HomeMy WebLinkAbout; Calle Barcelona Pedestrian Crossing; Calle Barcelona Pedestrian Crossing; 2009-08-14Geotechnical and Environmental Sciences Consultants
GEOTECHNICAL EVALUATION
SETTLING SIDEWALK AND
DECORATIVE PILASTERS
CALLE BARCELONA
PEDESTRIAN OVERCROSSING
CARLSBAD, CALIFORNIA
PREPARED FOR:
City ofCarlsbad
1635 Faraday Avenue
Carlsbad, Califomia 92008
PREPARED BY:
Ninyo & Moore
Geotechnical and Environmental Sciences Consultants
5710 Ruffm Road
San Diego, Califomia 92123
August 14, 2009
Project No. 105225012
5710 Ruffin Road • San Diego, California 921 23 • Phone (858) 576-1000 • Fax (858) 576-9600
San Diego • Irvine • Ranclio Cucamonga • Los Angeles • Oal<land - Las Vegas • Phoenix • Denver • El Paso • Tucson
1 Ninyo &yy\iMir e
Geotechnical and Environmental Sciences Consultants
August 14, 2009
Project No. 105225012
Ms. Eva Plajzer, P.E.
City ofCarlsbad
1635 Faraday Avenue
Carlsbad, Califomia 92008
Subject: Geotechnical Evaluation
Settling Sidewalk and Decorative Pilasters
Calle Barcelona Pedestrian Overcrossing
Carlsbad, Califomia
Dear Ms. Plajzer:
In accordance with your request and authorization, we have performed a geotechnical evaluation
ofthe settling sidewalk and decorative pilasters at the northem approach for the Calle Barcelona
pedestrian overcrossing in Carlsbad, Califomia. This report presents our geotechnical findings,
conclusions, and repair recommendations for the project.
We appreciate the opportunity to be of service on this project.
Sincerely,
NINYO & MOORE
frey T. Kent, RE., G.E.
Senior Project Engineer
EFL/JTK/AN/gg
Distribution: (2) Addressee
Avram Nin>
Principal Engineer
5710 Ruffin Road • San Diego, California 92123 • Phone (858) 576-1000 • Fax (858) 576-9600
San Diego • Irvine • Rancho Cucamonga • Los Angeles • Oakland • Las Vegas • Phoenix • Denver • El Paso • Tucson
Calle Barcelona Pedestrian Overcrossing August 14, 2009
Carlsbad, Califomia Project No. 105225012
TABLE OF CONTENTS
Page
1. INTRODUCTION i
2. SCOPE OF SERVICES 1
3. SITE LOCATION AND PROJECT DESCRIPTION 2
4. SUBSURFACE EXPLORATION AND LABORATORY TESTING 2
5. SUBSURFACE CONDITIONS 3
6. DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS 3
6.1. Compaction Grouting 4
6.2. Sidewalk Replacement 5
6.3. Sidewalk Subgrade Preparation 5
7. LIMITATIONS 6
8. REFERENCES 8
Figures
Figure 1 - Site Location Map
Figure 2 - Subsurface Exploration Map
Appendices
Appendix A - Boring and Test Pit Logs
Appendix B - Laboratory Testing
105225012R.doc
Calle Barcelona Pedestrian Overcrossing August 14, 2009
Carlsbad, Califomia Project No. 105225012
1. INTRODUCTION
In accordance with your request and our proposal dated November 24, 2008, we have performed
a geotechnical evaluation of the settling sidewalk and decorative pilasters at the northem ap-
proach for the Calle Barcelona pedestrian overcrossing in Carlsbad, Califomia. The purposes of
this study were to evaluate the causes of the settlement, the potential for future settlement, and to
provide recommendations to mitigate the settlement. This report presents the results of our sub-
surface exploration and laboratory testing, our conclusions regarding the geotechnical conditions
at the project site, and our recommendations for mitigation.
2. SCOPE OF SERVICES
The scope of services for this study included the following:
• Reviewing background information including available geotechnical reports, geologic maps,
as-built project plans, and stereoscopic aerial photos.
• Performing a geologic reconnaissance of the project site to mark excavation locations for
utility clearance by Underground Service Alert (USA).
• Coring the sidewalk at one location within the sidewalk at northem approach for the over-
crossing. The core location was utilized as an access point for the drilling of a boring.
• Drilling, logging, and sampling one exploratory boring through the cored sidewalk. The bor-
ing was manually excavated to a depth of approximately 4.2 feet.
• Excavating, logging, and sampling two exploratory test pits adjacent to the decorative pilas-
ters. The test pits were manually excavated to depths up to approximately 6.5 feet.
• Performing geotechnical laboratory testing on soil samples to evaluate appropriate design
parameters.
« Performing and engineering analysis of data obtained from our background review, subsur-
face exploration, and laboratory testing.
• Preparing this geotechnical report presenting our findings, conclusions regarding the
cause(s) ofthe settlement, potential for future settlement, and recommendations to mitigate
the existing conditions.
105225012 R.doc P^m^sD^fjf^
Calle Barcelona Pedestrian Overcrossing August 14, 2009
Carlsbad, Califomia Project No. 105225012
3. SITE LOCATION AND PROJECT DESCRIPTION
The project site is located at the northem approach of the pedestrian overcrossing for Calle Bar-
celona in the City of Carlsbad, Califomia (Figures 1 and 2). The overcrossing is located
approximately 1,400 feet west ofthe intersection of Calle Barcelona and Paseo Avellano. This
overcrossing provides pedestrian access from the Rancho Los Encinitos community, over Calle
Barcelona, to the recreation center and day care facility within the Arroyo La Costa community.
The abutments of the overcrossing are approximately 20 feet higher than the roadway, and the
hillsides slope down from the abutments to the street. The elevation at the northem abutment ap-
proach is approximately 115 feet above mean sea level (MSL).
Based on correspondence and a site meeting with city personnel, we understand that the
overcrossing was constructed in 1999. City personnel have reported signs that the access
sidewalk and decorative pilasters adjacent to the northem abutment have experienced continual
settlement since constmction. Specifically, the City monitored the settlement for 12 months
starting in 2007. The monitoring indicated an additional 5 millimeters (approximately % inch) of
additional settlement had occurred during that 12-month time frame.
4. SUBSURFACE EXPLORATION AND LABORATORY TESTING
The scope and extent of our subsurface exploration was based on our observations from our field
reconnaissance and discussions with the City of Carlsbad regarding settlement at the site. Our
subsurface exploration was conducted on July 2, 2009, and consisted of the performance of one
exploratory boring and two test pits. The boring was excavated manually through the sidewalk at
the northem abutment approach to the overcrossing. A core was first extracted from the sidewalk
prior to the excavation of the approximately 4.2 feet deep boring. The two exploratory test pits
were manually excavated adjacent to the pilasters at the northem abutment approach depths up to
6.5 feet. Relatively undisturbed and bulk soil samples were obtained from within the boring and
the test pits at selected intervals. These samples were then transported to our in-house geotechni-
cal laboratory for testing. The approximate locations of the exploratory boring and test pits are
shown on Figure 2. The boring and test pit logs are included in Appendix A.
105225012 R.doc
Calle Barcelona Pedestrian Overcrossing August 14, 2009
Carlsbad, Califomia Project No. 105225012
Laboratory testing of representative soil samples included an evaluation of in-situ moisture content,
gradation analysis, and consolidation. The results of in-situ moisture content tests are presented on
the exploration logs in Appendix A. The other laboratory results are presented in Appendix B.
5. SUBSURFACE CONDITIONS
On July 2, 2009, we performed a subsurface exploration at the approach to the northem abutment
for the pedestrian overcrossing. During our subsurface explorafion, we encountered fill materials
at the surface or underlying the sidewalk and extending to the depths explored of approximately
6.5 feet. The fill materials generally consisted of light brown or brown, damp, loose to medium
dense, silty and clayey sand. Refusal to further drilling was encountered at a depth of 4.2 feet
within the boring due to the presence of concrete debris. Additional descriptions of the subsur-
face fill materials encountered are provided on the exploration logs in Appendix A.
Groundwater or seepage was not encountered during our subsurface exploration. Fluctuations in
the groundwater level and perched conditions may occur due to variations in ground surface to-
pography, subsurface geologic conditions and stmcture, rainfall, irrigation, and other factors.
6. DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS
As discussed earlier, we understand that the overcrossing was constmcted in 1999. Based on our
discussions with the City personnel, the sidewalk and pilasters adjacent to the northem abutment
have been displaying signs of distress since its constmcfion. In response to the observed distress,
the City personnel installed crack monitors to measure movement of the sidewalk and pilasters.
Starting in 2007, the measurements from the crack monitors were recorded by the City personnel
for a span of 12 months. During that span, the crack monitors indicated that an additional
5 millimeters (approximately % inch) of movement had occurred. During our site reconnais-
sance, we observed that the existing sidewalk was approximately 1 Vi inches lower than the
adjacent concrete flatwork for the northerly abutment. The pilasters were also observed to be tilt-
ing in the downslope direcfion and toward the adjacent abutment.
105225012 R.doc fj^m^an^fff^
Calle Barcelona Pedestrian Overcrossing August 14, 2009
Carlsbad, Califomia Project No. 105225012
Based on our review of the "as-built" project plans, the locafion of the settling sidewalk and pi-
lasters is situated on the backfill materials for the northem abutment. The plans depict the
presence of approximately 8 feet of backfill behind the northem abutment.
To evaluate the potential for future settlement of the existing fill materials, laboratory testing was per-
formed on samples collected during our subsurface exploration. The results of our consolidation tests
indicate the existing fills are compressible and possess a potential for soil collapse upon wetting.
Based on our background review, review of project plans, subsurface exploration, and laboratory
testing, we conclude the observed distress to the sidewalk and pilasters is due to soil settlement
ofthe northerly abutment backfill. Also, laboratory tesfing indicates that future settlement ofthe
abutment backfill will occur due to the compressibility and potential for hydro-consolidafion of
the subsurface soils. Accordingly, we recommend that mitigation of the effected area include the
densificafion of the existing fill materials using compaction grouting techniques. Recommenda-
fions for compacfion grouting are presented in the following section.
6.1. Compaction Grouting
To reduce the potential for future soil settlement and to increase the density ofthe existing fill
materials below the sidewalk and pilasters, we recommend that the existing fill materials be
compaction grouted. Based on the depths of fill indicated in the "as-built" plans and our sub-
surface exploration, the zone of compaction grouting is anticipated to extend from
approximately 2 feet to 10 feet below the existing ground surface. The horizontal limits of
compaction grouting should incorporate the horizontal limits ofthe settling sidewalks and pi-
lasters and extend a horizontal distance of 5 feet beyond the limits ofthe effected area. Due to
the presence of concrete and other constmction debris within the fill materials, difficulty in at-
taining the recommended penetration depth should be anticipated by the contractor.
Compaction grouting involves the injection of a low-slump, mortar-like grout under high pres-
sure to compact and displace the adjacent soils. The grout is injected at selected target zones
into the subsurface through small-diameter, steel grout pipes. The grout is injected in stages at
incremental depth intervals (generally at 2 foot intervals) to treat the problem soil zone. Typi-
105225012 R.doc fj^m^ajj^Bf^
Calle Barcelona Pedestrian Overcrossing August 14, 2009
Carlsbad, Califomia Project No. 105225012
cally, a grid pattem is designed to treat the lateral limits ofthe area of concem. The grout may
include a blend of fine aggregate such as sand, silt, clay, and cement to achieve a pumpable,
viscous grout with a low slump that remains intact after injection. Grout injection should be
performed at low rates and carefully monitored. During treatment, the grout pressure, grout
flow rate, and volume of grout should be monitored to evaluate the grouting process.
A qualified specialty contractor ufilizing appropriate methods and materials should perform
the compaction grouting. Monitoring of the existing improvements should be performed
during the compaction grouting to evaluate and reduce the potential for possible additional
distress, which may result from these operations. We request the opportunity to review the
grouting implementation plan submitted by the specialty contractor.
6.2. Sidewalk Replacement
During the compaction grouting operations, the existing sidewalk will experience additional
distress. We recommend that the sidewalk be replaced with 5 inches of concrete and rein-
forced with No. 4 steel reinforcing bars placed at 12 inches on center, both ways. The
reinforcement should be located in the middle one-third of the slab height. We recommend
that "chairs" be utilized to aid in the placement of the reinforcement.
In order to reduce the potential for shrinkage cracks in the concrete during curing, we rec-
ommend that the concrete be placed with a slump of 4 inches. The slump should be checked
at the site by the representative of a qualified materials testing laboratory prior to placement.
We recommend that Type V cement with a water/cement ratio of 0.45 or less be used for the
project. Stmctural concrete should be placed in accordance with the guidelines ofthe Ameri-
can Concrete Institute (ACI, 2005) and relevant project specifications.
6.3. Sidewalk Subgrade Preparation
Prior to the replacement of the sidewalk, we recommend that the upper 24 inches of sub-
grade soils be reprocessed and recompacted. Subgrade soils should be moisture conditioned
to near the laboratory optimum moisture content prior to recompaction. The subgrade soils
Calle Barcelona Pedestrian Overcrossing August 14, 2009
Carlsbad, Califomia Project No. 105225012
should be placed in horizontal lifts of approximately 8 inches in loose thickness and then
compacted by mechanical methods to a relative compaction of 90 percent as evaluated by
American Society for Testing and Materials (ASTM) Test Method D 1557. Successive lifts
should be treated in a like manner until the desired finished grades are achieved.
7. LIMITATIONS
The field evaluation, laboratory testing, and geotechnical analyses presented in this geotechnical
report have been conducted in general accordance with current practice and the standard of care
exercised by geotechnical consultants performing similar tasks in the project area. No warranty,
expressed or implied, is made regarding the conclusions, recommendations, and opinions presented
in this report. There is no evaluation detailed enough to reveal every subsurface condition. Varia-
tions may exist and conditions not observed or described in this report may be encountered during
constmction. Uncertainties relative to subsurface conditions can be reduced through additional
subsurface exploration. In particular, our subsurface exploration encountered some constmction
debris in the subsurface soils. In light of this fact and the nature of the backfill, the contractor
should anticipate unusual conditions in the area of the recommended compaction grouting. Addi-
tional subsurface evaluation will be perfonned upon request. Please also note that our evaluation
was limited to assessment of the geotechnical aspects of the project, and did not include evaluation
of stmctural issues, environmental concems, or the presence of hazardous materials.
This document is intended to be used only in its entirety. No portion ofthe document, by itself, is
designed to completely represent any aspect of the project described herein. Ninyo & Moore
should be contacted if the reader requires additional information or has questions regarding the
content, interpretations presented, or completeness of this document.
This report is intended for design purposes only. It does not provide sufficient data to prepare an
accurate bid by contractors. It is suggested that the bidders and their geotechnical consultant per-
fonn an independent evaluation of the subsurface conditions in the project areas. The independent
evaluations may include, but not be limited to, review of other geotechnical reports prepared for
the adjacent areas, site reconnaissance, and additional exploration and laboratory testing.
105225012 R.doc fj^majjaB^fjf^
Calle Barcelona Pedestrian Overcrossing August 14, 2009
Carisbad, Califomia Project No. 105225012
Our conclusions, recommendations, and opinions are based on an analysis of the observed site
conditions. If geotechnical conditions different from those described in this report are encountered,
our otfice should be notified and additional recommendations, if warranted, will be provided upon
request. It should be understood that tiie conditions of a site could change with time as a result of
natural processes or the activities of man at the subject site or nearby sites. In addition, changes to
the applicable laws, regulations, codes, and standards of practice may occur due to govemment ac-
tion or the broadening of knowledge. The findings of this report may, therefore, be invalidated over
time, in part or in whole, by changes over which Ninyo & Moore has no conti-ol.
This report is intended exclusively for use by the client. Any use or reuse ofthe findings, conclu-
sions, and/or recommendations of this report by parties other than the client is undertaken at said
parties' sole risk.
105225012R.doc
Calle Barcelona Pedestrian Overcrossing August 14, 2009
Carlsbad, Califomia Project No. 105225012
8. REFERENCES
American Concrete Institute (ACI), 2005, Building Code Requirements for Stmctural Concrete
(ACI 318-05) and Commentary (ACI 318R-05).
Califomia Building Standards Commission, 2007, Califomia Building Code, Titie 24, Part 2,
Volumes 1 and 2: dated June.
City of Carisbad, 2008, Engineering Standards, Volume 1, General Design Standards, 2004 Edi-
tion: revised June 30.
County of San Diego, 1975, Orthotopographic Survey, Sheet 330-1689, Scale 1:2,400.
Harden, D.R., 1998, Calipornia Geology: Prentice Hall, Inc.
Kennedy, M.P and Tan, S.S., 2008, Geologic Map of the Oceanside 30' x 60' Quadrangle, Califomia.
Ninyo & Moore, 2009, Revised Proposal for Geotechnical Evaluation, Settling Sidewalk and
Decorative Pilasters, Calle Barcelona Pedestrian Overcrossing, Carisbad, Califomia:
dated May 18.
Ninyo & Moore, In-house proprietary information.
Noms, R. M. and Webb, R. W, 1990, Geology op California, Second Edition: John Wiley & Sons, Inc.
Public Works Standards, Inc., 2009, "Greenbook," Standard Specifications for Public Works
Constmcfion.
United States Department of the Interior, Bureau of Reclamation, 1989, Engineering Geology
Field Manual.
105225012 R.doc fj^magiiB^fjf^
REFERENCE: 2005 THOMAS GUIDE FOR SAN DIEGO COUNTY, STREET GUIDE AND DIRECTORY
APPROXIMATE SCALE
2400 4800 FEET r\r
NOTE ALL DIMENSIONS, DIRECTIONS AND LOCATIONS ARE APPROXIMATE
Map IS Rand McNally, R.L.07-S-129
SITE LOCATION MAP FIGURE
1 PROJECT NO. DATE CALLE BARCELONA PEDESTRIAN OVERCROSSING
CARLSBAD, CALIFORNIA
FIGURE
1
105225012 8/09
CALLE BARCELONA PEDESTRIAN OVERCROSSING
CARLSBAD, CALIFORNIA
FIGURE
1
LEGEND
^ B-1 LOCATION OF EXPLORATORY BORING
TD=4 2' TD=TOTAL DEPTH IN FEET
^ jp.2 LOCATION OF EXPLORATORY TEST PIT
TD=6 5' TD=TOTAL DEPTH IN FEET
SOURCE AERIAL IMAGERY - MICROSOFT BING MAPS NINYO & MOORE, 2009
N
A
NOTE ALL DIRECTIONS, DIMENSIONS AND LOCATIONS ARE APPROXIMATE
APPROXIMATE SCALE
30 60 FEET
SUBSURFACE EXPLORATION MAP FIGURE
2 PROJECT NO. DATE CALLE BARCELONA PEDESTRIAN OVERCROSSING
CARLSBAD, CALIFORNIA
FIGURE
2
105225012 8/09
CALLE BARCELONA PEDESTRIAN OVERCROSSING
CARLSBAD, CALIFORNIA
FIGURE
2
Calle Barcelona Pedestrian Overcrossing August 14, 2009
Carlsbad, Califomia Project No. 105225012
APPENDIXA
BORING AND TEST PIT LOGS
Field Procedure for the Collection of Disturbed Samples
Disturbed soil samples were obtained in the field using the following methods.
Bulk Samples
Bulk samples of representative earth materials were obtained from the exploratory excava-
tions. The samples were bagged and transported to the laboratory for testing.
Field Procedure for the Collection of Relatively Undisturbed Samples
Relatively undisturbed soil samples were obtained in the field using the following methods.
The Split-Barrel Knocker Bar Sampler
The sampler, with an extemal diameter of 3.0 inches, was lined with 1-inch long, thin brass rings
with inside diameters of approximately 2.4 inches. The sampler was manually driven into the
ground with a hammer weighing approximately 35 pounds. The samples were removed from the
sample barrel in the brass rings, sealed, and transported to the laboratory for testing.
105225012R.doc
Explanation of Test Pit, Core, Trench and
Hand Auger Log Symbols
PROJECT NO.
o c
m
DATE
LU
OC
I-w
o
xx/xx
u. o CL
CO 2 Ul Q
>-
CC Q
2
g
^ CO
CO ^
SM
ML
SM
EXCAVATION LOG
EXPLANATION SHEET
FILL:
Bulk sample.
Dashed line denotes material ciiange.
- Drive sample.
- Sand cone performed.
• Seepage
• Groundwater encountered during excavation.
" No recovery with drive sampler.
• Groundwater encountered after excavation.
• Sample retained by others.
_ Shelby tube sample. Distance pushed in inches/length of sample
recovered in inches
•No recovery with Shelby tube sampler.
ALLUVIUM
Solid line denotes unit change.
Attitude: Strike/Dip
b: Bedding
c: Contact
j: Joint
f: Fracture
F: Fault
cs: Clay Seam
s: Shear
bss: Basal Slide Surface
sf: Shear Fracture
sz: Shear Zone
sbs: Sheared Bedding Surface
The total depth line is a solid line that is drawn at the bottom ofthe
excavation log. SCALE: 1 Inch = 1 foot
TestplI explanation.xls
U.S.C.S. METHOD OF SOIL CLASSIFICATION
MAJOR DIVISIONS SYMBOL TYPICAL NAMES
O
Q
w
o
I
w
< O U
o "
Ci ^
o
S o « ^.
o o
S A
GRAVELS
(More than 1/2 of coarse
fraction
> No. 4 sieve size)
SANDS
(More than 1/2 of coarse
fraction
<No. 4 sieve size)
GW
GP
GM
GC
SW
SP
SM
SC
Well graded gravels or gravel-sand mixtures,
little or no fines
Poorly graded gravels or gravel-sand
mixtures, little or no fines
Silty gravels, gravel-sand-silt mixtures
Clayey gravels, gravel-sand-clay mixtures
Well graded sands or gravelly sands, little or
no fines
Poorly graded sands or gravelly sands, little or
no fines
Silty sands, sand-silt mixtures
Clayey sands, sand-clay mixtures
O
Q
W
' s J
V
o
Z d
ML
SILTS & CLAYS
Liquid Limit <50
Inorganic silts and very fine sands, rock flour,
silty or clayey fine sands or clayey silts with
CL Inorganic clays of low to medium plasticity,
gravelly clays, sandy clays, silty clays, lean
OL
SILTS & CLAYS
Liquid Limit >50
Organic silts and organic silty clays of low
plasticity
MH Inorganic silts, micaceous or diatomaceous
fine sandy or silty soils, elaistic silts
CH Inorganic clays of high plasticity, fat clays
OH Organic clays of medium to high plasticity,
organic silty clays, organic silts
HIGHLY ORGANIC SOILS Pt Peat and other highly organic soils
GRAIN SIZE CHART
CLASSIFICATION
RANGE OF GRAIN SIZE
CLASSIFICATION
U.S. Standard
Sieve Sire
Grain Size in
Millimeters
BOULDERS Above 12" Above 305
COBBLES 12"to 3" 305 to 76.2
GRAVEL
Coarse
Fine
3" to No. 4
3" to 3/4"
3/4" to No. 4
76.2 to 4.76
76.2 to 19.1
19.1 to 4.76
SAND
Coarse
Medium
Fine
No. 4 to No. 200
No. 4 to No. 10
No. 10 to No. 40
No. 40 to No. 200
4.76 to 0.075
4.76 to 2.00
2.00 to 0.420
0.420 to 0.075
SILT & CLAV Below No. 200 Below 0,075
PLASTICITY CHART
j; 50 /
CH
CL MHf
CL- W ^ / ML&OL
—J
10 20 30 40 50 60 70 80 90 100
LIQUfD LIMIT (LL), V»
U.S.C.S. METHOD OF SOIL CLASSIFICATION
USCS Soil Classification Updated Nov, 2004
BORING LOG
CALLE BARCELONA PEDESTRIAN OVERCROSSING
CARLSBAD, CALIFORNIA
PROJECT NO.
105225012
DATE
8/09
LU LU
LL
CL
UJ
Q
Q
m cn
H
CO
o
o
>-
CO
z
LU
Q > cn a
H .
< CO
yd
t CO CO _;
<
_j O
DATE EXCAVATED 7/02/09
GROUND ELEVATION
BORING NO. B-I
LOGGED BY EFL
METHOD OF EXCAVATION Hand Auger/Manual
LOCATION East Side of Pedestrian Bridge
DESCRIPTION
c
m
-2
-4
9.1
- 10
17.
CONCRETE:
SM \Approximately 3.25 inches thick.
FILL:
Light brown, moist, loose to medium dense, clayey silty fine SAND; with
medium sand to gravel; iron oxide staining.
Concrete debris.
Total Depth = 4.2 feet. (Auger refusal on concrete.)
Groundwater not encountered.
Backfilled with dry concrete mix and patched with concrete on 7/02/09.
SCALE = 1 in./2ft.
TEST PIT LOG
CALLE BARCELONA PEDESTRIAN OVERCROSSING
CARLSBAD, CALIFORNIA
PROJECT NO.
105225012
DATE
8/09
LU LU
D.
LU Q
CO
UJ
<
CO UJ
Cd
I-
co
o
u. O
>
CO
z
UJ
Q >
CH
a
-z. o
H .
< CO O
ti= CO CO
CO <
_l
o
DATE EXCAVATED 7/02/09
GROUND ELEVATION
TEST PIT NO.
LOGGED BY
TP-
EFL
METHOD OF EXCAVATION Hand Auger/Manual
LOCATION East Side of Pedestrian Bridge
DESCRIPTION
c
m
-4
-6
- 10
SC FILL:
Brown, damp, loose to medium dense, silty clayey fine SAND; with trace of
medium sand; abundant roots.
SM Light brown, moist, loose to medium dense, clayey silty fine SAND; with
medium sand to gravel; iron oxide staining.
Total Depth = 4 feet.
Groundwater not encountered.
Backfilled on 7/02/09.
SCALE = 1 in./2ft.
TEST PIT LOG
CALLE BARCELONA PEDESTRIAN OVERCROSSING
CARLSBAD, CALIFORNLA
PROJECT NO.
105225012
DATE
8/09
UJ UJ
LL
CL
UJ
Q
CO
UJ
< CO
CQ
UJ Cd
D
h-
CO
o
o
>-
CO
UJ
Q
>
Cd
Q
< CO yd
y= CO
CO
CO ^
<
o
DATE EXCAVATED 7/02/09
GROUND ELEVATION
TEST PIT NO.
LOGGED BY
TP-2
EFL
METHOD OF EXCAVATION Manual
LOCATION West Side of Pedestrian Bridge
DESCRIPTION
nn
O c
m
-4
-6 8.0
10
12
SC FILL:
Brown, moist, medium dense, silty clayey fine SAND; with medium sand to
gravel; iron oxide staining and scattered rootlets.
SM Mottled brown with gray, moist, dense, silty fine SAND; with trace clay and
medium to coarse sand; iron oxide staining.
Total Depth = 6.5 feet.
Groundwater not encountered.
Backfilled on 7/02/09.
SCALE = 1 in./2 ft.
Calle Barcelona Pedestrian Overcrossing August 14, 2009
Carisbad, California Project No. 105225012
APPENDIX B
LABORATORY TESTING
Classification
Soils were visually and texturally classified in accordance with the Unified Soil Classification
System (USCS) in general accordance with ASTM D 2488. Soil classifications are indicated on
the logs of the exploratory excavations in Appendix A.
Moisture Content
The moisture content of samples obtained from the exploratory excavations was evaluated in ac-
cordance with ASTM D2216. The test results are presented on the logs of the exploratory
excavations in Appendix A.
Gradation Analvsis
A gradation analysis test was performed on a selected representative soil sample in general ac-
cordance with ASTM D 422. The grain-size distribution curve is shown on Figure B-l. The test
results were utilized in evaluating the soil classification in accordance with the USCS.
Consolidation Tests
Consolidation tests were performed on selected relatively undisturbed soil samples in general
accordance with ASTM D 2435. The samples were inundated during testing to represent adverse
field conditions. The percent of consolidation for each load cycle was recorded as a ratio of the
amount of vertical compression to the original height of the sample. The results of the tests are
summarized on Figures B-2 and B-3.
105225012 R.doc
GRAVEL SAND FINES
Coarse Fine Coarse Medium Fine SILT CLAY
U.S. STANDARD SIEVE NUMBERS
3" 2' VA' 1" y." .ff ^ff 4 B 16 30 50 100 200
HYDROMETER
GRAIN SIZE IN MILLIMETERS
PERFORMED IN .GENERAL ACCORDANCE WITH ASTM D 422
Symbol Sample
Location
Depth
(ft)
Liquid
Limit
Plastic
Limit
Plasticity
Index D30 Deo Cc
Passing
No. 200
(%)
USCS
• c-1 0.3-4.2 --~ --~ --37 SM
GRADATION TEST RESULTS FIGURE
B-1 PROJECT NO. DATE
CALLE BARCELONA PEDESTRIAN OVERCROSSING
CARLSBAD, CALIFORNIA
FIGURE
B-1 105225012 8/09
CALLE BARCELONA PEDESTRIAN OVERCROSSING
CARLSBAD, CALIFORNIA
FIGURE
B-1
I 105225012 SIEVE c-1 ® 0.3-4.2.)(ls
0.1
STRESS IN KIPS PER SQUARE FOOT
1.0 10.0 100.0
o «
<
D. X UJ
CO CO
LU _l Q.
< CO
u. o t-z
111 o
z o h-<
Q
_i O
CO z o o
-1.0
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
_
>
— -
-
—
i-^i:
—
\
v.* -\
— -
Seating Cycle Sample Location C-1
Loading Prior to Inundation Depth (ft.) 2.7-3.7
Loading After Inundation Soil Type SM
Rebound Cycle
PERFORMED IN GENERAL ACCORDANCE WITH ASTM D 2435
CONSOLIDATION TEST RESULTS FIGURE
B-2
PROJECT NO. DATE
CALLE BARCELONA PEDESTRIAN OVERCROSSING
CARLSBAD, CALIFORNIA
FIGURE
B-2 105225012 8/09
CALLE BARCELONA PEDESTRIAN OVERCROSSING
CARLSBAD, CALIFORNIA
FIGURE
B-2
105225012 CONSOLIDATION C-1 @ 2.7-3.7.xls
0.1
z
o
CO z <
X UJ
CO C/3 UJ
z
o
X
f-
m
_i
CL
<
CO
z
UJ o cc
Ui CL
z
o
H < D
_i O
CO z o o
STRESS IN KIPS PER SQUARE FOOT
1.0 10.0 100.0
Seating Cycle
Loading Prior to Inundation
Loading After Inundation
Rebound Cycle
PERFORMED IN GENERAL ACCORDANCE WITH ASTM D 2435
Sample Location TP-2
Depth (ft.) 5.5-6.5
Soil Type SM
yy^i^i^&yyVmire CONSOLIDATION TEST RESULTS FIGURE
B-3
PROJECT NO. DATE
CALLE BARCELONA PEDESTRIAN OVERCROSSING
CARLSBAD, CALIFORNIA
FIGURE
B-3 105225012 8/09
CALLE BARCELONA PEDESTRIAN OVERCROSSING
CARLSBAD, CALIFORNIA
FIGURE
B-3
105225012 CONSOLIDATION TP-2 ® 5.5-6.5.xls