NU
2 08/16 36 1 124.3 10.2 114.6 92 90 NU
3 08/16 33 3 115.5 11.2 104.7 91 90 NU
4 08/16 34 3 115.5 9.3 105.1 91 90 NU
5 oa/16 31 2 119.2 11.2 108.4 91 90 NU
6 08/16 32 2 119.2 11.6 107.5 90 90 NU
7 08/16 31 3 115.0 10.1 104.8 91 90 NU
8 08/16 32 3 115.5 9.8 105.6 91 90 NU
9 08/16 25 2 119.2 11.6 107.9 90 90 NU
10 08/16 26 2 119.2 12.3 108.6 91 90 NU
11 08/16 37 1 124.3 10.8 115.6 93 90 NU
12 08/16 38 1 124.3 9.3 112.7 91 90 NU
13 08/16 34 1 124.3 12.4 112.0 90 90 NU
14 08/16 35 119.2 10.2 107.5 90 90 NU
15 08/16 36 1 124.3 8.0 112.8 91 90 NU
16 08/16 37 1 124.3 7.6 113.3 91 90 NU
17 08/16 36 1 124.3 10.8 113.7 91 90 NU
18 08/16 37 1 124.3 10.4 114.6 92 90 NU
19 08/16 35 1 124.3 8.2 115.6 93 90 NU
20 08/16 36 1 124.3 9.1 113.1 91 90 NU
21 08/19 35 1 124.3 11.9 116.2 93 90 NU
22 08/19 36 1 124.3 10.8 112.0 90 90 NU
23 08/19 36 1 124.3 12.6 119.1 95 90 HU
24 08/19 37 1 124.3 14.8 116.1 93 90 HU
25 08/19 38 1 124.3 13.3 118.8 95 90 NU
26 08/19 39 1 124.3 12.2 117.6 94 90 HU
27 08/19 31 1 124.3 11.1 117.3 94 90 HU
28 08/19 32 1 124.3 10.8 112.9 91 90 HU
29 08/20 28 1 124.3 12.1 115.4 93 90 NU
30 08/20 29 1 124.3 12.8 111.5 90 90 NU
31 08/20 34 1 124.3 11.0 117.9 95 90 NU
32 08/20 35 1 124.3 11.5 114.0 92 90 NU
33 08/20 39 1 124.3 11.2 117.9 95 90 NU
34 08/20 40 1 124.3 11.0 114.7 92 90 NU
35 08/20 33 1 124.3 13.4 115.3 93 90 NU
36 08/20 34 1 124.3 9.0 116.2 93 90 NU
37 08/20 36 1 124.3 13.1 115.4 93 90 NU
38 08/20 37 1 124.3 12.3 113.8 92 90 NU
39 08/20 31 1 124.3 13.5 114.3 92 90 NU
40 08/20 32 1 124.3 15.9 113.5 91 90 NU
41 08/20 39 1 124.3 S.S 108.3 91 90 NU
42 08/20 40 1 124.3 8.4 116.5 94 90 NU
43 08/21 26 2 119.2 9.5 109.7 92 90 NU
44 08/21 26 3 115.5 14.7 106.2 92 90 «U
45 08/21 31 1 124.3 12.9 112.6 91 90 NU
46 08/21 32 3 115.5 14.4 106.2 92 90 NU
47 08/21 28 3 115.5 8.6 108.9 94 90 NU
48 08/21 29 3 115.5 16.2 106.3 92 90 HU
49 08/21 29 2 119.2 12.3 109.3 92 90 HU
50 08/21 30 1 124.3 13.2 112.9 91 90 HU
51 08/21 33 1 124.3 13.9 114.3 92 90 HU
52 08/21 34 2 119.2 11.6 107.6 90 90 NU
53 08/22 31 1 124,3 13.5 114.5 92 90 HU
54 08/22 32 1 124.3 11.9 113.0 91 90 NU
55 08/22 31 1 124.3 12.9 114.0 92 90 NU
56 08/22 32 1 124.3 9.9 115.9 93 90 NU
Explanation:
SC=SarKl Cones, NU=Nuclear, DC=Drive Cylinder, 0T=0ther
Project Name:
Cl{»it Name :
Broccato
Davidson Conmunities
Elevation
Test Test or Curve
Number Date Location Nunber
(feet)
TABLE 2
Field Density Test Results
Project Number: 04-7919-009-03-10
Page 2
Maximum Fill
Dry Moisture
Density Content
(pcf) (percent)
Fill
Dry Relative Required Retest Test
Density Compaction Compaction Number Method
(pcf) (percent) (percent)
57 08/22 34 2 119.2 11.6 110.7 93 90 _ HU
58 08/22 35 2 119.2 11.4 107.9 90 90 _ NU
59 08/22 33 1 124.3 10.1 114.1 92 90 NU 60 08/22 34 2 119.2 13.3 10S.4 91 90 NU 61 08/22 34 1 124.3 13.7 112.1 90 90 NU 62 08/22 35 1 124.3 8.1 118.8 96 90 NU 63 OS/22 36 1 124.3 S.O 118.0 95 90 _ NU 64 08/23 36 1 124.3 10.0 115.8 93 90 NU 65 08/23 37 2 119.2 15.7 110.5 93 90 _ HU 66 08/23 37 3 115.5 16.1 106.5 92 90 _ NU 67 08/23 35 2 119.2 11.7 108.4 91 90 NU 68 08/23 39 2 119.2 13.8 108.6 91 90 _ NU 69 08/23 40 2 119.2 15.6 108.4 91 90 NU 70 08/23 35 2 119.2 11.0 110.1 92 90 HU 71 08/23 36 2 119.2 14.8 108.0 91 90 _ NU 72 08/23 32 2 119.2 15.2 10S.9 91 90 NU 73 08/23 33 1 124.3 13.S 112.3 90 90 NU 74 08/23 34 3 115.5 12.8 106.5 92 90 _ HU 75 08/23 35 1 124.3 10.5 113.8 92 90 _ NU 76 08/23 36 1 124.3 12.9 116.3 94 90 _ NU 77 08/23 37 3 115.5 17.1 105.9 92 90 _ NU 78 08/26 38 2 119.2 14.6 108.7 91 90 NU
79 OS/26 39 1 124.3 9.8 121.1 97 90 NU SO 08/26 39 1 124.3 12.3 117.0 94 90 NU 81 08/26 40 1 124.3 12.0 117.5 95 90 NU 82 08/26 37 1 124.3 12.9 112.6 91 90 NU S3 08/26 38 1 124.3 14.1 111.9 90 90 _ NU 84 08/26 38 1 124.3 11,2 113.7 91 90 NU
85 08/26 39 1 124.3 10.1 114.1 92 90 NU
86 08/26 39 2 119.2 11.4 107.9 91 90 _ NU 87 08/26 40 2 119.2 11.6 110.7 93 90 NU 88 08/26 36 2 119.2 13.3 108.4 91 90 NU 89 08/26 37 1 124.3 11.1 115.6 93 90 _ NU 90 08/26 32 1 124.3 13.7 112.1 90 90 NU 91 08/26 41 1 124.3 13.0 112.8 91 90 _ NU 92 08/26 42 2 119.2 14.2 110.6 93 90 NU 93 08/26 39 1 124.3 10.2 113.4 91 90 NU 94 08/26 40 2 119.2 18.2 107.1 90 90 NU 95 08/26 41 3 115.5 13.3 106.7 92 90 _ NU 96 08/26 42 1 124.3 12.0 115.3 93 90 _ NU 97 08/26 42 2 119.2 13.1 108.7 91 90 _ NU 98 08/26 43 2 119.2 12.5 108.2 91 90 NU 99 08/27 41 1 124.3 11.3 111.9 90 90 NU 100 08/27 42 1 124.3 11.9 116.S 94 90 NU 101 08/27 42 1 124.3 12.0 111.9 90 90 NU 102 08/27 43 2 119.2 15.5 110.7 93 90 NU 103 08/27 42 1 124.3 13.8 111.0 89 90 105 NU
104 08/27 43 1 124.3 11.9 110.9 89 90 106 NU 105 08/27 42 1 124.3 12.1 115.0 93 90 NU 106 08/27 43 1 124.3 11.2 113.8 92 90 _ NU 107 08/27 44 1 124.3 10.4 114.2 92 90 NU 108 08/27 45 1 124.3 11.S 112.6 91 90 NU 109 08/27 43 1 124.3 10.8 114.8 92 90 _ NU 110 08/27 44 1 124.3 13.7 111.9 90 90 NU 111 08/27 44 1 124.3 13.3 112.7 91 90 NU 112 08/27 45 1 124.3 11.7 118.7 95 90 -HU
Explanation:
SC=Sand Cones, NU=Nuclear, DC=Drive Cylinder, OT=Other
Project Name:
Client Name : Broccato
Davidson Communities
Elevation
Test Test or Curve
Number Date Location Number
(feet)
TABLE 2
Field Density Test Results
Project Number: 04-7919-009-03-10
Page 3
Maximum FiU
Dry Moisture
Density Content
(pcf) (percent)
FiU
Dry Relative Required Retest Test
Density Compaction Compaction Number Method
(pcf) (percent) (percent)
113 08/28 44 2 119.2 10.3 108.1 91 90 NU 114 08/28 44 2 119.2 12.3 107.3 90 90 _ NU 115 08/28 45 1 124.3 14.9 111.6 90 90 NU 116 08/28 46 1 124.3 12.8 113.6 91 90 NU
117 08/28 46 1 124.3 11.3 113.7 91 90 HU
118 08/28 47 3 115.5 12.1 106.3 92 90 NU 119 08/28 44 2 119.2 13.4 107.8 90 90 NU 120 08/28 45 1 124.3 15.3 113.1 91 90 NU 121 08/28 45 1 124.3 14.9 110.5 88 90 122 NU 122 08/28 45 1 124.3 14.0 112.6 91 90 NU
123 08/28 42 1 124.3 11.5 117.1 94 90 NU
124 08/28 48 1 124.3 11.1 114.9 92 90 HU
125 08/28 47 2 119.2 12.4 105.9 91 90 HU
126 08/28 48 3 115.5 15.2 103.3 90 90 _ NU
127 08/29 41 3 115.5 10.0 104.4 90 90 NU
128 08/29 43 1 124.3 7.9 114.5 92 90 NU
129 08/29 44 2 119.2 7.8 101.3 85 90 131 HU
130 08/29 44 3 115.5 8.3 112.8 98 90 HU 131 08/29 44 2 119.2 13.7 109.4 92 90 NU 132 08/29 48 2 119.2 14.6 111.8 94 90 NU 133 08/29 45 2 119.2 11.4 111.7 94 90 NU 134 08/29 47 2 119.2 11.7 107.3 90 90 _ NU 135 08/29 45 1 124.3 10.6 124.6 100 90 HU
136 08/29 45 1 124.3 13.6 112.1 90 90 HU
137 08/29 50 1 124.3 12.1 114.7 92 90 NU
138 08/29 49 1 124.3 11.2 114.2 92 90 NU
139 08/29 48 2 119.2 13.1 111.2 93 90 NU
140 08/29 50 2 119.2 14.6 110.9 93 90 NU 141 08/30 36 4 111.6 15.2 103.3 92 90 NU
142 M 37 1 124.3 9.8 113.4 91 90 NU 143 M 30 2 119.2 11.8 108.7 91 90 HU
144 II 31 2 119.2 8.3 107.9 90 90 NU
145 II 31 2 119.2 14.6 110.0 92 90 NU
146 II 27 2 119.2 12.6 109.8 92 90 NU
147
••
28 1 124.3 15.0 111.9 90 90 HU
148 II 33 1 124.3 11.2 112.0 90 90 HU
149 II 34 1 124.3 10.2 115.2 93 90 NU 150 II 32 1 124.3 11.5 112.0 90 90 NU ist nunbers 151 through 159 not used
90 NU
160 II 33 3 115.5 14.4 104.6 90 90 NU 161 II 34 1 124.3 12.1 111.9 90 90 NU
162 II 35 1 124.3 12.7 112.6 90 90 NU 163 II 35 1 124.3 10.4 116.8 94 90 NU
164 II 36 1 124.3 12.0 113.5 91 90 NU
165 tl 38 1 124.3 11.6 119.7 96 90 NU
166 II 39 1 124.3 9.5 113.0 91 90 NU
167 II 39 1 124.3 10.6 114.8 92 90 NU
168 II 40 1 124.3 7.5 106.4 85 90 169 NU
169 II 40 1 124.3 11.7 114.5 92 90 NU
170 II 41 1 124.3 14.6 114.1 92 90 HU 171 09/03 36 1 124.3 13.2 113.9 91 90 HU 172 II 37 2 119.2 10.3 106.8 90 90 HU
173 tl 39 1 124.3 9.1 113.6 91 90 NU
174 II 40 2 119.2 12.5 110.8 93 90 NU 175 It 49 2 119.2 12.6 110.5 93 90 NU 176 II 50 1 124.3 13.4 115.7 93 90 HU
Explanation:
SC=Sand Cones, NU=»luclear, DC=Drive Cylinder, OT=Other
Project Name:
Client Name : Broccato
Davidson Communities TABLE 2
Field Density Test Results
Project Number: 04-7919-009-03-10
Page 4
Elevation Maximun Fill Fill
Test Test or Curve Ory Moi sture Dry Relative Required Retest Test
umber Date Location Number Density Content Density Compaction Compaction Nunber Methoi
(feet) (pcf) (percent) (pcf) (percent) (percent)
177 II 40 1 124.3 13.4 116.4 93 90 NU
178 It 41 2 119.2 14.6 109.2 92 90 NU
179 It 43 1 124.3 12.3 118.2 95 90 NU
180 tl 44 1 124.3 12.5 115.6 93 90 NU
181 tt 42 1 124.3 12.5 113.2 91 90 NU
182 II 43 1 124.3 11.4 114.1 92 90 NU
183 II 54 1 124.3 11.0 116.5 94 90 NU
184 II 56 2 119.2 16.7 107.4 90 90 NU
185 II 45 2 119.2 12.7 107.8 90 90 NU
186 It 46 1 124.3 11.6 114.3 92 90 NU
187 It 45 1 124.3 11.1 113.4 91 90 HU
188 It 46 1 124,3 14.8 112.1 90 90 HU
189 11 46 1 124,3 14.5 113.0 91 90 HU
190 tl 47 1 124.3 14.0 114.0 92 90 HU
191 II 48 2 119.2 12.8 109.9 92 90 HU
192 09/04 45 3 115.5 13.8 105.2 91 90 HU
193 II 46 1 124.3 11.0 116.9 94 90 HU
194 It 60 2 119.2 13.0 110.5 93 90 NU
195 It 61 1 124.3 13.7 113.8 91 90 NU
196 It 75 1 124.3 12.2 114.1 92 90 NU
197 It 76 3 115.5 17.2 106.3 92 90 NU
198 It 36 2 119.2 15.7 107.6 90 90 NU
199 It 37 4 111.6 18.5 101.2 91 90 NU
200 It 42 2 119.2 15.1 109.3 91 90 NU
201 It 43 1 124.3 14.2 114.2 92 90 NU
202 II 54 1 124.3 11.8 118.4 95 90 NU
203 It 55 1 124.3 12.3 117.1 94 90 NU
204 It 67 2 119,2 14.7 110.9 93 90 NU
205 It 68 2 119.2 16.1 110.2 92 90 NU
206 09/05 77 2 119.2 14.6 108.0 91 90 NU
207 It 78 1 124.3 12.0 113.7 91 90 NU
208 •1 89 1 124.3 13.3 113.2 91 90 HU
209 II 90 1 124.3 10,2 116.7 93 90 NU
210 II 80 2 119.2 16.5 109.3 91 90 HU
211 It 81 1 124.3 13.3 112.3 90 90 NU
212 It 70 2 119.2 15.3 107.0 90 90 NU
213 It 71 2 119.2 15.8 108.4 91 90 NU
214 It 50 1 124.3 13.2 113.4 91 90 NU
215 II 51 1 124.3 12.5 112.1 90 90 NU
216 It 77 1 124.3 10.3 113.1 91 90 NU
217 It 78 2 119.2 13.4 109.2 92 90 NU
218 It 87 2 119.2 16.5 106.8 90 90 NU
219 It 88 2 119.2 15.6 109.1 92 90 NU
220 09/06 92 2 119.2 11.7 110.9 93 90 HU
221 II 93 1 124.3 10.9 114.7 92 90 NU
222 II 83 1 124.3 11.3 113.9 91 90 NU
223 It 84 1 124.3 12.5 112.8 91 90 NU
224 It 63 2 119.2 14.5 106.8 90 90 HU
225 It 64 1 124.3 6.3 111.8 90 90 HU
226 It 64 1 124.3 12.8 113.8 90 90 HU
227 09/09 47 2 119.2 16.7 107.4 90 90 HU
228 It 48 1 124.3 13.6 114.5 92 90 HU
229 It 57 2 119.2 8.0 108.2 91 90 HU
230 It 58 2 119.2 10.8 110.7 93 90 HU
231 It 57 1 124.3 12.9 115.7 93 90 HU
232 •1 50 3 115.5 8.3 103.6 90 90 NU
Explanation:
SC=Sand Cones, NU=Nuclear, DC=Drive Cylinder, 0T=0ther
Project Name:
Client Name : Broccato
Davidson Comnunities
Elevation
Test Test or Curve
Number Date Location Number
tfeet)
TABLE 2
Field Density Test Results
Project Number: 04-7919-009-03-10
Page 5
Maximum Fill
Dry Moisture
Density Content
(pcf) (percent)
Fill
Dry Relative Required Retest Test
Density Coirpaction Compaction Nunber Method
(pcf) (percent) (percent)
233 II 51 3 115.5 15.6 106.4 92 90 NU 234 II 50 1 124.3 12.8 113.8 91 90 NU 235 11 73 2 119.2 12.6 109.8 92 90 NU
236 II 75 2 119.2 7.5 106.4 89 90 237 NU
237 II 75 2 119.2 15.0 109.6 92 90 NU
238 •1 86 1 124.3 11.0 117.6 94 90 HU
239 It 87 1 124.3 6.3 111.8 90 90 HU
240 It 87 1 124.3 12.3 117.8 95 90 NU 241 09/10 60 1 124.3 11.5 117.1 94 90 NU
242 II 61 1 124.3 12.8 113.8 91 90 NU 243 It 58 2 119.2 14.6 110.0 92 90 HU 244 •1 54 2 119.2 7.5 106.4 89 90 245 HU
245 It 54 2 119.2 14.6 109.2 92 90 NU
246 It 96 1 124.3 11.1 113.4 91 90 NU
247 II 97 2 119.2 8.3 107.9 90 90 NU
248 II 97 1 124.3 13.7 111.9 90 90 HU
249 II 80 1 124.3 12.7 112.6 90 90 HU
250 It 81 2 119.2 13.4 111.1 93 90 HU
251 II 95 1 124.3 10.8 115.8 93 90 HU
252 II 96 2 119.2 14.1 109.3 92 90 HU
253 It 63 2 119.2 11.3 111.1 93 90 HU
254 It 64 1 124.3 8.1 115.5 93 90 HU 255 It 64 1 124.3 10.3 113.1 91 90 NU 256 It 90 1 124.3 14.3 112.1 90 90 NU 257 II 91 1 124.3 10.9 114.7 92 90 NU
258 II 67 2 119.2 11.3 109.7 92 90 NU
259 It 68 2 119.2 14.9 110.0 92 90 NU
260 It 46 2 119.2 12.6 110.9 93 90 NU
261 It 47 1 124.3 14.8 111.5 90 90 HU
262 II 93 1 124.3 12.1 113.0 91 90 NU
263 •1 94 1 124.3 12.8 112.1 90 90 NU
264 It 100 1 124.3 15.3 112.0 90 90 NU
265 It 101 2 119.2 10.9 108.9 91 90 NU
266 It 86 1 124.3 10.5 117.9 95 90 HU
267 It 87 1 124.3 10.2 117.6 94 90 HU
268 II 88 1 124.3 11.0 118.3 95 90 HU 269 09/11 68 1 124.3 12.5 113.5 91 90 NU
270 II 69 1 124.3 14.7 112.1 90 90 NU
271 II 74 1 124.3 12.5 116.6 94 90 HU 272 It 75 1 124.3 14.2 114.2 92 90 HU 273 It 96 2 119.2 16.1 109.6 92 90 HU 274 II 97 2 119.2 14.3 110.0 92 90 NU 275 II 89 1 124.3 13.2 116.0 93 90 NU 276 It 90 1 124.3 14.6 113.0 91 90 NU 277 It 103 1 124.3 12.8 112.1 90 90 NU 278 It 104 2 119.2 10.9 108.9 91 90 HU 279 II 62 1 124.3 11.1 115.2 93 90 HU 280 II 63 1 124.3 14.4 113.3 91 90 NU 281 •1 77 2 119.2 10.3 108.5 91 90 NU 282 It 78 1 124.3 15.3 112.6 90 90 NU
283 It 78 2 119,2 10.9 108.9 90 90 NU
284 It 74 1 124.3 10.2 114.6 92 90 NU
285 It 98 1 124.3 12.3 114.6 92 90 HU
286 II 99 2 119.2 14.7 110.9 93 90 HU 287 II 106 2 119.2 10.8 110.7 93 90 HU 288 II 107 1 124.3 12.6 111.7 90 90 NU
Explanation:
SC=$and Cones, NU=Nuclear, DC=Drive Cylinder, OT=Other
Project Name: Broccato
Client Name : Davidson Comnunities
Elevation
Test Test or Curve
Nunber Date Location Nunber
tfeet)
TABLE 2
Field Density Test Results
Project Nunber: 04-7919-009-03-10
Page 6
Maximum Fill
Dry Moisture
Density Content
tPcf) (percent)
Fill
Ory Relative Required Retest Test
Dens i ty Compact i on Compact i on Number Method
fpcf) (percent) (percent)
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
09/12
09/13
09/16
09/17
108
100
101
100
101
88
89
48
49
79
80
96
97
99
100
74
75
65
66
52
53
54
24
25
24
25
27
28
29
30
26
27
29
30
30
29
30
31
32
32
31
32
32
32
33
34
34
34
35
34
35
35
37
38
37
38
1
2
2
1
1
1
1
2
1
2
1
3
2
1
1
1
1
1
2
2
1
2
1
1
3
2
2
1
1
1
1
1
1
2
2
1
2
2
2
2
1
1
1
1
2
1
1
2
1
1
2
2
3
1
1
3
124.3
119.2
119.2
124.3
124.3
124.3
124.3
119.2
124.3
119.2
124.3
115.5
119.2
124.3
124.3
124.3
124.3
124.3
119.2
119.2
124.3
119.2
124.3
124.3
115.5
119.2
119.2
124.3
124.3
124.3
124.3
124.3
124.3
119.2
119.2
124.3
119.2
119.2
119.2
119.2
124.3
124.3
124.3
124.3
119.2
124.3
124.3
119.2
119.2
124,3
119.2
119.2
115.5
124.3
124.3
115.5
16.5
12.5
12.6
11.4
14.5
10.6
12.1
12.6
15.0
12.4
11.3
12.1
13.4
13.3
12.0
10.3
13.2
12.6
11.7
15.6
11.8
16.5
13.7
12.2
17.2
15.7
15.1
14.2
14.6
11.5
11.0
10.2
12.1
8.0
10.8
15.3
16.1
14.3
9.0
10.3
13.2
8.1
11.9
12.1
13.4
5.7
12.2
16.5
13.3
12.3
8.1
13.9
15.8
13.2
13.2
9.0
111.5
110.8
110.5
114.1
113.0
114.8
111.9
109.8
111.9
108.9
113.7
106.3
107.8
112.7
111.4
113.1
113.4
112.2
111.1
109.1
114.5
103.8
113.8
114.1
106.3
107.6
109.3
114.2
111.3
111.3
117.6
117.6
113.0
108.2
110.7
112.0
109.6
110.0
104.4
108.5
116.0
115.5
116.9
111.6
109.6
116.1
115.8
109.3
112.3
114.4
115.5
111.1
105.1
115.6
115.6
104.4
90
93
92
92
91
92
90
92
90
91
91
92
90
91
90
91
91
90
93
91
92
90
91
92
92
90
92
92
90
90
94
94
91
91
93
90
92
92
87
91
93
93
94
90
92
93
93
92
90
92
97
93
91
93
93
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
328
NU
NU
HU
NU
NU
NU
NU
NU
NU
NU
NU
HU
HU
HU
NU
NU
NU
NU
HU
HU
NU
HU
HU
NU
NU
HU
NU
NU
NU
HU
NU
NU
NU
NU
NU
NU
NU
HU
HU
HU
NU
NU
NU
HU
NU
NU
NU
NU
HU
HU
HU
NU
NU
NU
NU
NU
Explanation:
SC=Sand Cones, NU=Nuclear, DC=Drive Cylinder, OT=Other
Project Name:
Client Name :
Broccato
Davidson Communities
Elevation
Test Test or Curve
Nunber Date Location Hunber
tfeet)
TABLE 2
Field Density Test Results
Project Number: 04-7919-009-03-10
Page 7
Maximum Fill
Ory Moisture
Density Content
(pcf) (percent)
Fill
Dry Relative Required Retest Test
Dens i ty Compact i on Compact i on Nunber Method
(Pcf) (percent) (percent)
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
Expianation:
SC=Sand Cones, NU=Nuclear, DC=Drive CyUnder, OT=Other
II 38 3 115.5 15.6 106.4 92 90 II 39 2 119.2 15.6 109.1 91 90 It 40 1 124.3 12.0 114.3 92 90 It 39 1 124.3 12.7 115.8 93 90 It 40 1 124.3 14.0 112.1 90 90 It 40 3 115.5 17.2 105.6 91 90 II 41 3 115.5 8.3 103.6 90 90 II 41 3 115.5 17.2 106.3 92 90 09/18 42 1 124.3 13.6 114.5 92 90 It 43 2 119.2 13.9 110.8 93 90 It 42 1 124.3 14.2 114.2 92 90 •1 43 1 124.3 15.4 112.2 90 90 It 44 1 124.3 12.1 117.2 94 90 II 45 1 124.3 11.0 117.6 94 90 II 46 1 124.3 12.9 115.7 93 90 II 42 2 119.2 15.3 107.0 90 90 11 43 1 124.3 13.4 113.9 91 90
•I 43 1 124.3 12.3 115.1 92 90 II 44 2 119.2 11.2 109.7 92 90 It 25 1 124.3 11.1 114.9 92 90 II 26 2 119.2 11.3 109.7 92 90 II 28 2 119.2 15.5 108.8 91 90 09/19 29 1 124.3 13.5 112.4 90 90 It 29 2 119.2 15.0 109.6 92 90 It 30 2 119.2 10.8 110.0 92 90 II 28 1 124.3 11.8 114.5 92 90 It 29 1 124.3 12.8 113.4 91 90 It 31 1 124.3 13.7 118.0 95 90 It 32 1 124.3 13.2 115.6 93 90
09/20 31 1 124.3 12.9 115.7 93 90 It 32 1 124.3 11.5 111.3 90 90 II 32 1 124.3 15.3 112.0 90 90 II 33 1 124.3 14.7 112.1 90 90 II 34 1 124.3 12.6 112.2 90 90 II 35 1 124.3 13.8 113.7 91 90 II 34 1 124.3 10.2 116.7 94 90 It 35 2 119.2 14.1 109.3 92 90 It 34 3 115.5 12.3 106.1 92 90 It 35 2 119.2 14.4 110.2 92 90
09/23 36 1 124.3 13.4 113.0 91 90
» 37 2 119.2 14.6 108.0 91 90 It 35 2 119.2 16.2 107.6 90 90 It 36 1 124.3 13.7 111.8 90 90 It 32 1 124.3 11.5 112.0 90 90 II 33 1 124.3 12.7 112.6 90 90 II 34 1 124.3 14.8 112.1 90 90 II 36 1 124.3 14.5 113.0 91 90 II 37 2 119.2 14.9 110.5 93 90 It 39 1 124.3 14.9 111.6 90 90 It 40 1 124.3 11.2 113.8 91 90 09/24 44 1 124.3 16.5 111.5 90 90 II 46 1 124.3 12.5 114.6 92 90 It 38 1 124.3 12.3 111.6 90 90 It 39 2 119.2 14.3 110.0 92 90 II 42 1 124.3 12.1 117.2 94 90 II 43 1 124.3 12.1 113.0 91 90
NU
NU
HU
HU
HU
NU
NU
NU
NU
NU
HU
HU
HU
NU
NU
NU
NU
NU
NU
NU
NU
NU
HU
HU
HU
HU
HU
HU
NU
HU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
NU
HU
NU
NU
NU
NU
NU
HU
HU
HU
NU
NU
HU
NU
NU
NU
Project Name: Broccato
Client Nane : Davidson Comnunities
Test
Nunber
Test
Date
Elevation
or
Location
tfeet)
Curve
Nunber
TABLE 2
Field Density Test Results
Project Number: 04-7919-009-03-10
Page 8
Maximum
Ory
Density
tPcf)
Fill
Moisture
Content
(percent)
FiU
Dry
Density
fPCf)
Relative
Compaction
(percent)
Required
Compaction
(percent)
Retest
Number
Test
Method
401 II 44 1 124.3 15.4 111.4 90 90 NU
402 09/25 44 2 119.2 14.6 103.9 87 90 408 NU
403 It 45 2 119.2 13.9 105.7 89 90 409 NU
404 It 34 2 119.2 11.6 109.7 92 90 NU
405 •1 44 2 119.2 13.0 109.8 92 90 NU
406 It 45 1 124.3 14.3 109.6 88 90 410 NU
407 tl 43 2 119.2 13.6 107.6 90 90 NU
408 II 44 2 119.2 14.4 106.7 90 90 NU
409 If 45 2 119.2 13.6 108.3 91 90 NU
410 II 45 1 124.3 14.1 112.1 90 90 NU
Explanation:
SCsSand Cones, NU^Nuclear, DC=Drive Cylinder, 0T=0ther