HomeMy WebLinkAbout; Improvements to McGuire Residence; Report for Testing Compacted Fill for Building Pad; 2005-08-08CONSTRUCTION TESTING & ENGINEERING, INC.
SAN DIEGO, CA
1441 Montiel Road
Suite 115
Escondido, CA 92026
(760) 746-4955
(760) 746-9806 FAX
RIVERSIDE, CA
12155 Magnolia Ave.
Suite 6C
Riverside, CA 92503
(951) 352-6701
(951) 352-6705 FAX
VENTURA, CA
1645 Pacific Ave.
Suite 107
Oxnard, CA 93033
(805) 486-6475
(605) 486-9016 m.
TRACY, CA
242 W. Larch
Suite F
Tracy, CA 95376
(209) 639-2690
(209) 839-2695 FAX
SACRAMEHTO, CA
3626 Madison Ave.
Suite 22
N. Higlilands, CA 95660
(916) 331-6030
(916) 331-6037 FAX
N. PALM SPRINGS, CA
19020 N. Indian Ave.
Suite 2-K
N. Palm Springs, CA 92258
(760) 329-4677
(760) 328-4896- FAX
REPORT FOR TESTING OF COMPACTED FILL FOR BUILDING PAD
PROPOSED IMPROVEMENTS TO MCGUIRE RESIDENCE
5035 TIERA DEL ORO STREET
CARLSBAD, CALIFORNIA
GRADING PLAN NO. DWG 426-1A
PREPARED FOR:
LEO AND SUSAN MCGUIRE
C/O: MR. JOHN PYJAR
DOMINY + ASSOCIATES ARCHITECTS
2150 WEST WASHINGTON, SUITE 303
SAN DIEGO, CALIFORNIA 92110
PREPARED BY:
CONSTRUCTION TESTING & ENGINEERING, INC.
1441 MONTIEL ROAD, SUITE 115
ESCONDIDO, CALIFORNIA 92026
CTE PROJECT NO. 10-6766G AUGUST 8, 2005
GEOTECHNICAL I ENVIRONMENTAL I CONSTRUCTION INSPECTION AND TESTING I CIVIL ENGINEERING I SURVEYING
TABLE OF CONTENTS
SECTION PAGE
1.0 PROPOSED DEVELOPMENT 1
2.0 FILL PLACEMENT 1
3.0 TESTING 1
4.0 TREATMENT OF BUILDING PADS 2
5.0 ADDITIONAL CONSTRUCTION OBSERVATION 2
6.0 CONCLUSIONS AND RECOMMENDATIONS 2
6.1 Foundations and Slab Recommendations 3
6.2 Shallow Foundations 3
6.3 Foundation Settlement 4
6.4 Foundation Setback 4
6.5 Lateral Load Resistance 4
6.6 Concrete Slab-On-Grade 5
6.7 Basement and Retaining Walls 5
7.0 LIMITATIONS 6
TABLES
TABLE I COMPACTION TEST SUMMARY
TABLE II LABORATORY TEST DATA
FIGURES
FIGURE 1 SITE INDEX MAP
FIGURE 2 COMPACTION LOCATION MAP
Report of Testing of Corapacted Fiil for Building Pad Page I
Proposed Improvements to McGuire Residence
5035 Tierra Del Oro, Carlsbad, Catifornia
August 8, 2005 CTE Job No. 10-6766G
1.0 PROPOSED DEVELOPMENT
The site is located on the west side of Tierra Del Oro Street approximately 0.5 mile west of Interstate
5 Freeway. The site is roughly rectangular in shape and slopes down slightly to the west. The site is
situated at an elevation of approximately 30 feet, overlooking the Pacific Ocean to the immediate
west. The proposed development/project includes the demolition of existing improvements and the
construction of a new single-story, wood frame building and associated improvements. Associated
improvements may include parking and drive areas, utilities, and landscaping areas. Figure 1 is a
map showing the generai site location and the previous rough topography ofthe area.
2.0 FILL PLACEMENT
Compacted fill was placed during recent grading to prepare the site for the construction of the
proposed improvements. Fill materiai was derived from on site sources. Fill was generally placed in
uniform compacted lifts at above optimum moisture content. Grading was performed using standard
heavy-duty construction equipment.
3.0 TESTING
Testing was performed to supplement field observations in promoting compliance with the
applicable project requirements. Field-testing of the compacted fill material was conducted in
accordance with ASTM D2922 and D3017 (nuclear method). Results of the field-testing indicate
that fill materials were compacted to the appropriate minimum percentage of the laboratory
maximum dry density as determined by test method ASTM D-1557.
Report of Testing of Compacted Fill for Building Pad Page 2
Proposed Improvements to McGuire Residence
5035 Tierra Del Oro, Carlsbad, Califomia
August 8, 2005 CTE Job No. 10-6766G
Tabulated results of the field compaction testing performed are provided in the attached Table I,
"Compaction Test Summary." Laboratory determination ofthe reference compaction values for the
fill materials is provided in Table II, "Laboratory Test Resuhs." Figure 2 attached shows the
approximate location of the compaction tests performed in the building pad areas.
4.0 TREATMENT OF BUILDING PADS
Beyond the building limits, materials were overexcavated to competent materials. Materials were
then recompacted as competent, moist, engineered fill. Exposed subgrades were scarified and
moisture conditioned before compaction. As modified herein, proposed structure foundations Avill be
deepened to bear entirely upon competent native materials.
5.0 ADDITIONAL CONSTRUCTION OBSERVATION
In general, any future grading and backfllling should be observed and tested to assure conformance
with recommendations presented herein and in the approved project soils report.
6.0 CONCLUSIONS AND RECOMMENDATIONS
We conclude that the soil engineering and engineering geologic aspects of the grading are in
compliance with the approved geotechnical report (except as noted herein) and the grading plan
(Grading plan No. DWG 426 1 -A). Therefore the proposed site is considered suitable for support of
the proposed improvements and the site is considered adequate for its intended use.
The recommendations presented herein generally remain unchanged from the original approved soils
report with the exception of the recommendations for deepened foundations.
Report of Testing of Compacted Fill for Building Pad Page 3
Proposed Improvements to McGuire Residence
5035 Tierra Del Oro, Carlsbad, California
August 8, 2005 CTE Job No. 10-6766G
6.1 Foundations and Slab Recommendations
The proposed project previously included the construction of building improvements upon
engineered fill soils. However, proposed structure footings will now be founded entirely on
competent native soils using deepened spread and continuous footings. To eliminate the potential for
differential settlements of these lightly loaded stmctures, building foundations should not straddle
cut/fill interfaces.
6.2 Shallow Foundations
Deepened continuous and isolated spread footings are suitable for use at this site. However, footings
should not straddle cut/fill interfaces. We anticipate that all building footings will be founded
entirely in competent native materials. Foundation dimensions and reinforcement should be based
on allowable bearing values of 2,500 pounds per square foot (psf) for minimum 24-inch deep
footings founded in competent native materials. The allowable bearing value may be increased by
500 psf for each additional twelve inches of embedment, up to a maximum value of 3,500 psf The
allowable bearing value may be increased by one third for short duration ioading which includes the
effects of wind or seismic forces. Tiebacks are recommended to connect isolated footings.
Footings should be at least 15 inches wide and deepened to the depth of competent native materials.
Depths shall be approved by a CTE engineer or geologist. Footing reinforcement for continuous and
isolated foundations shall be designed and placed as per the project structural engineer. As
necessary, foundations may be backfilled with minimum two-sack cement/sand slurry to the design
bottom of footing elevation (s).
Report of Testing of Compacted Fill for Building Pad Page 4
Proposed Improvements to McGuire Residence
5035 Tierra Del Oro, Carlsbad, California
August 8, 2005 CTE Job No. 10-6766G
6.3 Foundation Settlement
The maximum post-construction compression settlement is expected to be on the order of 1.0 inch.
Maximum differential settlement of continuous footings is expected to be on the order of 0.55
inches. Dynamic settlements are anticipated to be less than 0.5 inches. The modified settlement
estimates results from the time lapse between rough and finish grading.
6.4 Foundation Setback
Footings for structures should be designed such that the minimum horizontal distance from the face
of adjacent slopes to the outer edge of the footing is a minimum of 15 feet. In addition, footings
should bear beneath an imaginary 1:1 plane extended up from the nearest bottom edge of adjacent
trenches and/or excavations. Footings may be deepened or backfilled with a two-sack slurry in order
to meet this requirement.
6.5 Lateral Load Resistance
The following recommendations may be used for shallow footings on the site. Foundations placed in
engineered fill materials may be designed using a coefficient of friction of 0.35 (total frictional
resistance equals the coefficient of friction times the dead load). A design passive resistance value of
250 pounds per square foot per foot of depth (with a maximum value of 1,000 pounds per square
foot) may be used. The allowable lateral resistance can be taken as the sum of the frictional
resistance and the passive resistance, provided the passive resistance does not exceed two-thirds of
the total allowable resistance.
Report of Testing of Compacted Fill for Building Pad Page 5
Proposed Improvements to McGuire Residence
5035 Tierra Del Oro, Carlsbad, California
August 8, 2005 CTE Job No. 10-6766G
6.6 Concrete Slab-On-Grade
Lightly loaded concrete slabs should be designed for the anticipated loading, but be a minimum of
five inches thick. Minimum slab reinforcement should consist of #4 reinforcing bars placed on 24-
inch centers, each way at mid-slab height (or equivalent).
Moisture sensitive floor areas shall be underlain by a minimum 10-mil visqueen layer, with all laps
sealed or taped. Slabs subjected to heavier loads may require thicker slab sections and/or increased
reinforcement.
6.7 Basement and Retaining Walls
For the design of walls below grade where the surface of the backfill is level, it may be assumed that
the soils will exert an active lateral pressure equal to that developed by a fluid with a density of 35
pcf The active pressure should be used for walls free to yield at the top at least 0.2 percent ofthe
wall height. For walls restrained so that such movement is not permitted, an equivalent fluid
pressure of 55 pcf should be used, based on at-rest soil conditions. The above design active and at
rest pressures shall be increased by 20 and 30 pcf, respectively, for backfill sloping up to 2:1
(horizontal: vertical).
The above values assume non-expansive backfill and free draining condifions. Measures should be
taken to prevent a moisture buildup behind all walls below grade. Drainage measures should include
free draining backfill materials and perforated drains. Drains should discharge to an appropriate
Report of Testing of Compacted Fill for Building Pad Page 6
Proposed Improvements to McGuire Residence
5035 Tierra Del Oro, Carlsbad, California
August 8, 2005 CTE Job No. 10-6766G
offsite locafion. The project architect should evaluate the necessity of waterproofing or a relatively
flat composite drain system along the exterior of any basement walls.
We recommend that walls below grade be backfilled with soils having an expansion index of 20 or
less. The backfill area should include the zone defined by a 1:1 sloping plane, extended back from
the base ofthe wall. Wall backfill should be compacted to at least 90 percent relative compacfion,
based on ASTM D1557-91. Backfill should not be placed unfil walls have achieved adequate
structural strength. Heavy compactors, which could cause distress to walls, should not be used
within three feet of the face of wall.
7.0 LIMITATIONS
As limited by the scope of the services that we agreed to perform, our opinions presented herein are
based on our observations, test resuhs, and understanding ofthe proposed site development. Our
service was performed according to the currently accepted standard of practice and in a way that
provides a reasonable measure of the compliance of the grading operafions with the job
requirements. No warranty, express or implied, is given or intended with respect to the performance
ofthe project in any respect. Submittal ofthis report should not be construed as relieving the
grading contractor of his responsibility to comply with the project requirements.
Report of Testing of Compacted Fill for Building Pad
Proposed Improvements to McGuire Residence
5035 Tierra Del Oro, Carlsbad, California
August 8, 2005
Page 7
CTE JobNo. 10-6766G
The opportunity to be of service is appreciated. If you have any questions regarding testing
conducted, observations made during construction or recommendations presented herein, please do
not hesitate to contact this office.
Respectfully submitted,
CONSTRUCTION TESTING & ENGINEERING, INC.
Dan T. Math, GE #2665
Principal Engineer
CONSTRUCTION TESTING & ENGINEERING, INC.
GFOTFCHNICAl AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION
1441 MONTIEL ROAD. STE 115 ESCONDIDO CA 92026(760)746-4955
SITE INDEX MAP
PROPOSED MC<;UIRE RESIDENCE IMPROVEMEOTS
5035 TIERRA DEL ORO
CARLSBAD, CAIJFORNIA
rrn JOB NO.
scM.r.
10-6766G
AS SHOWN
FIGURt: .
TIERRA
SEPTIC TANK REMO^
CJ
Mxr & SUMP
PUMP SPEancATinfj
PUMP L,-- ! HP
0 - 7 7J (JPW
APPROXIMATE
COMPACTION TEST
LOCATION
CONSTRUCTION TESTING & ENGINEERING, INC.
' GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION
1441 MONTIEL ROAD. STE 115 ESCONDIDO CA. 92026 <760) 746-4855
COMPACTION TEST LOCATION MAP
PROPOSED MCGUIRE RESIDENCE IMPROVEMENTS
5035 TIERRA DEL ORO STREET
CARLSBAD, CALIFORNIA
10-6766G
'SCALE: NONE
DATi mm ^
08/05 2
TABLE I
COMPACTION TEST SUMMARY
Job Name: McGuire Residence
Job Address: 5035 Tierra Del Oro Street, Carlsbad
JobNo. 10-6766G
Date: 8/8/2005
Date Test
No.
Location Elevation
Feet
Density
pcf
Moisture
Content
%Dry
Weight
Relative
Compaction
%
Soil
Type
6/8/2005 1 Septic Tank Removal Area Backfilling North East Portion -115.4 11.9 91% 1
6/8/2005 2 Septic Tank Removal Area Backfilling North East Portion -119.4 11.9 94% 1
6/8/2005 3 Sepfic Tank Removal Area Backfilling North East Portion -115.2 10.9 91% 1
6/14/2005 4 Subgrade Slope South West Middle Portion 29.4 109.9 10.0 90% 2
6/14/2005 5 Subgrade Slope North West Middle Portion 29.4 110.1 10.3 90% 2
6/15/2005 6 Subgrade Slope North West Middle Portion 30.9 112.0 9.3 92% 2
6/15/2005 7 Subgrade Slope South West Middle Portion 30.9 112.1 10.1 92% 2
6/15/2005 8 Subgrade Slope South West Middle Portion 31.9 114.4 9.8 94% 2
6/15/2005 9 Subgrade Slope North West Middle Portion 31.9 113.4 10.1 93% 2
6/30/2005 10 South West Limits -23.0 114.6 12.8 95% 3
6/30/2005 11 West Limits -24.0 119.3 10.7 99% 3
6/30/2005 12 North Limits at Building -24.0 112.5 10.5 93% 3
6/30/2005 13 East Limils at Slope -24.5 113.9 9.2 94% 3
7/29/2005 14 West Corner of Wall FSG 132.0 6.0 99% 2
7/29/2005 15 Central Corner of Wall FSG 126.1 4,8 98% 2
7/29/2005 16 North East of Wall FSG 127.0 5.0 98% 2
7/29/2005 17 North End of Wall FSG 129.0 5.0 99% 2
** TEST FAILED, SEE RETEST
TABLE II
LABORATORY TEST DATA
Job Name; McGuire Residence JobNo. 10-6766G
Job Address: 5035 Tierra Del Oro Street, Carlsbad Date 8/8/2005
Maximum Optimum
Sample No. Dry Density Moisture Soil
pcf Content Description
%wt
1 126.5 7.5 Dark brown silty SAND with organics.
2 122.0 7.5 Silty fme brown SAND.
3 121.0 II.O Medium brown cohesionless SAND.
CONSTRUCTION TESTING & ENGINEERING, INC.
SAN DIEGO, CA
1441 Montiel Road
Suite ns
Escondido, CA 92026
(760) 746-4955
(760) 746-9806 FAX
RIVERSIDE, CA
12155 Magnolia Ave.
Suite 6C
Riverside, CA 92503
(951) 352-6701
(951) 352-6705 BW
VENTURA, CA
1645 Pacific Ave.
Suite 107
Oxnard, CA 93033
(605) 486-6475
(605) 486-9016 FAX
TRACY. CA
242 W. Larch
Suite F
Tracy, CA 95376
(209) 639-2690
(209) 639-2695 FAX
SACRAMENTO, CA
3628 Madison Ave.
Suite 22
N. Highlands. CA 95660
(916) 331-6030
(916) 331-6037 FAX
N. PALM SPRINGS, CA
19020 N. Indian Ave.
Suite 2-K
N. Palm Spnngs, CA 92256
(760) 329-4677
(760) 326-4896- FAX
REVISED REPORT FOR TESTING OF COMPACTED FILL FOR BUILDING PAD
PROPOSED IMPROVEMENTS TO MCGUIRE RESIDENCE
5035 TIERA DEL ORO STREET
CARLSBAD, CALIFORNIA
GRADING PLAN NO. DWG 426-1A
PREPARED FOR:
LEO AND SUSAN MCGUIRE
C/O: MR. JOHN PYJAR
DOMINY + ASSOCIATES ARCHITECTS
2150 WEST WASHINGTON, SUITE 303
SAN DIEGO, CALIFORNIA 92110
PREPARED BY:
CONSTRUCTION TESTING & ENGINEERING, INC.
1441 MONTIEL ROAD, SUITE 115
ESCONDIDO, CALIFORNIA 92026
CTE PROJECTNO. 10-6766G AUGUST 8, 2005, REVISED AUGUST 26, 2005
GEOTECHNICAL I ENVIRONMENTAL I CONSTRUCTION INSPECTION AND TESTING I CIVIL ENGINEERING I SURVEYING
TABLE OF CONTENTS
SECTION PAGE
1.0 PROPOSED DEVELOPMENT 1
2.0 FILL PLACEMENT 1
3.0 TESTING 1
4.0 TREATMENT OF BUILDING PADS 2
5.0 ADDITIONAL CONSTRUCTION OBSERVATION 2
6.0 CONCLUSIONS AND RECOMMENDATIONS 2
6.1 Foundations and Slab Recommendations 3
6.2 Shallow Foundations 3
6.3 Foundation Settlement 4
6.4 Foundation Setback 4
6.5 Lateral Load Resistance 4
6.6 Concrete Slab-On-Grade 5
6.7 Basement and Retaining Walls 5
7.0 LIMITATIONS 6
TABLES
TABLE I COMPACTION TEST SUMMARY
TABLE II LABORATORY TEST DATA
FIGURES
FIGURE 1 SITE INDEX MAP
FIGURE 2 COMPACTION LOCATION MAP
Revised Report of Testing of Compacted Fill for Building Pad Page 1
Proposed Improvements to McGuire Residence
5035 Tierra Del Oro, Carlsbad, California
August 8, 2005, Revised August 26, 2005 CTE Job No. 10-6766G
1.0 PROPOSED DEVELOPMENT
The site is located on the west side of Tierra Del Oro Street approximately 0.5 mile west of Interstate
5 Freeway. The site is roughly rectangular in shape and slopes down slightly to the west. The site is
situated at an elevation of approximately 30 feet, overlooking the Pacific Ocean to the immediate
west. The proposed development/project includes the demolition of existing improvements and the
construction of a new single-story, wood frame building and associated improvements. Associated
improvements may include parking and drive areas, utilities, and landscaping areas. Figure 1 is a
map showing the general site location and the previous rough topography of the area.
2.0 FILL PLACEMENT
Compacted fill was placed during recent grading to prepare the site for the construction of the
proposed improvements. Fill material was derived from on site sources. Fill was generally placed in
uniform compacted lifts at above optimum moisture content. Grading was performed using standard
heavy-duty construction equipment.
3.0 TESTING
Testing was performed to supplement field observations in promoting compliance with the
applicable project requirements. Field-testing of the compacted fill material was conducted in
accordance with ASTM D2922 and D3017 (nuclear method). Resuhs of the field-testing indicate
that fill materials were compacted to the appropriate minimum percentage of the laboratory
maximum dry density as determined by test method ASTM D-1557.
Revised Report of Testing of Compacted Fill for Building Pad Page 2
Proposed Improvements to McGuire Residence
5035 Tierra Del Oro, Carlsbad, Califomia
August 8, 2005, Revised August 26, 2005 CTE Job No. 10-6766G
Tabulated results of the field compaction testing performed are provided in the attached Table I,
"Compaction Test Summary." Laboratory determination ofthe reference compaction values forthe
fill materials is provided in Table II, "Laboratory Test Results." Figure 2 attached shows the
approximate location of the compaction tests performed in the building pad areas.
4.0 TREATMENT OF BUILDING PADS
Beyond the building limits, materials were overexcavated to competent materials. Materials were
then recompacted as competent, moist, engineered fill. Exposed subgrades were scarified and
moisture conditioned before compaction. As modified herein, proposed structure foundations will be
deepened to bear entirely upon competent native materials.
5.0 ADDITIONAL CONSTRUCTION OBSERVATION
In general, any fixture grading and backfllling should be observed and tested to assure conformance
with recommendations presented herein and in the approved project soils report.
6.0 CONCLUSIONS AND RECOMMENDATIONS
We conclude that the soil engineering and engineering geologic aspects of the grading are in
compliance with the approved geotechnical report (except as noted herein) and the grading plan
(Grading plan No. DWG 426 1 -A). Therefore the proposed site is considered suitable for support of
the proposed improvements and the site is considered adequate for its intended use.
The recommendations presented herein generally remain unchanged from the original approved soils
report with the exception of the recommendations for deepened foundafions.
Revised Report of Testing of Compacted Fill for Building Pad Page 3
Proposed Improvements to McGuire Residence
5035 Tierra Del Oro, Carlsbad, California
August 8, 2005, Revised August 26, 2005 CTE Job No. 10-6766G
6.1 Foundafions and Slab Recommendations
The proposed project previously included the construction of building improvements upon
engineered fill soils. However, proposed structure foofings will now be founded entirely on
competent nafive soils using deepened spread and confinuous footings. To eliminate the potenfial for
differential settlements of these lightly loaded structures, building foundations should not straddle
cut/fill interfaces.
6.2 Shallow Foundations
Deepened continuous and isolated spread footings are suitable for use at this site. However, footings
should not straddle cut/fill interfaces. We anficipate that all building foofings will be founded
entirely in competent native materials. Foundation dimensions and reinforcement should be based
on allowable bearing values of 2,500 pounds per square foot (psf) for minimum 24-inch deep
footings founded in competent native materials. The allowable bearing value may be increased by
500 psf for each additional twelve inches of embedment, up to a maximum value of 3,500 psf The
allowable bearing value may be increased by one third for short duration loading which includes the
effects of wind or seismic forces. Tiebeams are recommended to connect isolated footings.
Footings should be at least 15 inches wide and deepened to the depth of competent native materials.
Depths shall be approved by a CTE engineer or geologist. Foofing reinforcement for confinuous and
isolated foundations shall be designed and placed as per the project structural engineer. As
necessary, foundations may be backfilled with minimum two-sack cement/sand slurry to the design
bottom of footing elevation (s).
Revised Report of Tesfing of Compacted Fill for Building Pad Page 4
Proposed Improvements to McGuire Residence
5035 Tierra Del Oro, Carlsbad, Califomia
August 8, 2005, Revised August 26, 2005 CTE Job No. 10-6766G
6.3 Foundafion Setfiement
The maximum post-constmcfion compression settlement is expected to be on the order of 1.0 inch.
Maximum differenfial settlement of continuous footings is expected to be on the order of 0.55
inches. Dynamic settlements are anticipated to be less than 0.5 inches. The modified settlement
estimates results from the time lapse between rough and finish grading.
6.4 Foundation Setback
Foofings for structures should be designed such that the minimum horizontal distance from the face
of adjacent slopes to the outer edge ofthe foofing is a minimum of 15 feet. In addition, foofings
should bear beneath an imaginary 1:1 plane extended up from the nearest bottom edge of adjacent
trenches and/or excavafions. Footings may be deepened or backfilled with a two-sack slurry in order
to meet this requirement.
6.5 Lateral Load Resistance
The following recommendations may be used for shallow footings on the site. Foundations placed in
engineered fill materials may be designed using a coefficient of friction of 0.35 (total frictional
resistance equals the coefficient of friction times the dead load). A design passive resistance value of
250 pounds per square foot per foot of depth (with a maximum value of 1,000 pounds per square
foot) may be used. The allowable lateral resistance can be taken as the sum of the fricfional
resistance and the passive resistance, provided the passive resistance does not exceed two-thirds of
the total allowable resistance.
Revised Report of Tesfing of Compacted Fill for Building Pad Page 5
Proposed Improvements to McGuire Residence
5035 Tierra Del Oro, Carlsbad, California
August 8, 2005, Revised August 26, 2005 CTE Job No. 10-6766G
6.6 Concrete Slab-On-Grade
Lightly loaded concrete slabs should be designed for the anticipated loading, but be a minimum of
five inches thick. Minimum slab reinforcement should consist of #4 reinforcing bars placed on 24-
inch centers, each way at mid-slab height (or equivalent).
Moisture sensifive floor areas shall be underlain by a minimum 10-mil visqueen layer, with all laps
sealed or taped. Slabs subjected to heavier loads may require thicker slab secfions and/or increased
reinforcement.
6.7 Basement and Retaining Walls
For the design of walls below grade where the surface of the backfill is level, it may be assumed that
the soils will exert an acfive lateral pressure equal to that developed by a fluid with a density of 35
pcf The active pressure should be used for walls free to yield at the top at least 0.2 percent of the
wall height. For walls restrained so that such movement is not permitted, an equivalent fluid
pressure of 55 pcf should be used, based on at-rest soil conditions. The above design active and at
rest pressures shall be increased by 20 and 30 pcf, respectively, for backfill sloping up to 2:1
(horizontal: vertical).
The above values assume non-expansive backfill and free draining condifions. Measures should be
taken to prevent a moisture buildup behind all walls below grade. Drainage measures should include
free draining backflll materials and perforated drains. Drains should discharge to an appropriate
Revised Report of Testing of Compacted Fill for Building Pad Page 6
Proposed Improvements to McGuire Residence
5035 Tierra Del Oro, Carlsbad, California
August 8, 2005, Revised August 26, 2005 CTE Job No. 10-6766G
offsite location. The project architect should evaluate the necessity of waterproofing or a relafively
flat composite drain system along the exterior of any basement walls.
We recommend that walls below grade be backfilled with soils having an expansion index of 20 or
less. The backfill area should include the zone defined by a 1:1 sloping plane, extended back from
the base ofthe wall. Wall backfill should be compacted to at least 90 percent relative compacfion,
based on ASTM D1557-91. Backfill should not be placed until walls have achieved adequate
stmctural strength. Heavy compactors, which could cause distress to walls, should not be used
within three feet of the face of wall.
7.0 LIMITATIONS
As limited by the scope ofthe services that we agreed to perform, our opinions presented herein are
based on our observations, test results, and understanding of the proposed site development. Our
service was performed according to the currently accepted standard of pracfice and in a way that
provides a reasonable measure of the compliance of the grading operations with the job
requirements. No warranty, express or implied, is given or intended with respect to the performance
of the project in any respect. Submittal ofthis report should not be construed as relieving the
grading contractor of his responsibility to comply with the project requirements.
Revised Report of Testing of Corapacted Fill for Building Pad
Proposed Iraprovements to McGuire Residence
5035 Tierra Del Oro, Carlsbad, Califomia
August 8, 2005, Revised August 26, 2005
Page 7
CTE JobNo. 10-6766G
The opportunity to be of service is appreciated. If you have any questions regarding tesfing
conducted, observafions made during construction or recommendafions presented herein, please do
not hesitate to contact this office.
Respectfully submitted,
CONSTRUCTION TESTING & ENGINEERING, INC.
fan T. Math, GE #2665
Principal Engineer
.A^ CONSTRUCTION TESTING & ENGINEERING, INC.
GEOTECHNICAI, AND CONSTRUCTION ENGINEERING TESTING ANO INSPECTION
1441 MONTIEL ROAD, STE 115 ESCONDIDO CA. 92026 (760) 746-4955
SITE INDEX MAP
PR()K>SED MCGUIRE RESIDENCE IMPROVEMENTS
5035 TIERRA DEL ORO
CARLSBAD, CALIFORNIA
10-6766G
AS SHOWN
SEPTIC TANK REMO
APPROXIMATE
COMPACTION TEST
LOCATION
\^ GEOTECHNICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION jiui^jl^^ ^^^1 MONTIEL ROAD, STE 115 ESCONDIDO CA. 92026 (760) 746-4955
COMPACTION TEST LOCATION MAP
PROPOSED MCGUIRE RESIDENCE IMPROVEMENTS
5035 TIERRA DEL ORO STREET
CARLSBAD, CALIFORNIA
10-6766G COMPACTION TEST LOCATION MAP
PROPOSED MCGUIRE RESIDENCE IMPROVEMENTS
5035 TIERRA DEL ORO STREET
CARLSBAD, CALIFORNIA
NONE
COMPACTION TEST LOCATION MAP
PROPOSED MCGUIRE RESIDENCE IMPROVEMENTS
5035 TIERRA DEL ORO STREET
CARLSBAD, CALIFORNIA DATE PlillRI!: _
08/05 2
TABLE I
COMPACTION TEST SUMMARY
Job Name: McGuire Residence Job No. 10-6766G
Job Address: 5035 Tierra Del Oro Street, Carlsbad Date: 8/8/2005
Date Test Location Elevation Density Moisture Relative Soil
No. Feet pcf Content
%Dry
Weight
Compaction
%
Type
6/8/2005 1 Septic Tank Removal Area Backfllling North East Portion -115.4 11.9 91% 1
6/8/2005 2 Septic Tank Removal Area Backfilling North East Ponion -119.4 11.9 94% 1
6/8/2005 3 Septic Tank Removal Area Backfilling North East Portion -115.2 10.9 91% 1
6/14/2005 4 Subgrade Slope South West Middle Portion 29.4 109.9 10.0 90% 2
6/14/2005 5 Subgrade Slope North West Middle Portion 29.4 110.1 10.3 90% 2
6/15/2005 6 Subgrade Slope North West Middle Portion 30.9 112.0 9.3 92% 2
6/15/2005 7 Subgrade Slope South West Middle Portion 30.9 112.1 10.1 92% 2
6/15/2005 8 Subgrade Slope South West Middle Portion 31.9 114.4 9.8 94% 2
6/15/2005 9 Subgrade Slope North West Middle Portion 31.9 113.4 10.1 93% 2
6/30/2005 10 South West Limits -23.0 114.6 12.8 95% 3
6/30/2005 11 West Limits -24.0 119.3 10.7 99% 3
6/30/2005 12 North Limits at Building -24.0 112.5 10.5 93% 3
6/30/2005 13 East Limits at Slope -24.5 113.9 9.2 94% 3
7/29/2005 14 West Corner of Wall FSG 132.0 6.0 99% 2
7/29/2005 15 Central Corner of Wall FSG 126.1 4.8 98% 2
7/29/2005 16 North East of Wall FSG 127.0 5.0 98% 2
7/29/2005 17 North End of Wall FSG 129.0 5.0 99% 2
8/24/2005 18 Slab on Grade East Portion 36.82 110.4 7.3 90% 2
8/24/2005 19 Slab on Grade West Portion 36.82 111.4 8.0 91% 2
8/24/2005 20 Slab on Grade West Lower Portion 31.82 111.7 8.3 92% 2
TEST FAILED, SEE RETEST
TABLE II
LABORATORY TEST DATA
Job Name: McGuire Residence JobNo. 10-6766G
Job Address: 5035 Tierra Del Oro Street, Carlsbad Date 8/8/2005
Maximum Optimum
Sample No. Dry Density Moisture Soil
pcf Content Description
%wt
1 126.5 7.5 Dark brown silty SAND with organics.
2 122.0 7.5 Silty fine brown SAND.
3 121.0 11.0 Medium brown cohesionless SAND.