HomeMy WebLinkAbout; Costa Real Municipal Water District Expansion; Soils Report; 1987-03-30- WESTERN
SOIL AND FOUNDATION ENGINEERING, INC. - PHONE 74c3553 423 HALE AVENUE AREA CODE e,* ESCONOIOO. CAIIFOF1NIA 9202.5
-
- March 30, 1987
COSTA REAL MUNICIPAL WATER DISTRICT - 5950 EL Camino Real
Carlsbad, CA 92008
-
Attention: WILLIAM E. BLAKESLEY
Re: OUR PROJECT NO. 86-93 - Headquarters Expansion Project
C.R.M.W.D. Project No. 86-107
5950 El Camino Real - Carlabad, California
Subject: ADDENDUM NO. 1 TO OUR RePORT OF PRELIMINARY SOIL INVESTIGATION
-
Mr. Blakesley:
This report presents the results of our Addendum No. 1 to our Report of - Reliminary Soil Investigation, dated January 30, 1987. Addendum No. 1
consisted of three additional test pits in the vicinity of the rectangular
-~ shaped proposed and future buildings situated parallel and near the western
property line. The test pit locations are shown on Plate Number 1A
-
The new test pit numbers are T-9, T-10, and T-11. (Plate numbers 11, 12,
and 13, respectively.) -
The soil in the vicinity of the three new test pits consisted of loose to - medium dense, very moist to wet, brown clayey sand and sandy clay to depths
ranging from 1 to 3% feet below existing ground surface.
-
-
ENGINEERING DEf’T. LIBRARY
CiZyof Cartsbad
2075 Las Palmas Drive
caflsbd CA 92009-4859
-
- Underlying the sandy clay and clayey sand was medium hard to very hard, moist,
light brown to orange siltstone to at least the depths investigated (7 to 9% feet).
The siltstone became difficult to excavate with a 580 C backhoe at depths ranging -
from 7 to 9b feet below existing ground surface.
- A sir inch thick layer of very dense quartsite was encountered in test pit
number T-10 at a depth of 5 feet.
-
Free groundwater was not encountered in any of the test pits and no seeps
- were observed.
For reconnnendations and conclusions, refer to the Report of Preliminary Soil -
Investigation, pages 3 through 6, inclusive.
- Test pits T-9 through T-11 were made on February 19, 1987.
-. The depths of removal at each test pit location are shown on Table lA, attached.
- In our Preliminary Soil Investigation report, foundation and slab-on-grade
recommendations were made. Considering the very high expansive soils, two
alternatives to these recommendations are given as follows: -
-
-
-
.-
First, selective grading may be used in order
to keep the expansive soils from being placed in
the upper four feet of the building pads. Then
the near surface soils may be tested to determine
their potential expansion. Foundation and slab
recommendations may be made based on test results
obtained. Footing and slab requirements may be
reduced accordingly.
A second alternative would be to import non-
expansive soil (expansion potential of 4 percent
or less) and place into the upper 4 feet of
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
.-
-
-
building pads within the perimeter of 5 feet
beyond the building perimeters, The building
perimeter would include all concrete slabs - and walks.
_ The upper two feet of parking areas may be treated similarly in order to increase
the Resistance “R” Value of the near surface soils and thusly decrease the structural
pavement section. -
If you have any questions after reviewing the findings and recosssendations contained
- in the attached report, please do not hesitate to contact this office. This opportunity
to be of professional service is sincerely appreciated.
-
Very truly yours,
WRSTFRN SOIL AND FOUNDATION ENGINEERING, INC. -~ -@F-
- DENNIS E. ZIMMRMAR RCE 26676
DEZ:ch
- Attachments: Table 1, Test Pit Logs
Distribution: (8) Addressee
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-
-
-
-
-
-
-
.-
g
E 3
1 .
.
2 .
3::
.
4.
.
5.
I
6.
.
7-
m
8-
-
9-
m
LO-
-
e
A
i
3
T I :
-
-
- -
-
1 .j
$!
3j 4 I
i
-
-
TV&CR NuuJcc T-9
8hfJtfD8 298
DESCUIPTI#
Brown Clayey
Sand/sandy clay k
Light Brown
Siltstone
Orangish Brown
Siltstone
Brown Ironstained
Siltstone
Quartzite
Brown Ironstained
Siltstone
Difficult Digging with
580 C Backhoe at 9'-0"
Bottom of Test Pit at 9'-6"
Wet
Moist
Moist
Moist
Dry
Moist
--
,oose
:ed.
.ard
,ard
ry Ha
3-y
,ard
g& 2;
e*Y ense
--
i ~;~4,9~f;y,E:pcpsion SUBSURFACI! lX?LORAtlON LOG
Reject NA.'8i-i07 LOO@- BT: DZ DATJ mooeD: v,,o,g,
I JOJ NUYIRR: 86-93 I Plate No. 11
-
-
-.
-
-
-
-
-
-
-
-
-
-
Y s
E :
.
1.
.
2.
3.
.
4.
m
5 -
I
6,
s
7,
w
B-
i
:
-
-
-
-
-
T&3 WUWtl T-10
ncv~tfm 301
DESCRIPTI#
~“over 4” Base ram clayey Sand/ andy Clay
,ight Brown and
#range Layered and
esicated Siltstone
rang&h brown
iltstone
suartzite
rangish Brown
iltstone
&tom of Test Pit at 7’-6”
Wet
Very
rioist
Floiit
Dry
Xoist
LOOSC
4ed.
$ard
zz
iea3
Ez
$ard
Jery
iard
c’ 5 8. t: .! z
m .a 8 -
f: Z!:
:: e
SUBSURfACE tX?LORAtlON LOG
LOOOCO l T: DZ OAT1 maa~w/l9/07
~001 muu818: 86-93 Plate No, 12
l-
2-.
3-
4-
5-
6-
7--
8-
e
e t
-
-
-
t’ka WLe T-11
mvrtml 300
DESCRIPfI#
fr”AC over 4” Base
rowrt Sandy Clay/ ’
layey Sand
lrangish Brown
lesicated Siltstone
lrangish Brown
,iltstone
&tom Of Test Pit At 7 * -0”
‘ery
[oist
iois t
loist
Zoft
lard/
Loose
to Me
Jense
Med iu
Hard
Hard
Very
Hard
t
f :
&’ 8
SUBSURfACI EXPLORATION LOG
-
-
-.
-
TABLE 1A
BEQIJIBED DEPTH OF REMOVAL
TEST PIT
NUMBER
T-9
T-10
T-11
DEPTH OF REMOVAL
AT THIS LOCATION
(FEET)
3
5
5
SOIL AND FOUNDATlON ENGINEERING, INC.
_~
-
-
-~
--
-
-
-
-
-
-
-
WESTERN
SOIL AND FOWNDATlON ENGINEERING, INC.
PHONE 746-3553 423 HALE A”ENV.5
ARE.4 CODE 619 ESCONDIDO. CALIFORWIIA 920.25
January 30, 1987
COSTA REAL MUNICIPAL WATER DISTRICT
5950 El Camino Real
Carlsbad, CA 92008
Attention: WILLIAM E. BLAKFSLEY
BE: Job No. 86-93
Headquarters Expansion Project
C.R.M.W.D. Project No. 86-107
5950 El,Camino Real
Carlsbad, California 92008
SUBJECT: Report Of Preliminary Soil Investigation
Mr. Blakesley:
In accordance with your request, we have completed a preliminary soils investigation
for the proposed project. We are presenting, herewith, our findings and recommend-
ations.
The findings of this study indicate that the site is suitable for the proposed
development provided the special site preparation and foundation reconrmendations
presented in the attached report are complied with.
If you have any questions after reviewing the findings and recormnendations
contained in the attached report, please do not hesitate to contact this office.
This opportunity to be of professional service is sincerely appreciated.
Very truly yours,
WESTERN SOIL AND FOUNDATION ENGINEERING, INC.
DEZ: ji
Attachments - Distribution: Addressees (8)
TABLE OF CONTENTS
-
-~
-
-
-
-
-
-
-
-
Introduction and Project Description
Project Scope
Findings
Site Description
Groundwater
Recommendations and Conclusions
Site Preparation
Field Explorations
Laboratory Testing
Limitations
Table I
Plate Number 1
Plate Number 2
Plate Number 3-10
Plate Number 11
APPENDIX
Existing Fill
Imported Fill
Surface Drainage
Earthwork
Cut and Fill Slopes
Rippability
General
Transition Areas
Lateral Resistance
Retaining Walls
Footing Observations
Asphaltic Concrete
Pavement
PAGE
1
1
2
2
3
3
3
3
3
4
4
4
4
4
4
5
5
6
6
ATTACHMENTS
Removal Depths
Plot Plan
Unified Soil Classification Chart
Trench Logs
Laboratory Test Results
Grading Specifications and Recommendations
WESTERN
SOIL AND FOUNDATlON ENGINffRlNG, INC.
.-
-
--
-
PRELIMINARY SOIL INVESTIGATION
HEADQUARTERS EXPANSION PROJECT
C.R.M.W.D. PROJECT NO. 86-107
5950 EL CAMINO REAL
CARLSBAD, CALIFORNIA 92008
-
-
Prepared For:
COSTA REAL MUNICIPAL WATER DISTRICT
5950 EL CAMINO REAL
CARLSBAD,CA 92008
JOB NO. 86-93
JANUARY 30, 1987
- WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-
-
-~
-~
-.
-
-
-
-.
_.
-
-
-
PRELIMINARY SOIL INVESTIGATION
HEADQUARTERS EXPANSION PROJECT
C.R.M.W.D. PROJECT NO. 86-107
5950 EL CAMINO REAL
CARLSBAD, CALIFORNIA, 92008
INTRODUCTION AND PROJECT DESCRIPTION
This report presents the results of our preliminary soils investigation for
the proposed Headquarters Expansion Project.
It is our understanding that the proposed construction will consist of three
new structures. All are proposed to be of masonry construction. Building A
is to be a lOO’x150’ warehouse located in the southeast quadrant of the site.
It is suspected that this site may be in the uncontrolled fill area. Building B
is a 4O’xlOO’ shop building located in the northeast quadrant; and Building C
is a 7,500 sq. ft. addition extending easterly from the existing administration
building. Other site improvements yet unplanned may include a vehicle fueling
facility, paved parking and work areas, storm drains and street improvements
on the service road along the easterly boundary.
The site configuration and test pit locations are shown on Plate Number 1.
PROJECT SCOPE
This investigation consisted of a surface reconnaissance, subsurface explorations,
obtaining representative samples, laboratory testing, analysis of the field and
laboratory data, and preparation of this report. Specifically, the intent of
this analysis was to:
a) Explore the subsurface conditions to the depths
influenced by the proposed construction,
WESTERN
SOI1 AND FOUNDATION ENGINEERING, INC.
-l-
.-
-
-
-
-~
-
-
-
-
-
-
b) Evaluate, by laboratory tests, the pertinent
engineering properties of the various strata
which will influence the development, in-
cluding their bearing capacities, expansive
characteristics, and settlement potential,
c) Develop soil engineering criteria for site
grading,
d) Determine potential construction difficulties
and provide recormnendations concerning these
problems, and
e) Recommend an appropriate foundation system
for the type of structures anticipated and
develop soil engineering design criteria
for the recommended foundation design.
FINDINGS
The property is irregular in shape. The site is a 6.5 acre parcel lying along
the east side of El Camino Real approximately one quarter mile north of Palomar
Airport Road. The westerly portion of the property is currently occupied by the
District’s administrative office, a metal maintenance and operations building,
a temporary trailer housing the engineering department and a paved parking lot.
The easterly portion is undeveloped and is used as a pipe and materials storage
area. The site slopes generally easterly at a grade of about five percent.
The site varies in elevation from about 311 feet above M.S.L. in the northwest
corner to about 270 feet above M.S.L. in the southeast corner.
The site is covered with loose fill soils with trash, that range in depth from
1 to 12 feet below existing grade at the locations investigated. These soils
are composed of fine to coarse sands and silty clays. The fill soil is under-
lain by colluvial soils to depths below existing grade of 1 to 14 feet. These
WESTERN
SOIL AND FOUNDATlON ENGINEERING, INC.
-2-
-
soils consist of silty clays and clayey silts. These colluvial soils are soft
to stiff and very moist to wet. The colluvial soils are underlain by formational
soils consisting of very moist, hard to very hard siltstone.
The silty clays and clayey silts of the fills and colluvial soils are in the
very high expansive range. These soils require special consideration as dis-
cussed later in this report.
.-~
.
..-
.~.
_-.
-.
-
-
-
GROUNDWATER : Free groundwater was not encountered in any of the exploratory
trenches and no surface seeps were observed. It must be noted, however, that
fluctuations in the level of groundwater may occur which may not have been
evident at the time of our field investigation. One exception is perched water at
a depth of three feet in test pit Number T-5.
RBCOEMENDATIONS AND CONCLUSIONS
SITE PREPARATION
EXISTING FILL: We recommend that any existing fill, topsoil, alluvium, colluvium,
and low density soil be removed to firm natural ground from beneath proposed
fill pad areas, parking and driveway areas, slabs or sidewalks so that struct-
ures will be supported on firm material. This soil may be replaced, if desired,
as a properly controlled fill densified to at least 90% relative compaction.
All deleterious materials, trash and oversized debris encountered in this fill
should be removed and legally disposed of off-site.
Based on the findings of this study, it appears that the maximum depth of removal
and recompaction of the native soils will be on the order of 15 feet. The actual
depths of removal will vary from 3 to 15 feet. The actual depth of removal
at each test pit location is shown on Table I, attached. The horizontal limits
of these recommendations should include the area within the perimeter of 15
feet beyond the exterior of any buildings, pavements, walks or other improve-
ments. All areas to receive asphaltic or Portland cement concrete pavements,
slabs or sidewalks should be treated similarly.
IMPORTED FILL: Imported fill, if required at this site, should be examined by
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-3-
-.
--
-~
-
-
-
._
-
-
SOIL AND FOUNDATION ENGINEERING, INC. -
our office to determine their suitability prior to importing these materials.
SURFACE DRAINAGE : Surface drainage should be directed away from the structures
and ponding of water should not be allowed adjacent to their foundations.
EARTRWORR: All earthwork and grading contemplated for site preparation should
be accomplished in accordance with the attached Recommended Grading Specifi-
cations and Special Provisions. All special site preparation recommendations
presented in the sections above will supersede those in the standard Recommended
Grading Specifications. All embankments, structural fill, and fill should be
compacted to a minimum of 90%. Utility trench backfill should be compacted
to a minimum of 90% of its maximum dry density. The maximum dry density of
each soil type should be determined in accordance with A.S.T.M. Test Method 1557-78,
Method A or C.
CUT AND FILL SLOPES: We recommend that cut and fill slopes be constructed with
a slope ratio of 2.O:l.O (horiaontal:vertical) or flatter, to a maximum height
of 20 feet.
Slopes should be planted as soon as feasible after grading. Slope erosion
including sloughing, rilling, and slumping of surficial soils may be anticipated
if the slopes are left unplanted for a long period of time, especially during
rainy seasons. Erosion control and drainage devices should be installed in
compliance with the requirements of the controlling agencies.
RIPPASILITY: All soil material exposed in the test pits (trenches) can be
excavated by conventional means.
FOUNDATIONS: Considering the expansive soils in the very high range, the
structures should be supported on continuous footings bearin, in compacted
on-site soil material at a minimum depth of 24 inches. Footings may be designed
for an allowable dead plus live load bearing value of 1500 pounds per square
foot. These values may be increased by one-third for short-term loads, including
wind or seismic. Footings should have a minimum width of 12 inches. Due to
WESTERN
-4-
-
_-
-
-
-
-
-
-~
-
-
-
-
-
-
the very highly expansive soils, all continuous ,footings should contain at least
four #5 reanforcing bars, two top and two bottom.
Settlements under building loads are expected to be within tolerable limits
for the proposed structures.
Concrete slabs-on-grade may be supported on compacted soil material. Due to
the highly expansive soils, five inches of clean washed concrete sand should
be placed beneath the slab. Slab reinforcing should be provided in accordance
with the anticipated use of and loadings on the slabs. As a minimum, due to
the highly expansive soils, the slabs should be reinforced with #A bars at 15
inches on center both ways located at mid-height of concrete slab. The slab
should be a minimum of five inches thick. In areas where moisture-sensitive
floor coverings are to be utilized and in other areas where floor dampness would
be undesirable, we recommend consideration be given to providing an impermeable
membrane beneath the slabs. The membrane should be covered with 2 inches of sand
to protect it during construction and to allow the concrete to cure properly.
The sand should be lightly moistened just prior to placing the concrete. Care
should be taken not to puncture the visqueen. All joints (laps) in the visqueen
should be a minimum of 6 inches in width and sealed with an approved sealer.
TRANSITION AREAS : Foundations supported partially on cut and partially on fill
are not recamnended. The tendency of cut and fill soils to compress differ-
ently can frequently result in unequal structural support and subsequent crack-
ing to portions of the structure. Therefore, in transition areas, we recommend
that the entire cut area be overexcavated and replaced with soils compacted to
a minimum of 90%. This overexcavation or undercutting should be carried to a
depth of 3 feet below finish subgrade.
LATERAL RESISTANCE: Resistance to lateral loads may be provided by friction
at the base of the footing and by passive pressure against the adjacent soil.
For concrete footings on compacted soil a coefficient of friction of 0.30 may
be used. An allowable passive uniform pressure of 250 pounds per square foot
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-5-
per foot of depth acting against the foundations may be used in design.
-
-
-
-.
-
-
-
-
-
-
-
If footings are proposed adjacent to slope areas, we recommend that the footings
be deepened to provide a minimum horizontal distance from the outer edge
of footings to the adjacent slope face of one-half the height of the slope.
The minimum and maximum distances should be 8 and 12 feet, respectively.
RETAINING WALLS: Retaining walls must be designed to resist lateral earth
pressures and any additional lateral loads caused by surcharge loads. We
recommend unrestrained walls be designed for an equivalent fluid pressure of
35 pounds per cubic foot (pcf) where backfill is level. We recommend restrained
walls be designed for an equivalent fluid pressure of 35 pcf plus an additional
uniform lateral pressure of 6~ pounds per square foot where H=the height of
backfill above the top of the wall footing in feet. Wherever wall will be
subjected to surcharge loads, they should also be designed for an additional
uniform lateral pressure equal to one-third the anticipated surcharge pressure
in case of unrestrained walls, and one-half the anticipated surcharge in the
case of restraining walls.
The preceding design pressures assume there is sufficient drainage behind the
walls to prevent the build-up of hydrostatic pressures from surface water in-
filtration. Adeqnate drainage may be provided by means of weep holes with per-
meable material installed behind the walls or by means of a system of subdrains.
Backfill placed behind the walls should be cuspacted to a minimum degree of
compaction of 90% using light compaction equipment. If heavy equipment is
used, the walls should be appropriately temporarily braced.
FOOTING OBSERVATIONS: All footing excavations should be reviewed by the Soils
Engineer prior to placing reinforcing steel and concrete.
ASPBALTIC CONCRETE PAVEMENT. The asphaltic concrete pavement section should
be designed by our office. During the earthwork operations, we should sample
the subgrade soil material, perform R-Value tests, and design the pavement section
accordingly.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-6-
.-
_-
-
--
-
-
-
-
-
-
-
-
FIELD EXPLORATIONS
gillbe ghbniarface explorations were made at the locations indicated on the
acEahPd PI&e Number 1 on January 6, 1987. These explorations consisted of
trcnch+s dmg by means of a blackhoe. The field work was-conducted under the
obsar&iOP Of our geology and soil engineering personnel.
‘l& explortiions were carefully logged when made. These logs are presented on
the followimg Plate Numbers 3 through 10. The soils are described in accord-
aDce with tfhe Unified Soils Classification System as illustrated on the attached
eimplified chart on Plate Number 2. In addition, a verbal textural description,
the wet color, the apparent moisture and the density or consistency are presented.
The density of granular material is given as either very loose, loose, medium
dense, dense or very dense. The consistency of silts or clays is given as either
very soft, soft, medium stiff, stiff, very stiff or hard. Samples of typical
and representative soils were obtained and returned to the laboratory for testing.
LABORATORY TESTING
Laboratory tests were performed in accordance with the generally accepted
American Society for Testing and Materials (A.S.T.M.) test methods or suggested
procedures. Test results are shown on Plate Number 11.
WESTERN
SO/l AND FOUNDATION ENGINEERING, INC.
-7-
-
-
-
-
-
The rccomendatioaa praaantcd in thie report are coatingcat upoa
our review of final plana aad l pacificatioaa. The soil l agiaaar
should raviav and verify the compliance of tha find plaa vith
thir report and with Chapter 70 of the Uniform BuildinS Code.
It is rcc-nded that Uaatern Soil and Foundation Engineering,
IIZC.) be retained to provide continuous roil engineering l arvicea
during the earthwork operations. This is to obaerva compliaace with
the design ctincapta, specifications or recomendationr and to allow
design changes in the event that subsurface conditions differ from
those anticipated prior to start of construction.
The recommendations and opinions expressed in this report reflect
our best estimate of the project requirements based on an evaluation
of the rubsurface soil conditions encountered at the subsurface ex-
ploration locations and the assumption that the soil conditions do
not deviate appreciably from those encountered. It should be recog-
nised that the performance of the foundations and/or cut and fill
slopes may be influenced by undisclosed or unforeseen variations in
the soil conditions that may occur in the intermediate sad unexplored
areaa. Any unusual conditions not covered in thia report that may
be encountered turing site development should be brought to the
attention of the soils engineer so that he may make modifications
if necessary.
Thib office should be adviaad of any changes in the project scope so
that it may be determined if the ret-ndationr contained herein
are appropriate. This should be verified in writing or modified by
a vritten addendum.
The findings of this report are valid as of this date. Changer in
the condition of a property can, however, occur vith the passage of
time, whether they be due to natural processes or the work of mm
WESTERN
SO/l AND FOUNDAllON ENGINEERING, INC.
-B-
_-
-
-
-
-
-
01) this or adjacanc propartier. IO addition, changer ia the State-
of-the-&t and/or Government Coder may occur. Due to ruch changer,
the findinga of the report may be invalidated wholly or in part by
changer bayond our control. Therefore, this report should not ba
relied upon after a period of one year without a review by ua veri-
fying the ruitability of the coaclurioar and reccnmnendationa.
We will be rerpouaibla for our data, interpretationa, and recow
mendationa, but #hall not be rerponribla for the interpretationa by
othcra of the information daveloped. Our earvicar conrirt of pro-
farrioaal conrultation and obrervatioo only, and no warranty of any
kind whatsoever, exprerr or implied,’ ir made or intended in con-
nection with the work performed or to be performad by UI, or by our
propoeal for consulting or other rervicer, or by our furnishing of
oral or written reportr or finding*.
It ia the rerponribility of the Client or the Client’r representa-
tive to enrurc that the information and recomendationr contained
herein are brought to the attention of the eugineer and architect
for the project and incorporated into the project’e planr and rpeci-
ficationr, It ir further hir rerponribility to take the necersary
measures to enmre that the contractor and hir subcontractors carry
out ruch recommendationa during construction.
WESTERN
SO/l AND FOUNDATION ENGINEERING, INC.
-‘,.-
ATTACHMENTS
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
SEE BACK POCKET FOR PLATE I
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-
-
-
-
-
-
-
-
-
-
TABLE I
REQUIRED DEPTH OF REMOVAL
Test Pit
NO.
T-l
T-2
T-3
T-4
T-5
T-6
T-l
T-8
Depth of Removal
at This Location
(Feet)
6
6
6
9
3
15
7
10
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-.
-
-
-.
-
-~
-~
-
. EUBSURIACX gIPLORATIOU LeC37.M)
UNIPBD SOIL CLASSIPICATLOU CURT
SOIL DESCUPTICM GROUPSYMSOL mP1cALKAm8
I. CUNSE GRAINND, Norc alan
helf of mtcriel ir Jerger
then Wo. 200 ricve size.
GRAVNLS CLSEAN GRAmLs
More then helf of
couee frection ir
luger than No. 4
eievc l ixe but
meller then 3”
GRA~LsIiITEFINEs
-(Apprecieble mount
of finer)
SANDS CLEAN SANDS
sthen half of
coerce frection ie
mellor then No. 4
aiave rize. SANDSWITEIFINES
(Apprecieble emunt
of finer)
II. FINE GRAINED, More then
helf of meteriel ir smeller
then No. 200 crieve #ire.
SILTS AND CLAYS
Liquid Limit
leee then 50
SILTY AND CUYS
Liquid Limit
greater than 50
BIGELY ORGANIC SOILS
ta
CP
GN
GC
SW
SP
811
SC
CL
OL
ml
CN
08
PT
Well greded grevelr, grAvel-
rend mixturee, little or no
finesr.
Poorly peded grevelr, grevcl-
sad mixture*, little or no
finer.
Silty grevele, poorly gredcd
grovel-aend-rilt nixturer.
Clayey gravel*, poorly
greded grevel-rend, cley
mixturer.
Well greded sand, grevelly
send@, little or no finer.
Poorly graded oande, gravelly
randr, little or no finer.
Silty eanda, poorly graded
mad end rilt mixtures.
Clayey eende, poorly greded
sand end cley mixturer.
Inorganic riltr end very
fine rendr, rock flour, rendy
rilt or cleyey-rilt-rend
mixtures with slight plert-
icity.
Inorgenic cleyr of low to
medium plerticity, grevelly
cleyyr, rendy cleyr, l ilty
cleyr, lcen cleye.
Orgenic rilty and organic
silty cleyr of lov plerticity
Inorgmic l iltye, miceceous
or dietomeceour fine randy
or l ilty’eoilr, el4rtic
riltr;
Inorgenic cleyr of high
plrrticity, fet
Organic cleyr of medium
to high plerticity.
Peet end other highly
orgenic roilr
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
PLATE NUMBER 2
T :
t’ :
f ;
s 1 .
1--
2- CK
BA
3-
4--
5-- BAG
6'
7-
8-
9-
lo-
IL-CK
L2-
-
,
,i
ii
:j ,
i
SP
-
CL
-
L/I
-
L
-
T&NCRNVURER T-l
Eltvrtltn 301.0
DESCRIPTIDR
Light Brown Fine to Coar Very
Sand (Fill1 Moist
Brown Silty Clay
Gray-Orange Silty Clay t Very
Clayey Silt Moist
Gray Siltstone With Iron Very Staining Moist
Sttom of Trench
Kcavated With Case 580
ickhoe
CK=Chunk Samples
BAG=Loose Bulk Sample
E : :1 i : ::
Very
Moist
+g:
Z-i -=I
z;:
::I
0’
Loose
Soft
to
Mediuu
Stiff
Stiff
Hard
But
Fract-
ured
ecomir
=Y .ard
:
f 3; bS 0’
95.8
100.: 25.7 91.6
.04.8 22.0
I- s - a- *= . .
gi
0
25.0
z :s Ff :f: :;
z
34.3
. .
SUBSURFACE EXPLORATION LOG HEADQUARTERS EXPANSION PROJECT
C.R.M.W.D. PROJ. No. 86-107 Lotam w: "eG* DATE LL)OatD: 1-6-87
,0, I(uy,Im:86-93 Plate No. 3
.
-
T t
‘z
r
:
:
-
.
1'
.
2.
3-
4-
5-
-
6'
m
7-
m
8-
-
9-
m
lo-
: :
3 1
LA
-
-
/ .i
:I
:: ,
,
L
-
L -
L
-
L
-
-
TRENCH NUMBER T-2
Eltvrtion 300.5
DESCRlPTIOW
;ray Silty Clay With Roe
(Fill)
slack to Dark Gray Silty
kganic Clay
brownish-Gray Silty Clay
3rown Silty Clay
(Colluvium)
:ray Siltstone With Iron
Stain
(Formation)
3ottom of Trench
excavated With Case 580
3ackhoe
BAG=Loose Bulk Samples
r : : i l s
r i l 1
wet
Jet
iJet
Very
bioist
Very
Moist
-8 -0’ Y’
Soft
to
?tediun
Stiff
Mediun
Stiff
Mediun
Stiff
Mediun
Stiff
Hard
.m
; ZY! ;:g; a-1
xi
ri;
:-! !
_
107.1
106.:
u* e-
2: . I
zg = 0 v
23.4
21.2
UpAnQUARTERS EXPANSION PROJECT - - c.K.M.W.D. PROJ. No. 86-107
SUBSURFACE EXPLORATION LOG
boo@- l T’: “.G. DATE LC)OOED: ,mhwR7
-01 wy1m86-93 Plate No. 4
r T-3 Y r : T&CH NUMBER :
5 : :
i 3 :!! EtWJttOll 297.5 f
:: xs
0 ; . l *
: : : a DESCRIPTIDN -
SP Light Brown F-C Sand ‘cry Loose - (Fill bist
1- SP Brown Very Silty Fine Sal Moist Loose
CL Orange-Brown Silty Clay ‘cry Soft 91.3
' BAG loist to
Medium
Stiff
3-
_.
(Colluvium) &--
-BAG a ale Yellow Clayey Silt ‘cry o.ft to 90.4
loist .edium
5-- ,tiff
a rown-Gray Siltstone With ‘cry .ard
- nterbedded Lenses of Gra: Ioist Fract-
6- ine Sandstone With Iron red)
taining
7-
8-
9-
lO-
11-
lz?-
(Formation)
&tom of Trench
lery 'cry
foist Lard
BAG-Loose Bulk Samples
- L
24.2
28.2
HEADQUARTERS EXPANSION PROJECT SUBSURFACE EXPLORATION 100
C.R.M.W.D. PROJ. No. 86-107
LOQDCD BT: ".G. DATK LDQQcD:,-~-*,
I 1,0, wuurrr+36-93 1 Plate No. 5
TREiCH NLMBER T-4
Elcvrtton 294.0
: - * F .
f ; E a a : :
2- BA
3-
4--
5-
6-
7-
9-
Lo-
ll-
12-
-
Jft tc
odium
riff
P
:: Ef - u
iz = 8
::
., ’
t:
:: l .
2;; . l a
DESCRIPTIDN
Olive Brown Silty Clay Very
With Fragments of Silt- Moist
stone and Chunks of Asph. to
alt wet
(Fill)
ark Gray Clay Wiih Decom.
wing Organics
(Colluvium)
'e t
-5 St . . - c :x :
CL
-
:Ljo;
87.0 25.0
.04.0 25.0
rown-Gray Silty Clay Wit1
inor Organic Material
'et
0
cl-y oist
:dium
riff
(Colluvium)
ray Siltstone With Iron
taining.Bi-Valve Impress-
on
IL
I
cry .oist
wd
try
lrd
(Formation) (Formation)
Bottom of Trench urn of Trench
Very Slow Digging With Slow Digging With
Case 580 Backhoe 580 Backhoe
1 BAG=Loose Bulk Samples -Loose Bulk Samples
HEADQUARTERS EXPANSION PROJECT C.R.M.W.D. PROJ. No. 86-107
.
SUBSURFACE EXPLORATION LOG
Looam BT: "*G* DA11 L008ED:l-6-87 !
JOB nt~~~cn: 86-93 plate No. 6
.
1.
.
2’
.
3-
4-
.
5.
.
6’
-
P
a
8-
-
: ,z
;i
‘i
: a
b
-r
r&x NWB&R T-5 ,t* 2 l
f: 8c ts#- i t -2
ttcvrtlon 303.5 YI
2s
b’ -Is i : f-
2;: t DZ c 8
ta' \ OW . .
-8 :,‘a ; **
x
z;: = 0
DESCRIPTIDR VC 1 2 v
Dark Brown Silty Fine ro very Loose
Coarse Sand (Fill: Moist
L Gray Siltstone Very Hard
(Fragmented) Moist
. -
4:: zz tz :E a :-
Perched Water at 3'
Less Fragmented at .4'
(Formation)
-
ottom of Trench
?ry Slow Digging With
ase 580 Backhoe
ety
ard
SUBSURFACE EXPLORATION LOG RallON LOG
HEADQUARTERS EXPANSION PROJECT
C.R.M.W.D. PROJ. No. 86-107 LOOOKD BY': "*G. DATE LDoow1-6-87 OATL ~~00~1-6-87
a, IIuy,~n: 86-93 Plate NO. 7 . 7 ,
2-
3-
4-
5-
6'
7-
8'
P
lo-
LP-
BAG
1r 6 -SK
I4
Etevrtlon 293.0
DESCRIPTIOll
SM Brown very Silty Fine to
Medium Sand With Many
Chunks of Asphalt up to
18" and Concrete up to
4-5 feet.
Minor Amounts of Wood
(Sides Caving)
(Fill) .------------
iron Silty Fine to Mediu
and
'ragments of Clay Pipe,
.arge Blocks of Concrete,
;ome Asphaltic Concrete
md Wood
-
(Fill)
ark Brown Clayey Silt
(Colluvium)
rownish Gray Fragmented
iltstone
& : m :
:: ti a 1
Moist 10086
s-e
oist
. - -
Bose
rY ist
dium
iff
rY ist ,d
HEADQUARTERS EXPANSION PROJECT tihALq”AK’MKS EXi SUBSURFACE EXPLORATION LOG
C.R.M.W.D. PROJ. No. 86-107 C.R.M.W.D. PROJ. No. 86-107 LoOOm BT: ".G. D4tC LOOOLD: l-,5&37
*, muyIEII: 86-93 Plate No. 8
: TRENCH NUMBER T-6 7 : *i; s;o : z 5
: f
I- I
s (Continued) u!! ;x- f :: L Elevation :: fY3 l a; I: 2% 293.0 ;g -- c :: SE z=; Uf 0. .I 3 2; 2 :
5 ..a :o’ .I g;‘; l -L 0’; : : I _. l a l 0= 2 ‘JO =:: 0’ =o =a
u DESCRIPTIOR ; "
15 ::
ML Brownish Gray Fragmented very Hard
Siltstone Moist
16
1 Bottom of Trench
Backhoe.Fully Extended
18 Excavated With Case 580
Backhoe
-
.
CK=Chunk Samples BAGsLoose Bulk Sample
HEADQUARTERS EXPANSION PROJECT SUBSURFACE EXPLORATION LOG
C.R.M.W.D. PROJ. No. 86-107 LOOQCO ay:V.G. 01~s Loaoefxl-6-87
JO. WUYBI?~~: 86-93 Plate No. 8 (Cont.1
I Y 5 I
f ; r ! a :
1'
2' CK
3-
4-
5-
6'-
7
8-
9-
o--
I-
z-
1
i’
:I I
,
IM
z-
L-
-
L
-
~--
T&tiCkl HUHBER T-7
Elrv&n
DEScRIPTIon
lrown Silty Sand (Fill lellow Brown Sandy CJaye ;ilt
(Fill)'
)ark Brown Clayey Silt
(Colluvium)
'ale Yellow Clayey Silt
;ray Siltstone With Lens ,t? Fine Sandstone and
:ron Staining
(Formation)
Ittom of Trench :cavated With Case 580 xkhoe
CK=Chunk Samples
Moist ILoose Very i?aiG Moist Dense
Ve?Zy
Moist
Very Moist
Very Moist
Stiff
3rd
lut :agme.
:ed
ird
:o !ry rd
: f *: 0 I r! x
i! ::: - - zt zz ‘0’ u
HEADQUARTERS EXPANSION PROJECT SUBSURFACE EXPLORATION LOG
C.R.M.W.D. PROJ. No. 86-107 LoaacD Dr: "eG- DATE LoOaiD: l-6-87
-, muyIgm: 86-93 Plate No. 9
-_
--
-
-
-
-
--
-
-
-
-
-,
-
-
-
-
-
5 t
8 :
f ; 2 8 0 1
l-r-
2-
3-
4-
5’
6’
7-
8--
P-
lo-
ll-
lF-
-
z TiEtiCH NIMBER T-8
$ i fltvr~ion
0. 'f
f 0 DESCRIPTIDN
ML, Pale Yellow Clayey Silt
(Fill)
SM Dark Brown Silty Fine Sam With Large Chunks of
Asphalt up to 2 feet
(Fill)
CL Brown Silty Clay
(Colluvium)
ML Pale Orange-Yellow Clayey Silt
Mz, Yellow-Gray Siltstone
Weathered and Fragmented
:: :f a. t6 * 8
lery loist
foist
e=Y oist
e=y oist
S-=Y oist
of
2nLtb
[edium
lense
80088
0 :edium ense
tiff
aft to
odium
tiff
3rd
-
-
-
HEADQUARTERS EXPANSION PROJECT SUBSURFACE EXPLORATION LOG
C.R.M.W.D.PROJ. No. 86-107 LOQOCD BY: V.G. DAYC LC)OOCD: l-6-87
I
JO1 MUYICR: 86-93‘ [Plate No. 10
-
LABORATORY TEST RESULTS
-
-.
-
-.
-
-
..-
-
-
Maximum Density/Optimum Moisture
Sample No. Location
Maximum
Density (PCf)
optimum
Moisture (Percent)
A T-l @ 2.0' 113.7 16.0
B T-l @ 5.5' 109.5 16.3
C T-2 @ 2.0' 116.5 14.8
Direct Shear*
Sample Location Cohesion Angle of Internal Friction Number (PCf) (Degrees)
A T-l @ 2.0' 740 11
*Sample remolded to 90% of maximum dry density at optimum
moisture content, Samples saturated prior to testing.
Expansion Test
Percent Expansion Potential Expansion Index Expansion Sample No. Location Per UBC
C T-2 @ 2.0' 14.4 144 Very High
-
WESTEl?N
SO/l AND FOUNDATION ENGINEERING, INC.
PLATE NUMBER 11
WESTE/?N
SO/l AND FOUNDATION ENGINEERING, /NC.
WESTERN
SO/L AND FOUNDATION ENGINEERING, INC.
-. l WQNL ,.exes3 4x3 HALE bMN”C .
*Lltr CODE 810 ItscDNDIDO. cALIFMNI* msa2s
- SF?RXFICATIONS ?OR CONSTWCTIoIl OP COWl’llOLLED FILLS
-.
CLNERAL DESCBIPTIOW: %e coertruction of controlled fillr l bell consist of
adequate prelrminery roil invcrtigetionr, end clearing, removal of exirting l tructurem end foundetionr , preparerion of lend to be filled, cxcevation of earth end rock frw. cut area, compaction end control of the fill, end l ll other wrk neccrrery to complete the grading of the filled l rea to conform
mth the loner, grader, end eloper l m ahown on the l ccepted plane.
CLBARINC AND PBEPARATION OF ASEAS TO BE PILLED: Tel All fill control projectr ahell have e preliminery aoil inveotigetion or l via+ examination, depending upon the nature of the job, by l qualified roil
engineer prior to grading.
-
_.
._.
_.
-
(b) All timber, treea, brush, vegetation, end other rubbish rhell be removed, piled end burned, or otherwise disposed of to leeve the prepared l ree with l
finirhed l ppcereocc free from unsightly debrir.
(c) Any soft, wampy or otherwire unruiteble l rear, #hall be corrected by dreinege
gr remove1 of comprerrible materiel, or both, to the depthr iodiceted on the plenr or es directed by the roil engineer.
(d) The nature1 ground which ir determined to be retirfectory for the rupport
of the filled ground rhell then be ploued or rcerified to l depth of et leert
rix incher (6”) or deeper l a rpecified by the roil engineer, end until the eur-
fete ir free from rut*, h\rmnocke, or other uneven feeturer which would tend to prevent uniform compaction by the equipment to be wed.
(c) Uo fill l hell be pieced until the prepared native ground he@ been l pprwed
by the roil engineer,
(f) Nhere fillr are ude on the hillrider vith eloper greeter thee 5 (horizontell to 1 (verticel), borirontel bencher rhell be cut into firm undisturbed nature1
ground to prwide leterel end verticel rtability. The initial bench et the toe of tbe fill rhall be et leert 10 feet in width on firm undirturbcd natural ground et the elevation of the toe #take. The roil engineer #hell determine the vidth
end frequency of rllnrcceeding benchcr which will very with the roil condition*
md the rteeperr of elope.
(g) After the neturel grouod her been prepered, it rhell be brought to the proper
moirture content and cmpected to oot lerr then 90% of muilur denrity, A.S.T.U. Dl557-64T.
-~
-
-
_-
-
(h) Expansive roils may require rpecial compaction rpecificrtions aa directed in the preliminary roil invertigation by the roil engineer.
(i) The cut portion@ of building padr in which rock-like material exista mey
require excrvation end recompaction for density canprtibility with the fill xa
directed by the roil engineer.
NATERLALS : The fill roilr shall coneirt of select materiels graded l o that at
leaat 40 percent of the material p&area the No. 4 sieve. The material may be obtained frw the excavation, l borrow pit, or by mixing roils from one or more #ourcen. The material wed #hall be free fran vegetrble matter, end other del- eteriour rubrtancer, and rhall not contain rockr or lw~pe greater then 6 inches
in diameter. If excessive vegetrtion, rockr, or l oile with unacceptable physical
charecteristics l re encountered, these materiala Ihall be dirpored of in vaate area8 designated on the plans or l # directed by the roil engineer. If roil0
l re encountered during the grading operation vhich were not reported in the
preliminary *oil investigation, further testing will be required to l rcertein
their engineering propertier. Any rpeciel treatment recommended in the prelim-
inary or subcequent roil reports not,cwered herein #hall become en addendum to
these rpecificationr.
No material of a perishable, spongy, or otherwise unstable nature rhsll be used in the fills.
PLACING. SPREADING AND COMPACTING FILL-MATERIAL: ‘2e) The @elected fill materiel rhall be placed in layerr uhich #hall not exceed
l ix incher (6”) when compected. Each layer shell be spread evenly cud rhall be
thoroughly blede-mixed during the rpreading to ineuremiifonuity of materiil;and moisture in each layer.
(b) When the moisture content of the fill material ie below that specified by
the ooil engineer, wter @hall be added until the moisture content is oear optimum
es determined by the roil engineer to eaaure thorough bonding during the can-
patting procere.
(c) When the moisture content of the fill material is above that specified by
the coil engineer, the fill material shall be aerated by blading and scarifying,
or other ratisfactory method@ until the moisture content is near optimum AS determined by the Ioils engineer.
(d) After eech layer has been placed, mixed and rpreod evenly, it shall be thoroughly compacted to not less than the rpecified maximum density in accord-
l nce with A.S.T.H. Dl557-64T. Compaction shall be by means of tamping or cheep*-
foot rollers, multiple-vheel pneumatic-tired rollers, or other types of rollers.
Rollers shell be of such design that they will be able to compact the fill to the rpecified density. Rolling of each layer shall be continuous over its entire
srea and the roller shall make sufficient passes to obtain the desired density.
The entire area to be filled shall be compacted to the specified density.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-2-
-.
-
.,-
-
-
-
-
_-
-
.-
(e) ,lill rloper l bell be compectrd by weoe of rbccprfoot rollrrr or otbu
l uiteble cquipmeut. Cmpectiog operetiooe l hell be cootioued until the elopes ue l teble but not too denre for pleotiog cod until there ir no l pprecieble m&t of loore roil oo the eloper. Campectiog of the l lopee l hell be l ccampliehed by beckrolliog the l lopee in iocrerotr of 5 to 5 feet in l levetieo seio or by other
metbode produeiog l etiefectory rerultr.
(f) yield deoeity tentm l hell be rde by the mail eogioeer for approximately l ech
foot in l levetioo seio l fter compectioo, but oat to exceed two feet io vertieel
beight betveeo temtm. The locetioo of the temtm in plan elm11 be #paced to give the beet poreible coverage end l hell be teken no farther then 100 feet epert. Tertr l hell be tekeo oo coroer eod terrece 100 for eech two feet in l levetioo
gein. The roil l ogioeer mey t&e l dditiooel teetr u conridered neceeruy to
check oo the uoiformity of compectioo. Mere l heepefoot rollerr UC wed, the
teeta mhelr’be tekeo in the cwpmcted uteriel below the dirturbed rurfece. ,lso
dditiooel Ieyerr of fill l hell be rpreed until the field deoeity tertr iodicete thet the rpecified density her been obtained.
(0) The fill operetioo l hell be cootioued io rix inch (6”) compacted Ieyerr, em
rpecified l bove, until the fill her been brought to the fioiihed eloper cod greder
l e l bouo oo tbe l ccepted pleor.
mPERvIsIoN: Supervirioo by the coil eogioeer l hell be mede during the filliog
cod campectiog operetiooe eo that he ceo certify that the fill vea made in ucord-
eoce 6th l ccepted rpecificetioom.
The rpecificetioor sod roil tertiog of rubprede, subbeee, md beee meterielr for roede, or other public property l hell be done in l ccordeoce with l pecificetiooe
of the govecoiog l geocy.
BE&SOUL LIMITS: Uo fill uteriel l hell be pieced, rprcad, or rolled during uufevoreble weether cooditiooe. Theo the uork ir interrupted by hemy rein,
grediog l hell oot be rerumd uotil field temta by the roil l ogioeer iodicete
thet the moirture cooteot cod deority of the fill l re l e previourly rpecified. Io the eveot thet, in the opioioo of the-engineer, l oile ooeetirfectory l e foundetioo uteriel ue l ocouotered, they #hell oot be incorporated io the grediog end dieporitioo vi11 be aede et the eogioeer’e dircretioo.
WESTERN
SO/L AND FOUNDATlON ENGINEERING, INC.
-E