HomeMy WebLinkAbout; Broccato at Batiquitos Shores; Addendum to As-Graded Geotechnical Report; 1996-12-10Geotechnics
Incorporated
December 10, 1996
Principals;
Anthony F. Belfast
Michael P. Imbriglio
W. Lee Vanderhurst
Brookfield Davidson Homes
12865 Pointe Del Mar, Suite 200
San Diego, California 92014
Project No. 0002-008-03
Document No. 6-0789
Attention: Mr. Luis Nunez
SUBJECT: ADDENDUM TO AS-GRADED GEOTECHNICAL REPORT
Broccato at Batiquitos Shores
Carlsbad, Califonnia
Reference: As-Graded Geotechnical Report, Broccato at Batiquitos Shores, Carlsbad,
Califonnia: Geotechnics Incorporated, November/, 1996, ProjectNo. 0002-008-03.
Gentlemen:
This letter modifies and supersedes the foundation recommendations presented in the referenced
as-graded report. The modifications reflect the two foundation conditions that result from site
grading, as discussed in previous geotechnical investigations for the site. Accordingly, the
following design criteria are recommended for the planned post-tensioned systems.
I. LOTS UNDERLAIN AT DEPTH BY PRECONSOLIDATED ALLUVIAL SOIL: Lots 1
through 7, Lots 10 through 48, Lots 51 through 60, and Lots 63 and 64.
Allowable Bearing Pressure:
Differential Settlement:
2,000 Ibs/ft^ at slab subgrade, with one-third
increase for intermittent loads such as wind or
seismic.
VA inches
LOTS UNDERLAIN BY COMPACTED FILL AND/OR FORMATIONAL MATERIALS: Lots
8, 9 and 65 through 76.
Allowable Bearing Pressure:
Differential Settlement:
2,000 Ibs/ft^ at slab subgrade, with one-third
increase for intermittent loads such as wind or
seismic.
% inch
9951 Business Park Ave., ste. B • San Diego CaUfomia • 92131
Phone (619) 536-1000 • Fax (619) 536-8311
Brookfield Davidson Homes Project No. 0002-008-03
December 10, 1996 Document No. 6-0789
Page No. 2
In addition we are clarifying the information we have provided regarding moisture protection
beneath on-grade slabs. The standard moisture protection used in the San Diego area consists
of 2-inches of clean sand over plastic sheeting, over an additional 2-inches of clean sand, over
subgrade. No unusual groundwater conditions are anticipated which would preclude the use of
this section. It has been our experience that moisture transmission rates using this system are
typically on the order of 6 to 12 pounds of water per 1,000 square feetper day. We recommend
that the plastic sheeting be at least 10 mil thickness.
The recommendations presented herein are considered generally consistent with methods
typically used in southem California, and have been developed using the degree and skill
ordinarily exercised, under similar circumstances, by reputable geotechnical consultants practicing
in this or similar localities. No other wan-anty, expressed or implied, is made as to the
conclusions and professional opinions included in this letter. Other alternatives may be available.
The foundation recommendations herein should not be considered to preclude more restrictive
criteria of governing agencies or by the structural engineer. The design of the foundation sysiem
should be performed by the project stnjctural engineer, incorporating the geotechnical parameters
described in this letter.
We would be happy to meet with you should you have any questions or would prefer to discuss
this further. We appreciate this opportunity to provide continued services on this project.
GEOTECHNICS INCORPORATED
Anthony F. Belfast, P.E. C 40333
Principal
Distribution: (5) Addressee
Gcolcchnict Incorporated
Geotechnics
Incorporated
Principals:
Anthony F. Belfast
Michael P. Imbriglio
W. Lee Vanderhurst
AS-GRADED GEOTECHNICAL REPORT
Broccato at Batiquitos Shores
Cartsbad, Calrfomia
prepared for:
Brookfield Davidson Homes
12865 Pointe Del Mar, Suite 200
San Diego, California 92014
by:
GEOTECHNICS INCORPORATED
Project No. 0002-008-03
Document No. 6-0461
November 7, 1996
9951 Business Park Ave., Ste. B • San Diego Califomia • 92131
Phone (619) 536-1000 • Fax (619) 536-8311
Geotechnics
Incorporated
Principals:
Anthony F. Belfast
Michael P. Imbriglio
W. Lee Vanderhurst
November 7, 1996
Brookfield Davidson Homes
12865 Pointe Del Mar, Suite 200
San Diego, Califomia 92014
Attention: Mr. Dale Gleed
SUBJECT: AS-GRADED GEOTECHNICAL REPORT
Broccato at Batiquitos Shores
Carlsbad, California
Project No. 0002-008-03
Document No. 6-0461
Gentlemen:
This report summarizes the results of the observation and testing services provided during the
earthwork construction of the Broccato at Batiquitos Shores development. In our opinion, the
grading and compaction was performed in general accordance with the intent of the project
geotechnical recommendations and with the requirements of the City of Carlsbad.
We appreciate this opportunity to provide professional services. If you have any questions or
comments regarding this report or the sen/ices provided, please do not hesitate to contact us.
Respectfully submitted,
GEOTECHNICS INCORPORATED
W. Lee Vanderhurst, C.E.G.
Principal
DR/RAT/WLV/AFB
Distribution: (5) Addressee
9951 Busmess Park Ave., ste. B • San Diego Califomia • 92131
Phone (619) 536-1000 • Fax (619) 536-8311
AS-GRADED GEOTECHNICAL REPORT
Broccato at Batiquitos Shores
Cartsbad, Calrfomia
TABLE OF CONTENTS
1.0 INTRODUCTION 1
2.0 SCOPE OF SERVICES 1
3.0 SITE DESCRIPTION 2
4.0 PROPOSED DEVELOPMENT 2
5.0 GEOLOGIC CONDITIONS 3
5.1 Torrey Sandstone 3
5.2 Terrace Deposits 3
5.3 Alluvium 4
5.4 Colluvium 4
5.5 Documented Fill 4
5.6 Groundwater 4
5.7 Seismicity 5
6.0 SUMMARY OF GRADING OPERATIONS 5
6.1 Preparation of Existing Ground .... 5
6.2 Fill g
6.3 Cut and Fill Slopes g
6.4 Backdrains g
7.0 LABORATORY TESTING g
8.0 FIELD DENSITY TESTING 7
9.0 GEOTECHNICAL EVALUATION AND RECOMMENDATIONS 7
9.1 Fill Compaction 7
9.2 Slope Stability 8
9.3 Site Drainage g
9.4 Settlement Monitoring 9
9.5 Foundations ^0
9.5.1 Post-Tensioned Slabs ^ ' 10
9.5.2 Lateral Resistance 10
9.5.3 Slope Setback 11
9.5.4 Moisture Protection for Slabs 11
9.6 Exterior Slabs 11
9.7 Earth Retaining Structures 11
10.0 LIMITATIONS 12
APPENDICES
Appendix A References
Appendix B Laboratory Testing
Appendix C pjeid Density Test Results
AS-GRADED GEOTECHNICAL REPORT
Broccato at Batiquitos Shores
Carisbad, Califbmia
1.0 INTRODUCTION
This report summarizes the results of the testing and observation services provided during the
earthwork construction of Broccato at Batiquitos Shores. The purpose of the observation and
testing services was to evaluate the conformance of the earthwork construction with the
geotechnical recommendations and the project plans and specifications. Our services were
provided in accordance with our Proposal No. 6-126 (Geotechnics Incorporated, 1996a), and
Brookfield Davidson Homes' Contraci No. A1410.
2.0 SCOPE OF SERVICES
Field personnel were provided for this project to observe the grading of the site and conduct field
density tests. The observation and testing assists us in developing professional opinions
regarding the earthwork construction. Our services did not include supervision or direction of the
actual work of the contractor, his employees, or agents. Our services included the following:
Laboratory testing to determine pertinent engineering characteristics of the soils used in
the fills and exposed at finished grade. The results are summarized in Appendix B.
Observation ofthe geologic conditions exposed during excavation and grading ofthe site.
On-site engineer/geologist was provided to evaluate slope stability conditions and provide
recommendations to improve slope stability. The geologic mapping is compiled on the
Geotechnical Maps, Plates 1 through 4.
Observation and testing of fill placement during the site grading. Daily field reports were
prepared summarizing the observed earthwork operations. Test results are summarized
in Appendix C.
Installation of settlement monuments in areas where alluvium was not completely
removed, and monitoring and evalualion of the on-site settlement.
Geotechnics Incorporated
Brookfield Davidson Homes Project No. 0002-008-03
Broccato at Batiquitos Shores Document No 6-0461
Novembers 1996 Page No 2
Preparation of this report which summarizes our observations and test results, our
conclusions regarding the earthwork construction and site condilions, and
recommendations regarding foundation, slab, and pavement seciion design.
3.0 SITE DESCRIPTION
Broccato at Batiquitos Shores is located off of Batiquitos Drive in Carisbad, California as shown
on the Site Location Map, Figure 1. The site encompasses roughly 40 acres on the north shore
of Batiquitos Lagoon. The site is bound by Batiquitos Lagoon and a sewer pump station to the
south, open space to the east and west, and by a residential neighborhood and Batiquitos Drive
to the north.
The site's topography originally consisted ofa generally north-south trending drainage canyon with
moderately steep slopes to the east and west. Secondary drainages incised the slopes.
Elevations ranged from approximately 12 feet above mean sea level (MSL) at the southern end
of the site, to approximately 154 feet MSL al the northeastern corner of the site.
Exisling improvements al the site included a paved access road lo the lagoon and pump station,
a storm drain along the west side of the road, a force sewer main from the pump station, and a
water main and utility easement that crossed the site from east to west near the central portion
of the site. The northeastern part of the site also included some previously graded areas and a
large stockpile of soil.
4.0 PROPOSED DEVELOPMENT
The Broccato project will include the constructton of 73 single-family homes along residential
streets, with open space along much ofthe perimeter. The pads are generally separated by short
retaining walls or slopes that are generally less than 10 feet high although slopes up to 30 feel
high also exist between parallel streets. Natural slopes and conslrucled slopes up to 30 feet high
border the east and west sides of the development.
The projeci includes large areas of open space. The open space has been partitioned and given
lot numbers which are Lots 49, 50, 61, 62, and 77 through 81. The residenlial lots are numbered
1 through 48, 51 through 60. and 63 through 76.
Geotechnics Incorporated
Brookfield Davidson Homes Project No. 0002-008-03
Broccato at Batiquitos Shores Document No 6-0461
November 7, 1996 Pagg No 3
The improvements include the re-alignment of Batiquitos Drive and the construction of seven cul-
de-sacs, abandonment of an existing water line, and the construction of a storm drain sysiem.
The cul-de-sacs are named Gabianno Lane. Cigno Court, Piovana Court, Merio Court. Grivetta
Court, and Anatra Court. A de-silling basin was lo be constructed al the soulh end of the site;
however, this structure was nol constructed at the time of this report. Developmeni of the site
also included the construction of retaining walls between pads and in rear yards at the base of
slopes. The walls were generally less than 7 feet high.
5.0 GEOLOGIC CONDITIONS
The subject site is situated in the coastal plain seciion of the Peninsular Range Province, and is
primarily underiain by Cenozoic sedimentary bedrock malerials and surficial deposits.
Specifically, the site is underiain by the Eocene-age Torrey Sandstone, Quaternary-age terrace
deposits, alluvial and colluvial soil, and compacted fill soil. The approximate as-graded geologic
condilions are depicted on the attached As-Graded Geotechnical Map, Plates 1 through 3.
5.1 Torrev Sandstone
As observed at the site, the Torrey Sandstone consisted of pale gray and yellow brown,
silly, fine- lo medium-grained sandstone. In general, the sandstone was moderately
cemented and massive. Occasional concretions of strongly cemented maierial were
encountered.
The Torrey Sandstone was exposed al the base of the slopes along the western and
eastem sides ofthe site, and at finish grade in Lots 72 through 75. The Torrey Sandstone
likely underiies the entire site at depth.
5.2 Terrace Deoosits
Terrace deposits were exposed in the upper portions ofthe slopes along the western and
eastern sides of the site, and in the cut slope along the northeastern corner of the site.
As observed in the excavalions. the terrace deposits consisted of orange-brown, clayey
fine- lo medium-grained sandstone with some gravels al the base of the formation. The
sandstone was generally weakly to moderately cemented and massive.
Geotechnics Incorporated
Brookfield Davidson Homes Project No. 0002-008-03
Broccato at Batiquitos Shores Document No 6-0461
November 7, 1996 Page No 4
5.3 Alluvium
Alluvial soils underlie much of the site. The alluvium was left in place where the
groundwater table made removal impractical. As observed by the grading, the alluvium
consisted of brown to dark brown, silty lo slightly silty, fine lo medium grain sand. The
alluvium was generally loose to medium dense.
5.4 Colluvium
Colluvial soils were exposed in the slopes surrounding the projeci. The colluvium
consisted of reddish brown, silly fine sand that was generally loose and dry. Colluvial
soils were removed from areas that were lo receive fill and siructural loads.
5.5 Documented Fill
Documented fill was encountered in the northeastern portion ofihe site. Fill was originally
placed under the observation and testing of ICG Incorporated in 1991 along the re-
alignment of Batiquitos Drive. More grading was performed in 1994 under the observation
of Geotechnics (1995). The materials used in the fill were derived primarily from
excavations In the property east of the Broccato projeci, and consisted primarily of silly
sand.
Stockpiled soil also existed al the site in the area of Lols 3 through 15. This material also
originated primarily from excavations east of the site. The stockpiled material was
removed and re-used as fil! maierial during the final grading of the subjecl site.
5.6 Groundwater
Groundwater was encountered during the removal of alluvial soils. The water table was
at an approximate elevation of 5 feet MSL at the southern end of the site, and at an
approximale elevation of 20 feel MSL near the intersection of Batiquitos Drive and
Gabbiano Lane. Groundwater seepage was also observed in the slope behind Lol 72 al
the contact belween the underiying terrace deposii and the overiying colluvium.
Geotechnics Incorporated
Brookfield Davidson Homes Project No. 0002-008-03
Broccato at Batiquitos Shores Document No 6-0461
November 7.1996 p 5
5.7 Seismicity
Several faults were observed in the Eocene-age sandstone during the grading ofthe site.
Theses faults, however, did nol offset the overiying colluvium. and accordingly, are nol
considered active. The active fault nearest to the site is the Rose Canyon fault localed
approximately 2 miles lo the west. A magnitude 6.5 earthquake on the Rose Canyon fault
could result in peak horizontal bedrock accelerations of approximately 0.48g.
6.0 SUMMARY OF GRADING OPERATIONS
In general, the earthwork consisted of the grading of the house pads, slopes, and street
subgrades. The site grades are shown on the Geolechnical Map. Plates 1 through 4. The
projeci grading plans, prepared by O'Day Consultants (1990), serve as base maps for the
Geotechnical Map.
Grading was performed by C.E. Wilson Corporation. Typical cut and fill mass grading techniques
were employed using heavy earth-moving equipment. Site grading began wilh the removal of
deleterious malerials and loose surficial soils. Fill soils were placed lo bring areas up lo design
grades, and individual lols were graded.
6.1 Preparation of Existing Ground
The site was cleared of surface obstructions and stripped of vegetation. Exisling loose
and unsaturated surficial soils were removed lo expose competent bedrock materials, fill
soils placed during previous grading, or alluvial soils saturated by a standing water table.
Existing utilities that were to be abandoned, and the exisling access road, were removed
and replaced with compacted fill. The stockpiled material previously placed on the site
was used in compacled fills.
Where transitions belween bedrock and fill crossed building pads, the bedrock portion of
the lot was over-excavated approximately 3 feel deep, and brought back to planned grade
with compacted fill. Lols 65 and 71 were over-excavated lo reduce the potential of
differential settlement due to cut/fill transitions.
Geotechnics Incorporated
Brookfield Davidson Homes Project No 0002-008-03
Broccato at Batiquitos Shores Document No. 6-0461
November 7.1996 Pa g
The approximale limits of removals, and the approximate elevation of the bottom of the
removals, are indicated on the Geotechnical Map. Prior to placing fill, the exposed
surfaces were scarified lo a deplh of 6 lo 8 inches, brought to approximately optimum
moisture content, and compacled.
6.2 FNI
Fill soils for site grading were typically placed in 6- lo 8-inch thick lifts, brought to
approximate optimum moisture content, and compacted by the equipment delivering,
watering, or mixing the soil. The equipment used for compaction consisted of rubber-tired
compactors, bulldozers, blades, water Irucks. and scrapers.
6.3 Cut and Fill Slopes
Slopes up to 30 feet in heighl were constructed in general accordance with the project
plans and specificalions at a slope ratio of 2:1 (horizontal to vertical). Much of the slopes
along the east and west sides of the site were over-excavated lo remove exposed loose
surficial soils such as colluvium. The upper portion of the slope behind Lot 72 was also
over-excavated. The slopes were re-constructed wilh fill soils and backdrains to reduce
the potential for seepage through the slope faces, and lo act as a buttress against the
loose colluvial soils. Fill slopes were back-rolled and track-walked at finished grade.
6.4 Backdrains
Backdrains were conslrucled beneath the buttressed slopes. The drains consisted of two-
sided filter fabric, approximately 6 feet in height, that were placed against the
over-excavated slope al an elevation approximately 2 feet below and 4 feet above the
finish toe of slope. The fabric was wrapped around perforated PVC pipes which were
connected to the on-site slorm drain sysiem. However, the subdrains on Lot 72 and at
the desilting basin were not tied-in to an outlet al the time of this report.
7.0 LABORATORY TESTING
The various malerials used as fill are described in Figure B-1 of Appendix B, "Laboratory Testing".
The maximum density and optimum moisture conleni of the soil types used as fill were
Geotechnics Incorporated
Brookfield Davidson Homes Project No 0002-008-03
Broccato at Batiquitos Shores Document No. 6-0461
November 7. 1996 Pa ^o 7
determined in the laboratory by ASTM method D1557-91 (Modified Proctor). The fills generally
consisted of fine- to medium-grained sand, silty sand, and clayey sand.
To evaluate malerials for conformance wilh project specificalions, expansion index testing was
conducted on representative samples collected from the finish-graded pads. ASTM lest method
D4829 was used lo evaluate the expansion index. The results of the expansion index testing are
presented on Figure B-2 of Appendix B. The results of the tests indicale expansion potentials
ranging from very low to medium.
8.0 FIELD DENSITY TESTING
In-place moisiure and density tests were made in accordance with ASTM D2922-91 and D3017-
88 (Nuclear Gauge Method). The results of the tests conducted during this phase of mass
grading of Broccato are tabulated in Figures C-1 through C-12 of Appendix C. "Field Density Test
Results". Appendix C presents the relative compaction of the fill as compared lo the respective
maximum density (ASTM Dl 557-91). The densily testing conducted on the previously
documented fills is presented in the referenced reports (ICG, 1991; Geotechnics, 1995).
The locations and elevations indicated forthe tests presented on the Geotechnical Map are based
on field survey stakes and estimates from the grading plan topography, and should only be
considered rough estimates. The eslimated locations and elevations should not be utilized for
lhe purpose of preparing cross sections showing lest locations, or in any case, for the purpose
of after-the-fact evaluating of the sequence of fill placement.
9.0 GEOTECHNICAL EVALUATION AND RECOMMENDATIONS
In our opinion, grading and compaction was performed in general accordance wilh the intent of
the projeci geotechnical recommendations (San Diego Soils Engineering, 1986). and with the
requirements of the Cily of Carisbad. The conclusions and recommendations conlained herein
are based on the observations and testing performed between June 25. 1996. and October 28,
1996. No representations are made as to the qualily and extent of materials not observed.
9.1 Fill Compaction
Geotechnics Incorporated
Brookfield Davidson Homes Project No. 0002-008-03
Broccato at Batiquitos Shores Document No 6-0461
November 7. 1996 Page No. 8
Based upon our observations and testing, it is our professional opinion that fill soils were
placed in accordance with the compaction criteria of 90 percent of the maximum density
as determined by ASTM D1557-91. Where field testing indicated less than 90 perceni
relative compaction, the pertinent fill soils were reworked to achieve the specified
compaction.
9.2 Slope Stabilitv
Fill and cut slopes were constructed to heights up lo 30 feel. Slope slability was
evaluated based on the referenced geotechnical investigation (San Diego Soils
Engineering. 1986). and site observations of conditions exposed during grading.
In general, slopes should be stable with regard lo deep-seated failure with a factor of
safely of at least 1.5. Slope analysis was based on our best estimate of the prevailing
geologic condilions, groundwater condilions and soil strength characteristics. It should be
realized that site condilions can be complex and variable due lo changes in stratigraphy,
geologic structure, and changes in groundwater. II is possible that conditions can differ
from those anticipated in our analysis. In addition, cuts or retaining walls constructed al
the loe of slopes could decrease slope stability. Any changes lo constructed slope
heights, ratios, retaining walls, or addition of surcharge should be evaluated by the
geolechnical consultant.
Man-made and natural slopes will weather over lime as a result of welling and drying,
biologic forces and gravity. As a result, the outer 5 feet of slope face may undergo minor
down-slope creep over the years. While il is not possible to completely eliminate this
effect, it can be minimized by establishing deep-rooted vegetation on the slope,
maintaining the drainage patterns established during constaiction, and by rodent control.
We recommend vegetation which is adapted to semi-arid climates, therefore requiring
minimal irrigation.
9.3 Site Drainaae
Foundation and slab performance depends greatly on how well the runoff waters drain
from the site. This is true both during construction and over the entire life of the structure.
The ground surface around structures should be graded so that water flows rapidly away
from the structures withoul ponding. The surface gradient needed to achieve this depends
Geotechnics Incorporated
Brookfield Davidson Homes Project No. 0002-008-03
Broccato at Batiquitos Shores Document No. 6-0461
November 7. 1996 Page NO 9
on the prevailing landscape. In general, we recommend that pavement and lawn areas
wilhin five feel of buildings slope away at gradients of al least two perceni. Densely
vegetated areas should have minimum gradients of at least five percent away from
buildings within five feel of the structure's perimeter. Densely vegetated areas are
considered those in which the planting lype and spacing is such lhal the flow of water is
impeded.
Planters should be buill so lhal water from them will not seep inlo the foundation, slab,
or pavement areas. Site irrigation should be limited to the minimum necessary to sustain
landscaping plants. Should excessive irrigation, water line breaks, or unusually high
rainfall occur, saturated zones or "perched" groundwater may develop in fill soils. This
condition may result in excessive moisiure migration into and through foundations and
slabs. Damage lo landscape may also occur.
9.4 Settlement Monitoring
Consolidation of the alluvium due lo the weighl of the planned fill was monitored during
fill placemenl and evaluated using settlement monuments. The settlement monuments
consisted of 24-inch-square sleel plates with y4-inch-diameter iron pipe extensions. The
pipe was added as the fill placement progressed upward. The lops of the pipes were
surveyed by O'Day Consultants on a regular basis and provided lo us for our review. The
approximale locations of the settlement monuments are presented on the Geotechnical
Maps, Plates 1 through 4.
Preliminary estimates by San Diego Soils Engineering, Inc. (1986) of the alluvial
settlement was on the order of up to 5 inches. Based on the settlement data obtained
during grading, settlement of up lo approximately S-Yi inches was observed in Monument
1 located in Lot 42. Settlement of about 1 lo l-'A inches was measured in Monuments
2 through 7. Monument 4 currently shows about 4 inches of settlement. The settlement
dala is presented on Figures 2.1 through 2.8, Settlement Monument Data.
Based on the settlement data, it appears the areal settlement is essenlially complete. The
amouni of settlement measured during grading is wilhin the amounts eslimated in the
preliminary geolechnical investigation. Fulure settlement may occur in addition to the
measured values. The amount of future settlement depends on the amouni of irrigation
Geotechnics Incorporated
Brookfield Davidson Homes Project No 0002-008-03
Broccato at Batiquitos Shores Document No 6-0461
November 7. 1996 Page NO 10
by the homeowners. Structures should be designed for the settlement values given in
Section 9.5.1.
9.5 Foundations
The following recommendations are based on our testing and observation of the grading,
the laboratory testing ofthe soil near finish grade, and are considered generally consistent
wilh methods typically used in southern California. Other alternatives may be available.
The foundation recommendations herein should not be considered lo preclude more
restrictive crileria of governing agencies or by the staictural engineer. The design of the
foundation sysiem should be performed by the project structural engineer incorporating
the geolechnical parameters described in the following sections.
In general, the expansion index testing indicated that the soils exhibit very low and low
expansion potential except for Lots 69 and 70 which exhibited a medium expansion
potential. The following parameters assume an expansion index of less than 90, and that
the siructure will be founded either entirely on compacted fill or entirely on relatively
undislurbed formational material. We understand lhal posl-lensioned slabs will be used
al each of the lots.
9.5.1 Post-Tensioned Slabs
For design of post-tensioned slabs, a bearing value of 2,000 pounds per square
fool and a differenlial settlement value of 1-14 inches may be used for design. A
one-third increase in the bearing value may be used for short term wind and
seismic loading. A minimum fooling embedment depth of 18 inches below the
lowest adjacent grade should be provided.
9.5.2 Lateral Resistance
Lateral loads against siruclures may be resisted by friction between the bottoms
of footings or slabs and the supporting soil. A coefficient of friction of 0.3 is
recommended. Alternatively, a passive pressure of 300 pcf is recommended for
the portion of vertical foundation members embedded inlo formational soil. If
friction and passive pressure are combined, the passive pressure value should be
reduced by one-third.
Geotechnics Incorporated
Brookfield Davidson Homes Project No. 0002-008-03
Broccato at Batiquitos Shores Document No 6-0461
November 7. 1996 Page No 11
9.5.3 Slope Setback
Footings on slopes should be founded at a deplh such that the distance belween
the lower outside edge of the footing and the face of any slope is at least 5 feet.
9.5.4 Moisture Proiection for Slabs
Concreie slabs constructed on soil ultimately cause the moisiure content lo rise
in the underiying soil. It is our understanding that the planned moisture proiection
for slabs on grade is lo consist of 2 inches of sand, over a 6-mil visqueen vapor
barrier. II has been our experience that such systems will transmit from
approximately 6 to 12 pounds of moisture per 1000 square feet per day. It is our
opinion that soil conditions do not exist that would preclude the use of the
indicated moisture protection on this project. II should be recognized, however,
that this sysiem relies entirely on the integrity of the visqueen membrane.
Accordingly, care should be taken lo proiect the visqueen against all punctures
and to provide adequate overlap al all seams. To further reduce the amount of
moisture migration, we recommend placing a 4-inch thick layer of coarse sand
over the visqueen.
9.6 Exterior Slabs
Reinforcemenl and the use of crack control joints should help conlrol random cracking and
differenlial movement. Slabs should be at least 4 inches in Ihickness and should be
reinforced wilh at least 6-inch by 6-inch, W1.4 by W1.4 welded-wire fabric. Slabs may
bear directly on compacted subgrade. Crack conlrol joinis should be provided on al least
5-foot centers each way.
9.7 Earth Retaining Structures
Retaining walls should be backfilled wilh material exhibiting a low expansion potential, less
than 35 as evaluated by UBC Slandard 29-2 (Expansion Index test). Materials exhibiting
a greater expansion potential would increase the lateral pressures beyond design values.
The following design parameters for earth retaining structures are provided assuming
backfill wilh a low potential for expansion.
Geotechnics Incorporated
Brookfield Davidson Homes Project No. 0002-008-03
Broccato at Batiquitos Shores Document No 6-0461
November 7. 1996 Page No 12
Equivalent Fluid Pressure with level backfill: 35 Ibs/ft^
Equivalent Fluid Pressure wilh 2:1 sloping backfill: 45 Ibs/ft^
Allowable Soil Bearing: 2,000 Ibs/ft^
Passive Pressure: 300 Ibs/ft^
Coefficient of Friction, soil to concreie: 0.3
The equivalent fluid pressures are based on the active soil slate, assuming the walls are
free to rotate at least 1 perceni of the wall heighl. The pressures do nol include
surcharge loads, hydrostatic pressure, or seepage forces. Walls should be fully drained
to prevent hydrostatic or seepage pressures. When combining passive pressure and
friction for passive resislance, the passive pressure should be reduced by one-third.
It has been our experience lhal site retaining walls frequently develop high moisture or
free water in the backfill due to heavy irrigation that commonly occurs in subdivisions.
This leads lo problems such as efflorescence on the face of the wall and spalling of
stucco finishes. To decrease such problems, il is suggested that walls be moisture-
proofed on the positive side in addition lo having a back-drain.
Retaining wall backfill should be compacled lo at least 90 percent relative compaction
(ASTM Dl 557-91). Backfill should nol be placed unlil walls have achieved adequate
structural strength. Heavy compaction equipmenl which could cause distress lo walls
should not be used. Temporary excavations in compacled fill greater than 4 feet in heighl
should be no steeper than 1:1 (horizontal lo vertical). Temporary excavations in
formational materials should be no steeper than M:1.
10.0 UMITATIONS
Our services were performed using the degree of care and skill ordinarily exercised, under similar
circumstances, by reputable soils engineers and geologists practicing in this or similar localities.
No olher warranty, expressed or implied, is made as lo the conclusions and professional advice
included in this report. The samples taken and used for testing, the observations made and the
in-place field testing performed are believed representative of the projeci; however, soil and
geologic conditions can vary significantly belween tested or observed locations.
Geotechnics Incorporated
Brookfield Davidson Homes
Broccato at Batiquitos Shores
November 7, 1996
Project No. 0002-008-03
Document No. 6-0461
Page No. 13
This report is issued with the understanding that it is the responsibility of the owner, or of his
representative, to ensure that the information and recommendations contained herein are brought
to the attention of the architect and engineer for the project and incorporated inlo the plans, and
the necessary steps are taken to see that the contractor and subcontractors carry out such
recommendations in the field.
As in most major projects, conditions revealed by excavation may be at variance with preliminary
findings. If this occurs, the changed conditions must be evaluated by Geotechnics Incorporated
and designs adjusted as required or alternate designs recommended. Although our observations
and testing did nol reveal deficiencies, we do not guarantee the conlractor's work, nor do the
services provided by Geotechnics relieve the contractor of responsibility in the event of
subsequently discovered defects in his work.
The findings of this report are valid as of the present date. However, changes in the conditions
of a property can occur with the passage of lime, whether they be due to natural processes or
the works of man on this or adjacent properties. In addition, changes in applicable or appropriate
standards may occur, whether they result from legislation or the broadening of knowledge.
Accordingly, the findings of this report may be invalidated wholly or partially by changes outside
our control. Therefore, this report is subject lo review and should not be relied upon after a
period of three years.
GEOTECHNICS INCORPORATED
Robert A. Torres, P.E. C 43077
Senior Engineer
W. Lee Vanderhurst, C.E.G. 1125
Principal
Anthony F. Belfast, P.E. C 40333
Principal
Geotechnics Incorporated
Ill
X
O
a:
LL
Q
UJ
<
W CH
LU
X
h-
O
CD
CO
<
o
X H
CD
o>
CO T- T-O I —» O CD -T< §° Q.
(A
< o
02S
UJ
t
CO
0
o
S
CD
CO o I oo o o CNJ o o o 0) O lil o<2 lx. c 0) E U o a.
o £ S
1-5 E
>
O (D
y o
UJ
s
IU
UJ
CQ CQ
(S3H0NI) N0I1VA313 NI 39NVH0
SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 o Project No. 0002-008-03 Document No. 6-0461 FIGURE 2.2 SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 , 1^ o Project No. 0002-008-03 Document No. 6-0461 FIGURE 2.2 SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 Project No. 0002-008-03 Document No. 6-0461 FIGURE 2.2 SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 Project No. 0002-008-03 Document No. 6-0461 FIGURE 2.2 SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 Project No. 0002-008-03 Document No. 6-0461 FIGURE 2.2 SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 Project No. 0002-008-03 Document No. 6-0461 FIGURE 2.2 SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 Project No. 0002-008-03 Document No. 6-0461 FIGURE 2.2 SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 Project No. 0002-008-03 Document No. 6-0461 FIGURE 2.2 SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 Project No. 0002-008-03 Document No. 6-0461 FIGURE 2.2 SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 o Project No. 0002-008-03 Document No. 6-0461 FIGURE 2.2 SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 J o SETTLEMENT MONUMENT DATA Broccato at Batiquitos Shores Brookfield Davidson Homes SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 / SETTLEMENT MONUMENT DATA Broccato at Batiquitos Shores Brookfield Davidson Homes SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 / SETTLEMENT MONUMENT DATA Broccato at Batiquitos Shores Brookfield Davidson Homes SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 SETTLEMENT MONUMENT DATA Broccato at Batiquitos Shores Brookfield Davidson Homes SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 1 O SETTLEMENT MONUMENT DATA Broccato at Batiquitos Shores Brookfield Davidson Homes SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 —¥ 10 PAYS ELAPSE SETTLEMENT MONUMENT DATA Broccato at Batiquitos Shores Brookfield Davidson Homes SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 — 1 10 PAYS ELAPSE SETTLEMENT MONUMENT DATA Broccato at Batiquitos Shores Brookfield Davidson Homes SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 < •
1
• •
• • 10 PAYS ELAPSE SETTLEMENT MONUMENT DATA Broccato at Batiquitos Shores Brookfield Davidson Homes SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 / 10 PAYS ELAPSE SETTLEMENT MONUMENT DATA Broccato at Batiquitos Shores Brookfield Davidson Homes SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 10 PAYS ELAPSE SETTLEMENT MONUMENT DATA Broccato at Batiquitos Shores Brookfield Davidson Homes SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 10 PAYS ELAPSE SETTLEMENT MONUMENT DATA Broccato at Batiquitos Shores Brookfield Davidson Homes SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 10 PAYS ELAPSE SETTLEMENT MONUMENT DATA Broccato at Batiquitos Shores Brookfield Davidson Homes SETTELMENT MONUMENT DATA MONUMENT 2 - LOT 48 1 ! —•—Seriesi (U -»—«
CO
l-H
^ o 1 ! —•—Seriesi (U -»—«
CO
l-H
^ o 1 ! —•—Seriesi (U -»—«
CO
l-H
^ o
• 1 ! —•—Seriesi (U -»—«
CO
l-H
^ o
• 1 1 ! —•—Seriesi (U -»—«
CO
l-H
^ o
• 1 ! —•—Seriesi (U -»—«
CO
l-H
^ o
O r- est
(S3H0N
cn
) N011VA3n3 Nl 39NVHD
in 1 ! —•—Seriesi (U -»—«
CO
l-H
^ o
CO o
o LU « Q.
UJ
(0
>
T- CO Souj CD K 0(5 o 9 eg o o o c a> E o _ o
< " .« Q £ S 1-5 E 2 w o
UJ X
3 .t; o
z =3 49
2s >
S'S ID
liJ o <u
S
UJ
(O
(S3H0NI) NOIIVASIS Nl 30NVH0
LU
10 > <
o
W
i
CO o I CO o o I CM o o o •6 0) O UJ CD oc 5(2 u-c a> E Z3 O o
-3 *S O
O =5 >
o (i>
H O
UJ
E
UJ
UJ
(S3H0NI) N0llVA3n3 Nl 30NVH0
Q
» O.
tu
> < a
CO T- IO O CD CO o o CNJ o o o d z 0) 9 m <D €C cz E O _ O O'Q
a
m S
Z
O
w "I
^ >
UJ o -
rJ o 2
UJ
(S3H0NI) NOIlVA3n3 Nl 30NVH0
Q
LU
tn
0.
LU
CO >-<
•
CO CO O CD OE. 6 <»> Z E t5 3 0) o g-Q D-
< O
« "Z o S
AS O
= 49
2 !S ^
Q Z ™ 12 UJ ^ ^
o
UJ
S
Z O
UI
Ul
CO
S 2
(S3H3NI) NOIlVA3n3 Nl 39NVH0
(S3H0NI) N0llVA3n3 Nl 30NVH0
CO T- 1^ §9}" O CD K 6 ^ z E ^ y 0) o a.
< (0
o 2 (0
E o X
3 Si O
Q ^ -S ^ ra ^ CD Q
Z^2
m O (1>
UJ o
o 2
UJ
z
LU
S
3
Z
O
Q.
CO
z LU 0.
O
I
00 Z z LU lU
51
to
; :,, r^*^,^ - —
a
Ul <0
a
IU
<
Q
(S3H0NI) NOI1VA3-I3 Nl 30NVH0
CO CO g9|{! o CD DC goo §551 d <!> Z E +- =3 O o 0) o O'Q
< w
Q 2 S Hjg E o
UJ X Soc 3 ±; o = =) (0 5 o-S O =s >
«CQ Q
Z ™ 2
IU o (i> si$l "I Si 8
Hoc
Ul
APPENDIX
A
APPENDIX A
REFERENCES
American Society for Testing and Malerials, 1992, Annual Book of ASTM Slandards, Seciion 4,
Construction, Volume 04.08 Soil and Rock; Dimension Stone; Geosynthetics, ASTM
Philadelphia, PA. 1296 p.
Geotechnics Incorporated, 1995, Interim Compaction Report, Broccato Developmeni, Carisbad,
California: Project No. 0002-008-00, dated March 13.
Geotechnics Incorporated, 1996a, Proposal for Geolechnical Services, Testing and Observation
During Grading, Broccato, Carlsbad, California; Proposal No. 6-126, dated June 21.
Geotechnics Incorporated, 1996b, Review of Submittal Contractor Submittal No. 1, Buttress
Backdrain Geofabric, Broccato by Batiquitos Shores, Carisbad, California- Project No
0002-010-00, dated June 25.
Geotechnics Incorporated, 1996c, Review of Contractor Submittal No. 3, Buttress Backdrain
Geofabric, Broccato by Batiquitos Shores, Carisbad, California: Projeci No. 0002-008-03
dated July 12.
Geotechnics Incorporated, 1996d, Foundation Design Recommendations, Lols 11,12,13,47,48,
and 53 through 60, Broccato by Batiquitos Shores, Carisbad, California: Projeci No 0002-
008-03, dated August 13.
Geotechnics Incorporated, 1996e, Interim As-Graded Letter for Model Lots, Lols 10 through 15,
Broccato by Batiquitos Shores, Carisbad, California: Project No. 0002-008-03, dateci
September 11.
Geotechnics Incorporated, 1996f, Geolechnical Recommendations, Proposed Widening of
Batiquitos Drive, Carisbad, California: Project No. 0002-008-03, dated October 21.
Geotechnics Incorporated, 1996g, Pavement Sections, Broccato - Azure Cove, Carisbad,
California: Project No. 0002-008-03, dated October 21.
Geotechnics Incorporated, 1996h, Disclosure for Broccato Lols: Project No. 0002-008-03 dated
October 22.
ICG Incorporated, 1991, Remedial Grading, Broccato at Batiquitos Shores, Carisbad, California-
Project No. 04-7919-009-00-01, dated March 27, 1991.
O'Day Consultants, 1990, Grading Plan for Broccato, Carisbad Tracl 89-19- Project No
P.E.2.91.05, 21 sheets.
San Diego Soils Engineering. 1986, Preliminary Geotechnical Report, Proposed Multi-Family
Residential Site, Batiquitos Drive, Carisbad. California: Job No. 25052-00, dated May 21.
Geotechnics Incorporated
APPENDIX
B
APPENDIX B
LABORATORY TESTING
Selected representative samples of soils encountered were tested using test methods of the
American Society for Testing and Materials, or other generally accepted slandards. A brief
descriplion of the tests performed follows:
Classification: Soils were classified visually according to the Unified Soil Classification System,
and in accordance with ASTM D2487.
Maximum Densltv/Optimum Moisture: The maximum densities and optimum moisiure contents
of representative soil samples were determined by using test melhod ASTM D1557-91, modified
Proctor. The test results are summarized in Figure B-1.
Expansion Index: The expansion potential of selected soils was characterized by using the lest
melhod ASTM D4829. The results are presented in Figure B-2.
Geotechnics Incorporated
NO. DESCRIPTION
MAXIMUM
DENSITY
(PCF)
OPTIMUM
MOISTURE
(%)
1 Yellow-brown sllty fine lo medium SAND (SM) 123.4 10.5
2 Pale yellow-brown medium SAND (SP) 108.0 14.3
3 Brown silty fine SAND (SM) 117.9 11.4
4 Light reddish brown clayey SAND (SC) 130.7 8.6
5 Brown silty SAND (SM) 123.2 9.6
6 Brown silty SAND (SM) 125.1 10.0
7 Lighl gray and yellow-brown silty fine SAND
(SM)
111.5 14.0
8 Brown silly fine SAND (SM) 125.6 10.5
9 Reddish brown silty fine to medium SAND
(SM)
127.4 8.9
10 Reddish brown fine SAND (SP) 118.5 12.0
11 Reddish brown fine SAND (SP) 125.0 9.5
12 Olive gray silly SAND (SM) with clay 115.5 14.5
13 Yellowish brown silly SAND (SM) 118.0 11.5
Geotechnics
Incorporated
Maximum Density
Broccato
Brookfield Davidson Homes
Project No. 0002-008-03
Document No. 6-0461
Figure B-1
SAMPLE
NUMBER
SAMPLE
LOCATION
REPRESENTING
LOTS
EXPANSION
INDEX
EXPANSION
POTENTIAL
1 Lot 14 Lots 13- 15 26 Low
2 Lol 11 Lols 10 - 12 15 Very Low
3 Lot 32 Lots 31-33 0 Very Low
4 Lot 38 Lots 37 - 39 0 Very Low
5 Lot 41 Lols 40 - 42 3 Very Low
6 Lot 44 Lols 43 - 46 0 Very Low
7 Lot 48 Lots 47 & 48 0 Very Low
8 Lot 52 Lots 51 - 53 0 Very Low
9 Lol 35 Lots 34 - 36 0 Very Low
10 Lot 29 Lots 27 - 30 14 Very Low
11 Lot 25 Lols 24 - 26 4 Very Low
12 Lol 22 Lots 21-23 0 Very Low
13 Lot 19 Lots 18-20 8 Very Low
14 Lot 55 Lols 54 - 56 0 Very Low
15 Lot 58 Lots 57 - 60 6 Very Low
16 Lot 16 Lols 16 & 17 30 Low
17 Lol 67 Lots 65 - 68 0 Very Low
18 Lot 7 Lots 6 - 9 21 Low
19 Lot 4 Lols 2, 4 & 5 29 Low
20 Lol 3 Lots 1 & 3 0 Very Low
21 Lot 63 Lots 63 & 64 0 Very Low
22 Lot 74 Lots 74 - 76 0 Very Low
23 Lot 70 Lols 69 & 70 56 Medium
94 Int 79 1 n\t^ 71 - 7.? n Vprv 1
UBC TABLE NO. 29-C, CLASSiFICATION OF EXPANSIVE SOiL
EXPANSION INDEX POTENTIAL EXPANSION
0-20 Very Low
21-50 Low
51-90 Medium
91-130 High
Above 130 Verv Hiah
Geotechnics
Incorporated
Expansion index Tests
Broccato
Brookfield Davidson Homes
Project No, 0002-008-03
Document No. 6-0461
Figure B-2
APPENDIX
C
APPENDIX C
FIELD DENSiTY TEST RESULTS
In-place moisture and density lesls were made in accordance wilh ASTM D2922-91 and D3017-
88 (Nuclear Gauge Melhod). The results of these tests are tabulated in the Figures C-1 through
C-12, "Field Density Test Results". The approximate lest locations are presented on the attached
Geotechnical Map, Plates 1 through 4. The locations and elevations indicated for the tests
presented on the Geolechnical Map are based on field survey slakes and estimates from the
grading plan topography, and should only be considered rough estimates. The estimated
locations and elevations should not be utilized for the purpose of preparing cross seciions
showing test locations, or in any case, for the purpose of after-the-fact evaluating of the sequence
of fill placement.
The precision of the field density lest and the maximum dry density test is nol exact and
variations should be expected. For example, the American Society for Testing and Materials has
recently researched the precision of ASTM Method No. D1557 and found the accuracy of the
maximum dry density to be plus or minus 4 percent of the mean value and the optimum moisture
content lo be accurate lo plus or minus 15 percent of the mean value; the Society specifically
stales the "acceptable range of test results expressed as a percent of mean value" is the range
staled above. In effect, an indicated relative compaction of 90 percent has an acceptable range
of 86.6 to 92.8 percent based on the maximum dry density determination.
Geotechnics Incorporated
Geotechnics
Incorporated
DENSITY TEST RESULTS
Broccato al Batiquitos Shores
Brookfield Davidson Homes
Project No. 0002-008-03
Document No. 6-0461
FIGURE C-1
Test
No.
Test
Date
Elevation
[ft]
Location/
Station
Soil
Type
Max. Dry
Density
[pcf]
Moisture
Content
[%]
Dry
Density
[pcf]
Relative
Compaction
[%]
Required
Compaction
[%]
Retest
Number
1 6/26/96 13.5 46 1 123.4 10.2 108,8 88 90 2 2 6/27/96 13.5 46 1 123.4 10.9 111.8 91 90
3 6/27/96 12.5 48 1 123.4 7.9 111.6 90 90
4 6/27/96 14 47 3 117.9 8.2 108.6 92 90
5 6/28/96 14 48 3 117.9 12.0 110,8 94 90
6 6/28/96 14 47 1 123.4 7.8 115.4 94 90
7 6/28/96 13 46 1 123.4 8.5 117.1 95 90
8 6/28/96 12 45 1 123.4 8.8 119,1 97 90
9 7/1/96 15 55 1 123.4 9.5 113.8 92 90
10 7/1/96 14.5 54 1 123.4 8.7 116.4 94 90
11 7/1/96 10 43 3 117.9 8.4 107,9 92 90
12 7/1/96 15 Piovana 1 123.4 8.1 116.7 95 90
13 7/1/96 16 Piovana 1 123.4 7.4 115.2 93 90
14 7/1/96 16 54 3 117.9 13.5 111.5 95 90
15 7/1/96 17 55 4 130.7 10.4 120.4 92 90 16 7/2/96 10 43 1 123.4 6.9 112.7 91 90
17 7/2/96 13 44 1 123.4 6.4 111,6 90 90
18 7/2/96 14 44 1 123.4 8.3 115,9 94 90
19 7/2/96 10 43 3 117.9 10.6 109.4 93 90
20 7/2/96 11 42 3 117.9 12.0 108,3 92 90
21 7/2/96 12 43 1 123.4 8.8 111.8 91 90
22 7/2/96 14 42 1 123.4 7.0 113.8 92 90
23 7/2/96 12 42 3 117.9 11.9 106.9 91 90
24 7/2/96 13 42 3 117.9 13.3 109.4 93 90
25 7/2/96 15 43 3 117.9 9.1 110.1 93 90
26 7/2/96 14 45 1 123.4 9.6 118.3 96 90
27 7/2/96 15 44 1 123.4 11,6 113.2 92 90 28 7/3/96 16 45 1 123.4 10.5 113,1 92 90 29 7/3/96 15 44 1 123.4 8.2 114.0 92 90
30 7/3/96 15 42 1 123.4 8,7 117.2 95 90
31 7/3/96 14 42 1 123.4 8.5 116.8 95 90
32 7/3/96 17 46 1 123.4 7.0 111.1 90 90
33 7/3/96 17 45 1 123.4 7.3 111.9 91 90
34 7/3/96 18 48 1 123.4 8.8 112.1 91 90
35 7/3/96 19 47 1 123.4 7.8 111.1 90 90
36 7/3/96 19 55 1 123.4 8,5 110,9 90 90
37 7/3/96 20 Piovana 5 123.2 8.9 115.4 94 90
38 7/3/96 18 45 4 130.7 8.2 123.3 94 90
39 7/3/96 18 48 5 123.2 7,7 115,7 94 90
40 7/3/96 19 46 5 123.2 9.5 112.0 91 90
41 7/8/96 16 42 5 123.2 12.0 115.4 94 90
42 7/8/96 17 42 5 123.2 10.8 116.8 95 90
43 7/8/96 20 45 5 123.2 13.4 113.4 92 90
44 7/8/96 20 46 5 123.2 10.3 114.4 93 90
45 7/B/96 12 42 5 123.2 8.4 115,1 93 90
46 7/8/96 15 Parking 5 123.2 8,8 113.6 92 90
47 7/8/96 20 54 5 123.2 11.8 115.8 94 90
48 7/9/96 17 42 4 130.7 10.5 121.5 93 90
G e o t e c h n i n .q DENSiTY TEST RESULTS Project No. 0002-008-03
^ Incornorateri Broccato al Batiquitos Stiores Document No. 6-0461
Brookfield Davidson Homes FIGURE C-2
Test Test Elevation Location/ Soil Max. Dry Moisture Dry Relative Required Retest
No. Date [ft] Station Type Density Content Density Compaction Compaction Number
[pcf] [%] [pcf] t%I [%]
49 7/9/96 18 43 1 123,4 14.0 113.6 92 90
50 7/9/96 19 44 5 123.2 12.1 112.8 92 90
51 7/9/96 20 45 4 130.7 8.5 117,9 90 90
52 7/9/96 21 Piovana 5 123.2 11.9 115.3 94 90
53 7/10/96 13 39 5 123.2 6.4 108,7 88 90 54 54 7/10/96 13 39 5 123.2 8,8 113.9 92 90
54
55 7/10/96 13 34 5 123.2 8.3 112,2 91 90
56 7/10/96 14 40 5 123,2 9.6 111.8 91 90
57 7/10/96 14 Cigno 5 123.2 9.8 113.4 92 90 58 7/10/96 21 42 5 123,2 7.0 109,2 89 90 59 59 7/10/96 21 42 5 123.2 7.1 110.4 90 90
59
60 7/10/96 23 42 3 117.9 9,2 107,1 91 90 61 7/10/96 15 38 5 123.2 6.5 110.4 90 90 62 7/10/96 15 Cigno 5 123.2 10.0 112.6 91 90
63 7/11/96 13 51 5 123.2 8,7 119,9 97 90 64 7/11/96 18 51 5 123.2 8.5 116.7 95 90 65 7/11/96 16 36 5 123,2 10.7 117.3 95 90 66 7/11/96 16 35 5 123,2 13,0 113,2 92 90 67 7/11/96 17 40 5 123.2 10.9 113.4 92 90 68 7/11/96 18 37 3 117.9 12,2 112,9 96 90 69 7/11/96 18 42 3 117.9 11.4 109.5 93 90 70 7/11/96 18 40 5 123.2 11.1 115.8 94 90 71 7/11/96 19 38 5 123,2 13.1 116.2 94 90
72 7/11/96 20 39 5 123,2 12,3 117,0 95 90 73 7/11/96 20 Cigno 5 123.2 13.4 113.3 92 90 74 7/11/96 21 34 5 123.2 10,9 116,8 95 90
75 7/11/96 21 37 5 123.2 11,5 116.5 95 90
76 7/12/96 20 38 1 123.4 11.7 115.4 94 90
77 7/12/96 20 36 5 123.2 10.0 118,2 96 90
78 7/12/96 17 36 1 123,4 13.5 109,8 89 90 79 79 7/12/96 17 36 1 123.4 11.7 113.9 92 90
79
80 7/12/96 17 37 5 123,2 9.6 115.6 94 90 81 7/12/96 18 36 5 123.2 10,1 115.8 94 90 82 7/12/96 21.9 45 5 123.2 11.7 114.2 93 90
83 7/12/96 19 44 5 123.2 13.9 110.5 90 90 84 7/12/96 19 36 5 123.2 8.3 110.3 90 90 85 7/12/96 20 37 5 123,2 11.5 116.0 94 90
86 7/12/96 20:9 44 5 123.2 8.8 118.2 96 90 87 7/15/96 21 39 1 123.4 10.5 118,5 96 90 88 7/15/96 19.5 40 5 123.2 8.6 117.9 96 90
89 7/15/96 20 37 5 123,2 9.3 117,4 95 90 90 7/15/96 21 37 5 123.2 10.3 114.2 93 90 91 7/15/96 18 34 5 123,2 8.0 113.6 92 90 92 7/15/96 16 33 5 123.2 8.6 116.7 95 90 93 7/15/96 17 33 5 123,2 8.9 116.0 94 90 94 7/15/96 22 Cigno 1 123,4 10.5 118,3 96 90 95 7/15/96 23 38 1 123.4 13,0 116,1 94 90 96 7/16/96 20 43 5 123.2 8.5 108.6 88 90 97
Geotechnics
Incorporated
DENSITY TEST RESULTS
Broccato at Batiquitos Shores
Brookfield Davidson Homes
Project No. 0002-008-03
Documenl No. 6-0461
FIGURE C-3
Test Test Elevation Location/ Soil Max, Dry Moisiure Dry Relative Required Retest
No. Date [ft] Station Type Density Content Density Compaction Compaction Number
(pcf] [%J [pcf] [%J [%]
97 7/16/96 20 43 5 123.2 7.7 111.9 91 90
98 7/16/96 19 42 5 123.2 6.0 113.8 92 90
99 7/16/96 22 36 6 125.1 8.9 117.8 94 90
100 7/16/96 22 38 6 125,1 11.7 117.2 94 90
101 7/16/96 22 35 6 125,1 11.7 119,2 95 90
102 7/16/96 19 33 6 125.1 11.8 117.4 94 90
103 7/16/96 23 35 6 125.1 12.2 117,6 94 90
104 7/17/96 22 Merlo 3 117,9 12,8 110.5 94 90
105 7/17/96 21 26 3 117.9 12.2 111.8 95 90
106 7/17/96 20 24 5 123,2 9.5 111,3 90 90
107 7/17/96 20 24 5 123.2 9.3 110.7 90 90
108 7/17/96 22 25 6 125.1 10.7 117.4 94 90
109 7/17/96 22 25 6 125.1 12.0 117.1 94 90
110 7/17/96 23 26 5 123.2 9.1 112.6 91 90
111 7/18/96 '22 17 5 123.2 7.3 111.0 90 90
112 7/18/96 22 Merlo 5 123.2 9,9 117,6 95 90
113 7/18/96 23 27 5 123,2 8.1 115.1 93 90
114 7/18/96 23 24 5 123.2 9.0 116.9 95 90 115 7/18/96 21 Merlo 5 123,2 8,1 112.1 91 90
116 7/18/96 22 23 5 123,2 9.4 113,1 92 90
117 7/18/96 23 25 6 125.1 10,5 116.2 93 90 118 7/18/96 24 24 6 125.1 9.4 119.5 96 90
119 7/19/96 21 26 6 125,1 9.3 118,3 95 90
120 7/19/96 20 Gabbiano 4 130.7 8.5 121.9 93 90 121 7/19/96 22 Merlo 6 125.1 8,4 118.8 95 90
122 7/19/96 22 23 6 125.1 9,5 119,7 96 90
123 7/19/96 23 38 6 125.1 12.8 116.4 93 90
124 7/19/96 24 35 6 125.1 12.9 115.6 92 90
125 7/19/96 24 36 6 125,1 13,7 115.1 92 90
126 7/19/96 25 37 6 125.1 11,6 118.5 95 90
127 7/22/96 25 25 5 123.2 13.2 116.8 95 90
128 7/22/96 25 24 6 125.1 13,0 117,5 94 90
129 7/22/96 26 26 6 125.1 12.4 116.1 93 90
130 7/22/96 26 26 6 125.1 12.5 119.2 95 90
131 7/22/96 26 Merlo 6 125.1 11.7 117.8 94 90 132 7/22/96 27 24 5 123.2 13.4 114.1 93 90
133 7/22/96 27 25 5 123,2 11.7 115,0 93 90
134 7/22/96 28 25 5 123.2 11.3 115.9 94 90
135 7/23/96 27 26 6 125,1 11.5 118,8 95 90
136 7/23/96 28 26 6 125.1 13.2 117,9 94 90
137 7/23/96 28 25 5 123.2 8.4 116.8 95 90
138 7/23/96 29 24 5 123,2 7,9 116,0 94 90
139 7/23/96 28 Merlo 6 125.1 14,8 115,8 93 90
140 7/23/96 29 26 6 125.1 12.4 117.2 94 90
141 7/23/96 29 23 5 123,2 9.8 115,9 94 90
142 7/24/96 23 16 5 123.2 8.8 113,0 92 90
143 7/24/96 23 18 5 123.2 8.6 112,5 91 90 144 7/24/96 24 17 5 123.2 9.4 112,5 91 90
Geotechnics DENSiTY TEST RESULTS Project No. 0002-008-03
^__r n c o r p o r a t e d Broccato at Batiquitos Shores Document No. 6-0461
Brookfield Davidson Homes FIGURE C-4
Test Test Elevation Location/ Soil Max. Dry Moisture Dry Relative Required Retest
No. Date [ft] Station Type Density Content Density Compaction Compaction Number
[pcf] [%] [pcf] [%] [%]
145 7/24/96 30 26 6 125.1 12.9 114.3 91 90
146 7/24/96 31 25 6 125.1 11.9 118.6 95 90
147 7/24/96 31 24 6 125.1 12.5 116.7 93 90 148 7/24/96 24 16 5 123,2 10.5 113.1 92 90 149 7/24/96 25 17 5 123.2 12,6 111.0 90 90 150 7/25/96 31 Merlo 6 125.1 11.3 120.4 96 90 151 7/25/96 31 25 6 125.1 10.4 117,2 94 90 152 7/25/96 32 Merlo 4 130.7 8.7 120.5 92 90 153 7/25/96 32 23 5 123.2 8.0 116.4 94 90 154 7/25/96 25 16 5 123.2 10.3 114.0 93 90 155 7/25/96 28 19 6 125,1 12.8 114,2 91 90 156 7/25/96 30 19 6 125.1 8.6 118.1 94 90 157 7/25/96 33 Merlo 6 125.1 11.4 114.5 92 90 158 7/26/96 26 16 3 117.9 12.6 112.2 95 90 159 7/26/96 30 18 7 111.5 15.1 109.1 98 90 160 7/26/96 34 23 5 123.2 10,9 114.7 93 90 161 7/26/96 34 25 5 123.2 9.4 112.5 91 90 162 7/26/96 32 26 5 123.2 9,0 112,4 91 90
163 7/26/96 32 26 3 117.9 8.6 111.1 94 90 164 7/26/96 33 24 7 111.5 12.0 107.9 97 90 165 7/26/96 33 Merlo 7 111.5 14.7 106.8 96 90
166 7/29/96 20 58 1 123,4 10.7 112,9 91 90 167 7/29/96 21 57 1 123.4 12,0 112,9 91 90 168 7/29/96 22 56 3 117,9 13.3 111.1 94 90 169 7/29/96 23 56 5 123.2 8.3 115.2 94 90 170 7/29/96 21 Merlo 3 117.9 11.2 113.0 96 90 171 7/29/96 22 20 3 117.9 11.9 112,7 96 90 172 7/29/96 23 22 3 117.9 9.7 111,1 94 90 173 7/29/96 24 Merlo 3 117,9 10.0 112,6 96 90 174 7/30/96 27 16 3 117.9 11,6 111.2 94 90 175 7/30/96 28 17 3 117.9 9.5 111,9 95 90 176 7/30/96 24 21 5 123.2 8.8 113.2 92 90
177 7/30/96 26 19 5 123.2 8.6 115.6 94 90
178 7/30/96 26 Merlo 5 123.2 9.4 112,9 92 90 179 7/30/96 35 25 5 123.2 11.9 118.2 96 90 180 7/30/96 36 25 5 123.2 13,0 114.4 93 90 181 7/30/96 28 20 3 117.9 14.1 113,6 96 90 182 7/31/96 31 20 8 125.6 13.0 117.1 93 90 183 7/31/96 33 Merlo 8 125.6 10.7 115,7 92 90 184 7/31/96 31 21 8 125.6 11,0 119,6 95 90 185 7/31/96 32 22 4 130.7 9,2 122.7 94 90 186 7/31/96 33 16 8 125.6 10.3 118.9 95 90 187 7/31/96 34 18 8 125.6 8.9 119.3 95 90
188 7/31/96 32 21 5 123.2 10.7 113,8 92 90
189 7/31/96 34 19 5 123.2 9.1 116,6 95 90 190 8/1/96 24 57 7 111.5 14.6 107.4 96 90 191 8/1/96 25 56 3 117.9 11.3 111.9 95 90 192 8/1/96 25 58 6 125.1 8.7 118,5 95 90
Geotechni r.<3 DENSITY TEST RESULTS Project No. 0002-008-03
^ Incornorated Broccato at Batiquitos Shores Document No. 6-0461
Brookfield Davidson Homes FIGURE C-5
Test Test Elevation Location/ Soi! Max. Dry Moisture Dry Relative Required Retest
No. Date [ftJ Station Type Density Content Density Compaction Compaction Number
[pcf] [%] [pcf] [%] [%]
193 8/1/96 37 24 6 125.1 11.7 117,1 94 90
194 8/1/96 34 23 5 123,2 13,4 115.7 94 90
195 8/2/96 18 27 5 123.2 9.7 116.0 94 90
196 8/2/96 20 28 5 123,2 10.4 114.5 93 90 197 8/2/96 36 19 5 123.2 8.8 113,5 92 90
198 8/2/96 35 21 5 123,2 10.5 114.7 93 90
199 8/2/96 21 28 3 117.9 12,9 111,4 94 90 200 8/2/96 22 Piovana 3 117.9 14.3 114,1 97 90 201 8/5/96 21 29 8 125.6 9.6 122.6 98 90
202 8/5/96 21 32 8 125.6 11.4 120,1 96 90 203 8/5/96 38 20 5 123.2 9.2 114.7 93 90
204 8/5/96 38 19 5 123.2 11.2 116,7 95 90
205 8/5/96 21 34 8 125,6 13,6 115.0 92 90 206 8/5/96 22 Piovana 3 117.9 15.4 111.8 95 90 207 8/5/96 23 35 5 123,2 11.7 116.6 95 90 208 8/5/96 24 29 6 125.1 13,5 115.6 92 90 209 8/6/96 20 27 5 123.2 9.3 115.3 94 90 210 8/6/96 21 27 5 123.2 9.4 113,9 92 90 211 8/6/96 22 59 3 117.9 13.0 112.6 96 90 212 8/6/96 22 60 7 111,5 13.3 106.4 95 90 213 8/6/96 23 59 6 125.1 8,2 121,3 97 90
214 8/6/96 26 60 6 125.1 8.0 118.5 95 90
215 8/7/96 26 56 8 125.6 14,2 115.6 92 90 216 8/7/96 25 57 8 125.6 10.0 116,5 93 90
217 8/7/96 28 60 8 125,6 10.3 116.0 92 90
218 8/7/96 30 61 8 125.6 9.7 117.5 94 90
219 8/7/96 26 58 8 125.6 9.0 117.2 93 90
220 8/7/96 26 57 8 125.6 11.1 118.1 94 90
221 8/8/96 27 59 8 125.6 11.6 120.2 96 90
222 8/8/96 31 61 4 130.7 9.4 122.0 93 90
223 8/8/96 27 58 4 130.7 9.2 124.2 95 90 224 8/8/96 27 56 6 125.1 9.2 116.9 93 90
225 8/8/96 28 57 6 125.1 9,7 115.9 93 90 226 8/8/96 29 58 4 130,7 9.6 123.1 94 90
227 8/9/96 23 28 4 130.7 11.2 122.5 94 90
228 8/9/96 23 33 4 130.7 9.7 124,4 95 90 229 8/9/96 18 Galliano 3 117.9 9.4 110.1 93 90 230 8/9/96 17 Galliano 6 125.1 10.8 113,4 91 90 231 8/9/96 15 Galliano 6 125.1 10.6 115.3 92 90 232 8/12/96 19 54 6 125.1 8,0 110.1 88 90 233 233 8/12/96 19 54 6 125.1 11.4 119.9 96 90
233
234 8/12/96 20 54 6 125.1 11.3 117.4 94 90
235 8/12/96 20 51 3 117,9 10,4 110.2 93 90 236 8/12/96 20 52 3 117.9 9.9 109,3 93 90
237 8/12/96 21 53 5 123.2 B.6 114,4 93 90 238 8/12/96 21 Piovana 3 117,9 14.4 112.3 95 90
239 8/12/96 40 21 9 127.4 8.0 109.4 86 90 240
240 8/12/96 40 21 9 127.4 10.4 118.1 93 90
240
^1^^^ e o t e c h n i c s
•^•^^^^I n c o r p o r a t e d
DENSiTY TEST RESULTS
Broccato at Batiquitos Shores
Brookfield Davidson Homes
ProjectNo. 0002-008-03
Document No. 6-0461
FIGURE C-6
DENSiTY TEST RESULTS
Broccato at Batiquitos Shores
Brookfield Davidson Homes
ProjectNo. 0002-008-03
Document No. 6-0461
FIGURE C-6
Test
No.
Test
Date
Elevation
Ift]
Location/
Station
Soil
Type
Max. Dry
Density
[pcf]
Moisture
Content
[%]
Dry
Density
[pcf]
Relative
Compaction
[%]
Required
Compaction
(%)
Retest
Number
241 8/13/96 42 21 9 127.4 9.7 115.1 90 90 242 8/13/96 43 21 9 127.4 9.3 116.5 91 90 243 8/13/96 22 Piovana 7 111,5 13.8 105.4 95 90 244 8/13/96 -22 51 7 111.5 14.6 107.9 97 90 245 8/13/96 40 19 8 125.6 12.2 121,5 97 90 246 8/13/96 41 20 8 125.6 11,4 122.2 97 90 247 8/13/96 22 57 3 117,9 9.2 110.9 94 90 248 8/14/96 23 55 3 1179 14,1 110.9 94 90
249 8/14/96 24 54 3 117.9 15.1 110.4 94 90 250 8/14/96 23 52 5 123.2 9.7 113.4 92 90 251 8/14/96 23 Piovana 5 123.2 10.8 115,3 94 90 252 8/14/96 24 51 3 117.9 12.3 112.0 95 90 253 8/14/96 25 53 5 123.2 8.4 118.2 96 90 254 8/14/96 25 . 55 3 117.9 15.1 111.6 95 90
255 8/14/96 26 54 3 117.9 13.2 113,3 96 90 256 8/14/96 45 21 9 127.4 9.4 116.6 92 90 257 8/14/96 47 21 9 127.4 8.9 115.9 91 90 258 8/14/96 49 21 9 127.4 9.9 116.4 91 90 259 8/15/96 51 21 9 127.4 8,4 114.8 90 90 260 8/15/96 53 21 9 127.4 9.1 115.9 91 90 261 8/15/96 56 21 9 127.4 8.9 115.0 90 90 262 8/15/96 26 52 3 117.9 13,2 110.7 94 90 263 8/15/96 26 Piovana 3 117.9 13.6 110,8 94 90 264 8/15/96 27 53 9 127.4 9.6 116.3 91 90 265 8/15/96 28 54 9 127.4 10.6 118,2 93 90 266 8/16/96 29 53 9 127.4 8.0 114.9 90 90 267 8/16/96 29 52 9 127.4 8.3 116,5 91 90 268 8/16/96 23 48 9 127.4 9.1 119.5 94 90 269 8/16/96 23 47 9 127.4 8,7 120,6 95 90 270 8/16/96 30 52 9 1274 8.6 115.1 90 90
271 8/16/96 30 51 9 127.4 8,2 117.1 92 90 272 8/16/96 24 47 9 127,4 8.4 117.3 92 90 273 8/19/96 31 53 9 127.4 13,0 118,0 93 90 274 8/19/96 32 51 9 127.4 12,4 116.3 91 90 275 8/19/96 25 47 9 127,4 8.2 121.7 96 90 276 8/19/96 26 48 9 127.4 8.6 120.3 94 90 277 8/19/96 32 52 9 127.4 8.0 117.3 92 90 278 8/19/96 33 51 9 127.4 8.8 121.1 95 90
279 8/19/96 64 63 5 123.2 10.3 116.9 95 90
280 8/20/96 20 30 9 127.4 8.0 115.1 91 90 281 8/20/96 19 31 9 127.4 7,8 115.9 91 90 282 8/20/96 20 30 9 127.4 8,6 121,3 96 90 283 8/20/96 22 31 9 127.4 9.5 120.5 95 90 284 8/20/96 24 36 9 127,4 10.1 115,8 91 90 285 8/20/96 22 Piovana 9 127.4 11.4 115.9 91 90 286 8/20/96 23 30 10 118.5 11.3 110.8 94 90 287 8/21/96 28 22 9 127.4 8.1 118.3 93 90
288 8/21/96 36 22 9 127.4 8.7 119.5 94 90
Geotechnics
Incorporated
DENSITY TEST RESULTS
Broccato at Batiquitos Shores
Brookfield Davidson Homes
Project No. 0002-008-03
Document No. 6-0461
FIGURE c-7
Test
No.
Test
Date
Elevation
[ft|
Location/
Station
Soil
Type
Max. Dry
Density
[pcfj
Moisture
Content
[%]
Dry
Density
[pcf]
Relative
Compaction
[%]
Required
Compaction
[%]
Retest
Number
289 8/21/96 23 32 10 118.5 10.4 110.3 93 90
290 8/21/96 24 35 9 127.4 13,4 118.7 93 90 291 8/21/96 26 36 9 127,4 13.6 116,5 91 90
292 8/21/96 26 30 9 127.4 8,0 121.4 95 90 293 8/21/96 27 31 9 127.4 9.8 119,7 94 90 294 8/21/96 24 27 9 127,4 8.3 127.1 100 90 295 8/22/96 26 28 9 127.4 8.8 119.3 94 90 296 8/22/96 26 32 9 127.4 9.9 116.8 92 90 297 8/22/96 28 32 9 127.4 8.8 121,8 96 90
298 8/22/96 27 29 9 127.4 8.0 117.6 92 90 299 8/22/96 37 51 10 118.5 10.1 109.5 92 90 300 8/22/96 39 Access 9 127.4 8,3 119.8 94 90 301 8/22/96 41 52 9 127.4 9.6 119.4 94 90
302 8/23/96 43 51 5 123.2 8.6 115.8 94 90 303 8/23/96 45 Access 10 118.5 14,2 109,8 93 90 304 8/23/96 47 52 5 123,2 8.2 112.3 91 90
305 8/23/96 49 51 5 123.2 8.8 114,0 93 90 306 8/23/96 28 31 5 123,2 12,2 114,7 93 90 307 8/23/96 29 30 9 127.4 11.4 117.5 92 90 308 8/23/96 33 30 9 127.4 8.9 116.1 91 90 309 8/23/96 66 63 5 123.2 8,7 114.4 93 90 310 8/26/96 20 41 9 127.4 9.7 118,5 93 90 311 8/26/96 24 40 9 127.4 9,0 118.4 93 90 312 8/26/96 37 31 5 123.2 9.3 115.3 94 90 313 8/26/96 39 30 5 123,2 9.5 116,6 95 90 314 8/26/96 30 37 9 127.4 8.3 115.6 91 90 315 8/26/96 36 36 5 123.2 10.4 113,2 92 90 316 8/26/96 43 30 9 127.4 9,1 118.0 93 90
317 8/26/96 32 37 5 123.2 11.2 113.2 92 90 318 8/27/96 52 63 5 123.2 11.1 113.5 92 90 319 8/27/96 54 63 5 123.2 9.3 114.8 93 90 320 8/27/96 56 63 7 111.5 12.6 103.9 93 90 321 8/27/96 58 63 7 111.5 15.1 107.0 96 90 322 8/27/96 60 63 5 123.2 13.0 112.0 91 90 323 8/27/96 22 48 5 123.2 7.7 111.0 90 90 324 8/27/96 47 31 9 127.4 8.0 117,3 92 90 325 8/27/96 33 36 5 123,2 8.5 113.9 92 90 326 8/28/96 32 51 5 123.2 8.4 108.6 , 88 90 327 327 8/28/96 32 51 5 123.2 8.1 110,9 90 90
327
328 8/28/96 19 48 3 117.9 10.7 108.7 92 90 329 8/28/96 54 30 5 123.2 9.3 114,5 93 90 330 8/28/96 48 22 5 123.2 9.9 112.7 91 90 331 8/28/96 67 63 5 123.2 9.7 116,0 94 90 332 8/28/96 66 63 5 123,2 8,4 115,2 94 90 333 8/28/96 33 22 5 123.2 10,4 113.3 92 90 334 8/28/96 34 24 5 123.2 11,8 112,8 92 90 335 8/28/96 36 23 5 123.2 10.7 114,8 93 90 336 B/28/96 47 52 9 127.4 8,5 119,3 94 90
Geotechnics DENSITY TEST RESULTS Project No. 0002-008-03
^Incorporated Broccato al Batiquitos Shores Document No. 6-0461 ^Incorporated Brookfield Davidson Homes FIGURE c-8
Test Test Elevation Location/ Soil Max, Dry Moisture Dry Relative Required Retest No. Date [ft] Station Type Density
[pcf]
Content
[%]
Density
[pcf]
Compaction
[%]
Compaction
[%]
Number
337 8/29/96 32 53 9 127.4 8,1 120,4 95 90 338 8/29/96 34 52 9 127.4 9.5 121,3 95 90 339 8/29/96 35 61 3 117.9 13.0 108.1 92 90 340 8/29/96 23 59 5 123.2 8.3 111,6 91 90 341 8/29/96 26 59 5 123.2 8,5 111.1 90 90 342 8/29/96 28 16 3 117,9 13.4 109.6 93 90 343 8/29/96 32 58 5 123.2 11.9 115.1 93 90 344 8/29/96 34 57 5 123.2 9,3 111.3 90 90 345 8/30/96 32 59 10 118.5 13.0 111.9 94 90 346 8/30/96 34 59 10 118.5 11.3 112,6 95 90 347 8/30/96 38 57 10 118.5 12.1 111.2 94 90 348 8/30/96 36 Gabbiano 5 123.2 10.5 113,5 92 90
349 8/30/96 45 58 10 118.5 11.4 106.0 89 90 350 350 8/30/96 45 58 10 118,5 12.1 108,5 92 90
350
351 8/30/96 38 Gabbiano 5 123.2 9.0 113.7 92 90 352 8/30/96 37 Gabbiano 5 123,2 9.7 111.9 91 90 353 9/3/96 30 17 5 123.2 9.7 114.3 93 90
354 9/3/96 32 16 5 123.2 9.0 117.2 95 90 355 9/3/96 42 Gabbiano 9 127.4 10,3 120,6 95 90 356 9/3/96 41 15 9 127.4 9,7 119,8 94 90 357 9/3/96 38 16 5 123.2 11.9 114.6 93 90 358 9/3/96 40 15 5 123.2 12.0 113.4 92 90 359 9/3/96 73 10 7 111,5 15,1 107,0 96 90 360 9/3/96 42 15 5 123.2 12.3 117.3 95 90 361 9/4/96 45 Gabbiano 11 125.0 14.1 116.7 93 90 362 9/4/96 44 Gabbiano 11 125.0 9.2 116.5 93 90 363 9/4/96 42 16 11 125.0 10,8 115,2 92 90 364 9/4/96 46 15 10 118,5 11.6 112,7 95 90 365 9/4/96 48 2 10 118,5 11.8 113.0 95 90
366 9/4/96 47 2 10 118.5 10.7 108.1 91 90 367 9/4/96 50 15 11 125,0 9.0 113.5 91 90 368 9/4/96 51 15 11 125,0 9.6 113,4 91 90 369 9/4/96 53 15 10 118.5 12.4 109.8 93 90 370 9/4/96 55 15 10 118.5 11.1 108,5 92 90 371 9/5/96 53 Grivetta 5 123.2 10.5 111.7 91 90 372 9/5/96 56 15 5 123.2 10,7 114.9 93 90 373 9/5/96 38 23 7 111.5 13.3 104.1 93 90 374 9/5/96 39 24 7 111.5 14.1 103.8 93 90 375 9/5/96 62 14 12 115.5 13.0 106.0 92 90 376 9/5/96 65 13 7 111.5 14.3 104.6 94 90 377 9/5/96 68 12 12 115.5 13.9 108,1 94 90 378 9/5/96 70 12 12 115.5 14.8 106.3 92 90 379 9/5/96 58 15 12 115.5 13,7 108,9 94 90 380 9/5/96 72 11 12 115,5 12.9 108,1 94 90 381 9/6/96 64 14 12 115,5 12,9 109.9 95 90 382 9/6/96 73 11 12 115.5 14.9 109,8 95 90 383 9/6/96 73 10 12 115.5 14.2 109.9 95 90 384 9/6/96 67 13 12 115,5 14,1 108.2 94 90
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
^J^^^ e o t e c hn i c s
•MiM^^'c o r p o r a t e d
DENSiTY TEST RESULTS
Broccato at Batiquitos Shores
Brookfield Davidson Homes
Project No. 0002-008-03
Document No. 6-0461
FIGURE C-9
DENSiTY TEST RESULTS
Broccato at Batiquitos Shores
Brookfield Davidson Homes
Project No. 0002-008-03
Document No. 6-0461
FIGURE C-9
Test
No,
Test
Date
Elevation
[ft]
Location/
Station
Soil
Type
Max. Dry
Density
[pcf]
Moisture
Content
[%]
Dry
Density
[pcf]
Relative
Compaction
[%]
Required
Compaction
[%]
Retest
Number
385 9/6/96 71 12 12 115,5 12.1 107.7 93 90 386 9/6/96 71 64 1 123.4 9.8 112.8 91 90 387 9/6/96 73 64 1 123.4 10,0 111,6 90 90 388 9/6/96 74 64 5 123.2 9.0 111.1 90 90 389 9/7/96 74 11 12 115,5 14.1 107.7 93 90 390 9/7/96 75 10 12 115.5 14.7 105.3 91 90 391 9/7/96 73 9 12 115,5 15.0 108.6 94 90
392 9/9/96 71 7 11 125.0 11.2 115.0 92 90 393 9/9/96 75 8 11 125.0 8,9 115,2 92 90 394 9/9/96 69 63 3 117.9 11.5 113.5 96 90 395 9/9/96 75 64 12 115.5 15.8 108.6 94 90 396 9/10/96 58 21 11 125,0 11.0 113.3 91 90 397 9/10/96 27 37 11 125.0 9,9 117.8 94 90 398 9/10/96 26 36 11 125.0 9.5 118.4 95 90 399 9/11/96 91 65 6 125.1 9,7 116.2 93 90 400 9/11/96 93 65 11 125.0 10,1 111.1 89 90 401 9/11/96 93 65 11 125.0 11.3 115,3 92 90 402 9/11/96 95 65 11 125.0 11,0 115.2 92 90
403 9/11/96 97 66 11 125.0 10.3 113.1 90 90 404 9/11/96 99 66 11 125,0 10.6 113.9 91 90 405 9/11/96 100 66 10 118.5 12.0 110,1 93 90
406 9/11/96 60 63 5 123,2 10,5 114,2 93 90 407 9/12/96 101 65 11 125.0 8,3 116,3 93 90 408 9/12/96 102 65 11 125,0 11.6 116,4 93 90 409 9/12/96 104 65 11 125.0 8.9 117.7 94 90 410 9/12/96 65 63 5 123.2 12,0 112,3 91 90 411 9/12/96 106 65 11 125.0 8.8 118.4 95 90 412 9/12/96 107 66 12 115.5 15.4 107.8 93 90 413 9/12/96 108 66 12 115.5 13.8 105.8 92 90 414 9/12/96 109 67 3 117.9 11.3 110,9 94 90 415 9/13/96 20 39 5 123.2 B.5 114.8 93 90 416 9/13/96 19 34 5 123.2 9.9 115,1 93 90 417 9/13/96 109 65 5 1232 10.9 113.3 92 90 418 9/13/96 14 41 1 123.4 9.6 111.1 90 90 419 9/13/96 30 31 5 123,2 12.1 114.7 93 90 420 9/13/96 110 66 12 115.5 16,6 108.7 94 90 421 9/13/96 111 67 12 115.5 16.0 108,2 94 90 422 9/16/96 27 37 11 125.0 10,4 117.8 94 90 423 9/16/96 24 38 11 125.0 12.9 120.0 96 90 424 9/16/96 37 61 11 125.0 9.8 115.2 92 90 425 9/16/96 114 68 11 125.0 8.7 114.7 92 90 426 9/16/96 116 68 7 111,5 15.4 104.4 94 90 427 9/16/96 28 37 11 125.0 11.3 115.4 92 90
428 9/16/96 25 38 11 125,0 12.5 112.4 90 90 429 9/17/96 27 Gabbiano 5 123.2 10,2 112,4 91 90 430 9/17/96 29 Gabbiano 5 123,2 9,6 113,5 92 90 431 9/17/96 23 39 5 123.2 10.2 113.5 92 90 432 9/17/96 16 41 5 123.2 9.6 114.2 93 90
401
^j^^^G e o t e c h n i c s
H^^^^^^I n c o r p o r a t e d
DENSITY TEST RESULTS
Broccato al Baliquitos Shores
Brookfield Davidson Homes
Project No. 0002-008-03
Documenl No. 6-0461
FIGURE C-10
DENSITY TEST RESULTS
Broccato al Baliquitos Shores
Brookfield Davidson Homes
Project No. 0002-008-03
Documenl No. 6-0461
FIGURE C-10
Test
No.
Test
Date
Elevation
[ft]
Location/
Station
Soil
Type
Max. Dry
Density
[pcf]
Moisture
Content
[%]
Dry
Density
[pcf]
Relative
Compaction
[%]
Required
Compaction
[%]
Retest
Number
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
45B
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
9/17/96
9/18/96
9/18/96
9/18/96
9/18/96
9/18/96
9/18/96
9/18/96
9/19/96
9/19/96
9/19/96
9/19/96
9/19/96
9/19/96
9/19/96
9/19/96
9/20/96
9/20/96
9/20/96
9/20/96
9/20/96
9/20/96
9/20/96
9/20/96
9/21/96
9/21/96
9/21/96
9/21/96
9/21/96
9/23/96
9/23/96
9/23/96
9/23/96
9/23/96
9/23/96
9/23/96
9/23/96
9/23/96
9/23/96
9/24/96
9/24/96
9/24/96
9/24/96
9/24/96
9/24/96
9/25/96
9/25/96
9/25/96
21
37
39
35
39
77
41
19
67
72
68
45
64
46
29
32
44
30
21
62
49
43
46
47
33
31
37
36
40
42
34
30
28
25
26
44
28
46
49
48
44
52
43
50
50
22
33
39
40
Gabbiano
Gabbiano
60
Gabbiano
8
61
41
6
7
6
Batiquitos
5
Batiquitos
32
30
Gabbiano
29
34
4
Batiquitos
Gabbiano
Gabbiano
Gabbiano
31
32
51
52
19
24
53
54
36
35
33
23
33
23
Grivetta
22
20
Batiquitos
24
22
Batiquitos
34
59
60
11
9
9
12
12
11
11
1
11
11
12
3
12
12
9
9
12
11
11
12
12
3
7
12
11
11
11
11
11
11
11
9
9
9
11
11
11
11
3
11
11
13
9
11
13
11
11
5
125.0
127.4
127.4
115.5
115.5
125.0
125.0
123,4
125.0
125,0
115,5
117.9
115.5
115.5
127.4
127.4
115,5
125.0
125,0
115.5
115,5
117.9
111.5
115.5
125.0
125.0
125,0
125.0
125,0
125.0
125.0
127.4
127.4
127.4
125,0
125.0
125.0
125.0
117.9
125.0
125,0
118.0
127,4
125.0
118,0
125.0
125,0
123.2
10.1
9.2
10.7
13,2
14.1
9,5
12,0
7,0
10,8
11.6
17.3
11,3
14.1
14.4
11.3
10.2
13.9
13.1
11.1
14.7
14.1
11.7
15.0
13.2
8,0
8.5
8.5
7.5
11.0
12.9
8.8
8,5
8.9
9.3
10.1
9.2
10,6
10.1
11.2
10.2
9.3
10.6
8.1
11.1
11,5
8,1
9,1
9.0
117,8
121.1
121.0
105.6
106,7
115,1
116.7
112.6
113.4
117.2
107,8
108.7
110,3
106,7
122,0
124.1
106,2
119.4
119,4
111.9
109,4
111,0
103,9
105.0
115,6
116.9
116.6
114.7
117.7
114.5
113.5
122.1
120,4
125.3
115,3
117.5
116.4
115.3
109,2
115.5
114.4
111,9
123.4
116.8
110.3
114.6
117.4
114,3
94
95
95
91
92
92
93
91
91
94
93
92
95
92
96
97
92
96
96
97
95
94
93
91
92
94
93
.92
94
92
91
96
95
98
92
94
93
92
93
92
92
95
97
93
93
92
94
93
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
^^^^G e o t e c h n i c s
•••^•^^I n c o r p o r a t e d
DENSITY TEST RESULTS
Broccato al Batiquitos Shores
Brookfield Davidson Homes
ProjectNo. 0002-008-03
Document No. 6-0461
FIGURE C-11
DENSITY TEST RESULTS
Broccato al Batiquitos Shores
Brookfield Davidson Homes
ProjectNo. 0002-008-03
Document No. 6-0461
FIGURE C-11
Test
No.
Test
Date
Elevation
(ftl
Location/
Station
Soil
Type
Max. Dry
Density
[pcf]
Moisture
Content
[%]
Dry
Density
[pcf]
Relative
Compaction
(%J
Required
Compaction
[%]
Retest
Number
481 9/25/96 41 60 5 123.2 8.5 114.1 93 90 482 9/25/96 37 25 9 127.4 9.0 115.1 90 90 483 9/25/96 33 26 11 125.0 8.4 119,6 96 90 484 9/25/96 44, 60. 11 125.0 10.8 114.5 92 90 485 9/26/96 34 30 11 125,0 8.8 115.0 92 90 486 9/26/96 44 Gabbiano 11 125.0 10.1 121.7 97 90 487 9/26/96 48 Gabbiano 11 125.0 9.7 119,9 96 90 488 9/26/96 49 21 9 127.4 8,2 120.2 94 90 489 9/26/96 30 28 12 115,5 13.1 112.1 97 90 490 9/26/96 20 Cigno 5 123.2 8,5 111,9 91 90 491 9/26/96 29 48 9 127.4 8.1 121.5 95 90 492 9/26/96 53 Batiquitos 12 115.5 14.7 108.8 94 90 493 9/26/96 27 21 11 125.0 8.7 119.0 95 90 494 9/27/96 53 Gabbiano 13 118.0 14.8 108,6 92 90 495 9/27/96 55 Gabbiano 13 118,0 13.9 109.4 93 90 496 9/27/96 27 47 11 125.0 9.3 115.0 92 90 497 9/27/96 56 Gabbiano 13 118.0 11.9 109.4 93 90 498 9/27/96 57 Gabbiano 13 118.0 12.6 110.1 93 90 499 9/27/96 59 Batiquitos 13 118,0 12.5 109,1 92 90 500 9/27/96 60 1 11 125,0 10.8 116.6 93 90 501 9/27/96 62 1 13 118.0 13.0 109.5 93 90 502 9/28/96 46 20 11 125.0 8,7 111.9 90 90 503 9/28/96 42 19 11 125,0 9.4 120.1 96 90 504 9/28/96 36 18 9 127.4 9.6 122.6 96 90 505 9/28/96 33 17 9 127.4 9,8 122.4 96 90 506 9/28/96 44 16 12 115.5 14.9 112.4 97 90 507 9/28/96 63 1 11 125.0 10.3 113,1 90 90 508 9/30/96 59 Batiquitos 11 125.0 8.8 118.4 95 90 509 9/30/96 61 Gabbiano 11 125.0 9.7 115.0 92 90 510 9/30/96 27 55 11 125.0 9.2 113.5 91 90 511 9/30/96 28 56 6 125.1 8,2 124.6 100 90 512 9/30/96 29 57 6 125.1 9.6 121.4 97 90 513 9/30/96 30 58 6 125.1 8,5 123.6 99 90 514 9/30/96 65 1 11 125.0 9.0 115.5 92 90 515 9/30/96 53 61 11 125.0 9,3 116.7 93 90 516 10/1/96 61 61 11 125.0 10.0 115.2 92 90 517 10/1/96 28 Piov. 11 125.0 8.1 115,3 92 90 518 10/1/96 66 1 11 125,0 8.4 114.6 92 90 519 10/1/96 36 59 11 125.0 7.9 119.8 96 90 520 10/1/96 45 60 11 125.0 9,6 115,6 92 90 521 10/2/96 54 2 11 125.0 11.2 114.7 92 90 522 10/2/96 58 3 11 125.0 8,6 120.2 96 90 523 10/2/96 32 29 11 125.0 8,8 108.6 87 90 524 10/2/96 32 29 11 125.0 8.5 115,4 92 90 525 10/2/96 76 9 11 125,0 8,2 119,8 96 90 526 10/2/96 63 63 3 117.9 11,4 107,8 91 90 527 10/2/96 63 Batiquitos 11 125,0 8,5 112.5 90 90 528 10/2/96 50 Batiquitos 7 111.5 15.2 102,5 92 90
524
^^^^^G e o t e c h n i c s
•M^^^^^ Incorporated
DENSiTY TEST RESULTS
Broccato at Batiquitos Shores
Brookfield Davidson Homes
Projeci No. 0002-008-03
Documenl No. 6-0461
FIGURE C-12
DENSiTY TEST RESULTS
Broccato at Batiquitos Shores
Brookfield Davidson Homes
Projeci No. 0002-008-03
Documenl No. 6-0461
FIGURE C-12
Test
No.
Test
Date
Elevation
(ftl
Location/
Station
Soil
Type
Max. Dry
Density
[pcf]
Moisture
Content
(%]
Dry
Density
[pcf]
Relative
Compaction
t%]
Required
Compaction
[%]
Retest
Number
529 10/3/96 50 Batiquitos 13 118.0 9.6 106.1 90 530 10/3/96 21 44 5 123,2 10,3 116.7 95 531 10/3/96 117 68 13 118.0 12.9 113,9 97 532 10/3/96 114 67 13 118.0 8,2 107.7 91 533 10/4/96 112 66 13 118,0 13.0 112.3 95
534 10/4/96 108 65 13 118,0 10.2 108.1 92 535 10/4/96 56 2 11 125,0 8,2 113.6 91 536 10/4/96 57 Batiquitos 11 125.0 9.1 115.8 93 537 10/4/96 110 65 13 118,0 10.7 117.3 99 538 10/7/96 57 Batiquitos 11 125,0 9.5 120,4 96 539 10/7/96 68 Batiquitos 11 125.0 9,0 119.8 96 540 10/7/96 59 Batiquitos 11 125.0 8.5 121.4 97 541 10/8/96 118 69 9 127.4 9.0 124.0 97 542 10/8/96 118 70 9 127.4 8.5 125,6 99 543 10/8/96 117 71 13 11B.0 9.9 110.2 93 544 10/10/96 22 46 6 125.1 8.0 120.6 96 545 10/10/96 22 45 6 125.1 7.1 120.0 96 546 10/10/96 107 Batiquitos 7 111,5 13.3 104,8 94 547 10/10/96 87 Batiquitos 13 118.0 13.4 112.5 95 548 10/10/96 51 Batiquitos 13 118.0 11.5 107.6 91 549 10/11/96 118 71 13 118,0 12.7 109,1 92 550 10/15/96 136 72 13 118.0 10.5 106.6 90 551 10/15/96 140 72 7 111,5 15,9 104.1 93 552 10/21/96 76 64 11 125.0 10.8 117.8 94