GEOTECHNICAL INVESTIGATION PROPOSED JOHNSON RESIDENCE 1300 BLOCK of ADAMS AVENUE CARLSBAD, CALIFORNIA
JOB NO. 91-50
DECEMBER 20, 1991
WESTERN
SOIL AND FOUNDATION
ENGINEERING INC.
c j
-
-
-
-
.-
--
-
-
,-,
-
-
GEOTECHNICAL INVESTIGATION PROPOSED JOHNSON RESIDENCE 1300 BLOCK of ADAMS AVENUE CARLSBAD, CALIFORNIA
JOB NO. 91-50
DECEMBER 20, 1991
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-
-
-
WESTERN
Soil AND FOUNDATION ENGMER~IG, INC.
PHONE 746.3553
AREA CODE 619 423 HALE AVENUE
ESCONDIDO. CALIFORNIA 92029 -
December 20, 1991
Mr. Gerald Johnson 1413 Trabert Ranch Road Encinitas, California 92024
-.
-
-.
-
-
_-
-
-
-
_-
-.
Project: Job No. 91-50 Proposed Johnson Residence 1300 Block of Adams Avenue Carlsbad, California
Subject: Report of Geotechnical Investigation
Mr. Johnson:
In accordance with your request, we have completed a geotechnical investigation for the proposed project. We are presenting to you, herewith, our findings and recommendations for the development of this site.
The findings of this study indicate that this site is suitable for the proposed development provided that the special preparations and foundation recommendations presented in the attached report are complied with.
If you have any questions after reviewing the findings and recommendations contained in the attached report, please do not hesitate to contact this office. This opportunity to be of professional service is sincerely appreciated.
Respectfully submitted,
Vince Gaby,
VG/DEZ:kw CE 26676 GE 928
Attachments Distribution: (4) Addressee
-
- TABLE OF CONTENTS
Introduction and Project Description
Project Scope
Findings Site Description Subsurface Conditions Colluvium Groundwater
Page
1
-
-
-
--
-
-
-
..-
-
.-
-
-
-
-
Geologic Hazards 6 Faults and Seismic Hazards 6 Liquefaction 7 Landslides and Slope Stability 7
Recommendations and Conclusions 8 Site Preparation 8 Existing Soil 8
Expansive Soil 10 Earthwork 10 Cut and Fill Slopes 11 Rippability 12
Foundations General Transition Areas Lateral Resistance Retaining Walls Footing Observations
12 14 14 14 15
Field Explorations 16
Laboratory Testing 17
Plan Review 17
Limitations 18
Plate Number 1
Plate Number 2
Plate Numbers 3 through 5
Plate Number 6
Plate Number 7
Plate Number 8.
APPENDIX I
APPENDIX II References
ATTACHMENTS
Site Plan
Unified Soil Classification Chart
Trench Logs
Laboratory Test Results
Table I
Fill Slope Key
Specifications for Construction of Controlled Fills
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-
-
-
_-
-
,-
-
-
-
-
-
,-
GEOTECHNICAL INVESTIGATION PROPOSED JOHNSON RESIDENCE 1300 BLOCK of ADAMS AVENUE CARLSBAD, CALIFORNIA
Prepared For:
~ MR. GERALD JOHNSON 1413 TRABERT RANCH ROAD ENCINITAS, CALIFORNIA 92024
JOB NO. 91-50
DECEMBER 20, 1991
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-
- Johnson December 20, 1991
Our Job No. 91-50 Page 1
-
-
-
.-
_-
-
.-
-
-
-
-
-
-
GEOTECHNICAL INVESTIGATION PROPOSED JOHNSON RESIDENCE 1300 BLOCK of ADAMS AVENUE CARLSBAD, CALIFORNIA
INTRODUCTION AND PROJECT DESCRIPTION
This report presents the results of our geotechnical
investigation performed on the above referenced site. The
purpose of this investigation was to evaluate the existing
surface and subsurface conditions from a geotechnical perspective
in order to provide recommendations for your proposed develop-
ment.
The proposed project is a single family residence as sub-
mitted by you in preliminary form on the site plan included as
part of and shown on Plate Number 1 of this report. It is our
understanding that the proposed dwelling will be a one or two-
story wood-framed structure. The foundation will be slab-on-
grade with continuous and pad spread footings.
A grading plan had not been prepared at the time of this
writing. However, it is understood through verbal communication
with Doug Logan that the proposed grading will involve maximum
fills on the order of 10 feet. The maximum cut into naturally
occurring materials will also be approximately 10 feet.
Should any future development deviate signif.icantly from our
understanding of the project as described above, we should be
consulted for further recommendations.
WESTERN
SOIL AND FOUNDAJION ENGINEERING, INC.
-
-
-
-
-
.-
--
-
-
-
-
Johnson Our Job No. 91-50 December 20, 1991 Page 2
The site configuration and exploratory trench locations are
shown on Plate Number 1.
PROJECT SCOPE
This investigation consisted of a surface reconnaissance
coupled with a detailed subsurface exploration. Representative
surface and subsurface samples were obtained from the site and
returned to our laboratory for testing. An analysis of the field
and laboratory data collected is submitted in this report.
Specifically, the intent of this analysis was to:
a) Explore the subsurface conditions to the depths
that could be influenced by the proposed construc-
tion,
b) Evaluate, by laboratory tests, the pertinent
engineering properties of the various soil and
rock stratigraphic units which could influence the
development of this land, including bearing
capacities, expansive characteristics and
settlement potential,
c) Develop soil engineering criteria for site grad-
ing,
d) Determine potential construction difficulties and
provide recommendations concerning these problems,
WESTERN
SOIL AND FOUNDAJION ENGINEERING, INC.
-
-
Johnson December 20, 1991 Our Job No. 91-50 Page 3
e) Recommend an appropriate foundation system for the
type of structures anticipated and develop soil
engineering design criteria for foundation design.
FINDINGS
SITE DESCRIPTION: The property site is located in the 1300
block, on the west side of Adams Street, in the City of Carlsbad,
California. It is composed of A.P.N. 206-192-17. It can be
found in the south central portion of grid B-5, page 14 of the
Thomas Brothers Guide for San Diego County.
The property is irregular in configuration and encompasses
approximately 1.4 acres. It is bounded to the north and west by
single family residences and to the south by undeveloped
property. Approximately 2832 feet front Adams Street along the
eastern property line.
The subject site is situated upon an easterly falling
hillside. The topography is moderately to very steeply inclined.
Elevations~ range from 170% feet above mean sea level (M.S.L.)
near the hilltop to 34% feet (MS-L.) along Adams Street. A less
steep shelf in the northeastern portion of the property is the
proposed residence site. Drainage is by sheet flow towards Adams
Street and eventually into Agua Hedionda Lagoon.
WESTERN
SOIL AND FOUNDAJION ENGINEERING, INC.
--
-
-
-
,-.
-
-
-
.-
-.
-
Johnson Our Job No. 91-50 December 20, 1991 Page 4
No improvements were observed on site during our investiga-
tion. At that time, the majority of the property was covered by
dense native chaparral.
SUBSURFACE CONDITIONS: The project site is underlain by
Quaternary age nearshore marine terrace sediments deposited on
Eocene age sandstone. These units have been mapped by Weber
(1982) as the Lindavista Formation and the Santiago Formation,
respectively. These formational deposits are mantled by
Holocene colluvium. Each of these is described below from
oldest to youngest.
SANTIAGO FORMATION: The Santiago Formation is represented in the
site vicinity by very pale gray to pale yellow slightly silty
medium to coarse grained sandstone. It is massively bedded,
moderately well cemented and composed primarily of subangular
grains of quartz and feldspar. It is lithologically similar to
Member B of the Santiago Formation as described by Wilson (1972).
LINDA VISTA FORMATION: On site the Santiago Formation is
unconformably overlain by beachlnearshore marine terrace
deposits. These are composed of dark orange, fine to medium
grained sand. They are moderately well indurated and massively
bedded. Near the surface these sediments are well cemented
becoming less cemented with depth. The cement is ferruginous
giving these deposits their orange coloring.
WESTERN
SON AND FOUNDATION ENGINEERING, INC.
-
-
-
-
-
-
-.
-
-
-
-
-.
Johnson Our Job No. 91-50 December 20, 1991 Page 5
In exploratory trench T-2 (plate 4) the Lindavista Formation
contained a large weathered clast of medium .to coarse grained
sandstone. This entrapped material was approximately four to
five feet in diameter, roughly spheroidal and appeared to be
derived from the eocene Santiago Formation. This feature was not
observed in any of the other exploratory trenches.
COLLUVIUM: The formational sediments are mantled by colluvium
which varies from 1 to 4 feet in thickness. For the purposes of
this study the term colluvium is used to describe both in-situ
developed soil as well as slope wash materials. It consists of
dark brown silty fine to medium grained sand. It is generally
porous, dry to damp and poorly consolidated. Near the contact
with the underlying Lindavista Formation it is occasionally
cemented and can be somewhat difficult to distinguish from the
Lindavista Formation.
GROUNDWATER: Free groundwater was not encountered in any of our
exploratory trenches. However, fluctuations in the level and
flow of groundwater may occur in this area depending on annual
precipitation and irrigation.
WESTERN
SO/L AND FOUNDATlON ENGINEERING. INC.
-
-
-
-
.-
-
-
-
Johnson Our Job No. 91-50 December 20, 1991 Page 6
GEOLOGIC HAZARDS
FAULTS AND SEISMIC HAZARDS: There are no known active or poten-
tially active faults on or in the immediate vicinity of the
project site. There are, however, several faults located in
sufficiently close proximity that movement associated with them
could cause significant ground motion at the site. The table
below presents the probable maximum earthquake magnitudes and
accelerations anticipated at the site. These accelerations are
based on the assumption that the maximum probable earthquake
occurs on specific faults at the closest point on that particular
fault to the site.
SEISMICITY OF MAJOR FAULTS
Maximum Probable Probable Bedrock Distance Magnitude Acceleration* Fault (Miles) (Richter) (9)
Rose Canyon 8 6.0 - 7.0 0.28-0.42 (Offshore) L L
Elsinore 22 ,~ 7.0 0.20 L
San Jacinto 40 7.8 0.15 L
San Andreas 66 8.5 0.1 L
L= Local Magnitude
*(From Schnabel and Seed, 1972).
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-
Johnson Our Job No. 91-50 December 20, 1991 Page 7
LIQUEFACTION: Saturated, loose, uniform fine grained sands and
silts will not exist under building pads if the grading operation
-
-
is performed in strict accordance with the recommendations
contained in this report. Therefore, it is unlikely that
liquefaction would affect the site.
-
-
LANDSLIDES AND SLOPE STABILITY: No evidence indicating the
presence of deep seated landslides were observed on the project
site. However, it is highly recommended that as-built inspec-
tions of all cut slopes be conducted by the Soil Engineer or
Engineering Geologist during grading.
We anticipate that the slopes proposed for this project will
be stable if constructed in accordance with the recommendations
contained in this report.
No evidence suggesting the presence of geologic hazards that
would preclude the development of this proposed project were
observed in our exploratory trenches. We did, however, encounter
poorly consolidated, near surface, soil material. Recommenda-
tions concerning these conditions are presented in the following
sections of this report. During the grading operation, a Regist-
ered Geotechnical Engineer from our firm must inspect the site
for adverse geologic conditions.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-.
-
-
-.
-
-
,.-
-
_-~
.-
-
-~
-
Johnson December 20, 1991 Our Job No. 91-50 Page 8
RECOMMENDATIONS AND CONCLUSIONS
SITE PREPARATION
EXISTING SOIL: We recommend that any existing fill, topsoil,
colluvium, and low density soil be removed to firm natural ground
from beneath any proposed fill pad areas in their entirety, so
that structures will be supported on firm material. Areas to
receive asphaltic or concrete pavements, slabs, driveways or
sidewalks must be treated similarly.
This soil may be replaced as a controlled fill recompacted
to at least 90% of its maximum dry density. All deleterious
materials and oversized debris encountered in this
fill must be removed and legally disposed of off-site.
Based on the findings of this study, the depth of removal
will range from 1.0 to 4.0 feet. Table I of this report presents
anticipated removal depths in the area of our exploratory trench-
es.
If groundwater is encountered during the removal and recom-
paction of the soil or difficulty is encountered in achieving a
minimum of 90 percent relative compaction, then this office shall
be consulted for further recommendations.
WESTERN
SOIL AND FOUNDAJION ENGINEERING, INC.
Johnson December 20, 1991 Our Job No. 91-50 Page 9
-
-
-
-
-
-~
-
-
-
-
SUBDRAINS: If fills are proposed for canyon areas or drainage
swal es, a subdrain system shall be designed to alleviate poten-
tial groundwater problems. The system shall carry water legally
off-site. These drains shall be placed in the center of the
troughs created by the natural drainage swales at the impervious
contact. The final determination for the location of the sub-
drains shall be made by the Soil Engineer during grading of the
site.
The subdrains shall consist of a trench at least 36 inches
deep and 24 inches wide. The lower 24 inches of the trench shall
be excavated into dense, natural soil material. The upper 12
inches will be installed in compacted fill. The drain shall have
a minimum one percent gradient. A 4 inch diameter perforated
pipe shall be placed in the trench with perforations down. The
pipe shall be ABS schedule 40 (ASTM-D1527) or SDR 23.5 (ASTM-
D2751) or approved equivalent. A minimum of 6 cubic feet of
filter material per linear foot of subdrain shall be placed in
the trench. Further, there shall be a minimum of 6 inches of
filter material under the pipe. The pipe shall be centered in
the trench horizontally. Filter material shall comply with
CalTrans Class 2 filter material. The last 20 feet of pipe shall
be non-perforated with eight feet inside the filter material.
Drains should connect to an appropriate storm drain inlet or
drainage system.
WESTERN
SOIL AND FOUNDATION ENGINEERING, JNC.
-
-.
-
-
-
.-
-
.-
-
Johnson Our Job No. 91-50 December 20, 1991 Page 10
In lieu of Class 2 filter material, 3/4-inch rock wrapped
with Mirafi 140N non-woven geotextile, or approved equal, may be
used. The geotextile shall lap at least 18 inches on top of the
rock.
EXPANSIVE SOIL: Expansive soils (expansion index of 51 or
greater) were not encountered in our subsurface exploration. It
is unlikely that expansive materials will occur on the building
pads following the grading operation. However, should any
expansive soil be uncovered during the earthmoving operation,
these should be kept at least 3 feet below the proposed finish
subgrade.
IMPORTED FILL: Imported fill, if required at this site, should
be examined by our office to determine their suitability prior to
importing these materials.
SURFACE DRAINAGE: Surface drainage shall be directed away from
structures. The ponding of water or saturation of soils can
not be allowed adjacent to any of the foundations. Surface water
must not be allowed to drain in an uncontrolled manner over the
top or face of any slope.
EARTHWORK: All earthwork and grading contemplated for site
preparation must be accomplished in accordance with the attached
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-_
-
-
-
-
-
Johnson Our Job No. 91-50
December 20, 1991 Page 11
Specifications for Construction of Controlled Fills. All special
site preparation recommendations presented in the sections above
will supersede those in the Standard Specifications for Construc-
tion of Controlled Fills. All embankments, structural fill, and
fill shall be compacted to a minimum of 90%. All utility trench
backfill must be compacted to a minimum of 90% of its maximum dry
density. The maximum dry density of each soil type shall be
determined in accordance with A.S.T.M. Test Method D1557-78.
Prior to commencement of the brushing operation, a pregrad-
ing meeting shall be held at the site. The Developer, Surveyor,
Grading Contractor, and Soil Engineer should attend. Our firm
should be given at least 48 hours notice of the meeting time and
date.
-
CUT AND FILL SLOPES: We recommend that cut and fill slopes be
constructed with a slope ratio of 2.O:l.O (horizontal:vertical)
or flatter, to a maximum height of 10 feet.
Cut slopes shall be constructed in dense natural soil or
rock material. All cut slopes must be inspected for adverse
geologic conditions during the grading operation by a representa-
tive of our firm.
-~
--
-
Fill slopes shall be keyed into dense natural ground. The
key shall be a minimum of 2 feet deep at the toe ~of slope and
fall with 5% grade toward the interior of the proposed fill areas
(Plate Number 8).
WESTERN
SOIL AND FOUNDATION ENGINEERING, /NC
-.
-
.-
-
-->
-
-
-
-.
-
-
-
-
-
-
-
-
I Johnson December 20, 1991 Our Job No. 91-50 Page 12
All keys must be inspected by the Soil Engineer or his
representative in the field.
Slopes shall be planted as soon as feasible after grading.
Slope erosion including sloughing, riling, and slumping of
surface soils may be anticipated if the slopes are left unplanted
for a long period of time, especially during rainy seasons.
Erosion control and drainage devices must be installed,in com-
pliance with the requirements of the controlling agencies.
RIPPABILITY: The materials encountered within our exploratory
trenches are rippable by conventional means to the depths
investigated.
FOUNDATIONS
GENERAL: Structures should be supported on continuous or pad
footings bearing in dense natural ground or nonexpansive soil
material recompacted in accordance with the recommendations
contained in this report. Footings must be designed with the
minimum dimensions and allowable dead plus live load bearing
values given in the table below:
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-
-
-
-
-
Johnson Our Job No. 91-50 December 20, 1991 Page 13
FOOTING PARAMETERS
Type Minimum Minimum Allowable Soil
Number of of Depth Width Bearing Value Stories Footins (inches) (inches) (u.s.f.1
1 Continuous 12 12 2000
2 Continuous 18 15 2500
1 or 2 Pad 24 30 3500
The minimum depth given shall be below finish subgrade
(bottom of sand cushion). All continuous footings shall contain
at least one No. 4 reinforcing bar top and bottom to provide
structural continuity and to permit spanning of local ir-
regularities.
-
The soil load bearing values presented above may be in-
creased by one-third for short term loads, including wind or
seismic. The allowable soil bearing value of import soil materi-
al shall be determined after its selection.
Settlement under building loads are expected to be within
-
-
tolerable limits for the proposed structures.
Concrete slabs-on-grade may be supported on compacted
on-site soil or dense natural ground. Three inches of clean
washed concretes sand shall be placed beneath the slab for curing.
Slab reinforcing shall be provided in accordance with the an-
ticipated use of and loadings on the slab.
WESTERN
SO/l AND FOUNDATION ENGINEERING, INC.
-
- Johnson December 20, 1991 Our Job No. 91-50 Page 14
-
-
-
-
-
-
-
-
-
-
-
-
-
In areas where moisture sensitive floor coverings are to be
utilized and in other areas where floor dampness would be un-
desirable, we recommend consideration be given to providing an
impermeable membrane (6-mil visqueen or equal) beneath the slabs.
The membrane shall beg placed mid-height within the sand to
protect it during construction. The sand shall be lightly
moistened just prior to placing the concrete. Care shall be
taken not to puncture the membrane. All joints (laps) in the
membrane should be a minimum of 6 inches in width and sealed with
an approved sealer.
TRANSITION AREAS: Foundations supported partially on cut and
partially on fill are not recommended. The tendency of cut and
fill soils to compress differently can frequently result in
unequal structural support and subsequent cracking to portions of
the structure. Therefore, in transition areas, we recommend that
the entire cut area be over excavated and replaced with soils
compacted to a mi’nimum of 90%. This over excavation or under-
cutting shall be carried to a depth of 2 feet below the bottom of
the deepest proposed footing.
LATERAL RESISTANCE: Resistance to lateral loads may be provided
by friction at the base of the footing and by passive pressure
against the adjacent soil. For concrete footings in compacted or
dense natural soil, an allowable coefficient of friction of 0.40
WESTERN
SO/l AND FOUNDATION ENGINEERING, INC.
..~.
-
-.
,-.
-
-
-
-
-,
-
-
-
Johnson Our Job No. 91-50
December 20, 1991 Page 15
may be used. An allowable passive uniform pressure of 250 pounds
per square foot per foot of depth acting against the foundations
may be used in design.
If footings are proposed adjacent to slope areas, we recom-
mend that the footings be deepened to provide a minimum horizon-
tal distance from the outer edge of footings to the adjacent
slope face equal to one-half the height of the slope. This
horizontal distance shall be no less than 7 feet and no more than
10 feet.
RETAINING WALLS: Retaining walls must be designed to resist
lateral earth pressures and any additional lateral loads caused
by surcharge loads. We recommend unrestrained walls be designed
for an equivalent fluid pressure of 35 pounds per cubic foot
(pcf) where backfill is level. We recommend restrained walls be
designed for an equivalent fluid pressure of 35 pcf plus an
additional uniform lateral pressure of 6H pounds per square foot
where Ii = the height in feet of backfill above the top of the
wall footing. Wherever walls will be subjected to surcharge
1 oads, they should be designed for an additional uniform lateral
pressure equal to one-third the anticipated surcharge pressure in
case of unrestrained walls, and one-half the anticipated sur-
charge in the case of restraining walls.
The preceding design pressures assume there is sufficient
drainage behind the walls to prevent the build-up of hydrostatic
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-
-.
-
-
-
-.
-
Johnson Our Job No. 91-50 December 20, 1991 Page 16
pressures from surface water infiltration. Adequate drainage may
be provided by means of weep holes with permeable material
installed behind the walls or by means of a system of subdrains.
Expansive soils (greater than 5.0 percent swell or an
expansive index of 50) shall not be used as retaining wall
backfill material.
Backfill placed behind the walls shall be compacted to a
minimum degree of compaction of 90 % using light compaction
equipment. If heavy equipment is used, the wall shall be ap-
propriately temporarily braced during the compaction process.
FOOTING OBSERVATIONS: All footing excavations shall be inspected
by the Soil Engineer prior to placing reinforcing steel and
concrete.
FIELD EXPLORATIONS
Three subsurface explorations were made on December 16, 1991
at the locations indicated on Plate Number 1. These explorations
consisted of trenches excavated by a Ford 550 backhoe. The
trenches were each logged using standard geological techniques.
The field work was conducted by our geology and soil engineering
personnel.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-
-
-~
-
-.
-
-
-
-
-
-
-
.-
Johnson December 20, 1991 Our Job No. 91-50 Page 17
The logs are presented on Plate Numbers 3 through 5. The
soils are described in accordance with the Unified Soils Clas-
sification System as illustrated on the attached simplified chart
(Plate Number 2). In addition, a verbal textural description,
the wet color, the apparent moisture and the density or consis-
tency are presented. The density of granular material is given
as either very loose, loose, medium dense, dense or very dense.
The consistency of silts or clays is given as either very soft,
soft, medium stiff, stiff, very stiff or hard. Samples of
typical and representative soils were obtained and returned to
our laboratory for testing.
LABORATORY TESTING
Laboratory tests were performed in accordance with the
American Society for Testing and Materials (A.S.T.M.) test
methods or suggested procedures. Test results are shown on Plate
Number 6.
PLAN REVIEW
Western Soil and Foundation Engineering, Inc. should review
the grading plans prior to the start of grading.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-
- Johnson December 20, 1991 Our Job No. 91-50 Page 18
-.
-
-
-
-
-
-
-
-
LIMITATIONS
The recommendations presented in this report are contingent
upon our review of final plans and specifications. The soil
engineer should review and verify the compliance of the final
plans with this report and with Chapter 70 of the Uniform Build-
ing Code
It is recommended that Western Soil and Foundation Engineer-
ing, Inc. be retained to provide continuous soil engineering
services during the earthwork operations. This is to observe
compliance with the design concepts, specifications or recommen-
dations and to allow design changes in the event that subsurface
conditions differ from those anticipated prior to start of
construction. Western Soil and Foundation Engineering, Inc. will
not be held responsible for earthwork of any kind performed
without our observation, inspection and testing.
The recommendations and opinions expressed in this report
reflect our best estimate of the project requirements based on an
evaluation of the subsurface soil conditions encountered at the
subsurface exploration locations and the assumption that the soil
conditions do not deviate appreciably from those encountered. It
should be recognized that the performance of the foundations
and/or cut and fill slopes may be influenced by undisclosed or
unforeseen variations in the soil conditions that may occur in
the intermediate and unexplored areas. Any unusual conditions
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-.
-
-
-
-
-
-
-.
-
.-
-
-.
.-
-
.~
-
Johnson December 20, 1991
Our Job No. 91-50 Page 19
not covered in this report that may be encountered during site
development should be brought to the attention of the soil
engineer so that he may make modifications, if necessary.
This office should be advised of any changes in the project
scope so that it may be determined if the recommendations con-
tained herein are appropriate. This should be verified in
writing or modified by a written addendum.
The findings of this report are valid as of this date.
Changes in the condition of a property can, however, occur with
the passage of time, whether they be due to natural processes or
the work of man on this or adjacent properties. In addition,
changes in the State-of-the-Art and/or Government Codes may
occur. Due to such changes, the findings of the report may be
invalidated wholly or in part by changes beyond our control.
Therefore, this report should not be relied upon after a period
of one year without a review by us verifying the suitability of
the conclusions and recommendations.
We will be responsible for our data, interpretations, and
recommendations, ,but shall not be responsible for the interpreta-
tions by others of the information developed. Our
services consist of professional consultation and observation
only, and no warranty of any kind whatsoever, expressed or
implied, is made or intended in connection with the work per-
formed or to be performed by us, or by our proposal for consult-
ing or other services, or by our furnishing of oral or written
reports or findings.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-
-
-
-
-
-
-
-
-.
-
-
-
-
.-
Johnson December 20, 1991 Our Job No. 91-50 Page 20
It is the responsibility of the Client or the Client's
representative to ensure that the information and recommendations
contained herein are brought to the attention of the engineer and
architect for the project and incorporated into the project's
plans and specifications. It is further his responsibility to
take the necessary measures to ensure that the contractor and his
subcontractors carry out such recommendations during construc-
tion.
Respectfully submitted,
WESTERN SOIL.AND FOUNDATION ENGINEERING, INC.
-
Vince Gaby, Project Geologist
I Dennis E. Zimmerman CE 26676 GE 928 VG/DEZ:kw
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-
-
-
..-
-
-
_~~
-
-
-
-
-
-
-
-
-
-
-
-
ATTACHMENTS
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-
-
-
-
-
.-
-
-
.-
-
-
-
-~
-
,EGEND
APPROX I MRTE LOCRTlOti
E% PURRTORY OF TRENCH
FIVE FOOT COrJiOoR
INTERvI=IL, FROM COUNT
ToPoGRRPHlC MRP
PLRTE ONE
SITE PLAN
JOHNSON RESlDEKf
JOB tib. 91-50
\\u
,\
\ \ i
’ \l\\ \\ +A\
WESTERN
SOIL AN0 FOUNOATION ENGINEERING ~ \\
-
-
-
.~
--.
-
-
-
.-
-
-
-
-~
-
-
-
-
-
SUBSURFACE EXPLORATION LEXXND
UNIFIED SOIL CLASSIFICATION CHART
SOIL DESCRIPTION GROUP SY?lBOL TYPICAL NAKiXS
I. COARSE GRAINED, Xore than
half of material is larger - than No. 200 sieve size.
GRAVELS CLEAN GRAVELS
Hare than half of coarse fraction is
larger than No. 4
sieve size but smaller than 3" GRAVELS WITH FINES
(Appreciable amount
of fines)
SANDS CLEAN SANDS
Yore than half of
coarse fraction is
smaller than No. 4 sieve size. SANDSWITHFIh'ES
(Appreciable amount of fines)
II. FINE GRAINED, More than half of material is Smalley than No. 200 sieve size.
SILTS AND CLAYS
Liquid Limit
less than 50
SILTY AND CLAYS
Liquid Limit greater than 50
HIGHLY ORGANIC SOILS
Gw
GP
GY
GC
SW
SP
S?l
SC
ML
CL
OL
ml
CH
OH
PT
Well graded gravels, gravel- sand mixtures, little or no fines. Poorly graded gravels, gravel-
sand mixtures, little or no
fines. Silty gravels, poorly graded
gravel-sand-silt mixtures.
Clayey gravels, poorly graded gravel-sand, clay mixtures.
Well graded sand, gravelly
sands, little or no fines.
Poorly graded sands, gravelly sands, little or no fines. Silty sands, poorly graded aand and silt mixtures. clayey sands, poorly graded sand and clay mixtures.
Inorganic silts and very
fine sands, rock flour, sandy silt or clayey-silt-sand
mixtures with slight plast- icity. Inorganic clays of low to medium plasticity, gravelly
clays, sandy clays, silty clays, lean clays. Organic silty and organic silty clays of low plasticity Inorganic siltys, micaceous or diatomaceous fine sandy or silty soils, elastic silts. Inorganic clays of high plasticity, fat Organic clays of medium to high plasticity. Peat and other highly organic soils
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
PLATE NUMBER 2
-
-
-
-
-
-
-.
-
-
-
-
-
_-
-
-
-
-
I- w
If
E a
K
l-
2-
-
3-
4-
s-
6-
7-
S-
9-
lo-
ll-
12-
k! E TRENCH NUMBER T-1
t !i ELEVATION 622 w JO 2 g & SAMPLING
5 I= METHOD FORD 550 BACKHOE
iz _I ” DESCRIPTION
FL? Dark Brown Silty Fine to Medium ;zkjt Sand (Colluvium) c;: : . . ._‘.
I
:r:‘! .:.-. . . SW
Dark~Orangish-Brown Well Cemented
Fine to Medium Grained Sandstone
Contains Sporadically Occurring
Subrounded Pebble
grades to
Dark Orange Poorly Cemented Fine
to Medium Sandstone
(TERRACE DEPOSITS)
1% ,. :- ..I-. :: ‘..I,‘.
14- ;:;*:‘: ; ; . .:, .:.:
15- Bottom of Trench @ 14.5 Feet
-I I
‘00 NUMBER CARLSBAD, CALIFORNIA
91-50 GERALD JOHNSON RESIDENCE
+‘w
=a
W3 at-
if??
LO
Q5
Damp Loose
Damp
to
Yoist
Dense
lamp
to
)=y
!fediu
Dense
to
Dense
-
.21.(
7 W> a-
2;
0;
ZC ‘
5.3
-
DATE LOGGED
I
LOGGED BY
12-16-91 V.G.
SUBSURFACE .EXPLORATION LOG PLATE NO. 3
-
.-
.-
-
- I
-
-
. . .
-.
-
-
-
-
-.
-
-
-
.-
-
I- ”
it!
I I- n.
E -
1.
2:
3-
4.
5
6.
7-
8-
9-
lo-
ll-
12-
13-
14-
15-
:
E! g TRENCH NUMBER T-2
t 2 ELEVATION 50+ ,>
w ‘!i; 2 z v, SAMPLING
I -1 5 fn METHOD FORD 550 BACKHOE
2 UC -J 0 DESCRIPTION c.;L-‘;y; :::;=::z Dark Brown Silty Fine to Medium
;.sv.z Sand .:7I:,;y: :; :-:-:. .-... ...A (Colluvium) .r ‘.' :.. : .;,.:,z;;i c j;$j$
.y:r';; Dark Brown Slightly Silty Fine t<
-<jF:? Medium Sand, moderately well .y.:+.:. ‘.‘-:.:: cemented
I. I _._., .+ . . ,. :: . . . . . . . . . . grades to
I cl :sw': Dark Orange well cemented Fine tl
B i:S?: Medium Sand . ..'..Z.. :I .I.:. :;:.:y .;;:i. :-.*..:: . . :. . . . . . >.p.:..'- :; ::;:::,.I;
grades to poorly ?:?? Cemented Orange Fine to Medium
Sand
X-- Inclusion of Paleosol derived from Eocene Strata
(TERRACE DEPOSITS)
(undulating erosional~ contact)
.?:T:; Yellow Slightly Silty Medium to
't Coarse Grained Sandstone ;sp; ::...'; moderately well cemented . . .._.. :1'/;. .*.: (Santiago Formation) . : _.. I I Bottom of Trench @ 14.5 Feet
I 2 OB NUMBER
I
CARLSBAD, CALIFORNIA
91-50 GERALD JOHNSON RESIDENCE
l-c zz ww a+ =lt!? $g
0
Damp Loose
Damp Dense
Dry Mediu
Dense
12-16-91 I V.G.
116
121
112
-
w a
3
t- m
0
z
-
T
4.:
1..
-
SUBSURFACE EXPLORATION LOG PLATE NO. i,
$: w I rg SF: ( c-l i Liz az 0 I VI
7 I 1
1
?
12.L
-
7
4
!
-
-
-
.~
-
-
-
-
-
-
-
-
-
-
-
-
.-
-
-
z
2
:
tl P -
g TRENCH NUMBER T-3
5 ELEVATION &7+ JO
2 ; SAMPLING
$ METHOD FORD 550 BACKHOE
1.
2;
3-
i
” DESCRIPTION
‘SM’ Brown Silty Fine to Medium Sand ;y& with roots and leaves (Colluvium:
$$:$: Pale Orange thinly bedded ;ig;$ Fine to Medium Sand (Colluvium) L. . . . . . ..::: '>:,z; Dark Brown Silty Fine to
;,wc Medium Sand (Colluvium)
4.
5-
;c&;: ii ,<T.".',.' .-sr. ::;:;.;: ,.+;:. :j:y . . .(- :..xz Dark Orangish-Brown well cementer ..-. .: ;w/; Slightly Silty Fine to ;P:;I Medium Sand
6-
ii
t
IL
ii I
z
-
-
-
-
-
.~ ,.:.s.. : ::.:.c : :,.. I .,.. -f) (TERRACE DEPOSITS)
Bottom of Trench @ 6.0 Feet
7-
8-
9-
lo-
ll-
12-
13-
14-
15-
OS -
JMBER
I
CARLSBAD, CALIFORNIA 91-50 GERALD JOHNSON RESIDENCE
+llJ Za
2c”
2’” PO as
Damp ,oose
Dry ,oose
Damp ,oose To
lediu, )ense
Damp lense
DATE LOGGEC LOGGED BY
12-16-91 V.G.
-
- -
- 7
-
__
SUBSURFACE EXPLORATION LOG PLATE NO. 5
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
LABORATORY TEST RESULTS
MAXIMUM DENSITY/OPTIMUM MOISTURE
Maximum
Dry Optimum
Sample Density Moisture Location Descrivtion IPCf) (Percent)
T-2 @ 6.0' Dark Orange Fine to Medium 122.5 8.1 Sand
DIRECT SHEAR*
Sample Location
*T-2 @ 6.0'
Apparent Angle of Cohesion Internal Friction
(PSf) (deqreesl
50 33
* Sample remolded to 90% of maximum dry density at 3% over
optimum moisture content. All samples saturated prior to
testing.
MECHANICAL SIEVE ANALYSIS
Percent Passing U.S. Standard Sieve
Sample Location #4 #lo #40 #lOD #200
T-2 @ 4.0' 99.8 99.1 70.1 26.1 18.5
T-2 @ 6.0' 100 99.6 64.5 16.0 9.3
WESTERN
SO/L AND FOUNDATION ENGINEERING, INC. Dl-e.. h,^ L
-
-
-
- TABLE I
-
-
-
-
-
-
TRENCH NUMBER
DEPTH OF SOIL REMOVAL BELOW EXISTING GRADE (FEET)
T-l
T-2
T-3
T-4
NOTE:
1.0
2.0
4.0
3.0
It should be recognized that variations in soil
conditions may occur between exploratory trenches
that will require additional removal. In areas
where fill slope toe keys are proposed, add a
minimum of 2.0 feet to removal depths presented
above.
-
The soil in the exploratory trenches encountered
in the removal process should be removed and
recompacted to 90 percent relative compaction.
-
-
-
WESTERN
SOIL AND FOUNDATION ENGINEERING, /NC.
-
-,
-
-~
-
-
-
-
-
-
FILL SLOPE KEY
NATURAL GROUND
PROJECTED PLANE
I TO I YIu(IUIJM FROM TOE OF
8’ MINIMUM BENCH
CCMPETENT EARTH
MATERIAL
(HEIGHT VARIES)
KEY DEPTH GACKDFiANS MAY GE REQUIRED PER
RECOMMENDATIONS OF SOILS ENGINEER
GERALD JOHNSON RESIDENCE
CARLSBAD, CALIFORNIA
JOE NO. 91-50 OATE 12-16-91
WESTERN PLATE NO. a
SOIL AND FOUNOATION ENGINEERING INC.
-
-
-
-
-,
-
-
-
-
-
-
-
-
-
APPENDIX I
WESTERN
SO/l AND FOUNDATlON ENGINEERING, INC.
.-
- WESTERN
SOIL AND FOUNDATION ENGINEERNG, INC.
PHONE 746-3553 423 HALE AVENUE
AFlEA CCIDE 619 ESCCJNDIDO. CAUFcmNlA 92029
- SPECIFICATIONS FOR CONSTRBCJION OF CONTROLLED FILLS
-_
-
GENERAL DESCRIPTION: The construction of controlled fills shall consist of adequate preliminary soil investigations, and clearing, removal of existing structures and foundations, preparation of land to be filled, excavation of earth and rock from cut area, compaction and control of the fill, and all other work necessary to complete the grading of the filled area to conform with the lines, grades, and slopes as shown on the accepted plans.
UING AND PREPARATION OF AREAS TO BE FILLED:
(a)
-
-
-
-.
.-
-
(b)
(0)
Cd)
(e)
(f)
All fill control projects shall have a preliminary soil investigation or a visual examination, depending upon the nature of the job, by a qualified soil engineer prior to grading.
All timber, trees, brush, vegetation, and other rubbish shall be removed, piled and burned, or otherwise disposed of to leave the prepared area with a finished appearance free from unsightly debris.
Any soft, swampy or otherwise unsuitable areas, shall be corrected by drainage of removal of compressible material, or both, to the depths indicated on the plans or as directed by the soil engineer.
The natural ground which is determined to be satisfactory for the support of the filled ground shall then be plowed or scarified to a depth of at least six inches (6") or deeper as specified by the soil engineer, and until the surface is free from ruts, hummocks, or other uneven features which would tend to prevent uniform compaction by the equipment to be used.
No fill shall be placed until the prepared native ground has been approved by the soil engineer.
Where fills are made on the hillsides with slopes greater than 5 (horieontal) to 1 (vertical), horizontal benches sha-11 be cut into firm undisturbed natural ground to provide lateral and vertical stability. The initial bench at the toe of the fill shall be at least 10 feet in width on firm undisturbed natural ground at the elevation of the toe stake. The soil engineer shall determine the width and frequency of all succeeding benches which will vary with the soil conditions and the steepness of slope.
- page 2
(g) After the natural ground has been prepared, it shall be brought to the proper moisture content and compacted to not less than 90% of maximum density, A.S.T.M. D1557-78.
(h) Expansive soils m&y require special compaction specifications as directed in the preliminary soil investigation by the soil engineer.
(i) The cut portions of building pads in which rock-like material exists may require excavation and recompaction for density compatibility with the fill as directed by the soil engineer.
MATERIALS: The fill soils shall consist of select materials graded so that at least 40 percent of the material passes the No. 4 sieve. The material may be obtained from the excavation, a borrow pit, or by mixing soils from one or more sources. The material used shall be free from vegetable matter, and other deleterious substances, and shall not contain rocks or lumps greater than 6 inches in diameter. If excessive vegetation, rocks, or soils with unacceptable physical characteristics are encountered, these materials shall be disposed of in waste areas designated on the plans or as directed by the soil engineer. If soils are encountered during the grading operation which were not reported in the preliminary soil investigation, further testing will be required to ascertain their engineering properties. Any special treatment recommended in the preliminary or subsequent soil reports not covered herein shall become an addendum to these specifications.
No material of a perishable, spongy, or otherwise unstable nature shall be used in the fills.
PLACING, SPREADING AND COMPACTING FILL MATERIAL:
(a) The selected fill material shall be placed in layers which shall not exceed six inches (6") when compacted. Each layer shall be spread evenly and shall be thoroughly blade-mixed during the spreading to insure uniformity of material and moisture in each layer.
(b) When the moisture content of the fill material is below that specified by the soil engineer, water shall be added until the moisture content is near optimum as determined by the soil engineer to assure thorough bonding during the compacting process.
(c) When the moisture content of the fill material is above that specified by the soil engineer, the fill material shall be aerated by blading and scarifying, or other satisfactory methods until the moisture content is near optimum as determined by the soils engineer.
.- -’
-
-
-
-
-
-~
-
-
-
.-
WESTERN
SOIL AND FOUNDATION ENGINEERING, /NC:
--
page 3
(d) After each’layer has been placed, mixed and spread evenly, it shall be thoroughly compacted to not less than the specified maximum density in accordance with A.S.T.W. D1557-78. Compaction shall be by means of tamping or sheepsfoot rollers, multiple-wheel pneumatic-tired rollers, or other types of rollers. Rollers shall be of such design that they will be able to compact the fill to the specified density. Rolling of each layer shall be continuous over its entire area and the roller shall make sufficient passes to obtain the desired density. The entire area to be filled shall be compacted to the specified density.
(e) Fill slopes shall be compacted by means of sheepsfoot rollers or other suitable equipment. Compacting operations shall be continued until the slopes are stable but not too dense for planting and until there is no appreciable amount of loose soil on the slopes. Compacting of the slopes shall be accomplished by backrolling the slopes in increments of 3 to 5 feet in elevation gain or by other methods producing satisfactory results.
(f) Field density tests shall be made by the soil engineer for approximately each foot in elevation gain after compaction, but not to exceed two feet in vertical height between tests. The location of the tests in plan shall be spaced to give the best possible coverage and shall be taken no farther than 100 feet apart. Tests shall be taken on corner and terrace lots for each two feet in elevation again. The soil engineer may take additional tests as considered necessary to check on the uniformity of compaction. Where sheepsfoot rollers are used, the tests shall be taken in the compacted material below the disturbed surface. No additional layers of fill shall be spread until the field density tests indicate that the specified density has been obtained.
(g) The fill operation shall be continued in six inch (6”) compacted layers, as specified above, until the fill has been brought to the finished slopes and grades as shown on the accepted plans.
SUPERVISION2 Supervision by the soil engineer shall be made during the filling and compacting operations so that he can certify that the fill was made in accordance with accepted specifications.
The specifications and soil testing of subgrade, subbase, and base materials for roads, or other public property shall be done in accordance with specifications of the governing agency.
-
.-
.-
.-.
-
WESTERN
SO/l AND FOUNDATION ENGINEERING, INC.
-
-
-
-
-
-
-
-
paw 4
SEASONAL LIMITS: No fill material shall be placed, spread, or
rolled during unfavorable weather conditions. When the work is interrupted by heavy rain, grading shall not be resumed until field tests by the soil engineer indicate that the moisture content and density of the -fill are as previously specified. In the event that, in the opinion of the engineer, soils unsatisfactory as foundation material are encountered, they shall not be incorporated in the grading, and disposition will be made at the engineer's discretion.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-.
-
-
-
-‘7
- .
-
-
-
-
--
-
-
-_
-
-~-
-
-
APPENDIX II
WESERN
SOIL AND FOUNDATION ENGINEERING, INC.
-
-
-
-
-
_-
-
-
.-
-
-
-
-
-
REFERENCES CITED
Kennedy, Michael P., 1975 Geology of The San Diego Metropolitan Area, California: California Division of Mines and Geology, Bulletin 200.
Singh, Awtar, 1970, Shear Strength and Stability of Man-Made Slopes: Journal of the Soil Mechanics and Foundation Division, ASCE SM6, (November 1970,) pp. 1879-1892.
Weber, F. Harold Jr., July 1, 1982, Recent Slope Failures, Ancient Landslides, and Related Geology of the North-Central Coast Area, San Diego County, California, CDMG Open-File Report 82-12.
Wilson, Kenneth L., December 1972, "Eocene and Related Geology of a Portion of the San Luis Rey and Encinitas Quadrangles San Diego County, California", Masters Thesis, U.C. Riverside.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.